About this file

This document is a Request for Quotes (RFQ) for a Core Lab Electrical Upgrade Installation at the Washington DC VA Medical Center. The contractor shall furnish all necessary labor, materials, and management to install electrical wiring, conduit, a 40 KVA uninterruptible power supply (UPS), transfer switches, and a new electrical panelboard to power new medical equipment in the Core Lab. The work includes interfacing the new electrical system to the existing emergency power supply. Qualified contractors must be licensed master electricians with at least 5 years of experience working on electrical systems at VA medical facilities. Quotes are due by July 15, 2024 at 10:00 AM EST. The contract will be awarded as a firm-fixed-price purchase order to the contractor providing the best value based on technical qualifications, past performance, and price. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to J059--Posting Answers to Vendor Questions - Core Lab Electrical Upgrade Install - DC VAMC 688-24-3-459-0307, newest first.
File Type Posted
Final plan.pdf PDF
PowerVar 3300 users manaul A01-00134 3300 REV F 4-5-21.pdf PDF
ANSWERS TO VENDOR QUESTIONS - 36C24524Q0670.pdf PDF
3300 Series Footprint and Clearance Requirements.pdf PDF
UPS Specs.pdf PDF
36C24524Q0670 0001_1.docx DOCX document
Power Conditioning Distribution Unit.pdf PDF
36C24524Q0670 0001.pdf PDF
Wage Determination Washington D.C.pdf PDF
36C24524Q0670_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

688-24-3-459-0307

36C24524Q0670

Trever Turcotte 304-263-0811 07-15-2024

10:00 AM EDT

90C Department of Veterans Affairs NCO 5 Contracting Office Services Team 1 Bldg. 101 Perry Point MD 21902

X 100

X

238210

$19 Million

N/A

X

90C

Department of Veterans Affairs Washington DC VA Medical Center

50 Irving Street N.W.

Washington DC 20422

90C

Department of Veterans Affairs NCO 5 Contracting Office Services Team 1

VA FSC

PAYMENT WILL BE MADE BY

FSC e-Invoice Payment Invoice must be submitted electronically http://www.fsc.va.gov/einvoice.asp Invoice Setup Information 1-877-489-6135

See CONTINUATION Page

THIS IS A REQUEST FOR QOUTES (RFQ) FOR A CORE LAB

UPGRADE ELECTRICAL INSTALLATION FOR THE WASHINGTON DC VAMC

PLEASE SEE STATEMENT OF WORK (SOW). CONTRACTOR TO PROVIDE

ALL LABOR AND PARTS FOR THIS REQUIREMENT.

SITE VISITS BY REQUEST ONLY. REQUESTS DUE BY JULY 8th, 2024 ALL QUESTIONS DUE BY JULY 10th, 2024.

QUOTES DUE BY MONDAY, JULY 15th, 2024 @ 10:00 AM EST.

SEND QUOTES TO Billie.Pratt@va.gov

SEE SOW AND DETAILED INSTRUCTIONS TO OFFERORS

See CONTINUATION Page

X X

Trever Turcotte mailto:Billie.Pratt@va.gov

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 STATEMENT OF WORK

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (NOV 2023)

C.2 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

C.3 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

C.4 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

C.5 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)

C.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.7 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (MAY 2024)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

D.1 Wage Determination Washington D.C

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (SEP 2023)

E.2 SUPPLEMENTAL INSTRUCTIONS TO QUOTERS

E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

E.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C245 Trever.Turcotte@va.gov Department of Veterans Affairs NCO 5 Contracting Office Services Team 1

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] 30 DAYS IN ARREARS

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

http://www.fsc.va.gov/einvoice.asp

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

mailto:Trever.Turcotte@va.gov

B.2 STATEMENT OF WORK

LOCATION:

WASHINTON DC VAMC

50 IRVING STREET N.W.

WASHINGTON, DC 20422

Background:

At the Washington DC Veterans Affairs Medical Center (DC VAMC) the Core Lab is installing new processing equipment on the basement floor in Suite GB 200. With the new equipment existing emergency power needs the have a “Power Bridge” consisting of a 40 KVA Uninterruptable Power Supply (UPS). The UPS will be supplied by an existing feeder and circuits will be routed from a new panelboard supplied by the output of the UPS. The electrical circuits for these locations are detailed in the following scope. Additionally, each piece of equipment will require power poles with power as specified in the attached details.

The Electrical Contractor under this requirement shall install the power as outlined below in the scope to include distribution and interfacing to an 40KVA UPS in the closet in room GB 220, power to be installed per space plan attached in Suite GB 200.

Scope of Work:

Contractor shall be a Master Licensed Electrical Contractor and shall furnish all necessary travel, tools, labor, materials, parts, and personnel management necessary to fulfill all tasks within this requirement. All work shall be inspected under local authority with proof of passing final inspection.

The requirement is outlined in the following.

• The electrical circuits to be added will originate from the Lab Suite electrical.

panel—Room GB200, from a 120/208 3-phase panel labeled //// being installed in the ceiling of Lab GB200 and the ceiling in the nearest hallway between GB200 and GB 220 terminated at 40 KVA UPS within the closet. (See provided information for details and routes for electrical cabling installation).

• Details of the installation is as follows:

• Scope of work entails the installation of an Uninterpretable Power Supply (UPS) to provide a

“bridge’ in the Emergency Power Supply System (EPSS) and act a power filter for the attached equipment for the Core Lab.

• The one line depicts the installation; the UPS will be placed remotely in room GB-220 from the equipment in which it will be supplying.

• The UPS shall be fed from Panelboard EDL-3-BB; the overcurrent device required for this feeder to be back fed will be comprised of a breaker kit consisting of an MBKQR3, a P1 3 Phase MB Kit QR Type Main/Sub-Feed with a QRH23B150, 3 phase 150 ampere 25 KAIC rated breaker assembly. This is assembly is compatible with existing Siemens Panelboard P1C42ML250CTF—Type P1.

• From EDL-3-BB located in GB-200, the feeder will be routed from inside the wall up and through the ceiling toward GB-220 down the hallway from GB-200 about 100 feet away.

The feeder shall consist of a wiring method recognized and installed to the per chapter 3 of the latest edition of the National Electrical Code (NEC).

• The Feeder shall be rated for 150 Amperes, copper conductors and rated for the location enclosed in a raceway or conduit. If the Contractor decides to utilize a cable method such a Metal Clad, this installation shall include transition to either electrical metallic tubing (EMT), rigid or intermediate metal conduit (RMC or IMC) exposed from the ceiling down the wall to the equipment.

• The feeder shall be installed from EDL-3-BB in GB-200 to the line side of either a fused disconnect or circuit breaker enclosure rated minimum 150-ampere 3-phase disconnect (with a permanent means to lock out in the open position) located in GB-220. The disconnect shall be labeled “EDL-3-BB-UPS” with a label attached denoting where it is fed from.

• From the load side of this equipment (EDL-3-BB-UPS) a 150-ampere feeder shall be installed that will feed a manual transfer switch (MTS) rated 150- ampere 3-phase minimum (designated as MTS-EDL-3-BB) and the UPS. This device shall accommodate a means accept two feeders (Feeder #1 and Feeder #2) either by compression connections or multi-port mechanical lugs installed complying to the UL listed means of application.

• Feeder #1 from EDL-3-BB-UPS will be routed to the UPS equipment and connected to Input terminals per manufactures instructions and the NEC. The conduit enclosure shall be of either electrical metallic tubing (EMT), rigid or intermediate metal conduit (RMC or IMC) and using minimum lengths of a flexible metal conduit as outlined in each of the wiring methods listed in chapter 3 of the NEC.

• Feeder #2 from EDL-3-BB-UPS will be routed to a manual transfer switch (MTS-EDL-3- BB) provided by the Contractor. The Contractor shall terminate this feeder to Source 2 of the manual transfer switch. The installation shall be consistent with previous requirements as to the type of conduit enclosure utilizing applicable sections on the NEC pertaining to the method selected.

• Contractor shall make connections from the battery bank for the UPS to the UPS itself, installing as per manufactures instructions.

• The contractor shall install a 150-amp feeder using similar wiring methods minimizing flexible metal conduit as stated in the NEC from the UPS output to the manual transfer switch (MTS-EDL-3-BB). This feeder shall terminate to Source 1 of the MTS.

• The contractor shall install a feeder from the MTS to an equipment panel (designated EQ- MTS-EDL-3-BB) rated 150-ampere minimum 3-phase. This feeder will terminate load side of the MTS and routed to the equipment panel. The equipment panel EQ-MTS-EDL-3-BB is to be installed in GB-200. A wall constructed by the VA Medical Center will be provided so the Contractor can flush mount the panelboard will be located adjacent to the existing panelboard EDL-3-BB.

• The panel board EQ-MTS-EDL-3-BB shall be provided with a main breaker, the main breaker shall have a maximum rating of 125-amperes as the load on the UPS cannot exceed

40 KVA.

• Contractor shall install circuits as specified in the Equipment specifications under Customers Power Responsibility.

• Contractor shall adhere to all requirements of the manufacture’s installation instructions and the National Electrical Code. Where one conflicts with the other the Contractor shall adhere with the most stringent.

• Contractor shall ensure:

o Appropriate protection for wiring method selected.

o The installation considers all working clearances, dedicated space per the

NEC 110.26 as well as the space layout provided by the equipment manufacture. Where one conflicts with the other the Contractor shall adhere with the most stringent.

o Grounding and Bonding shall be per manufacture specifications and the NEC article 250. Where one conflicts with the other the Contractor shall adhere with the most stringent.

o Contractor shall provide equipment that meets or exceeds available fault current at the line terminals of each piece of equipment installed. It will be acceptable to meet or exceed the AIC rating of Panelboard EDL-3-BB o Installation is installed to meet all applicable codes such including but not limited to NFPA 70, NFPA 1, NFPA99, and manufacture listed instructions.

• Involved voltage is 120/208 3-phase unless otherwise noted.

• Contractor shall provide the appropriate number and size circuit breakers equivalent to, and UL listed, for the load center or panel board. Additionally, the Interrupting rating of the breakers shall be equivalent to the existing circuit breakers installed. The circuits shall be installed, and the load balanced between the phases. Each breaker shall be labeled as to the circuit designation.

• Labeling shall be done on each accessible point to the raceway. Each circuit shall be identified at the outlet box and/or receptacle plate—the labeling shall be legible and permanent. The labeling shall include panel designation ///// and the number of the circuit in which the circuit originates.

• Complete all Terminations and Splices o All equipment is properly installed, secured, and supported with listed fasteners, straps, and /or supports.

o Complete all splices and terminations including bonding the equipment ground to each junction or outlet box.

• Labeling, Testing, and Confirming o The Electrical Contractor Shall demonstrate for the PROGRAM POC that all receptacles are operational and wired correctly, polarity checked, and equipment ground connected and available. Show all labeling is legible, permanent and provide appropriate explanation for servicing.

All walls, ceilings or floors the are penetrated shall be sealed with a UL listed firestop as required by National Fire Protection Association (NFPA) 1. Fire Resistant Details are attached.

Prior to placing a bid, interested contractors may want to do a site survey to obtain information and clarification.

Scope of work to be completed by contractor as follows:

• Install new Siemens 150-amp circuit breaker in the existing panel (furnished by the

VA)

• Furnish and install (1) 150-amp 3p enclosed circuit breaker (@ UPS)

• Furnish and install (2) 150-amp 3p 4w feeders from existing panel locations in lab to

UPS location (input and output of UPS)

• Furnish and install (1) 200-amp 3p double throw disconnect.

• Furnish and install (1) 225-amp 42 circuit 3p4w MLO panelboard (located adjacent to existing Siemens panel) and branch breakers as needed.

• Furnish and install (4) 2 compartment 12’ power poles.

Upon award, the Contractor will have 10 days to complete the required work.

PARTS:

The Contractor shall furnish and replace all parts as required to complete this requirement and shall comply with the latest edition of the National Electrical Code. If the Local AHJ has adopted an earlier version, the Electrical Contractor Shall provide that information to the Program Point of Contact.

Only new standard parts (manufactured by the maker of the equipment or equal there to) shall be furnished by the Contractor. Rebuilt parts used parts IS NOT permitted and shall not be installed. All parts supplied by the Contractor shall be Compliant and Listed for use with existing equipment.

Scheduling:

The Contractor shall schedule with the Contracting Officers Representative (COR). The PROGRAM POCwill ensure the staff using the space is notified when work is Scheduled to take place to ensure minimal impact to the any processes taking place.

The Contractor shall schedule with the PROGRAM POCat least 72 hours in advance and during normal working hours.

All Services shall be performed during regular business hours from 7:30 AM to 4:30 PM EST. Monday through Friday except for Federal Holidays. Federal Holidays observed (listed below) and any other day declared by the President of the United States by Executive Order deemed a Holiday.

This requirement will be performed at the DCVA Medical Center Washington DC.

Date Federal Holiday Sunday, January 1 New Years Day 2023

Monday, January 2 New Years Day 2023 (observed)

Monday, January 16 Martin Luther King Day 2023

Monday, February 20 Presidents Day 2023 *

Monday, May 29 Memorial Day 2023

Monday, June 19 Juneteenth 2023

Tuesday, July 4 Independence Day 2023

Monday, September 4 Labor Day 2023

Monday, October 9 Columbus Day 2023 **

Friday, November 10 Veterans Day 2023 (observed)

Saturday, November 11 Veterans Day 2023

Thursday, November 23 Thanksgiving 2023 https://www.calendardate.com/new_years_day_2023.htm https://www.calendardate.com/new_years_day_2023.htm https://www.calendardate.com/martin_luther_king_day_2023.htm https://www.calendardate.com/presidents_day_2023.htm https://www.calendardate.com/memorial_day_2023.htm https://www.calendardate.com/juneteenth_2023.htm https://www.calendardate.com/4th_of_July_2023.htm https://www.calendardate.com/labor_day_2023.htm https://www.calendardate.com/columbus_day_2023.htm https://www.calendardate.com/veterans_day_2023.htm https://www.calendardate.com/veterans_day_2023.htm https://www.calendardate.com/thanksgiving_2023.htm

Monday, December 25 Christmas Day 2023

CONFORMANCE STANDARDS:

Contractor shall ensure that the installation conforms to latest NFPA 70, the National Electrical Code or the Edition adopted by the Local Jurisdiction Washington DC. Contractor shall adhere to any local ordinances, local Building and Fire codes at a minimum this shall include NFPA 101 and NFPA 1.

GENERAL CONDITIONS AND DEFINITIONS:

1. VA: Veterans Affairs.

2. Program POC: Program Point of Contract is a VA employee of VAMC Facilities and Engineering Service officially assigned to act as a Project Manager and Inspector on behalf of VAMC and the Contracting Officer. Program POC hall be “First Point of Contact” on all matters concerning contract work for subject Project.

3. HOMERUN- Term used to describe new electrical branch circuits installed from the distribution panel to a point in which the branch circuits divide—common junction.

4. ICRA: Infection Control Risk Assessment. An ICRA form must be filled out and signed by Infection Control personnel prior to any work – coordinate with COTR.

5. ILSM: Interim Life Safety Measures. Any series of Operational Actions taken to temporarily reduce hazards posed by Life Safety deficiencies which have been created by demolition, renovation and which are to remain in place and in effect for duration of Contract work.

6. NFPA-NFC: National Fire Protection Association – National Fire Codes.

7. NEC: National Electrical Code, NFPA – NFC Standard 70

8. PROVIDE: Whenever used throughout the Scope of Work, term “Provide” is to be understood to mean – Purchase newly manufactured; Furnish delivered to VAMC work site in protective containers; Secure from tampering or theft; and Install in accordance with Contract Scope of Work, Drawings, Specifications and Manufacturer’s Instructions all required items of administrative submittals, labor, demolition, construction, equipment items, and installation works for entirety of Contract.

SAFETY PRECAUTIONS:

1. The Contractor shall comply with all applicable Federal, State and Local legal requirements regarding workers health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulation, such as applicable provision of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining https://www.calendardate.com/christmas_day_2023.htm the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees.

2. Contractor shall assume the responsibility to guard against causing fires and/or explosion and to protect Government Property, reference NFPA 241 and 29 CFR 1926.

3. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication or fire safety for occupants.

4. No flammable liquids shall be stored or used in the Medical Center.

5. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Association (NFPA) 10 and NFPA 41.

6. The Contractor shall receive from the PROGRAM POCa permit for all cutting, welding and soldering.

7. All necessary precautions shall be taken by the contractor to prevent activation of any existing smoke detectors or sprinkler heads.

HAZARDOUS MATERIAL REPORTING:

a. The Contractor shall maintain hazardous inventories and material safety data sheets (MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR’s 355, 370, &

372) to be stored and used at this Medical Center. Hazardous materials must be inventoried when received and when the project is completed.

b. Hazardous Materials Inventories, Material Safety Data Sheets and Material Quantities used shall be submitted to the Contracting Officer for approval.

c. In the event of a spill, Contractor shall immediately notify the Contracting Officer’s Representative as well as the Contracting Officer. The Contractor shall be solely responsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provision of 40 CFR Part 761.

ENVIRONMENTAL PROTECTION:

In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements” as well as the specific requirements stated elsewhere in the Contract Documents.

All hazardous and universal waste resulting from contractor demolition and construction shall be removed and properly disposed in accordance with 40 CFR 261 through 265, 40 CFR 273 and 40 CFR 279 by the contractor at no additional cost to the VA. This will include the disposal of ballasts, fluorescent bulbs, used oil, mercury switches and any hazardous material. Copies of disposal manifests must be provided to the COR.

INTERIM LIFE SAFETY MEASURES:

A series of operational actions taken to temporarily reduce the hazard posed by life safety deficiencies created during and until completion of construction.

ADDITIONAL INFORMATION:

Parking for contractors will not be permitted on the VAMC/DC facility. Violators will be towed at Contractor’s expense.

Contractor will maintain their own dumpster at an approved location for removal of waste materials as needed.

The PROGRAM POCwill be Jeffery Scott Lockamy, FACILITIES & ENGINEERING— Electrical/Electromechanical Supervisor

(202-745-8000 Ext. 5-8497).

Lonnell Roberts

CHIEF-MAINTENANCE & OPERATIONS (138)

Allan J. Federman

ACTING CHIEF OF MAINTENANCE (138)

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

LABOR COST - INSTALLATION OF ELECTRICAL WIRING FOR

WORKSTATIONS AND CONDUIT FOR NEW WORKSTATIONS IN

GB200, CONTRACTOR WILL FURNISH ALL NECESSARY

TRAVEL, TOOLS, LABOR, MATERIALS TO FULFILL ALL TASKS

FOR THIS REQUIREMENT PER THE STATEMENT OF WORK.

Contract Period: Base POP Begin:

POP End:

PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components

1.00 JB __________________ __________________

MATERIAL COSTS - INSTALLATION OF ELECTRICAL WIRING

FOR WORKSTATIONS AND CONDUIT FOR NEW

WORKSTATIONS IN GB200, CONTRACTOR WILL FURNISH ALL

NECESSARY TRAVEL, TOOLS, LABOR, MATERIALS TO FULFILL

ALL TASKS FOR THIS REQUIREMENT PER THE STATEMENT OF

WORK.

Contract Period: Base POP Begin:

POP End:

PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components

GRAND TOTAL __________________

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor.

(ii) Invoice date and number.

(iii) Contract number, line-item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered.

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212- 5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

The following clauses are incorporated into 52.212-4 as an addendum to this contract:

C.2 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

(a) Definition. for the Department of Veterans Affairs, ‘‘Service-disabled Veteran-owned small business concern or SDVOSB’’:

(1) Means a small business concern—

(i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR 802.201, Surviving Spouse definition);

(ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran;

(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;

(iv) The business has been certified for ownership and control pursuant to 38 U.S.C. 8127, 13 CFR 128, and is listed as certified in the SBA certification database at https://veterans.certify.sba.gov/; and

(v) The business agrees to comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size, government contracting, and the Veteran Small Business Certification Program at 13 CFR parts 121, 125, and 128.

(2) The term ‘‘Service-disabled Veteran’’ means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

(3) The term ‘‘small business concern’’ has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632).

(4) The term ‘‘small business concern owned and controlled by Veterans with service-connected disabilities’’ has the meaning given the term ‘‘small business concern owned and controlled by service-disabled veterans’’ under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)).

(5) The term “SDVOSB participant” or certified SDVOSB means a small business that has been certified in the SBA Veteran Small Business Certification Program and listed in the SBA certification database (see 13 CFR 128.102).

(b) General. In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128.

https://veterans.certify.sba.gov/

(1) Offers received from entities that are not certified SDVOSBs and listed in the SBA certification database at the time of offer shall not be considered.

(2) Any award resulting from this solicitation shall be made to a certified SDVOSB listed in the SBA certification database who is eligible at the time of submission of offer(s) and at the time of award.

(3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences.

(c) Representation. Pursuant to 38 U.S.C. 8127(e), only certified SDVOSBs listed in the SBA certification database are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible and certified SDVOSB as defined in this clause, 13 CFR 121, 125, and 128, and VAAR subpart 819.70.

(d) Agreement/LOS certification. When awarded a contract action, including orders under multipleaward contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size, and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting (LOS) requirements in 13 CFR 121.406(b) and 13 CFR 125.6. For the purpose of limitations on subcontracting, only certified SDVOSBs listed in the SBA certification database (including independent contractors) shall be considered eligible and/or ‘‘similarly situated’’ (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required LOS certification requirements in this solicitation (see 852.219–75 or 852.219–76 as applicable). These requirements are summarized as follows:

(1) Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SDVOSBs listed in the SBA certification database (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/ VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.

(2) Supplies/products.

(i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract.

(ii) In the case of a contract for supplies from a non-manufacturer, the SDVOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CFR 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements.

(3) General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database.

(4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified SDVOSBs listed in the SBA certification database.

(5) Subcontracting. An SDVOSB subcontractor must meet the NAICS size standard assigned by the prime contractor and be certified and listed in the SBA certification database to count as similarly situated. Any work that a first tier SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13

CFR 125.6.

(e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows:

[X] By the end of the base term of the contract or order, and then by the end of each subsequent option period; or

[] By the end of the performance period for each order issued under the contract.

(f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.

(g) Precedence. The VA Veterans First Contracting Program, as defined in VAAR 802.101, subpart 819.70, and this clause, takes precedence over any inconsistencies between the requirements of the SBA Veteran Small Business Certification Program and the VA Veterans First Contracting Program.

(h) Misrepresentation. Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company’s SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406–2 Causes for Debarment).

(End of Clause)

C.3 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON

SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND

CONSTRUCTION (JAN 2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .