024100 Demolition.docx

DOCX document 22 KB Posted

Attached to
Z2QA--Renovate/Expand 47-Bed Domiciliary Pod C, Bldg 502 (VA-21-00039017)
Solicitation number
36C24521B0011
Issued by

About this file

This solicitation requests proposals for the renovation and expansion of a Department of Veterans Affairs domiciliary building. The selected contractor will renovate an existing 17,600 square foot single story building and construct an additional 5,000 square feet to accommodate more occupants. The project scope includes HVAC system replacement, updated finishes, floor plan changes, and asbestos abatement. The estimated construction cost ranges from $5-10 million. Competition is restricted to verified Service Disabled Veteran Owned Small Businesses. Interested parties must attend the mandatory pre-bid site visit on the confirmed date and submit any questions in writing. Sealed bids are due on October 13, 2021 and will be publicly opened. Award will be made to the responsive and responsible bidder with the lowest price subject to availability of funds. The work must be completed in accordance with West Virginia licensing requirements and applicable federal acquisition regulations.

View the file

Other files

File Type Posted
36C24521B0011 0006.docx DOCX document
Question 18 arp.pdf PDF
Question 19 npodgfxform.pdf PDF
Question 20 nbrg8.pdf PDF
Asbestos Specs and Reports.zip ZIP file
36C24521B0011_1 - Revised 1-27-2022.docx DOCX document
36C24521B0011 0005.docx DOCX document
hrdw PB for M-WV.docx DOCX document
Pre-Bid RFIs Log -613-124 POD C 1-06-2022 SENT.xlsx XLSX spreadsheet
36C24521B0011 0004.docx DOCX document
36C24521B0011 0003.docx DOCX document
Pre-Bid Sign-In Sheet 12-21-2021.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHUDwgs Vol IIArch Part 2.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHUDwgs Vol IIArch Part 1.pdf PDF
36C24521B0011 0002.docx DOCX document
Pre-Bid Sign-In Sheet 12-07-2021.pdf PDF
Pre-Bid Sign-In Sheet 12-08-2021.pdf PDF
36C24521B0011_1.pdf PDF
36C24521B0011 0001.docx DOCX document
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol II_Arch Part 1.pdf PDF
613-124_Addendum No. 1.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_ICRA ILSM.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol II_Arch Part 2.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Specs.pdf PDF
36C24521B0011_1.docx DOCX document
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol I.pdf PDF
Wage Determination.pdf PDF
Drawings Volume II Part 1.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_ICRA ILSM.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Dwgs Vol III.pdf PDF
613-124 Ren Exp 47-Bed Dom C Pod Repl AHU_Contr Resp Postures.pdf PDF
Drawings Volume II Part 2.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-01-17

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.1 DESCRIPTION:

This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.

1.2 RELATED WORK:

A.Demolition and removal of roads, walks, curbs, and ongrade slabs outside buildings to be demolished.
B.Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).
C.Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
D.Reserved items that are to remain the property of the Government: Section 01 00 00, GENERAL REQUIREMENTS.
E.Asbestos Removal: Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
F.Lead Paint: Section 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.
G.Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
H.Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT.
I.Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.

1.3 PROTECTION:

A.Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT PREVENTION.
B.Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.
C.Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.
D.Provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck. Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris.
E.Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily.
F.In addition to previously listed fire and safety rules to be observed in performance of work, include following:
1.No wall or part of wall shall be permitted to fall outwardly from structures.
2.Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.
3.Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants.
G.Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Contracting Officer Representative (COR). The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal works. Repairs, reinforcement, or structural replacement must have COR’s approval.
H.The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.
I.The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.

1.4 UTILITY SERVICES:

A.Demolish and remove outside utility service lines shown to be removed.
B.Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.

PART 2 - PRODUCTS (Not Used)

PART 3 – EXECUTION

3.1 DEMOLITION:

A.Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto, as noted below:
1.As required for installation of new utility service lines.
2.To full depth within an area defined by hypothetical lines located 1500 mm (5 feet) outside building lines of new structures.
B.Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the COR. Break up concrete slabs below grade that do not require removal from present location into pieces not exceeding 600 mm (24 inches) square to permit drainage. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.
C.In removing buildings and structures of more than two stories, demolish work story by story starting at highest level and progressing down to third floor level. Demolition of first and second stories may proceed simultaneously.
D.Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations. All materials in the indicated trash dump areas, including above surrounding grade and extending to a depth of 1500mm (5feet) below surrounding grade, shall be included as part of the lump sum compensation for the work of this section. Materials that are located beneath the surface of the surrounding ground more than 1500 mm (5 feet), or materials that are discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications.
E.Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the COR. When Utility lines are encountered that are not indicated on the drawings, the COR shall be notified prior to further work in that area.

3.2 CLEANUP:

On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to COR. Cleanup shall include off the Medical Center disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.

E N D

02 41 00 - 5