Schedule E - Price Proposal Breakdown

This is a pricing template for the Sterile Storage Improvements Construction project at Lebanon VA Medical Center. Contractors must provide a detailed cost breakdown across 29 line items including demolition, structural elements (substructure, frame, roofing, exterior walls), interior components (subdivision, vertical circulation, wall/floor/ceiling finishes), building systems (fire protection, plumbing, HVAC, electrical, technology), site development, and general conditions. Additionally, contractors must separately itemize overhead (with percentage and dollar amount), profit (with percentage and dollar amount), and bond costs (with percentage and dollar amount) to arrive at the total proposal price for the base proposal.

This pricing breakdown supports the firm fixed-price RFP for construction services scheduled for award by the Department of Veterans Affairs, Veterans Integrated Service Network 4, at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The project magnitude is between $2,000,000 and $5,000,000, with a 300-calendar-day performance period from Notice to Proceed. This opportunity is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set-aside under NAICS Code 236220 (Commercial and Institutional Building Construction), with proposals due May 7, 2026, at 1:00 PM EST. A mandatory site visit is scheduled for April 15, 2026, at 10:00 AM EST.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule E – Price Proposal Breakdown Firm Name:

Table 1: Proposal

Total Price – Base Proposal

Table 2: Total Price Breakdown

Element of Work
Cost

Demolition

Substructure

Structural Frame

Roofing

Exterior Walls

Interior Subdivision

Vertical Circulation

Wall Finishes

Floor Finishes

Ceiling Finishes

Specialties

Casework and Trim

Equipment

Fire Protection

Plumbing

HVAC

Electrical

Technology

Site Development

General Conditions

Overhead (list percentage and $ amount)

Profit (list percentage and $ amount)

Bond (list percentage and $ amount)