Drawings - Sterile Storage - File 1 4-08-26.pdf
PDF 6 MB Posted
- Attached to
- Z1DA--Sterile Storage Improvements Construction Federal contract opportunity
- Solicitation number
- 36C24426R0056
About this file
This file consists of architectural and mechanical engineering drawings for the Sterile Storage Improvements construction project at Lebanon VA Medical Center in Lebanon, Pennsylvania. The drawings include cover sheets, Infection Control Risk Assessment (ICRA) plans, architectural floor plans, HVAC demolition and installation plans, electrical plans, and hydronic piping plans across multiple buildings (Buildings 1, 4, 17, 18, 22, 37, 101, 102, and 104) at various floor levels.
The project encompasses sterile storage room improvements requiring comprehensive HVAC modifications, including new fan coil units, humidifiers, dehumidifiers, thermostats, and room pressure sensors in designated sterile storage spaces. The drawings detail ICRA barrier specifications and dust control protocols appropriate for a medium-risk construction environment adjacent to occupied medical facilities. Mechanical systems work includes ductwork modifications, piping connections for humidifiers and dehumidifiers, and rebalancing of existing VAV boxes and diffusers to specified airflow rates. Electrical work involves thermostat relocations and integration with the building automation system. The project maintains active sprinkler and fire alarm systems throughout construction, requires 42-inch minimum egress clearance in corridors, and mandates coordination with VA Infection Control and facility operations. Construction must comply with International Building Code, NFPA standards, and all VA policies, with all work performed adjacent to operational patient care areas.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:0
A M
G001
COVER SHEET STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
GENERAL
G001 COVER SHEET
G100 ICRA NOTES AND PLANS
G101 ICRA PLANS
G102 ICRA PLANS
G103 ICRA PLANS
G104 ICRA PLANS
ARCHITECTURAL
A101 BUILDING 1 - THIRD FLOOR ARCHITECTURAL PLAN
A102 BUILDING 102 - FIRST FLOOR ARCHITECTURAL PLAN
VICINITY MAP
SITE
LOCATION MAP
SITE
LEBANON VAMC
STERILE STORAGE IMPROVEMENTS
PROJECT #595-23-104
1700 S LINCOLN AVENUE
LEBANON, PA 17042
OWNER:
LEBANON VA MEDICAL CENTER
1700 S LINCOLN AVENUE
LEBANON PA 17042
(717) 272-6621
ARCHITECT/ENGINEER:
AE WORKS, LTD
418 BEAVER STREET
SEWICKLEY, PA 15143
CONTACT: STEPHEN SIMONDS CONTACT: DAWN CINDRIC
MECHANICAL
M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
001-MD-100 BUILDING 1 - BASEMENT FLOOR HVAC DEMOLITION PLAN
001-MD-101 BUILDING 1 - FIRST FLOOR HVAC DEMOLITION PLAN
001-MD-102 BUILDING 1 - SECOND FLOOR HVAC DEMOLITION PLAN
001-MD-103 BUILDING 1 - THIRD FLOOR HVAC DEMOLITION PLAN
001-MD-104 BUILDING 1 - FOURTH FLOOR HVAC DEMOLITION PLAN
001-MD-105 BUILDING 1 - FIFTH FLOOR HVAC DEMOLITION PLAN
004-MD-101 BUILDING 4 - FIRST FLOOR HVAC DEMOLITION PLAN
017-MD-101 BUILDING 17 - FIRST FLOOR HVAC DEMOLITION PLAN
017-MD-102 BUILDING 17 - SECOND FLOOR HVAC DEMOLITION PLAN
017-MD-103 BUILDING 17 - THIRD FLOOR HVAC DEMOLITION PLAN
017-MD-104 BUILDING 17 - FOURTH FLOOR HVAC DEMOLITION PLAN
017-MD-105 BUILDING 17 - FIFTH FLOOR HVAC DEMOLITION PLAN
018-MD-104 BUILDING 18 - FOURTH FLOOR HVAC DEMOLITION PLAN
018-MD-105 BUILDING 18 - FIFTH FLOOR HVAC DEMOLITION PLAN
022-MD-101 BUILDING 22 - FIRST FLOOR HVAC DEMOLITION PLAN
022-MD-102 BUILDING 22 - SECOND FLOOR HVAC DEMOLITION PLAN
037-MD-101 BUILDING 37 - FIRST FLOOR HVAC DEMOLITION PLAN
101-MD-101 BUILDING 101 - FIRST FLOOR HVAC DEMOLITION PLAN
102-MD-101 BUILDING 102 - FIRST FLOOR HVAC DEMOLITION PLAN
104-MD-101 BUILDING 104 - FIRST FLOOR HVAC DEMOLITION PLAN
104-MD-103 BUILDING 104 - THIRD FLOOR HVAC DEMOLITION PLAN
001-M-100 BUILDING 1 - BASEMENT FLOOR HVAC PLAN
001-M-101 BUILDING 1 - FIRST FLOOR HVAC PLAN
001-M-102 BUILDING 1 - SECOND FLOOR HVAC PLAN
001-M-103 BUILDING 1 - THIRD FLOOR HVAC PLAN
001-M-104 BUILDING 1 - FOURTH FLOOR HVAC PLAN
001-M-105 BUILDING 1 - FIFTH FLOOR HVAC PLAN
004-M-101 BUILDING 4 - FIRST FLOOR HVAC PLAN
017-M-101 BUILDING 17 - FIRST FLOOR HVAC PLAN
017-M-102 BUILDING 17 - SECOND FLOOR HVAC PLAN
017-M-103 BUILDING 17 - THIRD FLOOR HVAC PLAN
017-M-104 BUILDING 17 - FOURTH FLOOR HVAC PLAN
017-M-105 BUILDING 17 - FIFTH FLOOR HVAC PLAN
018-M-104 BUILDING 18 - FOURTH FLOOR HVAC PLAN
018-M-105 BUILDING 18 - FIFTH FLOOR HVAC PLAN
022-M-101 BUILDING 22 - FIRST FLOOR HVAC PLAN
022-M-102 BUILDING 22 - SECOND FLOOR HVAC PLAN
037-M-101 BUILDING 37 - FIRST FLOOR HVAC PLAN
101-M-101 BUILDING 101 - FIRST FLOOR HVAC PLAN
102-M-101 BUILDING 102 - FIRST FLOOR HVAC PLAN
104-M-101 BUILDING 104 - FIRST FLOOR HVAC PLAN
104-M-103 BUILDING 104 - THIRD FLOOR HVAC PLAN
001-MP-100 BUILDING 1 - BASEMENT FLOOR PIPING PLAN
001-MP-101 BUILDING 1 - FIRST FLOOR PIPING PLAN
001-MP-102 BUILDING 1 - SECOND FLOOR PIPING PLAN
001-MP-103 BUILDING 1 - THIRD FLOOR PIPING PLAN
001-MP-104 BUILDING 1 - FOURTH FLOOR PIPING PLAN
001-MP-105 BUILDING 1 - FIFTH FLOOR PIPING PLAN
004-MP-101 BUILDING 4 - FIRST FLOOR PIPING PLAN
017-MP-101 BUILDING 17 - FIRST FLOOR PIPING PLAN
017-MP-102 BUILDING 17 - SECOND FLOOR PIPING PLAN
017-MP-103 BUILDING 17 - THIRD FLOOR PIPING PLAN
017-MP-104 BUILDING 17 - FOURTH FLOOR PIPING PLAN
017-MP-105 BUILDING 17 - FIFTH FLOOR PIPING PLAN
018-MP-104 BUILDING 18 - FOURTH FLOOR PIPING PLAN
018-MP-105 BUILDING 18 - FIFTH FLOOR PIPING PLAN
022-MP-101 BUILDING 22 - FIRST FLOOR PIPING PLAN
022-MP-102 BUILDING 22 - SECOND FLOOR PIPING PLAN
037-MP-101 BUILDING 37 - FIRST FLOOR PIPING PLAN
101-MP-101 BUILDING 101 - FIRST FLOOR PIPING PLAN
102-MP-101 BUILDING 102 - FIRST FLOOR PIPING PLAN
104-MP-101 BUILDING 104 - FIRST FLOOR PIPING PLAN
104-MP-103 BUILDING 104 - THIRD FLOOR PIPING PLAN
M501 HVAC DETAILS 1
M502 HVAC DETAILS 2
M503 HVAC DETAILS 3
M-701 HVAC SCHEDULES
M-702 VENTILATION INDEX
M800 CONTROL DIAGRAMS - LEGEND
M801 CONTROL DIAGRAMS 1
M802 CONTROL DIAGRAMS 2
SHEET INDEX
# Revisions Date
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
001-ED-104 BUILDING 1 - FOURTH FLOOR ELECTRICAL DEMOLITION PLAN
001-ED-105 BUILDING 1 - FIFTH FLOOR ELECTRICAL DEMOLITION PLAN
004-ED-101 BUILDING 4 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN
017-ED-104 BUILDING 17 - FOURTH FLOOR ELECTRICAL DEMOLITION PLAN
017-ED-105 BUILDING 17 - FIFTH FLOOR ELECTRICAL DEMOLITION PLAN
001-E-100 BUILDING 1 - GROUND FLOOR ELECTRICAL PLAN
001-E-101 BUILDING 1 - FIRST FLOOR ELECTRICAL PLAN
001-E-102 BUILDING 1 - SECOND FLOOR ELECTRICAL PLAN
001-E-103 BUILDING 1 - THIRD FLOOR ELECTRICAL PLAN
001-E-104 BUILDING 1 - FOURTH FLOOR ELECTRICAL PLAN
001-E-105 BUILDING 1 - FIFTH FLOOR ELECTRICAL PLAN
004-E-101 BUILDING 4 - FIRST FLOOR ELECTRICAL PLAN
017-E-101 BUILDING 17 - FIRST FLOOR ELECTRICAL PLAN
017-E-102 BUILDING 17 - SECOND FLOOR ELECTRICAL PLAN
017-E-103 BUILDING 17 - THIRD FLOOR ELECTRICAL PLAN
017-E-104 BUILDING 17 - FOURTH FLOOR ELECTRICAL PLAN
017-E-105 BUILDING 17 - FIFTH FLOOR ELECTRICAL PLAN
018-E-104 BUILDING 18 - FOURTH FLOOR ELECTRICAL PLAN
018-E-105 BUILDING 18 - FIFTH FLOOR ELECTRICAL PLAN
022-E-101 BUILDING 22 - FIRST FLOOR ELECTRICAL PLAN
022-E-102 BUILDING 22 - SECOND FLOOR ELECTRICAL PLAN
037-E-101 BUILDING 37 - FIRST FLOOR ELECTRICAL PLAN
101-E-101 BUILDING 101 - FIRST FLOOR ELECTRICAL PLAN
102-E-101 BUILDING 102 - FIRST FLOOR ELECTRICAL PLAN
104-E-101 BUILDING 104 - FIRST FLOOR ELECTRICAL PLAN
104-E-103 BUILDING 104 - THIRD FLOOR ELECTRICAL PLAN
E700 ELECTRICAL SCHEDULES
E701 ELECTRICAL SCHEDULES
E702 ELECTRICAL SCHEDULES
BID DEDUCT #1 03/02/20261
CHASE
CHASE
DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT
PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND
DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND
DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE
CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP
DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH
LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED
WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE
AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE
VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS
SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL
MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK
PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE
TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO
SPECIFIC VAMC POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.
RENOVATION
FOR THE PURPOSE OF THIS RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED ADJACENT TO MEDIUM
RISK AND COMPRISES WORK WHICH COULD GENERATE MODERATE TO HIGH LEVELS OF DUST NOT WITHIN THE
CONFINES OF A SUITE OR OFFICE AND INCLUDES EXTENSIVE CONSTRUCTION WORK (DEMOLITION) IN BUILDING 6
THROUGHOUT THE FIRST, SECOND FLOOR CEILING AND BASEMENT. THE DUST CONTROL PLAN SHALL BE
DISTRIBUTED AND REVIEWED BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.
A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF
FEASIBLE SEAL OFF ADJACENT AIR INTAKES.
• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND
REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.
• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN
DOORS IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.
B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION
PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT
FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT
PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER
WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF
AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS
NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST
BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER
IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE
REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY
DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL
SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH
AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY
PRESENCE OF INSECTS AND FLIES, WET CEILING TILE, ETC.
• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD
BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD
DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY
AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING
SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING
TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH
PATIENT-CARE AREAS WITH PRIOR APPROVAL OF THE VAMC.
• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT
EXCAVATION DEBRIS.
• CEILINGS THAT ARE REMOVED/MOIFIED TO ALLOW CONSTRUCITON OF ICRA BARRIERS SHOULD BE
REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.
VENTILATION AND ENVIRONMENTAL CONTROLS
• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR
RECIRCULATED AIR; FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE
NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN
INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER
MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE
TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHOULD BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.
• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND
MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING
RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE
DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE
THROUGHOUT THE PROJECT.
• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE
PARTITION.
CONTAMINATION OF PATIENT ROOMS
• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS
BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL
CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED
AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS
SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL
FROM THE CONSTRUCTION ZONE OR WORK AREA.
• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY
CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE
DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY
OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE
UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.
INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION
STEP #1: SELECT ACTIVITY TYPE BELOW:
CONSTRUCTION ACTIVITY TYPES:
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50
SQUARE FEET.
• PAINTING (BUT NOT SANDING)
• WALL COVERING
• ELECTRICAL TRIM WORK
• MINOR PLUMBING
• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS
OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE B
SMALL SCALE, SHORT DURATION (less than 1 day) ACTIVITIES WHICH CREATE
MINIMAL DUST
INCLUDES, BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING
• ACCESS TO CHASE SPACES
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES
INCLUDES, BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING
• REMOVAL OF FLOOR COVERING, CEILING TILES AND CASEWORK
• NEW WALL CONSTRUCTION
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
• MAJOR CABLING ACTIVITIES
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT NOT LIMITED TO:
• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING
SYSTEM.
• NEW CONSTRUCTION
IS IT LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR INFECTION
WITH TUBERCULOSIS? YES / NO
IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER
SYSTEM/LINES DURING ACTIVITY? YES / NO
STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN
A) INFECTION CONTROL RISK GROUPS
GROUP 1 - LOW: OFFICE AREAS:
GROUP 2 - MEDIUM: CARDIOLOGY, ECHOCARDIOGRAPHY, ENDOSCOPY, NUCLEAR
MEDICINE, PHYSICAL THERAPY, RADIOLOGY/MRI, RESPIRATORY THERAPY
GROUP 3 - HIGH RISK: CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT
SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS
GROUP 4 - HIGHEST RISK: ANY AREA CARING FOR IMMUNOCOMPROMISED
PATIENTS, CARDIAC CATH LAB, CENTRAL SUPPLY, INTENSIVE CARE UNITS,
MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS
STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:
CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS
** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II,
III, IV PRECAUTIONS ARE REQUIRED.
RISK LEVEL TYPE 'A' TYPE 'B' TYPE 'C' TYPE 'D'
GROUP 1 I II II III / IV
GROUP 2 I II III IV
GROUP 3 I II III / IV IV
GROUP 4 II III / IV III / IV IV
CONSTRUCTION TYPE:
D
RISK GROUP:
MEDIUM
RISK ASSESSMENT:
IV
ELECTRICAL
YES
POTABLE WATER
YES
HVAC
YES
MEDICAL VACUUM
YES
SEWER
YES
PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL
STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:
1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING
3. SEAL UNUSED DOORS WITH DUCT TAPE
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED
CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR
THE CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY
SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT.
1. CLEAN WORK UPON COMPLETION OF TASK
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP &/OR VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY
SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
4. WET MOP WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS I - DURING CONSTRUCTION PROJECT
CLASS I - UPON COMPLETION OF PROJECTS
CLASS II - DURING CONSTRUCTION PROJECT
CLASS II - UPON COMPLETION OF PROJECTS
CLASS III - DURING CONSTRUCTION PROJECT
CLASS III - UPON COMPLETION OF PROJECTS
CLASS IV - DURING CONSTRUCTION PROJECT
CLASS IV - UPON COMPLETION OF PROJECTS
(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)
CONTRACTOR'S SIGNATURE AND DATE
INFECTION CONTROL NURSE'S SIGNATURE AND DATE
1 LAYER 5/8" TYPE-X G.W.B.
5/8" G.W.B.
3 5/8" METAL STUDS @16" O.C.
BASE - SEE FINISH
SCHEDULE FOR TYPE
TRACK RUNNER
FLOOR SLAB
SEALANT - SEE SPECIFICATIONS
DECK OR
STRUCTURE ABOVE
NOTE:
1. FOR EXISTING PARTITIONS USED AS ICRA BARRIERS, THE CONTRACTOR
SHALL COMPLETE THE FOLLOWING:
· MODIFY EXISTING PARTITION TO A ONE-HOUR RATED ICRA BARRIER
· EXTEND PARTITION TO FLOOR DECK WITH 5/8” G.W.B. ON EACH SIDE
· FINISH WALL PARTITION AS DIRECTED BY UL RATING REQUIREMENTS
· INFILL EXISTING OPENINGS WITH 5/8” G.W.B ON EACH SIDE
· PROVIDE FIRESTOPPING AT ALL EXISTING PENETRATIONS
2. PROVIDE 45 MINUTE RATED DOOR TO ACCESS CONSTRUCTION AREA AT
ALL NEW AND EXISTING ICRA BARRIERS.
3. THE CONTRACTOR SHALL NOT BLOCK SPRINKLER PROTECTION ON THE
VA-OCCUPIED SIDE OF THE ICRA BARRIER.
STORAGE
51A
MULTIPURPOSE
RM
51B
STAFF LOCKERS
CORRIDOR
G036
STERILE SUPPLY
CORRIDOR
61A
STORAGE
116A
STORAGE
STORAGE
STAFF TOILET
STERILE STORAGE
CLEAN SUPPLY
HAC
CLEAN UTILITY
IT CLOSET
SOILED UTILITY
PASSAGE
STERILE SUPPLY
CLEAN SUPPLY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:0
A M
G100
ICRA NOTES AND PLANS STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
# Revisions Date
TEMPORARY ICRA PARTITION
1/4" = 1'-0"
Bldg 01-00 BASEMENT FLOOR - RM 51 - ICRA 1/4" = 1'-0"
Bldg 01-00 BASEMENT FLOOR - G036 - ICRA
1/4" = 1'-0"
Bldg 01-00 BASEMENT FLOOR - RM 16 - ICRA
ICRA KEYNOTES
1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA
PRIOR TO INSTALLATION.
2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.
3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING
(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING
FOR AREAS AFFECTED BY WORK.
1/4" = 1'-0"
Bldg 01-01 FIRST FLOOR - 116A - ICRA
1/4" = 1'-0"
Bldg 01-01 FIRST FLOOR - 111 - ICRA
1/4" = 1'-0"
Bldg 01-02 SECOND FLOOR - 216 - ICRA
1/4" = 1'-0"
Bldg 01-02 SECOND FLOOR - 257-ICRA
1/4" = 1'-0"
Bldg 01-02 SECOND FLOOR - 293 - ICRA
GENERAL ICRA NOTES
1. ICRA BARRIERS AND POLY SHEETING SHOWN ON THE ICRA PLANS ARE GENERAL LOCATIONS OF WHAT IS ANTICIPATED BEING NEEDED. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING AN ICRA PLAN FOR EVERY AREA OF CONSTRUCITON AND FORWARDING ONTO THE VA COR FOR APPROVAL BEFORE
STARTING ANY TYPE OF CONSTRUCTION.
2. A MINIMUM OF 42" EGRESS IS REQUIRED IN EGRESS CORRIDORS AT ALL TIMES.
FEC
FEC
DN
LAB
346A
EQUIP STORAGE
HAC
STORAGE
307A
STORAGE
ISOLATION ROOM
ISOLATION ROOM
HALL
CLEAN UTILITY
SOILED UTILITY
CLEAN UTILITY
SOILED UTILITY
CLEAN UTILITY
SOILED UTILITY
CLEAN UTILITY
TOILET
SOILED UTILITY
PULMONARY
RECPT / WAITING
123M
STORAGE
123B
BREAK ROOM
EXAM RM
TOILET
STORAGE
EXAM RM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:0
A M
G101
ICRA PLANS STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
ICRA KEYNOTES
1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA
PRIOR TO INSTALLATION.
2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.
3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING
(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING
FOR AREAS AFFECTED BY WORK.
# Revisions Date
1/4" = 1'-0"
Bldg 01-03 THIRD FLOOR - 346 & 346A - ICRA 1/4" = 1'-0"
Bldg 01-03 THIRD FLOOR - 307 - ICRA
1/4" = 1'-0"
Bldg 01-03 THIRD FLOOR - 370 - ICRA 1/4" = 1'-0"
Bldg 01-04 FOURTH FLOOR - 406 - ICRA
1/4" = 1'-0"
Bldg 01-04 FOURTH FLOOR - 472 - ICRA
1/4" = 1'-0"
Bldg 01-05 FIFTH FLOOR - 572 - ICRA 1/4" = 1'-0"
Bldg 04-01 FIRST FLOOR - 105 - ICRA
1/4" = 1'-0"
Bldg 17-01-FIRST FLOOR - 123M - ICRA 1/4" = 1'-0"
Bldg 17-02-SECOND FLOOR - 209 - ICRA
1/4" = 1'-0"
Bldg 17-02-SECOND FLOOR - 264 - ICRA
BID DEDUCT 1-
BID DEDUCT 1-
EXAM RM
EXAM RM
STORAGE
NURSE STATION
MED ROOM
365A
STORAGE
OFFICE
EXAM RM
EXAM RM
OFFICE
438A
OFFICE
STORAGE
OFFICE
VESTIBULE
OFFICE
EXAM RM
STORAGE
CORRIDOR
STERILE STORAGE
STORAGE
FEMALE DECON
555G
STORAGE
CORRIDOR
2 578
CLEAN STORAGE
CLEAN SUPPLY
STAFF TLT
517A
EXAM ROOM
EQUIPMENT
204A
CORRIDOR
1A10
STORAGE
1A18
STORAGE
1A17
MEN'S TLT
1A20
HAC
1A11
ELEC.
1A14
ELEV. LOBBY
1A15
ELEV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:1
A M
G102
ICRA PLANS STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
1/4" = 1'-0"
Bldg 17-03 THIRD FLOOR - 320 - ICRA 1/4" = 1'-0"
Bldg 17-03-THIRD FLOOR - 369 - ICRA
# Revisions Date
1/4" = 1'-0"
Bldg 17-04 FOURTH FLOOR - 426 - ICRA
1/4" = 1'-0"
Bldg 17-04 FOURTH FLOOR - 460 - ICRA
ICRA KEYNOTES
1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA
PRIOR TO INSTALLATION.
2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.
3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING
(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING
FOR AREAS AFFECTED BY WORK.
1/4" = 1'-0"
Bldg 17-04 FOURTH FLOOR - 472 - ICRA
1/4" = 1'-0"
Bldg 17-05 FIFTH FLOOR - 521 - ICRA
1/4" = 1'-0"
Bldg 17-05 FIFTH FLOOR - 536 - ICRA 1/4" = 1'-0"
Bldg 17-05 FIFTH FLOOR - 555G - ICRA 1/4" = 1'-0"
Bldg 17-05 FIFTH FLOOR - 578 - ICRA
1/4" = 1'-0"
Bldg 18-04 FOURTH FLOOR - 431 - ICRA 1/4" = 1'-0"
Bldg 18-05 FIFTH FLOOR - 517A - ICRA
1/4" = 1'-0"
Bldg 22-02-SECOND FLOOR - 216 - ICRA
NOTE: CONSTRUCTION SEQUENCE WILL NEED TO BE DISCUSSED WITH VA PRIOR TO INSTALLATION OF ANY ICRA
BARRIERS TO KEEP MIN EGRESS OF 42" CLEAR AT ALL TIMES IN THE CORRIDORS.
1/4" = 1'-0"
Bldg 37-01-FIRST FLOOR - 1A10 - ICRA
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
BID DEDUCT 1-
100C1
CONTROL RM
EGRESS
CORRIDOR ONLY
FEC
HAND
WASH
MEDS
CLEAN SUPPLY
MED ALCOVE
100C2
CORRIDOR
100C9
CORRIDOR
TOILET
DECON
163B
DECON
163A
DECON SHOWER
VESTIBULE
145B
CLEAN SUPPLY
145A
CLEAN LINEN
110B
PHYSIATRIST
OFFICE / EXAM RM
PHYSIATRIST
OFFICE / EXAM RM
RECEIVING AND
STROAGE RM
100C5
CORRIDOR
110C
STORAGE
STERILE SUPPLY
PACU
STORAGE
EQUIP ALCOVE
CLEAN UTILITY
CART ALCOVE
CONF RM
TOILET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:1
A M
G103
ICRA PLANS STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
1/4" = 1'-0"
Bldg 101-01-FIRST FLOOR - 132 - ICRA
ICRA KEYNOTES
1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA
PRIOR TO INSTALLATION.
2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.
3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING
(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING
FOR AREAS AFFECTED BY WORK.
1/4" = 1'-0"
Bldg 101-01-FIRST FLOOR - 104 - ICRA 1/4" = 1'-0"
Bldg 101-01-FIRST FLOOR - 163, 163A, 163B - ICRA
NOTE: CONSTRUCTION SEQUENCE WILL NEED TO BE DISCUSSED WITH VA PRIOR TO INSTALLATION OF ANY ICRA
BARRIERS TO KEEP MIN EGRESS OF 42" CLEAR AT ALL TIMES IN THE CORRIDORS.
1/4" = 1'-0"
Bldg 101-01-FIRST FLOOR - 145B - ICRA
1/4" = 1'-0"
Bldg 102-01-FIRST FLOOR - 110 - ICRA 1/4" = 1'-0"
Bldg 104-01-FIRST FLOOR - 1211 - ICRA
1/4" = 1'-0"
Bldg 104-01-FIRST FLOOR - 1209 - ICRA 1/4" = 1'-0"
Bldg 104-01-FIRST FLOOR - 1121 - ICRA
# Revisions Date 5 of 110
CLEAN STORAGE 1403
CONTROL RM
ANESTH WORK RM
14C2
CORRIDOR
14C4
CORRIDOR
CLEAN SUPPLY
HAC
EQUIP STOR
2 3
STERILE STORAGE
STORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:1
A M
G104
ICRA PLANS STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
ICRA KEYNOTES
1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA
PRIOR TO INSTALLATION.
2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.
3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING
(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING
FOR AREAS AFFECTED BY WORK.
1/4" = 1'-0"
Bldg 104-01-FIRST FLOOR - 1405 AND 1406 - ICRA 1/4" = 1'-0"
Bldg 104-01-FIRST FLOOR - 1508 - ICRA
1/4" = 1'-0"
Bldg 104-01-FIRST FLOOR - 1513 - ICRA
1/4" = 1'-0"
Bldg 104-03 THIRD FLOOR - 300 - ICRA 1/4" = 1'-0"
Bldg 104-03 THIRD FLOOR - 318 - ICRA
# Revisions Date 6 of 110
ELEVATOR
LOBBY
DF
DF
341K
341Q
341P
300C13-1
300C6-1300C9-1 300C8-1
300C11-1 300C12-1 C14-1 C15-1
1I
300C16A-1
325A
300C20-1
300C19-1
385A
386A
300C17-1
341G
341B 341A
332 300C16
300C4-1
315A
300C2-1
300C16-1
360 362 365
367366
365A 368A
369A
357A
333330
300C5-1320A
300C3-1
332A331A
371A
329A
328325
324A
324323A323
348A348
347D
347C
347B
347A
346A
341U
341H
341T
341D
341E
341J
341R
372A375A
373374
375376
276A 379A
377378
383A
384A
385B
385C
387A
391392
309 307A
304305
311A
312A
316A
318A
321 321A
317A
319319A
300C7-1
CORRIDOR
STAFF
TOILET
HAC
ELECTRICAL CLOSET
ELECTRICAL CLOSET
ELECTRICAL CLOSET
ELECTRICAL CLOSET
ELECTRICAL CLOSET
HAC
ELECTRICAL CLOSET
ELECTRICAL CLOSET
HACHAC HAC
HAC HAC HAC HAC
VESTIBULE
NURSE
STATION
NURSE STATION
CORRIDOR
BATH RM BATH RM
CORRIDOR
CORRIDOR
PATIENT SHOWER
PATIENT
SHOWER
NURSE
STATION
EXAM RM /
TREATMENT RM
CORRIDOR
SOILED UTILITY
BED RM - ISOLATION
BED RM - 1 BED PATIENT RM
BED RM - 2 BED
SERVICE LOBBY
STAFF
SHOWER
CORRIDOR
BATH RM
CORRIDOR
PUBLIC
ELEVATOR
SERVICE
ELEVATOR
HALL
HAC
STAFF
TOILET
CORRIDOR
BED RM - 2 BED STAIR HALL
BED RM - 2 BED
HACHAC
PATIENT
SHOWER
PATIENT
SHOWER
BED RM - 2 BED
PATIENT
SHOWER
BED RM - ISOLATION
BED RM - 2 BED
HAC
BATH RM
IT
CLOSET
STAIR HALL
UNISEX TOILET
CLEAN
UTILITYCLEAN UTILITY
NURSE
STATION
BATH RM
ANTE RM CORRIDOR
BATH RMBATH RM
BED RM - 2 BED
BED RM - 2 BED
PATIENT
SHOWER
BATH RM BED RM - 2 BED
STAIR HALLBED RM - 2 BED
BATH RM
BED RM - 2 BEDBATH RMBED RM - ISOLATION
OFFICEOFFICE
OFFICE
LAB
EQUIP
STORAGE
OFFICE
OFFICE
LAB
HAC
EQUIP STORAGE
WAITING
STAIR HALL
BIOMED
ENGINEER
PATIENT TOILET
BED RM - 1 BED
LOUNGE
BED RM - 1 BED
BED RM - ISOLATION
PATIENT TOILET
BIOMED
STORAGE
BED RM - ISOLATION
PATIENT
SHOWER
PATIENT
SHOWER
HACHAC
BED RM - 2 BEDBED RM - 2 BED
BATH RM
PATIENT
SHOWER
HACHAC
BED RM - 2 BED
TELEPHONE CLOSET
CONFERENCE
BED RM - 1 BED
PATIENT
SHOWER
BED RM - 1 BED
PATIENT
SHOWER
SECLUSION
GROUP RM
BED RM - 1 BED
PATIENT
SHOWER
BED RM - 1 BED
CLEAN UTILITY
MEDICATION RM
LAUNDRY
STAFF
LOUNGE
HEAD
NURSE
OFFICE
LOUNGE
GROUP RM
HAC
BED RM - 1 BED
NOURISHMENT
STORAGE PATIENT TOILET
UNISEX TOILET
WAITING
EQUIP
STORAGE
LAUNDRY
HAC
LOUNGE
HEAD
NURSE
OFFICE
CONFERENCE
BED RM - 1 BED
BATH RM
BED RM - 1 BED
BATH RM
DAY RM
UNISEX TOILET
BATH RM
BED RM - 1 BED
BED RM - 2 BEDBATH RM
BED RM - ISOLATION BATH RM
BATH RM
BED RM - 2 BED
BED RM - 2 BEDBATH RM
BED RM - 2 BED
DAY RM
NOURISHMENT
HAC
C O
R R
ID
O
R
DN
UPUP
DN
DNUP
UPDN
A2
LAB
346A
EQUIP STORAGE
HAC
A101
G101
G101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:1
A M
A101
BUILDING 1 - THIRD FLOOR ARCHITECTURAL
PLAN
STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
# Revisions Date
1/4" = 1'-0"
BUILDING 1 - THIRD FLOOR PLAN - ROOM 346 & 346A ENLARGEMENT
1/16" = 1'-0"
BUILDING 1 - THIRD FLOOR - OVERALL PLAN
GENERAL PROJECT NOTES
1 ALL CONSTRUCTION WORK TO CONFORM WITH THE APPLICABLE CODES AND ORDINANCES OF THE
LOCAL JURISDICTION, THE COMMONWEALTH OF PENNSYLVANIA, AND THE CURRENT ADOPTED
VERSION OF THE INTERNATIONAL BUILDING CODE FAMILY. THE CONTRACTOR TO POST NOTICES
AND COMPLY WITH THE GOVERNING LAWS OF THE JURISDICTION.
2 INSTALLATIONS PERFORMED IN CONNECTION WITH THESE DRAWINGS TO COMPLY WITH THE
MOST RECENT NFPA EDITION.
3 MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD THE PUBLIC AND ALL PERSONS ENGAGED IN
THE PERFORMANCE OF THE WORK.
4 THE DRAWINGS REFLECT CONDITIONS AS CAN BE INFERRED FROM VISIBLE CONDITIONS, OR
FROM DRAWINGS AND INFORMATION FURNISHED BY THE OWNER, BUT CANNOT BE GUARANTEED.
VERIFY ALL GRADES, LINE LEVELS AND DIMENSIONS INDICATED ON THE DRAWNGS AND REPORT
ALL INCONSISTENCIES TO THE ARCHITECT PRIOR TO THE EXECUTION OF THE WORK. RECHECK
ALL DIMENSIONS PRIOR TO ORDERING MANUFACTURED AND/OR FABRICATED ITEMS.
5 PLAN DIMENSIONS, UNLESS NOTED OTHERWISE, ARE TO THE FACE OF THE WALL FINISH OR
CENTERLINE OF COLUMN.
6 ASSUME FULL RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF PRODUCTS PURCHASED
FOR THIS PRODUCT AND STORED ON THE PROJECT SITE. COORDINATE WITH THE OWNER ON
PREFERRED LOCATIONS FOR STORED MATERIALS ON THE PROJECT SITE, IF ALLOWED AS PART
OF THE REQUIREMENTS OF THIS PROJECT.
7 MAINTAIN AREAS UNDER THE CONTRACTOR'S CONTROL TO BE FREE OF WASTE MATERIALS,
DEBRIS, AND RUBBISH. CONTAINERS FOR DEPOSIT OF DEBRIS AND RUBBISH WILL BE PROVIDED
BY THE CONTRACTOR. COORDINATE LOCATION OF CONTAINERS WITH THE OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT. REMOVE AND DISPOSE OF DEMOLITION MATERIAL OFF
SITE IN ACCORDANCE WITH APPLICABLE CODES AND/OR SPECIFICATIONS.
8 EXTRANEOUS MATERIALS TO BE PERIODICALLY REMOVED, AND AT THE CONCLUSION OF THE
PROJECT.
9 PROVIDE AND INSTALL ALL FIRESAFING / FIRESTOPPING MATERIALS AT ALL THROUGH-WALL AND
THROUGH-CEILING PENETRATIONS AS REQUIRED FOR THE CONSTRUCTION WORK AND TO
MAINTAIN FIRE RATINGS OF FLOORS AND WALLS. MATERIALS AND INSTALLATION DETAILS TO
CONFORM TO UNDERWRITER LABORATORIES LISTING FOR RATED ASSEMBLIES.
10 ALL WOOD FRAMING AND SHEATHING TO BE FIRE RETARDANT TREATED AS REQUIRED BY THE
BUILDING CODE CLASSIFICATION OF 'NONCOMBUSTIBLE'
11 DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO
CONSTRUCTION. NOTIFY THE ARCHITECT OF ANY DEVIATIONS OR DISCREPANCIES FOUND AND
RECEIVE DIRECTION BEFORE PROCEEDING.
12 DURING CONSTRUCTION THE CONTRACTOR WILL WORK ADJACENT TO PATIENT OCCUPIED
FLOORS. CONSTRUCTION RELATED ACTIVITIES ARE NOT TO ADVERSELY IMPACT THESE AREAS.
CONSTRUCTION RELATED ACTIVITIES THAT MIGHT AFFECT THESE AREAS MUST BE COORDINATED
WITH AND APPROVED BY THE VA PRIOR TO OCCURRENCE.
13 PROVIDE TEMPORARY DUST ENCLOSURES DURING ALL DEMOLITION AND CONSTRUCTION
ACTIVITIES. CONTRACTOR TO COORDINATE LOCATIONS WITH CONTRACTING OFFICER. IF EXISTING
WALLS ARE USED, PENETRATIONS MUST BE SEALED TO CREATE A DUST PROOF ENCLOSURE.
14 MODIFICATIONS TO THE EXISTING MEP SYSTEMS WILL IMPACT ADJACENT SPACES OUTSIDE THE GENERAL SCOPE OF WORK. ANY DISTURBANCE OF EXISTING CONDITIONS AND FINISHES MUST BE
REPAIRED TO MATCH THE CONDITIONS PRIOR TO CONSTRUCTION IMPACTS.
15 THE FACILITY IS OPERATIONAL. CONTRACTOR TO MAKE PROVISIONS FOR OWNER AND PUBLIC USE OF THE BUILDING AROUND THE CONSTRUCTION AREA. DELIVERIES, STAGING, STORAGE OF
MATERIALS AND OTHER CONSTRUCTION RELATED ACTIVITIES TO BE COORDINATED WITH THE
CONTRACTING OFFICER SO AS TO NOT ADVERSELY AFFECT THE BUILDING OPERATIONS.
16 ASBESTOS AND LEAD ARE NOT ANTICIPATED TO EXIST IN THE WORK AREA. HOWEVER, IF
ASBESTOS-CONTAINING MATERIAL IS DISCOVERED OR SUSPECTED, STOP WORKING IN THE AREA
IMMEDIATELY AND CONTACT THE CONTRACTING OFFICER.
17 ALL REVISIONS TO THE DRAWINGS MUST PROCEED THROUGH THE ARCHITECT. OWNER /
CONTRACTOR REVISIONS MAY BE CONSIDERED INVALID.
18 COMPARE AND COORDINATE ALL DRAWINGS FOR PROPER FIT AND ATTACHMENT OF ALL PARTS.
DETAILS NOT SHOWN OR DESCRIBED IN THESE NOTES TO BE CONSTRUCTED TO SAME SIZE AND
CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN, SPECIFIED, OR COMMONLY
CONSTRUCTED IN THE INDUSTRY.
19 NO STRUCTURAL MEMBER TO BE OMITTED, NOTCHED, CUT, BLOCKED OUT, OR RELOCATED
WITHOUT PRIOR APPROVAL BY THE ARCHITECT OR ENGINEER.
20 PROTECTIVE MEASURES TO BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT PROPERTY
AT ALL TIMES DURING CONSTRUCTION.
21 ALL TEMPORARY BRACING AND SHORING TO BE DESIGNED TO SUSTAIN ALL CONSTRUCTION
LOADS, SOIL PRESSURE, LATERAL AND OTHER LOADS TO WHICH THE STRUCTURE MAY BE
SUBJECTED.
22 COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER HEADS, REGISTERS, ETC. WITH THE
REFLECTED CEILING PLAN LAYOUT.
23 ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS TO BE CENTERED WITH SUSPENDED
ACOUSTICAL PANELS, UNLESS NOTED OTHERWISE ON DRAWINGS.
24 ALL VOIDS IN MASONRY, CONCRETE AND OTHER ASSEMBLIES CREATED AROUND PENETRATIONS
TO BE FILLED / PATCHED WITH CONSTRUCTION TO MATCH SURROUNDING CONDITIONS.
25 CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING EXISTING CEILINGS IN AREAS OF
CONSTRUCTION..
26 ALL EXISTING SPRINKLERS AND FIRE ALARM SYSTEMS ARE TO REMAIN ACTIVE THROUGHOUT
CONSTRUCTION
27 CONTRACTOR TO COODINATE ANY BUILDING SYSTEM SHUTDOWNS WITH VA COR PRIOR TO
SHUTTING DOWN ANY SYSTEM.
KEYNOTES
1 INFILL EXISTING OPENING WITH NEW WALL. PAINT AND ADD WALL BASE TO MATCH
ADJACENT WALLS
2 ADD NEW PARTITION AND DOOR TO CREATE A NEW STORAGE ROOM. MODIFY
EXISTING ACT CEILING AS REQUIRED TO INSTALL NEW PARTITION.
CONC.
RAMP
DN
NEW
GENERATOR
PAD
MORGUE COOLER SLAB
102A
100C5
100C4 100C3
104I
104H
110B
110A
124A
126A
109112
104A
104B
104C
104D
104E
104F
104G
104J
RECEPTION
CONSULT CLOSET
THERAPY GYM
WAITING
SOILED UTILITY
CORRIDOR
CORRIDOR CORRIDOR
STAFF
TOILET
STAFF
TOILET
STAFF
TOILET
STAFF
TOILET
PHYSIATRIST
OFFICE/EXAM RM
PROSTHETICS WORK AREA
ELECTRICAL CLOSET
PHYSIATRIST OFFICE/ EXAM RM
PHYSIATRIST OFFICE/ EXAM RM
HAC PIPE
CHASE
UNISEX TOILET
UNISEX TOILET
CLEAN LINEN
DRESSING RM
BREAK RM
BREAK RM
SUPV OF
PROSTHETICS
P.T. SUPV
OFFICE
IT
CLOSET
HYDROTHERAPY
PATIENT TOILET
OXYGEN STORAGE RM
KITCHEN
SOILED UTILITY
TREATMENT
TREATMENT
TREATMENT
PREP AREA
TREATMENT
TREATMENT
TREATMENT
STAFF
CHARTING
EQUIP
STORAGE
PHYSIATRIST
OFFICE/
EXAM RM
PROSTHETIC
RECEIVING AND
STORAGE RM
PHYSIATRIST
OFFICE/
EXAM RM
PHYSIATRIST
OFFICE/
EXAM RM
FEC
FEC
FEC
FEC
FEC
FEC
DN
DN
A102
110C
A1 110B
PHYSIATRIST
OFFICE / EXAM RM
110C
STORAGE ROOM
PHYSIATRIST
OFFICE / EXAM RM
PROSTHETIC
RECEIVING AND
STORAGE RM
4 7/8"
VARIES EQ.
WALL PARTITION W/ STUD
HEADER, TYP.
HEAD ANCHOR CLIP, SECURE
TO HEADER STUDS, TYP.
HOLLOW METAL FRAME
SCHEDULED DOOR
EQ.
2"
1/2"
5/ 8"
CONTINUOUS SEALANT -
BOTH SIDES
7/
8"
SCHEDULED DOOR
HOLLOW METAL FRAME
JAMB ANCHOR CLIP, SECURE
TO JAMB STUD, TYP.
WALL PARTITION W/ DOUBLE
STUDS AT JAMB, TYP.
E Q
2"
E Q
2" 5/8"1/ 2"
CONTINUOUS SEALANT - BOTH SIDES
HEAD JAMB
MTL STUD FR - REF SCHED FOR SIZE,
SPACING & WIDTH AS SPEC
SOUND BATT INSUL
1 LAYER OF 5/8" TYPE "X" GYP BD EACH
SIDE - PAINT TO MATCH ADJACENT WALLS
REF SCHED
OVERALL
WIDTH
UNDERSIDE OF STRUCTURE
BASE
PLAN
HEAD
TYPE A - FULL HEIGHT GWB PARTITION
SCHED CEILING, REF RCP
STEEL TRACK, FASTEN 2'-0" OC MAX
RUBBER BASE TO MATCH
ADJACENT WALLS - BOTH SIDES
SEALANT BOTH SIDES. FIRE SEALANT
REQUIRED AT RATED WALLS
SEALANT BOTH SIDES. FIRE SEALANT
REQUIRED AT RATED WALLS
STEEL TRACK, FASTEN 2'-0" OC MAX
L-BEAD IN FINISHED AREAS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts
/V L E
B -0
-A R
C H
.r v t
/1 /2
:0
:1
A M
A102
BUILDING 102 - FIRST FLOOR
ARCHITECTURAL PLAN
STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
595-23-104
11.17.25 DC SB
BID DOCUMENTS
# Revisions Date
1/16" = 1'-0"
BUILDING 102 - FIRST FLOOR ARCHITECTURAL OVERALL PLAN
1/4" = 1'-0"
BUILDING 102 - FIRST FLOOR ENLARGED PLAN
3" = 1'-0"
DOOR DETAILS
DOOR SCHEDULE
DOOR
NUMBER WIDTH
DOOR FRAME
HARDWARE SET
FIRE
RATING CARD ACCESS COMMENTSHEIGHT TYPE MATERIAL TYPE MATERIAL
110C 3' - 0" 7' - 0" FLUSH WOOD F1 HOLLOW METAL -
3/4" = 1'-0"
PARTITION TYPE
TYPE
OVERALL
WIDTH
FRAMING
WIDTH
FIRE
TEST
FIRE
RATING
STC
RATING
SOUND
INSUL. COMMENTS
A1 4 7/8" 3 5/8" - 0 hr 49 Yes
A2 6" 3 5/8" - 0 hr 49 Yes CONTRACTOR TO VERIFY WALL SIZE IN FIELD AND MATCH
EXISTING.
KEYNOTES
1 INFILL EXISTING OPENING WITH NEW WALL. PAINT AND ADD WALL BASE TO MATCH
ADJACENT WALLS
2 ADD NEW PARTITION AND DOOR TO CREATE A NEW STORAGE ROOM. MODIFY
EXISTING ACT CEILING AS REQUIRED TO INSTALL NEW PARTITION.
ABBREVIATIONS
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DHW DOMESTIC HOT WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RA RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SA SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACEMOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
X DEMOLISH
XN EXISTING TO BE RELOCATED
XR EXISTING TO REMAIN
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
CV CONSTANT-AIR VOLUME BOX
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HRU HEAT RECOVERY UNIT
IR INFRARED
MAU MAKE-UP AIR UNIT
PRV PRESSURE REDUCING VALVE
RTU ROOFTOP UNIT
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
SS SPLIT-SYSTEM
UH UNIT HEATER
VAV VARIABLE-AIR VOLUME BOX
WH WATER HEATER
EQUIPMENT TAG ABBREVIATIONS
KEYNOTE
DETAIL NUMBER
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
POINT WHERE NEW CONNECTS TO EXISTING
PIPELINE ABBREVIATIONS
REFRIGERANT LINESET (SUCTION/LIQUID)
CONDENSATE DRAIN
PIPELINE SYMBOLS
BALL VALVE
GATE VALVE
3-WAY VALVE
ECCENTRIC REDUCER
CHECK VALVE
PIPING TURNED UP
PIPING TURNED DOWN
TEE - OUTLET UP
TEE - OUTLET DOWN
PIPE CONTINUATION SYMBOL
BALANCING VALVE
DUCTWORK ABBREVIATIONS
OUTSIDE AIR
DUCTWORK SYMBOLS
SUPPLY AIR
RETURN AIR
EXHAUST AIR
RECTANGULAR DUCT, WIDTH (SHOWN) x DEPTH
OVAL DUCT, WIDTH (SHOWN) x DEPTH
ROUND DUCT, DIAMETER
RECTANGULAR DUCT MITERED ELBOW
RECTANGULAR/ROUND DUCT ROUNDED ELBOW
OVAL DUCT GORED ELBOW
RECTANGULAR TAKEOFF
ROUND TAKEOFF
RECTANGULAR SUPPLY DUCT UP/DOWN
ROUND SUPPLY DUCT UP/DOWN
RECTANGULAR RETURN DUCT UP/DOWN
ROUND RETURN DUCT UP/DOWN
RECTANGULAR RETURN DUCT UP/DOWN
ROUND RETURN DUCT UP/DOWN
OVAL SUPPLY DUCT UP/DOWN
RECTANGULAR DUCT CONTINUATION SYMBOL
DAMPER SYMBOLS
TAG
AIR TERMINAL
SYMBOLS
TAG
AIRFLOW
(CFM)
AIRFLOW
(CFM)
ROUND DUCT CONTINUATION SYMBOL
RS/RL OA
SA
RA
EA
18"x12"
18"/12"
18"
SD-1
RG-1
C
D
B
M
S
F MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
***ADD DUCTWORK AS REQUIRED***
POINT OF DISCONNECTION FROM EXISTING
RL REFRIGERANT LINESET (SUCTION & LIQUID)
H
S
P
T
DIGITAL HYGROMETER/HUMIDISTAT
ROOM PRESSURE SENSOR
TEMPTRAK SENSOR
DIGITAL HARD-WIRED THERMOSTAT
CD
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
HEATING HOT WATER SUPPLYHWS
HEATING HOT WATER RETURNHWR
DOMESTIC COLD WATERCW
DOMESTIC HOT WATERDHW
DOMESTIC HOT WATER RETURN LOOPHW-R
LOW PRESSURE STEAMLPS
LOW PRESSURE STEAM CONDENSATELPC
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
AE Works, LTD.
418 Beaver Street
Sewickley, PA 15143
Phone: 412-287-7333 www.ae-works.comAE WORKS®
A u to d e s k D o c s /V
L E
B -0
S te ri le
S to ra g e I m p ro v e m e n ts /V
L E
B -0
-M E
P
.r v t
/2
/2
:2
:4
A
M
M-001
MECHANICAL SYMBOLS, ABBREVIATIONS,
AND GENERAL NOTES
STERILE STORAGE IMPROVEMENTS
1700 S LINCOLN AVE, LEBANON, PA 17042
VLEB-016
11.17.25 TS AC
BID DOCUMENTS
HVAC GENERAL NOTES
1 NOT ALL SYMBOLS ARE NECESSARILY USED.
2 COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL
REFLECTED CEILING PLANS.
3 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND
COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.
4 ROOF OPENINGS, FLASHING, AND COUNTER FLASHING BY GENERAL CONTRACTOR. LOCATION
OF OPENINGS BY HEATING CONTRACTOR.
5 DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED
OTHERWISE.
6 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
7 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR WILL BE
RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE
CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.
8 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING,
STATE AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE
UNDERWRITER REQUIREMENTS.
9 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
10 MAINTAIN A MINIMUM OF 6-FT, 8-IN CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL
ROOMS.
11 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS
RECOMMENDED BY THE MANUFACTURER FOR ACCURACY. ALL SPACE TEMPERATURE,
PRESSURE, AND HUMIDITY MEASURING DEVICES SHALL BE WALL-MOUNTED.
12 TESTING ADJUSTING AND BALANCING (TAB) AGENCY MUST BE A MEMBER OF THE ASSOCIATED
AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU
(NEBB). TAB FIRM MUST HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.
PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL
STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S
QUALIFICATIONS.
13 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCTS OF A SINGLE MANUFACTURER MUST BE USED.
14 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.
15 ALL CONTROL WIRE AND CONDUIT MUST COMPLY…