Schedule E - Price Proposal Breakdown
This is a pricing template for the Sterile Storage Improvements Construction project at Lebanon VA Medical Center. Contractors must provide a detailed cost breakdown across 29 line items including demolition, structural elements (substructure, frame, roofing, exterior walls), interior components (subdivision, vertical circulation, wall/floor/ceiling finishes), building systems (fire protection, plumbing, HVAC, electrical, technology), site development, and general conditions. Additionally, contractors must separately itemize overhead (with percentage and dollar amount), profit (with percentage and dollar amount), and bond costs (with percentage and dollar amount) to arrive at the total proposal price for the base proposal.
This pricing breakdown supports the firm fixed-price RFP for construction services scheduled for award by the Department of Veterans Affairs, Veterans Integrated Service Network 4, at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The project magnitude is between $2,000,000 and $5,000,000, with a 300-calendar-day performance period from Notice to Proceed. This opportunity is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set-aside under NAICS Code 236220 (Commercial and Institutional Building Construction), with proposals due May 7, 2026, at 1:00 PM EST. A mandatory site visit is scheduled for April 15, 2026, at 10:00 AM EST.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule E – Price Proposal Breakdown Firm Name:
Table 1: Proposal
Total Price – Base Proposal
Table 2: Total Price Breakdown
| Element of Work |
| Cost |
Demolition
Substructure
Structural Frame
Roofing
Exterior Walls
Interior Subdivision
Vertical Circulation
Wall Finishes
Floor Finishes
Ceiling Finishes
Specialties
Casework and Trim
Equipment
Fire Protection
Plumbing
HVAC
Electrical
Technology
Site Development
General Conditions
Overhead (list percentage and $ amount)
Profit (list percentage and $ amount)
Bond (list percentage and $ amount)