Drawings - Sterile Storage - File 1 4-08-26.pdf

PDF 6 MB Posted

Attached to
Z1DA--Sterile Storage Improvements Construction Federal contract opportunity
Solicitation number
36C24426R0056
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This file consists of architectural and mechanical engineering drawings for the Sterile Storage Improvements construction project at Lebanon VA Medical Center in Lebanon, Pennsylvania. The drawings include cover sheets, Infection Control Risk Assessment (ICRA) plans, architectural floor plans, HVAC demolition and installation plans, electrical plans, and hydronic piping plans across multiple buildings (Buildings 1, 4, 17, 18, 22, 37, 101, 102, and 104) at various floor levels.

The project encompasses sterile storage room improvements requiring comprehensive HVAC modifications, including new fan coil units, humidifiers, dehumidifiers, thermostats, and room pressure sensors in designated sterile storage spaces. The drawings detail ICRA barrier specifications and dust control protocols appropriate for a medium-risk construction environment adjacent to occupied medical facilities. Mechanical systems work includes ductwork modifications, piping connections for humidifiers and dehumidifiers, and rebalancing of existing VAV boxes and diffusers to specified airflow rates. Electrical work involves thermostat relocations and integration with the building automation system. The project maintains active sprinkler and fire alarm systems throughout construction, requires 42-inch minimum egress clearance in corridors, and mandates coordination with VA Infection Control and facility operations. Construction must comply with International Building Code, NFPA standards, and all VA policies, with all work performed adjacent to operational patient care areas.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:0

A M

G001

COVER SHEET STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

GENERAL

G001 COVER SHEET

G100 ICRA NOTES AND PLANS

G101 ICRA PLANS

G102 ICRA PLANS

G103 ICRA PLANS

G104 ICRA PLANS

ARCHITECTURAL

A101 BUILDING 1 - THIRD FLOOR ARCHITECTURAL PLAN

A102 BUILDING 102 - FIRST FLOOR ARCHITECTURAL PLAN

VICINITY MAP

SITE

LOCATION MAP

SITE

LEBANON VAMC

STERILE STORAGE IMPROVEMENTS

PROJECT #595-23-104

1700 S LINCOLN AVENUE

LEBANON, PA 17042

OWNER:

LEBANON VA MEDICAL CENTER

1700 S LINCOLN AVENUE

LEBANON PA 17042

(717) 272-6621

ARCHITECT/ENGINEER:

AE WORKS, LTD

418 BEAVER STREET

SEWICKLEY, PA 15143

CONTACT: STEPHEN SIMONDS CONTACT: DAWN CINDRIC

MECHANICAL

M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

001-MD-100 BUILDING 1 - BASEMENT FLOOR HVAC DEMOLITION PLAN

001-MD-101 BUILDING 1 - FIRST FLOOR HVAC DEMOLITION PLAN

001-MD-102 BUILDING 1 - SECOND FLOOR HVAC DEMOLITION PLAN

001-MD-103 BUILDING 1 - THIRD FLOOR HVAC DEMOLITION PLAN

001-MD-104 BUILDING 1 - FOURTH FLOOR HVAC DEMOLITION PLAN

001-MD-105 BUILDING 1 - FIFTH FLOOR HVAC DEMOLITION PLAN

004-MD-101 BUILDING 4 - FIRST FLOOR HVAC DEMOLITION PLAN

017-MD-101 BUILDING 17 - FIRST FLOOR HVAC DEMOLITION PLAN

017-MD-102 BUILDING 17 - SECOND FLOOR HVAC DEMOLITION PLAN

017-MD-103 BUILDING 17 - THIRD FLOOR HVAC DEMOLITION PLAN

017-MD-104 BUILDING 17 - FOURTH FLOOR HVAC DEMOLITION PLAN

017-MD-105 BUILDING 17 - FIFTH FLOOR HVAC DEMOLITION PLAN

018-MD-104 BUILDING 18 - FOURTH FLOOR HVAC DEMOLITION PLAN

018-MD-105 BUILDING 18 - FIFTH FLOOR HVAC DEMOLITION PLAN

022-MD-101 BUILDING 22 - FIRST FLOOR HVAC DEMOLITION PLAN

022-MD-102 BUILDING 22 - SECOND FLOOR HVAC DEMOLITION PLAN

037-MD-101 BUILDING 37 - FIRST FLOOR HVAC DEMOLITION PLAN

101-MD-101 BUILDING 101 - FIRST FLOOR HVAC DEMOLITION PLAN

102-MD-101 BUILDING 102 - FIRST FLOOR HVAC DEMOLITION PLAN

104-MD-101 BUILDING 104 - FIRST FLOOR HVAC DEMOLITION PLAN

104-MD-103 BUILDING 104 - THIRD FLOOR HVAC DEMOLITION PLAN

001-M-100 BUILDING 1 - BASEMENT FLOOR HVAC PLAN

001-M-101 BUILDING 1 - FIRST FLOOR HVAC PLAN

001-M-102 BUILDING 1 - SECOND FLOOR HVAC PLAN

001-M-103 BUILDING 1 - THIRD FLOOR HVAC PLAN

001-M-104 BUILDING 1 - FOURTH FLOOR HVAC PLAN

001-M-105 BUILDING 1 - FIFTH FLOOR HVAC PLAN

004-M-101 BUILDING 4 - FIRST FLOOR HVAC PLAN

017-M-101 BUILDING 17 - FIRST FLOOR HVAC PLAN

017-M-102 BUILDING 17 - SECOND FLOOR HVAC PLAN

017-M-103 BUILDING 17 - THIRD FLOOR HVAC PLAN

017-M-104 BUILDING 17 - FOURTH FLOOR HVAC PLAN

017-M-105 BUILDING 17 - FIFTH FLOOR HVAC PLAN

018-M-104 BUILDING 18 - FOURTH FLOOR HVAC PLAN

018-M-105 BUILDING 18 - FIFTH FLOOR HVAC PLAN

022-M-101 BUILDING 22 - FIRST FLOOR HVAC PLAN

022-M-102 BUILDING 22 - SECOND FLOOR HVAC PLAN

037-M-101 BUILDING 37 - FIRST FLOOR HVAC PLAN

101-M-101 BUILDING 101 - FIRST FLOOR HVAC PLAN

102-M-101 BUILDING 102 - FIRST FLOOR HVAC PLAN

104-M-101 BUILDING 104 - FIRST FLOOR HVAC PLAN

104-M-103 BUILDING 104 - THIRD FLOOR HVAC PLAN

001-MP-100 BUILDING 1 - BASEMENT FLOOR PIPING PLAN

001-MP-101 BUILDING 1 - FIRST FLOOR PIPING PLAN

001-MP-102 BUILDING 1 - SECOND FLOOR PIPING PLAN

001-MP-103 BUILDING 1 - THIRD FLOOR PIPING PLAN

001-MP-104 BUILDING 1 - FOURTH FLOOR PIPING PLAN

001-MP-105 BUILDING 1 - FIFTH FLOOR PIPING PLAN

004-MP-101 BUILDING 4 - FIRST FLOOR PIPING PLAN

017-MP-101 BUILDING 17 - FIRST FLOOR PIPING PLAN

017-MP-102 BUILDING 17 - SECOND FLOOR PIPING PLAN

017-MP-103 BUILDING 17 - THIRD FLOOR PIPING PLAN

017-MP-104 BUILDING 17 - FOURTH FLOOR PIPING PLAN

017-MP-105 BUILDING 17 - FIFTH FLOOR PIPING PLAN

018-MP-104 BUILDING 18 - FOURTH FLOOR PIPING PLAN

018-MP-105 BUILDING 18 - FIFTH FLOOR PIPING PLAN

022-MP-101 BUILDING 22 - FIRST FLOOR PIPING PLAN

022-MP-102 BUILDING 22 - SECOND FLOOR PIPING PLAN

037-MP-101 BUILDING 37 - FIRST FLOOR PIPING PLAN

101-MP-101 BUILDING 101 - FIRST FLOOR PIPING PLAN

102-MP-101 BUILDING 102 - FIRST FLOOR PIPING PLAN

104-MP-101 BUILDING 104 - FIRST FLOOR PIPING PLAN

104-MP-103 BUILDING 104 - THIRD FLOOR PIPING PLAN

M501 HVAC DETAILS 1

M502 HVAC DETAILS 2

M503 HVAC DETAILS 3

M-701 HVAC SCHEDULES

M-702 VENTILATION INDEX

M800 CONTROL DIAGRAMS - LEGEND

M801 CONTROL DIAGRAMS 1

M802 CONTROL DIAGRAMS 2

SHEET INDEX

# Revisions Date

ELECTRICAL

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

001-ED-104 BUILDING 1 - FOURTH FLOOR ELECTRICAL DEMOLITION PLAN

001-ED-105 BUILDING 1 - FIFTH FLOOR ELECTRICAL DEMOLITION PLAN

004-ED-101 BUILDING 4 - FIRST FLOOR ELECTRICAL DEMOLITION PLAN

017-ED-104 BUILDING 17 - FOURTH FLOOR ELECTRICAL DEMOLITION PLAN

017-ED-105 BUILDING 17 - FIFTH FLOOR ELECTRICAL DEMOLITION PLAN

001-E-100 BUILDING 1 - GROUND FLOOR ELECTRICAL PLAN

001-E-101 BUILDING 1 - FIRST FLOOR ELECTRICAL PLAN

001-E-102 BUILDING 1 - SECOND FLOOR ELECTRICAL PLAN

001-E-103 BUILDING 1 - THIRD FLOOR ELECTRICAL PLAN

001-E-104 BUILDING 1 - FOURTH FLOOR ELECTRICAL PLAN

001-E-105 BUILDING 1 - FIFTH FLOOR ELECTRICAL PLAN

004-E-101 BUILDING 4 - FIRST FLOOR ELECTRICAL PLAN

017-E-101 BUILDING 17 - FIRST FLOOR ELECTRICAL PLAN

017-E-102 BUILDING 17 - SECOND FLOOR ELECTRICAL PLAN

017-E-103 BUILDING 17 - THIRD FLOOR ELECTRICAL PLAN

017-E-104 BUILDING 17 - FOURTH FLOOR ELECTRICAL PLAN

017-E-105 BUILDING 17 - FIFTH FLOOR ELECTRICAL PLAN

018-E-104 BUILDING 18 - FOURTH FLOOR ELECTRICAL PLAN

018-E-105 BUILDING 18 - FIFTH FLOOR ELECTRICAL PLAN

022-E-101 BUILDING 22 - FIRST FLOOR ELECTRICAL PLAN

022-E-102 BUILDING 22 - SECOND FLOOR ELECTRICAL PLAN

037-E-101 BUILDING 37 - FIRST FLOOR ELECTRICAL PLAN

101-E-101 BUILDING 101 - FIRST FLOOR ELECTRICAL PLAN

102-E-101 BUILDING 102 - FIRST FLOOR ELECTRICAL PLAN

104-E-101 BUILDING 104 - FIRST FLOOR ELECTRICAL PLAN

104-E-103 BUILDING 104 - THIRD FLOOR ELECTRICAL PLAN

E700 ELECTRICAL SCHEDULES

E701 ELECTRICAL SCHEDULES

E702 ELECTRICAL SCHEDULES

BID DEDUCT #1 03/02/20261

CHASE

CHASE

DUST CONTROL PLAN NOTES / DUST CONTROL PLAN HAZARD ASSESSMENT

PRIOR TO INITIATING WORK, CONTRACTOR WILL ASSESS THE SCOPE OF THE CONSTRUCTION ACTIVITIES AND

DETERMINE THE POTENTIAL RISK GROUPS INVOLVED BASED ON THE LOCATION OF ACTIVITIES AND EXTENT AND

DURATION OF THE WORK. LOW RISK GROUPS ARE CONSIDERED "OFFICE WORKERS", MEDIUM RISK GROUPS ARE

CONSIDERED ALL INPATIENT AND OUTPATIENT AREAS NOT IN THE HIGH RISK GROUP. HIGH RISK GROUP

DESIGNATION INCLUDES INPATIENT AREAS SUCH AS PEDIATRIC AND ADULT OPERATING/DELIVERY ROOMS, CATH

LABS, MYELO SUPPRESSION UNITS, ICUS, DIALYSIS, NURSERIES AS WELL AS CLINIC AREAS (CLINICS ASSOCIATED

WITH HEMATOLOGY, ONCOLOGY, PEDIATRIC INFECTION DISEASE, OR TRANSPLANT SERVICES) AND SERVICE

AREAS (CENTRAL PROCESSING, STERILE PROCESSING, FOOD PREP & SERVICE AREA AND PHARMACIES. THE

VAMC INFECTION CONTROL GROUP WILL CONFIRM AND APPROVE THE DESIGNATION PROVIDED IN THIS

SUBMITTED DUST CONTROL PLAN. VAMC IS ALSO RESPONSIBLE FOR ANY AND ALL INFECTION CONTROL

MEASURES DETERMINED AND ESTABLISHED BY VAMC POLICY, SUCH AS THE RELOCATION OF HIGH RISK

PATIENTS, APPROVING ALTERNATE TRAFFIC PATHS FOR CONSTRUCTION WORKERS OR ESTABLISH ALTERNATE

TRAFFIC PATTERNS FOR STAFF, PATIENTS AND VISITORS. THE PLAN SHOULD BE REVISED ACCORDING TO

SPECIFIC VAMC POLICIES OR CHANGING CONDITIONS AT THE SITE AS THEY MAY OCCUR.

RENOVATION

FOR THE PURPOSE OF THIS RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED ADJACENT TO MEDIUM

RISK AND COMPRISES WORK WHICH COULD GENERATE MODERATE TO HIGH LEVELS OF DUST NOT WITHIN THE

CONFINES OF A SUITE OR OFFICE AND INCLUDES EXTENSIVE CONSTRUCTION WORK (DEMOLITION) IN BUILDING 6

THROUGHOUT THE FIRST, SECOND FLOOR CEILING AND BASEMENT. THE DUST CONTROL PLAN SHALL BE

DISTRIBUTED AND REVIEWED BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.

A. EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

• DETERMINE IF THE IMPACTED AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED AIR; IF

FEASIBLE SEAL OFF ADJACENT AIR INTAKES.

• IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY FILTER BANKS FREQUENTLY AND

REPLACE AS NEEDED TO AVOID BUILDUP OF PARTICULATE.

• SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN

DOORS IN STAIRWELLS AND CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.

B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

• BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT REQUIRES. SMALL, SHORT DURATION

PROJECTS GENERATING MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD BE SEALED AT

FULL CEILING HEIGHT WITH AT LEAST 2-FOOT OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT

PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID, DUST-PROOF, AND FIRE-RATED BARRIER

WALLS (E.G., DRYWALL) WITH CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING. SEAL OFF

AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE USED FOR CONTAINMENT. LARGE DUST PROJECTS

NEED AN ENTRY VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT SEALS SHOULD BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST

BARRIER (MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE RIGID IMPERVIOUS BARRIER

IS BEING CONSTRUCTED. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PROJECT DUST BARRIERS SHALL BE

REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY

DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. CONTRACTOR PERSONNEL

SHALL MONITOR AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE SIMPLE CLUES SUCH

AS ACCUMULATIONS OF VISIBLE DUST EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED BY

PRESENCE OF INSECTS AND FLIES, WET CEILING TILE, ETC.

• TRAFFIC CONTROL; DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHOULD

BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED TIMES; AND ONLY

AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHOULD

DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

• DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING

DESIGNATED TRAFFIC ROUTES. EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHOULD BE REMOVED DAILY

AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY

PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHOULD BE USED, AND THE CHUTE OPENING

SHOULD BE SEALED WHEN NOT IN USE. FILTERS SHOULD BE BAGGED AND SEALED BEFORE BEING

TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH

PATIENT-CARE AREAS WITH PRIOR APPROVAL OF THE VAMC.

• EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT

EXCAVATION DEBRIS.

• CEILINGS THAT ARE REMOVED/MOIFIED TO ALLOW CONSTRUCITON OF ICRA BARRIERS SHOULD BE

REINSTALLED TO PRE-CONSTRUCTION CONDITIONS.

VENTILATION AND ENVIRONMENTAL CONTROLS

• AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR

RECIRCULATED AIR; FILTERS SHOULD BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER

MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

• NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA MUST BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE

NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHOULD PASS AIR THROUGH AN

INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER

MINUTE (FT3//MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST MUST BE

TIED INTO A RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHOULD BE USED BEFORE

EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

• ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHOULD BE VERIFIED DAILY.

• AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND/OR CONTRACTOR WILL VERIFY AND

MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING

RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. VAMC WILL MAKE

DETERMINATION ON PROVIDING FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR PRESSURE

THROUGHOUT THE PROJECT.

• MANOMETERS SHOULD BE LOCATED ON ICRA PARTITION DOOR AND ON THE NON-CONSTRUCTION SIDE OF THE

PARTITION.

CONTAMINATION OF PATIENT ROOMS

• WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD BE FREE OF LOOSE SOIL AND DEBRIS

BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORK (E.G. COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHOULD BE USED TO REMOVE DUST FROM CLOTHING

BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE CONTRACTOR SHALL

CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED

AREA). ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC. TRANSPORTED THROUGH OCCUPIED AREAS

SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL

FROM THE CONSTRUCTION ZONE OR WORK AREA.

• CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE MAINTAINED IN A CLEAN MANNER BY

CONTRACTORS AND SWEPT OR HEPA-VACUUMED DAILY FOR MORE FREQUENTLY AS NEEDED TO MINIMIZE

DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE CONSTRUCTION SHOULD BE DAMP MOPPED DAILY

OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE

UTILIZED TO MINIMIZE TRACKING OF HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.

INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION

STEP #1: SELECT ACTIVITY TYPE BELOW:

CONSTRUCTION ACTIVITY TYPES:

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50

SQUARE FEET.

• PAINTING (BUT NOT SANDING)

• WALL COVERING

• ELECTRICAL TRIM WORK

• MINOR PLUMBING

• ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS

OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

TYPE B

SMALL SCALE, SHORT DURATION (less than 1 day) ACTIVITIES WHICH CREATE

MINIMAL DUST

INCLUDES, BUT NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING

• ACCESS TO CHASE SPACES

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES

DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES

INCLUDES, BUT NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING

• REMOVAL OF FLOOR COVERING, CEILING TILES AND CASEWORK

• NEW WALL CONSTRUCTION

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

• MAJOR CABLING ACTIVITIES

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT NOT LIMITED TO:

• ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING

SYSTEM.

• NEW CONSTRUCTION

IS IT LIKELY THE CONTRACTOR'S STAFF WILL BE PLACED AT RISK FOR INFECTION

WITH TUBERCULOSIS? YES / NO

IS IT LIKELY THERE WILL BE PHYSICAL DISRUPTION OF THE WATER

SYSTEM/LINES DURING ACTIVITY? YES / NO

STEP #2: SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN

A) INFECTION CONTROL RISK GROUPS

GROUP 1 - LOW: OFFICE AREAS:

GROUP 2 - MEDIUM: CARDIOLOGY, ECHOCARDIOGRAPHY, ENDOSCOPY, NUCLEAR

MEDICINE, PHYSICAL THERAPY, RADIOLOGY/MRI, RESPIRATORY THERAPY

GROUP 3 - HIGH RISK: CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT

SURGERY, PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS

GROUP 4 - HIGHEST RISK: ANY AREA CARING FOR IMMUNOCOMPROMISED

PATIENTS, CARDIAC CATH LAB, CENTRAL SUPPLY, INTENSIVE CARE UNITS,

MEDICAL UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS

STEP #3: DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:

CONSTRUCTION ACTIVITY / INFECTION CONTROL MATRIX TO DETERMINE CLASS

** ICN MUST BE CONSULTED WHEN THE ASSESSMENT INDICATES THAT CLASS II,

III, IV PRECAUTIONS ARE REQUIRED.

RISK LEVEL TYPE 'A' TYPE 'B' TYPE 'C' TYPE 'D'

GROUP 1 I II II III / IV

GROUP 2 I II III IV

GROUP 3 I II III / IV IV

GROUP 4 II III / IV III / IV IV

CONSTRUCTION TYPE:

D

RISK GROUP:

MEDIUM

RISK ASSESSMENT:

IV

ELECTRICAL

YES

POTABLE WATER

YES

HVAC

YES

MEDICAL VACUUM

YES

SEWER

YES

PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL

STEP #4: COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:

1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING

3. SEAL UNUSED DOORS WITH DUCT TAPE

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR

FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED

CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR

FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR

THE CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE

THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT.

1. CLEAN WORK UPON COMPLETION OF TASK

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP &/OR VACUUM BEFORE LEAVING WORK AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

4. WET MOP WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS I - DURING CONSTRUCTION PROJECT

CLASS I - UPON COMPLETION OF PROJECTS

CLASS II - DURING CONSTRUCTION PROJECT

CLASS II - UPON COMPLETION OF PROJECTS

CLASS III - DURING CONSTRUCTION PROJECT

CLASS III - UPON COMPLETION OF PROJECTS

CLASS IV - DURING CONSTRUCTION PROJECT

CLASS IV - UPON COMPLETION OF PROJECTS

(TO BE COMPLETED BY CONTRACTOR AND SIGNED BY INFECTION CONTROL NURSE)

CONTRACTOR'S SIGNATURE AND DATE

INFECTION CONTROL NURSE'S SIGNATURE AND DATE

1 LAYER 5/8" TYPE-X G.W.B.

5/8" G.W.B.

3 5/8" METAL STUDS @16" O.C.

BASE - SEE FINISH

SCHEDULE FOR TYPE

TRACK RUNNER

FLOOR SLAB

SEALANT - SEE SPECIFICATIONS

DECK OR

STRUCTURE ABOVE

NOTE:

1. FOR EXISTING PARTITIONS USED AS ICRA BARRIERS, THE CONTRACTOR

SHALL COMPLETE THE FOLLOWING:

· MODIFY EXISTING PARTITION TO A ONE-HOUR RATED ICRA BARRIER

· EXTEND PARTITION TO FLOOR DECK WITH 5/8” G.W.B. ON EACH SIDE

· FINISH WALL PARTITION AS DIRECTED BY UL RATING REQUIREMENTS

· INFILL EXISTING OPENINGS WITH 5/8” G.W.B ON EACH SIDE

· PROVIDE FIRESTOPPING AT ALL EXISTING PENETRATIONS

2. PROVIDE 45 MINUTE RATED DOOR TO ACCESS CONSTRUCTION AREA AT

ALL NEW AND EXISTING ICRA BARRIERS.

3. THE CONTRACTOR SHALL NOT BLOCK SPRINKLER PROTECTION ON THE

VA-OCCUPIED SIDE OF THE ICRA BARRIER.

STORAGE

51A

MULTIPURPOSE

RM

51B

STAFF LOCKERS

CORRIDOR

G036

STERILE SUPPLY

CORRIDOR

61A

STORAGE

116A

STORAGE

STORAGE

STAFF TOILET

STERILE STORAGE

CLEAN SUPPLY

HAC

CLEAN UTILITY

IT CLOSET

SOILED UTILITY

PASSAGE

STERILE SUPPLY

CLEAN SUPPLY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:0

A M

G100

ICRA NOTES AND PLANS STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

# Revisions Date

TEMPORARY ICRA PARTITION

1/4" = 1'-0"

Bldg 01-00 BASEMENT FLOOR - RM 51 - ICRA 1/4" = 1'-0"

Bldg 01-00 BASEMENT FLOOR - G036 - ICRA

1/4" = 1'-0"

Bldg 01-00 BASEMENT FLOOR - RM 16 - ICRA

ICRA KEYNOTES

1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA

PRIOR TO INSTALLATION.

2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.

3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING

FOR AREAS AFFECTED BY WORK.

1/4" = 1'-0"

Bldg 01-01 FIRST FLOOR - 116A - ICRA

1/4" = 1'-0"

Bldg 01-01 FIRST FLOOR - 111 - ICRA

1/4" = 1'-0"

Bldg 01-02 SECOND FLOOR - 216 - ICRA

1/4" = 1'-0"

Bldg 01-02 SECOND FLOOR - 257-ICRA

1/4" = 1'-0"

Bldg 01-02 SECOND FLOOR - 293 - ICRA

GENERAL ICRA NOTES

1. ICRA BARRIERS AND POLY SHEETING SHOWN ON THE ICRA PLANS ARE GENERAL LOCATIONS OF WHAT IS ANTICIPATED BEING NEEDED. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETING AN ICRA PLAN FOR EVERY AREA OF CONSTRUCITON AND FORWARDING ONTO THE VA COR FOR APPROVAL BEFORE

STARTING ANY TYPE OF CONSTRUCTION.

2. A MINIMUM OF 42" EGRESS IS REQUIRED IN EGRESS CORRIDORS AT ALL TIMES.

FEC

FEC

DN

LAB

346A

EQUIP STORAGE

HAC

STORAGE

307A

STORAGE

ISOLATION ROOM

ISOLATION ROOM

HALL

CLEAN UTILITY

SOILED UTILITY

CLEAN UTILITY

SOILED UTILITY

CLEAN UTILITY

SOILED UTILITY

CLEAN UTILITY

TOILET

SOILED UTILITY

PULMONARY

RECPT / WAITING

123M

STORAGE

123B

BREAK ROOM

EXAM RM

TOILET

STORAGE

EXAM RM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:0

A M

G101

ICRA PLANS STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

ICRA KEYNOTES

1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA

PRIOR TO INSTALLATION.

2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.

3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING

FOR AREAS AFFECTED BY WORK.

# Revisions Date

1/4" = 1'-0"

Bldg 01-03 THIRD FLOOR - 346 & 346A - ICRA 1/4" = 1'-0"

Bldg 01-03 THIRD FLOOR - 307 - ICRA

1/4" = 1'-0"

Bldg 01-03 THIRD FLOOR - 370 - ICRA 1/4" = 1'-0"

Bldg 01-04 FOURTH FLOOR - 406 - ICRA

1/4" = 1'-0"

Bldg 01-04 FOURTH FLOOR - 472 - ICRA

1/4" = 1'-0"

Bldg 01-05 FIFTH FLOOR - 572 - ICRA 1/4" = 1'-0"

Bldg 04-01 FIRST FLOOR - 105 - ICRA

1/4" = 1'-0"

Bldg 17-01-FIRST FLOOR - 123M - ICRA 1/4" = 1'-0"

Bldg 17-02-SECOND FLOOR - 209 - ICRA

1/4" = 1'-0"

Bldg 17-02-SECOND FLOOR - 264 - ICRA

BID DEDUCT 1-

BID DEDUCT 1-

EXAM RM

EXAM RM

STORAGE

NURSE STATION

MED ROOM

365A

STORAGE

OFFICE

EXAM RM

EXAM RM

OFFICE

438A

OFFICE

STORAGE

OFFICE

VESTIBULE

OFFICE

EXAM RM

STORAGE

CORRIDOR

STERILE STORAGE

STORAGE

FEMALE DECON

555G

STORAGE

CORRIDOR

2 578

CLEAN STORAGE

CLEAN SUPPLY

STAFF TLT

517A

EXAM ROOM

EQUIPMENT

204A

CORRIDOR

1A10

STORAGE

1A18

STORAGE

1A17

MEN'S TLT

1A20

HAC

1A11

ELEC.

1A14

ELEV. LOBBY

1A15

ELEV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:1

A M

G102

ICRA PLANS STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

1/4" = 1'-0"

Bldg 17-03 THIRD FLOOR - 320 - ICRA 1/4" = 1'-0"

Bldg 17-03-THIRD FLOOR - 369 - ICRA

# Revisions Date

1/4" = 1'-0"

Bldg 17-04 FOURTH FLOOR - 426 - ICRA

1/4" = 1'-0"

Bldg 17-04 FOURTH FLOOR - 460 - ICRA

ICRA KEYNOTES

1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA

PRIOR TO INSTALLATION.

2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.

3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING

FOR AREAS AFFECTED BY WORK.

1/4" = 1'-0"

Bldg 17-04 FOURTH FLOOR - 472 - ICRA

1/4" = 1'-0"

Bldg 17-05 FIFTH FLOOR - 521 - ICRA

1/4" = 1'-0"

Bldg 17-05 FIFTH FLOOR - 536 - ICRA 1/4" = 1'-0"

Bldg 17-05 FIFTH FLOOR - 555G - ICRA 1/4" = 1'-0"

Bldg 17-05 FIFTH FLOOR - 578 - ICRA

1/4" = 1'-0"

Bldg 18-04 FOURTH FLOOR - 431 - ICRA 1/4" = 1'-0"

Bldg 18-05 FIFTH FLOOR - 517A - ICRA

1/4" = 1'-0"

Bldg 22-02-SECOND FLOOR - 216 - ICRA

NOTE: CONSTRUCTION SEQUENCE WILL NEED TO BE DISCUSSED WITH VA PRIOR TO INSTALLATION OF ANY ICRA

BARRIERS TO KEEP MIN EGRESS OF 42" CLEAR AT ALL TIMES IN THE CORRIDORS.

1/4" = 1'-0"

Bldg 37-01-FIRST FLOOR - 1A10 - ICRA

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

BID DEDUCT 1-

100C1

CONTROL RM

EGRESS

CORRIDOR ONLY

FEC

HAND

WASH

MEDS

CLEAN SUPPLY

MED ALCOVE

100C2

CORRIDOR

100C9

CORRIDOR

TOILET

DECON

163B

DECON

163A

DECON SHOWER

VESTIBULE

145B

CLEAN SUPPLY

145A

CLEAN LINEN

110B

PHYSIATRIST

OFFICE / EXAM RM

PHYSIATRIST

OFFICE / EXAM RM

RECEIVING AND

STROAGE RM

100C5

CORRIDOR

110C

STORAGE

STERILE SUPPLY

PACU

STORAGE

EQUIP ALCOVE

CLEAN UTILITY

CART ALCOVE

CONF RM

TOILET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:1

A M

G103

ICRA PLANS STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR - 132 - ICRA

ICRA KEYNOTES

1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA

PRIOR TO INSTALLATION.

2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.

3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING

FOR AREAS AFFECTED BY WORK.

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR - 104 - ICRA 1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR - 163, 163A, 163B - ICRA

NOTE: CONSTRUCTION SEQUENCE WILL NEED TO BE DISCUSSED WITH VA PRIOR TO INSTALLATION OF ANY ICRA

BARRIERS TO KEEP MIN EGRESS OF 42" CLEAR AT ALL TIMES IN THE CORRIDORS.

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR - 145B - ICRA

1/4" = 1'-0"

Bldg 102-01-FIRST FLOOR - 110 - ICRA 1/4" = 1'-0"

Bldg 104-01-FIRST FLOOR - 1211 - ICRA

1/4" = 1'-0"

Bldg 104-01-FIRST FLOOR - 1209 - ICRA 1/4" = 1'-0"

Bldg 104-01-FIRST FLOOR - 1121 - ICRA

# Revisions Date 5 of 110

CLEAN STORAGE 1403

CONTROL RM

ANESTH WORK RM

14C2

CORRIDOR

14C4

CORRIDOR

CLEAN SUPPLY

HAC

EQUIP STOR

2 3

STERILE STORAGE

STORAGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:1

A M

G104

ICRA PLANS STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

ICRA KEYNOTES

1 ANTICIPATED LOCATION OF TEMPORARY ICRA PARTITION. COORDINATE FINAL LOCATION WITH VA

PRIOR TO INSTALLATION.

2 PROVIDE STICKY MATS AT ENTRANCE TO ANY ROOM WITH WORK BEING DONE.

3 SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT POLY SHEETING

(VISQUEEN). PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING

FOR AREAS AFFECTED BY WORK.

1/4" = 1'-0"

Bldg 104-01-FIRST FLOOR - 1405 AND 1406 - ICRA 1/4" = 1'-0"

Bldg 104-01-FIRST FLOOR - 1508 - ICRA

1/4" = 1'-0"

Bldg 104-01-FIRST FLOOR - 1513 - ICRA

1/4" = 1'-0"

Bldg 104-03 THIRD FLOOR - 300 - ICRA 1/4" = 1'-0"

Bldg 104-03 THIRD FLOOR - 318 - ICRA

# Revisions Date 6 of 110

ELEVATOR

LOBBY

DF

DF

341K

341Q

341P

300C13-1

300C6-1300C9-1 300C8-1

300C11-1 300C12-1 C14-1 C15-1

1I

300C16A-1

325A

300C20-1

300C19-1

385A

386A

300C17-1

341G

341B 341A

332 300C16

300C4-1

315A

300C2-1

300C16-1

360 362 365

367366

365A 368A

369A

357A

333330

300C5-1320A

300C3-1

332A331A

371A

329A

328325

324A

324323A323

348A348

347D

347C

347B

347A

346A

341U

341H

341T

341D

341E

341J

341R

372A375A

373374

375376

276A 379A

377378

383A

384A

385B

385C

387A

391392

309 307A

304305

311A

312A

316A

318A

321 321A

317A

319319A

300C7-1

CORRIDOR

STAFF

TOILET

HAC

ELECTRICAL CLOSET

ELECTRICAL CLOSET

ELECTRICAL CLOSET

ELECTRICAL CLOSET

ELECTRICAL CLOSET

HAC

ELECTRICAL CLOSET

ELECTRICAL CLOSET

HACHAC HAC

HAC HAC HAC HAC

VESTIBULE

NURSE

STATION

NURSE STATION

CORRIDOR

BATH RM BATH RM

CORRIDOR

CORRIDOR

PATIENT SHOWER

PATIENT

SHOWER

NURSE

STATION

EXAM RM /

TREATMENT RM

CORRIDOR

SOILED UTILITY

BED RM - ISOLATION

BED RM - 1 BED PATIENT RM

BED RM - 2 BED

SERVICE LOBBY

STAFF

SHOWER

CORRIDOR

BATH RM

CORRIDOR

PUBLIC

ELEVATOR

SERVICE

ELEVATOR

HALL

HAC

STAFF

TOILET

CORRIDOR

BED RM - 2 BED STAIR HALL

BED RM - 2 BED

HACHAC

PATIENT

SHOWER

PATIENT

SHOWER

BED RM - 2 BED

PATIENT

SHOWER

BED RM - ISOLATION

BED RM - 2 BED

HAC

BATH RM

IT

CLOSET

STAIR HALL

UNISEX TOILET

CLEAN

UTILITYCLEAN UTILITY

NURSE

STATION

BATH RM

ANTE RM CORRIDOR

BATH RMBATH RM

BED RM - 2 BED

BED RM - 2 BED

PATIENT

SHOWER

BATH RM BED RM - 2 BED

STAIR HALLBED RM - 2 BED

BATH RM

BED RM - 2 BEDBATH RMBED RM - ISOLATION

OFFICEOFFICE

OFFICE

LAB

EQUIP

STORAGE

OFFICE

OFFICE

LAB

HAC

EQUIP STORAGE

WAITING

STAIR HALL

BIOMED

ENGINEER

PATIENT TOILET

BED RM - 1 BED

LOUNGE

BED RM - 1 BED

BED RM - ISOLATION

PATIENT TOILET

BIOMED

STORAGE

BED RM - ISOLATION

PATIENT

SHOWER

PATIENT

SHOWER

HACHAC

BED RM - 2 BEDBED RM - 2 BED

BATH RM

PATIENT

SHOWER

HACHAC

BED RM - 2 BED

TELEPHONE CLOSET

CONFERENCE

BED RM - 1 BED

PATIENT

SHOWER

BED RM - 1 BED

PATIENT

SHOWER

SECLUSION

GROUP RM

BED RM - 1 BED

PATIENT

SHOWER

BED RM - 1 BED

CLEAN UTILITY

MEDICATION RM

LAUNDRY

STAFF

LOUNGE

HEAD

NURSE

OFFICE

LOUNGE

GROUP RM

HAC

BED RM - 1 BED

NOURISHMENT

STORAGE PATIENT TOILET

UNISEX TOILET

WAITING

EQUIP

STORAGE

LAUNDRY

HAC

LOUNGE

HEAD

NURSE

OFFICE

CONFERENCE

BED RM - 1 BED

BATH RM

BED RM - 1 BED

BATH RM

DAY RM

UNISEX TOILET

BATH RM

BED RM - 1 BED

BED RM - 2 BEDBATH RM

BED RM - ISOLATION BATH RM

BATH RM

BED RM - 2 BED

BED RM - 2 BEDBATH RM

BED RM - 2 BED

DAY RM

NOURISHMENT

HAC

C O

R R

ID

O

R

DN

UPUP

DN

DNUP

UPDN

A2

LAB

346A

EQUIP STORAGE

HAC

A101

G101

G101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:1

A M

A101

BUILDING 1 - THIRD FLOOR ARCHITECTURAL

PLAN

STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

# Revisions Date

1/4" = 1'-0"

BUILDING 1 - THIRD FLOOR PLAN - ROOM 346 & 346A ENLARGEMENT

1/16" = 1'-0"

BUILDING 1 - THIRD FLOOR - OVERALL PLAN

GENERAL PROJECT NOTES

1 ALL CONSTRUCTION WORK TO CONFORM WITH THE APPLICABLE CODES AND ORDINANCES OF THE

LOCAL JURISDICTION, THE COMMONWEALTH OF PENNSYLVANIA, AND THE CURRENT ADOPTED

VERSION OF THE INTERNATIONAL BUILDING CODE FAMILY. THE CONTRACTOR TO POST NOTICES

AND COMPLY WITH THE GOVERNING LAWS OF THE JURISDICTION.

2 INSTALLATIONS PERFORMED IN CONNECTION WITH THESE DRAWINGS TO COMPLY WITH THE

MOST RECENT NFPA EDITION.

3 MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD THE PUBLIC AND ALL PERSONS ENGAGED IN

THE PERFORMANCE OF THE WORK.

4 THE DRAWINGS REFLECT CONDITIONS AS CAN BE INFERRED FROM VISIBLE CONDITIONS, OR

FROM DRAWINGS AND INFORMATION FURNISHED BY THE OWNER, BUT CANNOT BE GUARANTEED.

VERIFY ALL GRADES, LINE LEVELS AND DIMENSIONS INDICATED ON THE DRAWNGS AND REPORT

ALL INCONSISTENCIES TO THE ARCHITECT PRIOR TO THE EXECUTION OF THE WORK. RECHECK

ALL DIMENSIONS PRIOR TO ORDERING MANUFACTURED AND/OR FABRICATED ITEMS.

5 PLAN DIMENSIONS, UNLESS NOTED OTHERWISE, ARE TO THE FACE OF THE WALL FINISH OR

CENTERLINE OF COLUMN.

6 ASSUME FULL RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF PRODUCTS PURCHASED

FOR THIS PRODUCT AND STORED ON THE PROJECT SITE. COORDINATE WITH THE OWNER ON

PREFERRED LOCATIONS FOR STORED MATERIALS ON THE PROJECT SITE, IF ALLOWED AS PART

OF THE REQUIREMENTS OF THIS PROJECT.

7 MAINTAIN AREAS UNDER THE CONTRACTOR'S CONTROL TO BE FREE OF WASTE MATERIALS,

DEBRIS, AND RUBBISH. CONTAINERS FOR DEPOSIT OF DEBRIS AND RUBBISH WILL BE PROVIDED

BY THE CONTRACTOR. COORDINATE LOCATION OF CONTAINERS WITH THE OWNER'S

REPRESENTATIVE PRIOR TO PLACEMENT. REMOVE AND DISPOSE OF DEMOLITION MATERIAL OFF

SITE IN ACCORDANCE WITH APPLICABLE CODES AND/OR SPECIFICATIONS.

8 EXTRANEOUS MATERIALS TO BE PERIODICALLY REMOVED, AND AT THE CONCLUSION OF THE

PROJECT.

9 PROVIDE AND INSTALL ALL FIRESAFING / FIRESTOPPING MATERIALS AT ALL THROUGH-WALL AND

THROUGH-CEILING PENETRATIONS AS REQUIRED FOR THE CONSTRUCTION WORK AND TO

MAINTAIN FIRE RATINGS OF FLOORS AND WALLS. MATERIALS AND INSTALLATION DETAILS TO

CONFORM TO UNDERWRITER LABORATORIES LISTING FOR RATED ASSEMBLIES.

10 ALL WOOD FRAMING AND SHEATHING TO BE FIRE RETARDANT TREATED AS REQUIRED BY THE

BUILDING CODE CLASSIFICATION OF 'NONCOMBUSTIBLE'

11 DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO

CONSTRUCTION. NOTIFY THE ARCHITECT OF ANY DEVIATIONS OR DISCREPANCIES FOUND AND

RECEIVE DIRECTION BEFORE PROCEEDING.

12 DURING CONSTRUCTION THE CONTRACTOR WILL WORK ADJACENT TO PATIENT OCCUPIED

FLOORS. CONSTRUCTION RELATED ACTIVITIES ARE NOT TO ADVERSELY IMPACT THESE AREAS.

CONSTRUCTION RELATED ACTIVITIES THAT MIGHT AFFECT THESE AREAS MUST BE COORDINATED

WITH AND APPROVED BY THE VA PRIOR TO OCCURRENCE.

13 PROVIDE TEMPORARY DUST ENCLOSURES DURING ALL DEMOLITION AND CONSTRUCTION

ACTIVITIES. CONTRACTOR TO COORDINATE LOCATIONS WITH CONTRACTING OFFICER. IF EXISTING

WALLS ARE USED, PENETRATIONS MUST BE SEALED TO CREATE A DUST PROOF ENCLOSURE.

14 MODIFICATIONS TO THE EXISTING MEP SYSTEMS WILL IMPACT ADJACENT SPACES OUTSIDE THE GENERAL SCOPE OF WORK. ANY DISTURBANCE OF EXISTING CONDITIONS AND FINISHES MUST BE

REPAIRED TO MATCH THE CONDITIONS PRIOR TO CONSTRUCTION IMPACTS.

15 THE FACILITY IS OPERATIONAL. CONTRACTOR TO MAKE PROVISIONS FOR OWNER AND PUBLIC USE OF THE BUILDING AROUND THE CONSTRUCTION AREA. DELIVERIES, STAGING, STORAGE OF

MATERIALS AND OTHER CONSTRUCTION RELATED ACTIVITIES TO BE COORDINATED WITH THE

CONTRACTING OFFICER SO AS TO NOT ADVERSELY AFFECT THE BUILDING OPERATIONS.

16 ASBESTOS AND LEAD ARE NOT ANTICIPATED TO EXIST IN THE WORK AREA. HOWEVER, IF

ASBESTOS-CONTAINING MATERIAL IS DISCOVERED OR SUSPECTED, STOP WORKING IN THE AREA

IMMEDIATELY AND CONTACT THE CONTRACTING OFFICER.

17 ALL REVISIONS TO THE DRAWINGS MUST PROCEED THROUGH THE ARCHITECT. OWNER /

CONTRACTOR REVISIONS MAY BE CONSIDERED INVALID.

18 COMPARE AND COORDINATE ALL DRAWINGS FOR PROPER FIT AND ATTACHMENT OF ALL PARTS.

DETAILS NOT SHOWN OR DESCRIBED IN THESE NOTES TO BE CONSTRUCTED TO SAME SIZE AND

CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN, SPECIFIED, OR COMMONLY

CONSTRUCTED IN THE INDUSTRY.

19 NO STRUCTURAL MEMBER TO BE OMITTED, NOTCHED, CUT, BLOCKED OUT, OR RELOCATED

WITHOUT PRIOR APPROVAL BY THE ARCHITECT OR ENGINEER.

20 PROTECTIVE MEASURES TO BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT PROPERTY

AT ALL TIMES DURING CONSTRUCTION.

21 ALL TEMPORARY BRACING AND SHORING TO BE DESIGNED TO SUSTAIN ALL CONSTRUCTION

LOADS, SOIL PRESSURE, LATERAL AND OTHER LOADS TO WHICH THE STRUCTURE MAY BE

SUBJECTED.

22 COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER HEADS, REGISTERS, ETC. WITH THE

REFLECTED CEILING PLAN LAYOUT.

23 ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS TO BE CENTERED WITH SUSPENDED

ACOUSTICAL PANELS, UNLESS NOTED OTHERWISE ON DRAWINGS.

24 ALL VOIDS IN MASONRY, CONCRETE AND OTHER ASSEMBLIES CREATED AROUND PENETRATIONS

TO BE FILLED / PATCHED WITH CONSTRUCTION TO MATCH SURROUNDING CONDITIONS.

25 CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING EXISTING CEILINGS IN AREAS OF

CONSTRUCTION..

26 ALL EXISTING SPRINKLERS AND FIRE ALARM SYSTEMS ARE TO REMAIN ACTIVE THROUGHOUT

CONSTRUCTION

27 CONTRACTOR TO COODINATE ANY BUILDING SYSTEM SHUTDOWNS WITH VA COR PRIOR TO

SHUTTING DOWN ANY SYSTEM.

KEYNOTES

1 INFILL EXISTING OPENING WITH NEW WALL. PAINT AND ADD WALL BASE TO MATCH

ADJACENT WALLS

2 ADD NEW PARTITION AND DOOR TO CREATE A NEW STORAGE ROOM. MODIFY

EXISTING ACT CEILING AS REQUIRED TO INSTALL NEW PARTITION.

CONC.

RAMP

DN

NEW

GENERATOR

PAD

MORGUE COOLER SLAB

102A

100C5

100C4 100C3

104I

104H

110B

110A

124A

126A

109112

104A

104B

104C

104D

104E

104F

104G

104J

RECEPTION

CONSULT CLOSET

THERAPY GYM

WAITING

SOILED UTILITY

CORRIDOR

CORRIDOR CORRIDOR

STAFF

TOILET

STAFF

TOILET

STAFF

TOILET

STAFF

TOILET

PHYSIATRIST

OFFICE/EXAM RM

PROSTHETICS WORK AREA

ELECTRICAL CLOSET

PHYSIATRIST OFFICE/ EXAM RM

PHYSIATRIST OFFICE/ EXAM RM

HAC PIPE

CHASE

UNISEX TOILET

UNISEX TOILET

CLEAN LINEN

DRESSING RM

BREAK RM

BREAK RM

SUPV OF

PROSTHETICS

P.T. SUPV

OFFICE

IT

CLOSET

HYDROTHERAPY

PATIENT TOILET

OXYGEN STORAGE RM

KITCHEN

SOILED UTILITY

TREATMENT

TREATMENT

TREATMENT

PREP AREA

TREATMENT

TREATMENT

TREATMENT

STAFF

CHARTING

EQUIP

STORAGE

PHYSIATRIST

OFFICE/

EXAM RM

PROSTHETIC

RECEIVING AND

STORAGE RM

PHYSIATRIST

OFFICE/

EXAM RM

PHYSIATRIST

OFFICE/

EXAM RM

FEC

FEC

FEC

FEC

FEC

FEC

DN

DN

A102

110C

A1 110B

PHYSIATRIST

OFFICE / EXAM RM

110C

STORAGE ROOM

PHYSIATRIST

OFFICE / EXAM RM

PROSTHETIC

RECEIVING AND

STORAGE RM

4 7/8"

VARIES EQ.

WALL PARTITION W/ STUD

HEADER, TYP.

HEAD ANCHOR CLIP, SECURE

TO HEADER STUDS, TYP.

HOLLOW METAL FRAME

SCHEDULED DOOR

EQ.

2"

1/2"

5/ 8"

CONTINUOUS SEALANT -

BOTH SIDES

7/

8"

SCHEDULED DOOR

HOLLOW METAL FRAME

JAMB ANCHOR CLIP, SECURE

TO JAMB STUD, TYP.

WALL PARTITION W/ DOUBLE

STUDS AT JAMB, TYP.

E Q

2"

E Q

2" 5/8"1/ 2"

CONTINUOUS SEALANT - BOTH SIDES

HEAD JAMB

MTL STUD FR - REF SCHED FOR SIZE,

SPACING & WIDTH AS SPEC

SOUND BATT INSUL

1 LAYER OF 5/8" TYPE "X" GYP BD EACH

SIDE - PAINT TO MATCH ADJACENT WALLS

REF SCHED

OVERALL

WIDTH

UNDERSIDE OF STRUCTURE

BASE

PLAN

HEAD

TYPE A - FULL HEIGHT GWB PARTITION

SCHED CEILING, REF RCP

STEEL TRACK, FASTEN 2'-0" OC MAX

RUBBER BASE TO MATCH

ADJACENT WALLS - BOTH SIDES

SEALANT BOTH SIDES. FIRE SEALANT

REQUIRED AT RATED WALLS

SEALANT BOTH SIDES. FIRE SEALANT

REQUIRED AT RATED WALLS

STEEL TRACK, FASTEN 2'-0" OC MAX

L-BEAD IN FINISHED AREAS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts

/V L E

B -0

-A R

C H

.r v t

/1 /2

:0

:1

A M

A102

BUILDING 102 - FIRST FLOOR

ARCHITECTURAL PLAN

STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

595-23-104

11.17.25 DC SB

BID DOCUMENTS

# Revisions Date

1/16" = 1'-0"

BUILDING 102 - FIRST FLOOR ARCHITECTURAL OVERALL PLAN

1/4" = 1'-0"

BUILDING 102 - FIRST FLOOR ENLARGED PLAN

3" = 1'-0"

DOOR DETAILS

DOOR SCHEDULE

DOOR

NUMBER WIDTH

DOOR FRAME

HARDWARE SET

FIRE

RATING CARD ACCESS COMMENTSHEIGHT TYPE MATERIAL TYPE MATERIAL

110C 3' - 0" 7' - 0" FLUSH WOOD F1 HOLLOW METAL -

3/4" = 1'-0"

PARTITION TYPE

TYPE

OVERALL

WIDTH

FRAMING

WIDTH

FIRE

TEST

FIRE

RATING

STC

RATING

SOUND

INSUL. COMMENTS

A1 4 7/8" 3 5/8" - 0 hr 49 Yes

A2 6" 3 5/8" - 0 hr 49 Yes CONTRACTOR TO VERIFY WALL SIZE IN FIELD AND MATCH

EXISTING.

KEYNOTES

1 INFILL EXISTING OPENING WITH NEW WALL. PAINT AND ADD WALL BASE TO MATCH

ADJACENT WALLS

2 ADD NEW PARTITION AND DOOR TO CREATE A NEW STORAGE ROOM. MODIFY

EXISTING ACT CEILING AS REQUIRED TO INSTALL NEW PARTITION.

ABBREVIATIONS

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

CW COLD WATER

D DEGREE

DB DRY BULB

DIA DIAMETER

DN DOWN

DHW DOMESTIC HOT WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

E/A EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FD FIRE DAMPER

FDV FIRE DEPARTMENT VALVE

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

OA OUTSIDE AIR

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

R/A RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RA RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SA SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACEMOUNT

SP STANDPIPE

SP STATIC PRESSURE

STM STEAM

T THERMOSTAT

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

X DEMOLISH

XN EXISTING TO BE RELOCATED

XR EXISTING TO REMAIN

AC AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACCU AIR COOLING CONDENSING UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CWP CONDENSER WATER PUMP

CHWP CHILLED WATER PUMP

CV CONSTANT-AIR VOLUME BOX

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

HRU HEAT RECOVERY UNIT

IR INFRARED

MAU MAKE-UP AIR UNIT

PRV PRESSURE REDUCING VALVE

RTU ROOFTOP UNIT

SEP SEWAGE EJECTOR PUMP

SF SUPPLY FAN

SP SUMP PUMP

SS SPLIT-SYSTEM

UH UNIT HEATER

VAV VARIABLE-AIR VOLUME BOX

WH WATER HEATER

EQUIPMENT TAG ABBREVIATIONS

KEYNOTE

DETAIL NUMBER

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

POINT WHERE NEW CONNECTS TO EXISTING

PIPELINE ABBREVIATIONS

REFRIGERANT LINESET (SUCTION/LIQUID)

CONDENSATE DRAIN

PIPELINE SYMBOLS

BALL VALVE

GATE VALVE

3-WAY VALVE

ECCENTRIC REDUCER

CHECK VALVE

PIPING TURNED UP

PIPING TURNED DOWN

TEE - OUTLET UP

TEE - OUTLET DOWN

PIPE CONTINUATION SYMBOL

BALANCING VALVE

DUCTWORK ABBREVIATIONS

OUTSIDE AIR

DUCTWORK SYMBOLS

SUPPLY AIR

RETURN AIR

EXHAUST AIR

RECTANGULAR DUCT, WIDTH (SHOWN) x DEPTH

OVAL DUCT, WIDTH (SHOWN) x DEPTH

ROUND DUCT, DIAMETER

RECTANGULAR DUCT MITERED ELBOW

RECTANGULAR/ROUND DUCT ROUNDED ELBOW

OVAL DUCT GORED ELBOW

RECTANGULAR TAKEOFF

ROUND TAKEOFF

RECTANGULAR SUPPLY DUCT UP/DOWN

ROUND SUPPLY DUCT UP/DOWN

RECTANGULAR RETURN DUCT UP/DOWN

ROUND RETURN DUCT UP/DOWN

RECTANGULAR RETURN DUCT UP/DOWN

ROUND RETURN DUCT UP/DOWN

OVAL SUPPLY DUCT UP/DOWN

RECTANGULAR DUCT CONTINUATION SYMBOL

DAMPER SYMBOLS

TAG

AIR TERMINAL

SYMBOLS

TAG

AIRFLOW

(CFM)

AIRFLOW

(CFM)

ROUND DUCT CONTINUATION SYMBOL

RS/RL OA

SA

RA

EA

18"x12"

18"/12"

18"

SD-1

RG-1

C

D

B

M

S

F MANUAL BALANCING DAMPER

BACKDRAFT DAMPER

COMBINATION FIRE/SMOKE

FIRE DAMPER

SMOKE DAMPER

MOTORIZED DAMPER

***ADD DUCTWORK AS REQUIRED***

POINT OF DISCONNECTION FROM EXISTING

RL REFRIGERANT LINESET (SUCTION & LIQUID)

H

S

P

T

DIGITAL HYGROMETER/HUMIDISTAT

ROOM PRESSURE SENSOR

TEMPTRAK SENSOR

DIGITAL HARD-WIRED THERMOSTAT

CD

CHILLED WATER SUPPLYCHWS

CHILLED WATER RETURNCHWR

HEATING HOT WATER SUPPLYHWS

HEATING HOT WATER RETURNHWR

DOMESTIC COLD WATERCW

DOMESTIC HOT WATERDHW

DOMESTIC HOT WATER RETURN LOOPHW-R

LOW PRESSURE STEAMLPS

LOW PRESSURE STEAM CONDENSATELPC

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:2

:4

A

M

M-001

MECHANICAL SYMBOLS, ABBREVIATIONS,

AND GENERAL NOTES

STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

HVAC GENERAL NOTES

1 NOT ALL SYMBOLS ARE NECESSARILY USED.

2 COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL

REFLECTED CEILING PLANS.

3 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND

COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.

4 ROOF OPENINGS, FLASHING, AND COUNTER FLASHING BY GENERAL CONTRACTOR. LOCATION

OF OPENINGS BY HEATING CONTRACTOR.

5 DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED

OTHERWISE.

6 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

7 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE

INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR WILL BE

RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMMODATE ACTUAL SITE

CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.

8 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING,

STATE AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE

UNDERWRITER REQUIREMENTS.

9 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,

STRUCTURAL, CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT

DRAWINGS.

10 MAINTAIN A MINIMUM OF 6-FT, 8-IN CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL

ROOMS.

11 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS

RECOMMENDED BY THE MANUFACTURER FOR ACCURACY. ALL SPACE TEMPERATURE,

PRESSURE, AND HUMIDITY MEASURING DEVICES SHALL BE WALL-MOUNTED.

12 TESTING ADJUSTING AND BALANCING (TAB) AGENCY MUST BE A MEMBER OF THE ASSOCIATED

AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU

(NEBB). TAB FIRM MUST HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.

PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL

STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S

QUALIFICATIONS.

13 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE

PRODUCTS OF A SINGLE MANUFACTURER MUST BE USED.

14 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED

DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED

FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.

15 ALL CONTROL WIRE AND CONDUIT MUST COMPLY…

This is the start of the file's text. The full file is on GovTribe.