3300 Series Footprint and Clearance Requirements.pdf

PDF 71 KB Posted

Attached to
J059--Posting Answers to Vendor Questions - Core Lab Electrical Upgrade Install - DC VAMC 688-24-3-459-0307 Federal contract opportunity
Solicitation number
36C24524Q0670
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5

About this file

This document appears to be a footprint and clearance requirements specification for a 40 KVA Uninterruptible Power Supply (UPS) to be installed at the Washington DC Veterans Affairs Medical Center (DC VAMC) as part of a Core Lab electrical upgrade project. The specification outlines the required clearances around the UPS, including 36 inches at the front, 24 inches at the sides and rear, and 36 inches at the top to allow for installation and servicing. The related federal contract opportunity is a request for quotes (RFQ) for the electrical contractor to install the power distribution and interface the UPS in the Core Lab space. The RFQ specifies the scope of work, which includes installing power circuits from a new panelboard supplied by the UPS output to the various equipment locations in Suite GB 200.

View the file

Other files for this federal contract opportunity

Other files attached to J059--Posting Answers to Vendor Questions - Core Lab Electrical Upgrade Install - DC VAMC 688-24-3-459-0307, newest first.
File Type Posted
Power Conditioning Distribution Unit.pdf PDF
36C24524Q0670 0001.pdf PDF
Final plan.pdf PDF
PowerVar 3300 users manaul A01-00134 3300 REV F 4-5-21.pdf PDF
ANSWERS TO VENDOR QUESTIONS - 36C24524Q0670.pdf PDF
UPS Specs.pdf PDF
36C24524Q0670 0001_1.docx DOCX document
Wage Determination Washington D.C.pdf PDF
36C24524Q0670 -.pdf PDF
36C24524Q0670_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A01-00134 Rev. F 65

Footprint and Clearance Requirements

UPS Clearances:

Front 36"

Sides 24"

Rear 24"

Top 36"

NOTE: The front and side clearances on the UPS are required for the installation and servicing of the UPS and batteries.

6” side spacing may be maintained for normal UPS operation as long as the UPS is connected with flexible conduit; so as to move unit to open space with adequate side access for routine servicing.