Pre-Bid RFIs Log -613-124 POD C 1-06-2022 SENT.xlsx

XLSX spreadsheet 276 KB Posted

Attached to
Z2QA--Renovate/Expand 47-Bed Domiciliary Pod C, Bldg 502 (VA-21-00039017)
Solicitation number
36C24521B0011
Issued by

About this file

This is a solicitation for a construction project to renovate and expand a 47-bed domiciliary pod at a Department of Veterans Affairs medical center. The scope of work includes a complete renovation of an existing 17,600 square foot single-story building that is 30 years old, replacement of the HVAC system, addition of 5,000 square feet of new construction, abatement of asbestos floor tile and duct mastic, and exterior transite panels. Competition is restricted to Service Disabled Veteran Owned Small Businesses. The estimated construction cost range is $5 million to $10 million. Responses are due on October 13, 2021. Interested parties must register on the Vendor Information Pages and SAM websites to be eligible. A pre-bid site visit will be held, and all questions must be submitted in writing. The award will be made to the responsive and responsible bidder with the lowest price.

View the file

Other files

File Type Posted
36C24521B0011 0006.docx DOCX document
Question 18 arp.pdf PDF
Question 19 npodgfxform.pdf PDF
024100 Demolition.docx DOCX document
Question 20 nbrg8.pdf PDF
Asbestos Specs and Reports.zip ZIP file
36C24521B0011_1 - Revised 1-27-2022.docx DOCX document
36C24521B0011 0005.docx DOCX document
hrdw PB for M-WV.docx DOCX document
36C24521B0011 0004.docx DOCX document
36C24521B0011 0003.docx DOCX document
Pre-Bid Sign-In Sheet 12-21-2021.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHUDwgs Vol IIArch Part 2.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHUDwgs Vol IIArch Part 1.pdf PDF
36C24521B0011 0002.docx DOCX document
Pre-Bid Sign-In Sheet 12-07-2021.pdf PDF
Pre-Bid Sign-In Sheet 12-08-2021.pdf PDF
36C24521B0011_1.pdf PDF
36C24521B0011 0001.docx DOCX document
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol II_Arch Part 1.pdf PDF
613-124_Addendum No. 1.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_ICRA ILSM.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol II_Arch Part 2.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Specs.pdf PDF
36C24521B0011_1.docx DOCX document
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol I.pdf PDF
Wage Determination.pdf PDF
Drawings Volume II Part 1.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_ICRA ILSM.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol III.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Contr Resp Postures.pdf PDF
Drawings Volume II Part 2.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3.1 PTSD

CONSTRUCTION RFI LOG
ProjectPTSD RRTPRFIs allow 10 business days for review
VA PN:554-318
VEG PN:3.01
IDDateRequest for InformationResponsible FirmDecision MakerDate ForwardedRequest for Information ResponseDATE DUEDate CompletedDate on Sub CVDate on Faith CVFaith Deadline
Unique IDDate
AddedDescribe request for information.Ex: VA or VEG or Corps of ENGPerson who will
provide a response.Provide response to request for information.Date information is

needed by.

*green: complete *beige: due >7days *yellow: due < 7 days

*red: past dueDate this item was completed.
111/20/20Rcvd. 11/23/2020 Due 10/27/2020 (Civil/Structural Dept. Lead) Rick Keeler Arch. Lead Need misc steel details required by steel fabricator in order to prepare steel shop drawings. Due to long lead dleivery for joists these shop drawings are critical to our schedule So.02, S1.11, S1.12, S1.14, S1.15, A1.11VEGReid DumasSee markings on RFI response11/30/2011/25/2011/20/2011/20/2011/20/20
211/20/20Rcvd 10/23/2020 Due 10/27/2020 (Civil/Structural Dept.)
Details need to be consistent and cover all situations Recommend CMU not be set below grade SHEETS: S3.41, A3.21, A3.42, A3.51 -VEGReid Dumas & Rick KeelerWall Section D10 on Sheet A3.22 should be revised to match Wall Section H6 on Sheet A3.22. The lug for the concrete block should be deleted and the slab poured continuous to the outside face of the foundation wall. This also applies to Wall Section D4 on Sheet A3.21. Refer to attached revised structural Detail D8.
Well Section H8 on Sheet A3.22 should also delete the concrete block shown on the foundation wall. The floor slab and foundation wall should be poured out to the face of the concrete block wall above. The intent of this Wall Section is to show the finish applied to the foundation wall at this location. The basis of design for the retaining wall is the Versa-Lok System. When the retaining wall returns to the building foundation, a portion of the foundation wall is exposed concrete. See Elevation B9 on Sheet A2.11. The textured face of a Versa-Lok unit can be split off to form a 2”+/- unit which will be mortared to the face of the foundation wall. This will provide a finish on the foundation wall that will match the Versa-Lok Retaining Wall System. This design has been coordinated with a local representative11/30/2011/25/2011/23/2011/23/2011/23/20
311/23/20Rcvd 11/23/2020 (Civil/Structural Dept. Lead) Rick Keeler Arch. In accordance with paragraph 1.29 please provide details for the site project sign. In accordance with paragraph 1.30 request Standard Detail Drawing Number SD10000-02 (found on VA TIL) of safety sign showing required legend and otehr characteristics of sign. Spec oi 0000-24 1.29 & 1.30VEGReid Dumas & Rick KeelerSafety sign drawing submitted by Moses Jacobs12/3/2011/30/20None11/23/2011/23/20
411/25/20Rcvd 11/25/20 Foundation details S1.11VEGWill1. U/S of baseplate confirmed at 99’-5 ½” resting on pilaster. The

round objects are aluminum column covers and do not affect the u/s of base plate elevation (See note on DWG A1.11).

2. Top of footing shall be changed to 1’-0” to be consistent with adjacent footings.

3. Those are not structural columns. They are architectural features and must remain. 4. U/S of baseplate confirmed at 99’-5 ½” resting on pilaster as shown on DWG’S S3.21 and S3.22. It is not on continuous concrete ledge.

5. Sizes on footing details are typical and pilaster sizes shown are acceptable to accommodate base plates and anchor rod clear cover.

Baseplate types 1 and 3 max length is 16” and is attached to 20”

pilaster. Type 2 baseplate is 20” length attached to 24” pilaster.12/5/2012/1/2011/24/2011/24/2011/24/20
511/24/20Please see the attached RFI and advise on items 1 thru 3 for clarification at the door jamb steel.VEGWill1. Type shall read Q-125 and Q-126.

2. Anchors shall be post applied. Anchors shall be expoxy type concrete anchors at the diameter and embed as specified on the drawings. Hilti HY-200 or Simpson Set-XP or approved equivalent is acceptable.

3. Proposed connection is acceptable if the strength of the proposed

connection is equal to or exceeds strength of original weld design12/1/2012/1/2011/24/2011/24/2011/24/20
611/24/20Please see the attached and proivde verification of items 1 thru 3 at the entrance roof area. See S1.13VEG/ Sans StructuralWill12/1/2012/11/2011/24/2011/24/2011/24/20
711/24/20See Subcontractor input S1.13 and S1.14VEG/ Sans Structural12/1/2012/11/2011/24/2011/24/2011/24/20
811/24/20See subcontractor input S1.13-S1.15, S2.22, S2.42-43VEG/ Sans Structural12/1/2012/14/2011/24/2011/24/2011/24/20
911/25/20CD101 require relocation of existing irrigation control valve that is near East property Line. Can not find any indication of where this valve is to be relocated to. Also will removing this valve deactivate irrigation system for our project site?VEG/ Sans StructuralAdamOn CD101 change “EXISTING IRRIGATION VALVE TO BE

RELOCATED” to “EXISTING IRRIGATION VALVE TO BE

REMOVED”.

The existing irrigation valve will not be used in irrigation for the project

site. See L-400 for site irrigation point of connection in building.12/1/2012/1/20None11/25/2011/25/20
1011/30/20Floor loading confirmationVEG/ Sans StructuralReidSee markings on RFI response12/5/2012/14/2011/30/2011/30/2011/30/20
1112/3/20Potential impact to method excavation and backfillVEG/ Sans StructuralReidProvided new grade drawings - Will and John provided first response, then Reid and Dustin completed second revision12/16/2012/18/2012/3/203-Dec12/3/20
1212/11/20REMOVEDArchitecturalRick K.REMOVED12/24/20NA
1312/15/20Proposed alternate connection - clip angles on both sides of HSS membersStructuralReidSubcontractors alternative approved12/28/2012/27/2012/11/2012/15/2012/15/20
1412/15/20Drawing and detail sketchesStructuralReidJohn at San and Reid completed response including several new details12/30/2012/30/2012/11/2012/15/2012/15/20
1512/15/20Building footing subgrade soil compactionStructuralReid95% required - 100% not necessary - Kumar report used for reference on soil type only12/28/2012/17/20None12/15/2012/17/20
1612/18/20Deck openings requiring support frames belowStructuralDan NyugenDan Nyugen replied - coordinate with sheet M202 and mech contractor for consolidated layout drawing for all new systems - refer to spec 23 05 11 1.4.F for requirements12/23/2012/23/2012/18/2012/18/2012/18/20
1712/18/20Deck clarificationsStructuralReidYes, Vulcrafts suggestions were accepted12/23/2012/22/2012/17/2012/18/2012/18/20
1812/18/20Spray on fireproofing requirementsArchitecturalRick K.No spray on fireproofing required - LS101 and key note 9.29A are called out by Rick First response provided 12/29/2012/23/2012/31/2012/18/2012/18/2012/23/20
1912/18/20Grid layout dimensions and verifcationStructuralReidReid provided dimensions1/1/2112/23/2011/20/2012/18/2012/18/20
2012/21/20Deck sidelap connectionStructuralWillWill provided: See S1.12 for plan notes1/1/2112/22/2012/18/2012/21/2012/21/20
2112/18/20Joist seat depths from VulcraftStructuralReidApproved12/24/2012/29/2012/18/2012/21/2012/21/20
2212/22/20Strip stone v panelsArchitecturalRick K.Yes they match1/1/2112/24/2012/22/2012/22/2012/22/20
2312/29/20Aluminium framed sidingArchitecturalPaulPaul provided guidance on siding - spec 08 41 131/10/2112/31/2012/11/2012/29/2012/29/20
2412/31/20TransformersElectricalTrentDry type transformer is specd however, EPA requires oil containment type pad1/12/211/12/2111/13/2012/30/2012/30/20
251/4/21Connection clarificationsStructuralReid/JohnJohn at San and Reid completed response including several new details1/15/211/14/2112/31/201/1/211/7/21
261/4/21Edge of deckStructuralReid/John1/15/211/15/2112/31/201/1/211/7/21
271/8/21Step footingStructuralReid/DustinVEG provided step footing details for elevation1/8/211/8/21None1/8/211/8/21
281/8/21Screenwall anchor and steelStructuralReid/ PaulProceed with profile size shown1/22/211/15/211/5/211/8/211/8/21
291/8/21HSS Connection verificationStructuralReid/Dustin/ John1/19/211.1/4” plate stiffener is acceptable at this moment connection.
2.HSS connection is acceptable adjacent to moment connection.1/22/211/22/211/5/211/8/211/8/21
301/8/21Overhang clarificationStructuralReid/Dustin1/19/211'-10" overhang.1/22/211/20/211/5/211/8/211/8/21
311/13/21Back flow preventers (P301)PlumbingMark/ Bud1/19/21See specification section 22 05 23 Paragraph 2.7 for reduced pressure backflow preventer requirements.1/26/211/19/21None1/12/211/12/21
321/14/21cabinet width clarificationArchitecturalRick K.1/19/21Original design intent was that glass shelving would be supported by KV shelf brackets, one at each edge and one at the midpoint. No single glass span is greater than 2'-0". Color to match clear anodized aluminum or stainless steel per
manufacturer's recommendations.1/27/211/27/211/14/21
331/14/21Moment Weld clarificationsStructuralReid/Dustin1/19/211.Proposed moment connection at sloped connection is acceptable.

2.Plates can be reduced to 5” wide at top and 7” wide at bottom to work with W18x40 flange width.

3.L5x5x3/8 angle is acceptable where column terminates at roof level.

4.Use ¼” fillet welds at these connections.

5.Use ¼” fillet welds at these connections.

6.The proposed moment connection is acceptable.1/27/211/22/211/14/21
341/18/21DrainageCivilNANAAbandoned pipe - RFI removedNANA1/18/21
351/18/21Storm drain from FisherCivilDustin1/20/21See completed design from Ron and Dustin - design was redone due to missing pipe information on sewer pipe1/29/212/1/211/18/21
361/19/21ES102 COM BoxElectricalRon1/20/21Faith decided to remove com box, and build new1/31/211/21/211/19/21
371/19/21ES102 Transformer PadCivilReid1/19/21Reid provided dimensions2/1/211/19/211/19/21
381/19/21Shower SlabsArchitecturalPaul1/20/21All showers shall have depressed slabs to coordinate with E7/A9.312/1/211/22/211/19/21
391/20/21Stair materialsArchitecturalPaul1/22/21Construction documents show 9 risers on the bottom string, 14 on the top, with approximately 4’-6” clear at bottom of stairs on first floor. Please clarify the detail where the topmost riser and stringer meet the penthouse deck. Construction documents show the edge of deck on gridline B1. The intent was to cope the stringer to achieve this. Shop drawings show the edge of deck projecting +/- 9” into the stairwell.2/1/211/28/211/20/21
401/27/21ConductorsElectricalTrent1/27/21Please disregard wire sizes in Key Notes 2 & 3 and refer to feeder 700 on

sheet E-601 which shows the conductors being extended from the 15kV Normal Power Paralleling Switchgear in the main building through Vault EN3A as well as from the 15kV Paralleling Generator Switchgear through

Vault EN3B to the new transformers TN-1 and TE-1 serving the building.2/9/211/28/211/25/21
411/28/21CD 102 VA signsElectricalTrent1/28/21REDO DESIGN FOR LIGHTED SIGNS2/10/21
421/28/21RFI 27 FootingStructuralReid/Dustin/ John1/29/212/10/21
431/28/21P202 sewer/footing interfacePlumbingMark/ Bud2/2/212/10/21
441/28/21Light pole bases and coordinationLightingJill1/28/212/10/21
452/1/21Retainage wall elevationReid/Dustin2/1/212/12/21
462/3/21Stair layout - RFI 39 clarificationPaul2/3/212/16/21
47
48
49
50
51
52

&D Page &P of &N &G

3.06

4.08

4.17

4.26

18.10

19.26

Construction Request For Information (RFI) Log
ProjectRenovate 47-Bed Domiciliary Pod C and Replace AHUs
VA PN:613-124
VEG PN:19.26DATE: 1/19/2022
IDDate Rec'dDesign CommentResponseClient/ SourceAssignee(s)PriorityDate NeededDate Completed
Unique IDDate

Added (Incoming) Describe request for information (RFI). Response to the RFI Ex: VA, CFM, VEG or Corps of ENG Assignee Relative priority:

1-High 2-Medium 3-Low Date information is needed by.

*green: complete *beige: due >7days *yellow: due < 7 days *red: past due Date this item was completed.

(Outbound)

112/15/21What are the permit requirements for this project?VERIFY PERMIT REQUIREMENTS WITH SITE SAFETY OFFICER AND SAM POWELL, VA CORVA COMoses Jacobs, Project Architect112/22/2112/27/21
212/15/21Is it possible to provide as-built drawings of POD C for all trades?CD was burned with all drawings provided by VA at beginning of project and shipped Wednesday with arrival at noon Thrusday, Dec 30, 2021VA COMoses Jacobs, Project Architect112/22/2112/30/21
312/15/21Please provide a copy of the HazMat survey referenced on Drawing Page HA101 Volume II Part 1Copy of Hazmat/ ACM survey sent via email 12/29/2021VA COMoses Jacobs, Project Architect112/22/2112/29/21
412/15/21Details on A-620 and A-621 do not show sufficient anchorage to support blast rated aluminum storefront. Steel angle embeds will need to be provided by others in order for blast rated system to meet design criteria. Can you please provide steel angle details and sizing?SPECIFIC ANCHORAGE TO THE BUILDING STRUCTURE (INCLUDING BUT NOT LIMITED TO EMBEDS, TRANSFER BRACKETS AND ANCHORS) MUST BE DESIGNED AND PROVIDED BY THE STOREFRONT SUPPLIER/CONTRACTOR AND COORDINATED WITH OTHER TRADES. REFER TO Q5 RESPONSE.VA COMoses Jacobs/ Carrie Davis112/22/2112/27/21
512/15/21Due to the Mission Critical with GP2 loading and 50’ standoff requirements, all exterior frames and glazing will need to be blast resistant. This includes frames 1 and 2/A-620. All exterior aluminum frames will require connection to head and sill substrate. Slab embed plates will be required to which the custom mullion anchored. The head condition will need to have structural steel framing for custom mullion anchor connections. The current drawing details show only wood blocking. Can you please provide steel embed details and sizing?REFER TO STRUCTURAL DRAWINGS AND RESPONSE TO Q4VA COMoses Jacobs/ Carrie Davis112/22/2112/27/21
612/15/21Can you confirm that the only details to be included in the proposal are:
a.Signed/Completed SF-1442
b.Pricing Sheets
c.Bid Bond
d.Safety & Environmental Record
e.EMR
f.Reps & Certs
g.Acknowledgement of Immigration & Nationality Act of 1952These are the required documents. Please ensure that a full review is completed of the package requirements so all items are received complete.VA COKathryn Kaiser112/22/211/27/22
712/15/21In addition to the original, how many copies of the proposal should be submitted?One copy should be provided, as referenced on the SF1442.VA COKathryn Kaiser112/22/211/27/22
812/15/21Is hand delivery the only acceptable proposal delivery method?Proposals may be hand delivered or mailed to:

Department of Veterans Affairs Attn: Kathryn Kaiser 510 Butler Avenue, Bldg. 306A

Martinsburg, WV 25405VA COKathryn Kaiser112/22/211/27/22
912/15/21Will Pod C be occupied during construction?The C Pod will not be occupied during construction.VA COKathryn Kaiser112/22/211/27/22
1012/20/21According to spec 09 06 00 – Schedule for Finishes, Wardrobes & Bedroom Desks, Desktop is noted to be Quartz “Stellar Snow” and vertical surfaces are noted to be PLAM #1 – Formica “9479-NG Wide Plank Walnut”. Elevations 4 & 5/A-224 indicates the desktop as PLAM #2 and the vertical surfaces of the wardrobe as PLAM #3. Which is correct? If Plam #3 is correct – can you provide the plastic laminate color selection?FINISH CALLOUTS INDICATED ON ELEVATIONS 4 & 5/A-224 ARE SUPERSEDED BY THE SPECIFICATION. COMPLY WITH FINISHES INDICATED IN SPECIFICATION SECTION 09 06 00, SCHEDULE FOR FINISHES, 2.6 DIVISION 06 WOOD, PLASTICS, AND COMPOSITES, A. SECTION 06 20 00, FINISH CARPENTRY, 7. WARDROBES & BEDROOM DESKS.VA COMoses Jacobs, Project Architect112/27/2112/27/21
1112/20/21On plan A-113, there may be casework/cabinetry in the Laundry Rm 502C-149. There is no enlarged plan or elevations provided. Please clarify casework / countertop requirements for this roomCOMPLY WITH FINISHES INDICATED IN SPECIFICATION SECTION 09 06 00, SCHEDULE FOR FINISHES, 2.6 DIVISION 06 WOOD, PLASTICS, AND COMPOSITES, A. SECTION 06 20 00, FINISH CARPENTRY, 6. KITCHEN CABINETS.VA COMoses Jacobs, Project Architect112/27/2112/27/21
121/3/22Reference:

•Dwg E001 communications general notes (D) states all data to be Cat 6A, but on the same drawing under communication cabling requirements (1.A) states Cat 6 cabling •Dwg E001 communications general notes (F) states cameras to be Cat 6, but on dwg ET110 keynotes (3 & 7) states Cat 6A for cameras.

•Dwg E001 communication cabling requirements (14.A) states Cat 6 for WAP’s, but dwg ET110 keynote (1) states Cat 6A for WAP’s.

Need clarification on the structured cabling required (Cat 6 or Cat 6A):Cat 6A is now a VA requirement.VA COTrent Lindsley
Electrical Engineering11/10/221/9/22
131/3/22Flooring

• The finish plans show "WSF" or welded sheet flooring throughout except in the bathrooms. However, the finish schedule lists two products they call SV#1 & SV#2, both of which are plank tiles, not sheet vinyl.

• We are including wall tile for the shower enclosures. “Wall Tile & Schluter Dilex Trim inside shower enclosures receives wall panels.” Will these be installed by (others) or should we plan to install wall board and Schlueter with the tile?1- Provide and install per plans and specs dated 12/11/2020. Refer to Q22 Response (item 22). 2- Refer to plan pg A-413 / General note E and plan pg A-220 detail 17 for further clarification.VA COMoses Jacobs, Project Architect11/10/221/12/22
141/3/22Can we be provided a link for the plans and specifications for this project? The information on Sam.Gov does not seem complete/full size, can Architectural drawings showing building elevations, window/storefront details, door schedule be provided? They seem to be missingThe drawing and specifications for this project were provided with the solicitation package on SAMS.gov. Missing or updated information has been resolved with this amendment. Exterior Building Elevations are indicated on sheets A-210 to A-212. Window and Storefront Details are indicated on sheet A-621. The Door Schedule is shown on sheet A-620.VA COVA - Kathryn Kaiser11/10/221/27/22
151/3/22For the blast windows and storefront I would require the intended standoff distance, charge size and blast level. (blast levels are: 1, 2 , 3a, 3b or 4) can this information be provided? From what I see the intention is to use level 2.
Glazing 08 80 00 section 2.1 D call for low iron glass while in several other places I see sample requirements for tinted glass. The whole idea of low iron is to remove the excess iron from standard glass that removes the greenish tint present. Low Iron with tint defeats the purpose of Low Iron?Design standoff distance = 25-feet. Provide blast rated (hardened) window and storefront frames with 1-in AN IGU* glazing. Window/Storefront framing system must be connected to the primary building structure as indicated on the drawings. *1-in AN IGU = 1/4-in annealed outer lite x 1/2-in air gap x 1/4-in AN laminated inner lite with 0.030-in PVB interlayer.VA COMoses Jacobs, Project Architect11/10/221/10/22
181/3/22Ref Dwgs: EL113,EL114,EL115, and E504
EL114 calls for (1) 24 channel LV Panel. EL113 and EL115 has 16 channel LV panels Total (2). E 504 has description of 4 channel LV panels, which there is a total of 57. There is nothing in the specs nor any detail drawings show manufacturer or design. Requesting info on panel used in design or manufacturer.Refer to attached manufacturers information arp.PDFVA COMoses Jacobs, Project Architect

Trent Lindsley

Electrical Engineering11/10/221/10/22
191/3/22E505 calls for a Graphic Wall Pod. There is nothing in the specs nor any detail drawings show manufacturer or design. Requesting info on panel used in design or manufacturer.Refer to attached manufacturers information npod_gfx-form.PDFVA COMoses Jacobs, Project Architect

Trent Lindsley

Electrical Engineering11/10/221/10/22
201/3/22E505 calls for a 8 Port Network Bridge.. There is nothing in the specs nor any detail drawings show manufacturer or design. Requesting info on panel used in design or manufacturer.Refer to attached manufacturers information nbrg-8.PDFVA COTrent Lindsley
Electrical Engineering11/10/221/10/22
211/3/22E601 show 1-line description of MDP and MDPE. Specs Section 26-24-13 details requirements including electrical ratings, breaker sizes, interrupting ratings, etc. Can we assume that using existing Switchboard dimensions is all we need above this, to furnish vendors for pricing.ES-103 shows locations. Contractor should field verify space available.VA COTrent Lindsley
Electrical Engineering11/10/221/10/22
221/3/22Vinyl Sheet Flooring WSF (SV#1 and SV#2) specs given in the spec book does not verify as sheet but as plank. (Provided Option for both sheet and Plank separately, please confirm)

R: SV#1: Patcraft, Style TBD, 00250 Beachscape, Resilient 1600V Click Refresh, https://www.patcraft.com/product/detail/I600V/00250?installation-method=stagger&room-scene=1162#specs-sustainability

R: SV#2: Karndean, Style TBD, Neutral Oak LLP 307, Loose Lay Longboard

https://www.karndean.com/en/commercial-flooring/products/neutral-oak-llp307Provide and install WSF per A-640 - Room Finish Schedule (sheet dated 12/11/2020). Specification Section 09 06 00 (D. Section 09 65 16, Vinyl Sheet Flooring, Heat Welded Seams (WSF): should be corrected to read as follows: Finish Code = SV#1, Pattern Name = Enrich, Collection name = Eco System, Manufacturer = Patcraft, Mfg. Color Name/No. = Meditate/ 00105. NOTE: Omit SV#2.VA COMoses Jacobs, Project Architect11/10/221/12/22
231/3/22Two Resilient Sheet finishes are given that is SV#1 and SV#2 but room finish schedule as well as Finish plan only shows WSF therefore Separate sheet or planks are estimated for Corridors, Offices, Bedrooms, Bariatric Rooms and Lounges and separate for BOH Room respectively as per General Note D on sheet A-641. (Please confirm)
All flooring will be WSF except bathrooms as shown on plans and in specs. Refer to Q22 Response (item 22).VA COMoses Jacobs, Project Architect11/10/221/12/22
241/3/22Option for Resilient Plank is provided as per the General Note C on Sheet A-642 (Please confirm)
General Note C: Install Laminate Flooring at all corridors, Offices, Bedrooms, Bariatric Rooms, and LoungesDisregard "general note C". All flooring will be WSF as shown, other than bathrooms. Refer to Q22 Response (item 22).VA COMoses Jacobs, Project Architect11/10/221/12/22
251/3/22Shower Surrounds are composite shower panels therefore they are not estimated. (Please confirm)Include in bid as indicated on plans and in specs dated 12/11/2020.VA COMoses Jacobs, Project Architect11/10/221/12/22
261/4/22Is there any documentation of the invert of the 4” sanitary mains that run through the corridors?Project # 613-012B, record drawings 9/27/1982, sheet W-4R indicates an invert of 502.60' same drawings indicate a finished floor elevation of 508'VA COMoses Jacobs - Arch
Mitch Bible - Mech Eng.11/11/221/11/22
271/4/22Will a temporary hose bibb need to be provided during construction?Refer to Specification Section 01 00 00, Paragraph 1.21, subparagraph F.VA COMoses Jacobs - Arch
Mitch Bible - Mech Eng.11/11/221/11/22
281/4/22The specifications and Fixture Schedule on drawing P701 are for Shower Bath Faucet only, not the shower stall itself. During the site visit I noticed in the recently completed units the shower was a roll in one piece fiberglass unit that was recessed into the floor. What brand, size, and seat requirement are needed?Line 6 of the "Plumbing Fixture Schedule" identifies mark P-704 as "Shower with antiscald valve, head and hand held". Plan pg A-224 detail 1 shows fold down seat which is called out on pg A-413 detail 1, mark 12 and 13 under "Toilet Accessories Legend", also see pg A-414. Spec section 10 21 16 identifies the prefabricated shower enclosure product.VA COMoses Jacobs - Arch
Mitch Bible - Mech Eng.11/11/221/12/22
291/4/22We were informed that Johnson Controls Inc are the proprietary controls contractor for the facilities. Can we get the hospital's contact for JCI?Contact Abbad Malik - abbad.m.malik@jci.comVA COVA - Sam Powell/ COR11/11/221/27/22
301/4/22On the site walk, we were taken to a similar space that was just completed. We noticed that components were not the same manufacturer as indicated in these prints schedule. As long as we meet "equivalent", are there any issues with submitting substitute manufacturers?Equivalents are not acceptable, provide and install per plans and specs dated 12/11/2020.VA COMoses Jacobs - Arch
Mitch Bible - Mech Eng.11/11/221/12/22
311/4/22What will the regular working hours be on this project?Normal business hours, as listed in the solicitation, are Monday - Friday from 8:00am - 4:30pm. There are flexibilities to these hours that can be discussed after award.VA COVA - Kathryn Kaiser11/11/221/27/22
321/4/22Will all work be performed during regular hours?Not necessarily, refer to the General Requirements specification included with the package. Electrical, mech, data, etc shutdowns that affect other parts of the hospital will have to be performed off hrs. and as approved by the COR.VA COVA - Kathryn Kaiser11/11/221/27/22
331/5/22Is there a generator included in this project or is there some type of tie-in to a pre-existing generator?There is no new generator. Drawing E-602 shows connection to emergency power.VA COMoses Jacobs-Arch Trent Lindsley-EE11/11/221/11/22
341/6/22Will the contractor be responsible for removing/storing and re-installing furniture?No. The VA will remove moveable furniture. Built-in items are the contractor's responsibility. Equipment and other items to be re-installed are the responsibility of the contractor to remove, protect and re-install.GCVA - Sam Powell/ COR11/13/221/13/22
351/6/22Will the contractor be responsible for disposing of any furniture?No. The VA will remove moveable furniture. Built-in items are the contractor's responsibility. Equipment and other items to be re-installed are the responsibility of the contractor to remove, protect and re-install.GCVA - Sam Powell/ COR11/13/221/13/22
361/6/22Will the contractor be responsible for supplying any new furniture?No. The VA is responsible for furnishing and installing moveable items. The contractor is responsible for furnishing and installing built-in items, like millwork.GCVA - Sam Powell/ COR11/13/221/13/22
371/6/22Can other lighting controls be used instead of the nLight controls in the drawings?Systems by other manufacturers are allowed to bid as nLight was used as a basis of design. Final approval and acceptance of the proposed lighting control system will be determined by the design engineer during product submittal review for meeting design intent and specification requirements.GCRobert / Jill11/13/221/12/22
381/6/22We are getting feedback from numerous subcontractors in different trades and experiencing the same issue with both sets of plans that were released on Amd #2. Once they are uploaded to Planswift or any takeoff software, the drawings seem to pixalate and the scales are not working. It almost seems like they are screenshots. Vol 1 and 3 work perfectly, is there a way to export volume 2A and 2B the same way?The drawing issues were corrected through Amendment #2. If there are still difficulties contact the CO at kathryn.kaiser@va.govVA COKathryn Kaiser11/13/221/27/22
391/6/22Storefront frames type 1 and 2 call for a 1” solid panel (B.O.D. mapes). These frames are blast rated with a criteria that Mapes cannot match. The best they can offer is their MapeShield panel that is teste to DoD standards in 2005. One item we could offer is use the 1-5/16” blast rated glazing in these areas with a spandrel layer to give the desired aesthetics. Please let us know your thoughts.Provide opaque insulated panels in accordance with storefront manufacturer's requirements to maintain storefront system blast rating.GCMoses/Dee11/13/221/13/22
401/6/22Bid item 5 or Alternate #6 listed in the specifications is not listed on the solicitation’s description of work. Please confirm if this alternate will apply. If so, can the VA add that extra line item in Block 17 of the SF1442.The solicitation states, in Block 17 of the SF1442, that remaining bid items #2-5 are listed on pg. 9. The CO noticed during review, however, that there is a Bid Item #6 listed in the General Requirements that was not listed on pg. 1 of the 1442, listed in the Bid Item tabulation on pg. 2 of the 1442 or provided in the additional Bid Item's starting on pg. 9. A revised, complete 1442 document has been attached to this Amendment for response usage.GCKathryn Kaiser11/13/221/13/22
411/6/22Please confirm if Contractor will include dumpsters and/or storage units for any furniture to be removed or relocated currently inside bldg.See answers 34 and 35GCVA - Sam Powell/ COR11/13/221/27/22
421/6/22Window Basis of design?Wojan Window and Door Corp, M950 BlastGCMoses/Dee11/13/221/27/22
431/6/22When is the project intended to get awarded, NTP?This project is planned to be awarded well within the bid acceptance period.GCVA - Sam Powell/ COR11/13/221/27/22
441/6/22Are funds available this year?This solicitation is subject to the availability of funds but, award is anticipated this fiscal yearGCVA - Sam Powell/ COR11/13/221/27/22
451/6/22Please confirm that the qualified Superintendent cannot double hat the SSHO.See spec section 01 35 26GCVA - Sam Powell/ COR11/13/221/27/22
461/6/22Is this project sales tax exempt?NoGCVA - Sam Powell/ COR11/13/221/27/22
471/7/22Is MC cable acceptable for branch power and/or feeders?MC in not acceptable. See VA Specs.GCRobert11/14/221/14/22
481/7/22Is aluminum wire acceptable for feeders?See VA specs. Must be copper.GCRobert11/14/221/14/22
491/7/22Does the lighting control wiring (Cat 5) need to be in a raceway, or can it be installed without raceways?Cable tray is to be used for the installation and routing of the CAT5 lighting control network cable inside the bldg. If cable tray is not available in the area where the lighting control cable is installed, then provide hangers or j-hooks to avoid the cable resting upon the ceiling, piping or ductwork.GCJill / Robert11/14/221/10/22
501/7/22Please provide the preferred fire alarm vendor.COR has no access to vendor right now.GCVA - Sam Powell/ COR11/14/221/7/22
511/7/22Is there a schedule for this project?Schedules are developed by contractor.GCVA - Sam Powell/ COR11/14/221/7/22
521/7/22Will any of the electrical portion of the work need to be completed on off hrs?YesGCVA - Sam Powell/ COR11/14/221/7/22
531/7/22E-001 and appendix to Div 27(Communication Cable Requirement-1) states "2 data and 2 voice". E-501 #12 states "1 voice and 2 data", which is correct?The specs say (3) cables. 2-data and 1-voice. Use specifications for this item.GCRobert / John Cazer11/15/221/11/22
541/24/22What is the hardware group for doors 123, 132, 136 and 141For Doors 123, 132, and 141 CHANGE SPECIFICATION –
A.08 71 00 DOOR HARDWARE, Paragraph 3.5 Hardware Sets, : ADD Hardware Set as follows:

HW-10C

HingesQUANTITIY & TYPE AS NEEDED
2Wall StopL02121 CONVEX
1Set Auto Flush BoltsType 25
1Dust Proof Strike (L04021)570
1Storeroom LockF07Interchangeable Core
1Coordinator (Type 21A)2600 Series
2CloserC02011/C02021
2 Kick PlateJ102
2SilencerL03011
1set frame sealsR0Y164

OPERATION DESCRIPTION:

1. The doors are normally closed and secure.

2. Egress from the unsecured side is always available by turning the lever on the lockset.

3. Key on secured side will retract latch to allow entry. For Door 136: CHANGE Sheet A-620, Door Schedule (for Door No. 136) HDW SET from 10C to SH-5A.GCMoses/Dee11/24/221/25/22
551/24/22What is the minimum gauge of cold formed metal framing?Specification Section 054000 and Section 092216 supesede drawing requirements. Cold Formed Metal Framing must be 20 guage, minimum.VEGMoses11/24/221/26/22
561/24/22On Sheet A-113 there are several unreferenced Section call-outs. Where are these unreferenced Section call-outs shown on the drawings?The unreferenced Section call-outs on Sheet A-113 are unintended and should be ignored.VEGMoses11/24/221/26/22

18.12

18.13

18.14

CONSTRUCTION RFI LOG
ProjectReplace Boiler #1
VA PN:660-17-100
VEG PN:18.14
IDDateRequest for InformationClient/ SourceDecision MakerPriorityValhalla ResponseDate NeededDate CompletedAction for BulletinDate Completed
Unique IDDate
AddedDescribe request for information.Ex: VA, CFM, VEG or Corps of ENGAssigneeRelative priority:

1-High 2-Medium 3-Low Provide response to Client Comment/ Request Date information is needed by.

*green: complete *beige: due >7days *yellow: due < 7 days *red: past due Date this answer was provided. Date this item as completed.

14/27/20Composition Analysis Natural Gas***Answered directly by the VA***5/7/205/7/20
26/3/20Boiler Tie-In Location6/13/206/18/20
36/3/20Coal Bin Demolition6/13/206/10/20
46/17/20Wall Location and Expansion6/27/206/26/20
56/17/20Access Panels for CMU6/27/206/25/20
68/3/20Rebar Splicing Requirements8/13/208/3/20
78/20/20Electrical RelocationForwarded to electrical on 08/21/20208/30/208/24/20
88/20/20Footing and Foundation Steps8/30/208/25/20
98/24/20Foundation and Footing Clarifications9/3/208/25/20
108/24/20Steel Joist MeasurementsCanyons contacted the steel fabricator directly to answer their questions since this RFI was really a shop drawing that need some clarifications. No official RFI response was issued.
UPDATE: Steel joist design information was submitted in the resubmitted structutral steel shop drawings which were reviewed and returned.9/3/20-
119/8/20Steam Vault IssuesRHI was delayed in getting the GPR test results to the design team for structural evalulation of the vault lid. After analysis, the vault lid does not have sufficient capacity to carry the boiler load during installation so a 1" thick steel construction plate is being proposed to distribute the load.9/18/2010/21/20
129/15/20Foundation Wall Thickness9/25/209/18/20
1310/22/20Footing and Foundation Continuous Pour11/1/2010/22/20
1410/26/20Brick Veneer at Existing Electrical Shop WallPour new foundation stem wall to carry the new brick veneer11/5/2011/3/20
1511/17/20Expansion joint above damper on flue exhaust stackReviewed with no Exceptions…. as shown on drawings11/27/201/29/21
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

image1.png

File details come from the government source that posted it. Updated .