Drawings - Sterile Storage - File 2 4-08-26.pdf

PDF 6 MB Posted

Attached to
Z1DA--Sterile Storage Improvements Construction Federal contract opportunity
Solicitation number
36C24426R0056
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

These are mechanical, electrical, and plumbing (MEP) design drawings for the Sterile Storage Improvements construction project at Lebanon VA Medical Center in Lebanon, Pennsylvania. The drawings comprise detailed piping plans, HVAC schedules, control diagrams, and technical details across multiple buildings and floors, with project number VLEB-016 prepared by AE Works, LTD. The scope covers piping systems for chilled water supply/return (CHWS/CHWR), condensate drainage (CD), domestic hot water (DHW), cold water (CW), and refrigerant lines (RL/RS), along with air handling units, fan coil units (FCU), variable air volume (VAV) boxes, constant air volume (CAV) systems, and electrode steam humidifiers. HVAC details include specifications for ductwork hangers, trapeze supports, pipe penetrations, flexible connections, and vibration isolation systems. The designs incorporate multiple building systems across Buildings 1, 4, 17, 18, 22, 37, 101, 102, and 104, with specific attention to infection control requirements, space pressurization per VA PG-18-10 standards, and minimum clearances from rated walls and equipment. The ventilation index schedules designate all spaces as sterile storage with occupancy requirements of 40-66°F cooling and 50-60°F heating setpoints, 8-10 air changes per hour, and relative humidity control between 30-60 percent. Control sequences include continuous operation for most units with zone temperature sensors, modulating heating and cooling valves, and alarm provisions for temperature excursions and equipment failures.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL

CABINET

F.A.C

FEC

FEC

469 470

490A

C4-1E

C4-1F

439 440 489 C4-14 C4-12

C4-11

400C1A

400C2

NO. 2

446445 443438

407408

410411412

417418

400C1D

426427 428429

430431

490B

485A

400C4

461460

453A

453C453B

452A

457A

455A

NO.

NO. 3

467A

466A

C4-10AC4-10

468 473A

474A 474

476476A

477A

478A479A

C4-13AC4-13

479480 480A

400C5

400C3

C4-15

247400C1B400C1C

ELECTRICAL CLOSET ELECTRICAL CLOSET

PATIENT TOILET

ELECTRICAL CLOSET

ELECTRICAL CLOSET

ELECTRICAL CLOSETELECTRICAL CLOSET

STAFF

TOILET CHARTING CHARTING

CHARTING

BED RM - 2BED

CORRIDOR

ELEVATOR LOBBY

PUBLIC

ELEVATOR

BED RM - 1BED

CLEAN

UTILITY

SERVICE LOBBY

BATH RMBED RM - 1BED

DAY ROOMBED RM - 2BED

BATH RM

BATH RM

BED RM - 1BED

OFFICE

STAFF

LOCKERS

VESTIBULE

BREAK RM

STAFF

TOILET

CLEAN

UTILITY

CLEAN

STORAGE

NURSE

OFFICE

LAUNDRY

BATH RMBED RM - 1BEDSTORAGE

BED RM - 1BED

BATH RM

BATH RM

BED RM - 1BEDBED RM - 1BED

BATH RM

BED RM - 2BED

BATH RM

CORRIDOR

BED RM - 1BED

MEDICATION RM

LOUNGE

NURSE STATION

BED RM - 1BEDBATH RM

BED RM - 1BEDBED RM - 1BED

BATH RMBED RM - 1BED

BED RM - 1BED

BATH RM

BED RM - 1BED

HOSPICE

PATIENT ROOM

EQUIP

STORAGE

CORRIDOR

HAC

UNISEX TOILET

HOSPICE

PATIENT RM

OFFICE

STAIR

OFFICE

HACHAC

OFFICE

CONFERENCE

HAC

PIPE CHASE

MENS

TOILET

ENTRY

MEN

LOCKER

VESTIBULE

WOMEN TOILET

STAIR HALL

STAIR HALL

PUBLIC

ELEVATOR

SERVICE

ELEVATOR

BED RM - 2BED

BATH RM

STAIR HALL

STAFF

LOUNGE

CONFERENCE

NOURISHMENT

NURSE

STATION

MEDICATION RM

BATH RM

BED RM - 2BED

ALCOVEALCOVE

STAIR HALL BATH RM

BED RM - 2BED

BATH RM BED RM - ISOLATION

ANTE RM

BED RM - ISOLATIONBATH RM

BED RM - 2BED

BATH RM

BED RM - 2BED

BATH RMBATH RM

HACHAC

BED RM - 1BEDBED RM - 2BED

BATH RM

LAUNDRY

HAC

EQUIP STORAGE

WAITING

STORAGE

TREATMENT

DAY ROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDORCORRIDORCORRIDOR

SOILED

UTILITY

SOILED

UTILITY

CLEAN

UTILITY

DN

UPUP

DN

UP

DNUP

DN

UP UP

FEC

001-MP-104

001-MP-104

(E)CD

1/2" CW

(E)CD

1/ 2"

C W

3/ 4"

C D

(E )D

H W

(E )C

W (E

)D H

W (E

)C W

(E)FCU

HUM

CLEAN UTILITY

SOLID UTILITY

FCU-CC

(E)CD

(E)CHWR

(E)CHWS (E)CHWS

(E)CHWR

(E)CD

(E )C

W (E

)D H

W

3/4" CHWS

3/4" CHWR

3/4" CD

HUM

1/2" CW

CLEAN UTILITY

SOLID UTILITY

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:3

A

M

001-MP-104

BUILDING 1 - FOURTH FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

Bldg 01-04 FOURTH FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 01-04 FOURTH FLOOR PIPING

PLAN - ROOM 406

1/4" = 1'-0"

Bldg 01-04 FOURTH FLOOR PIPING

PLAN - ROOM 472

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 3/4" HUMIDIFIER DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING.

3 CONNECT NEW FCU PIPING CONNECT TO EXISTING PIPING.

4 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

# Revisions Date

STORAGE

UNISEX TOILETUNISEX TOILET

HAC

HAC

ALCOVE CHARTING

KITCHENCHARTING

TELEPHONE CLOSET

PATIENT TOILET

STORAGE

ELECTRICAL CLOSET

MECH

CORRIDOR

HAC

OFFICE

KITCHENETTE

STAFF TOILET

OFFICEOFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICEOFFICE

OFFICE

OFFICEOFFICEOFFICEOFFICEOFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE

CORRIDOR

ELEVATOR LOBBY

CORRIDOR

CORRIDOR

BED RM - 2 BED

OFFICE

HAC

WAITING

PATIENT TOILET

STORAGE

DINING

BREAK RM BREAK RM

HAC

PHYSICIAN OFFICE

PHYSICIAN OFFICE

PHYSICIAN OFFICE

PHYSICIAN OFFICE

BED RM - 2 BED

PATIENT

SHOWER

BATH RM

BED RM - 2 BED

BED RM - 1 BED

PATIENT

SHOWER

BED RM - 1 BED

ALCOVE

PATIENT TOILET

BATH RM

PATIENT

SHOWER

EQUIP

STORAGE PATIENT

SHOWER

BED RM - 2 BED PATIENT

SHOWER

BED RM - 2 BED

STORAGE

OFFICE OFFICE

STAFF LOCKERS

ELECTRICAL CLOSET

ENTRY PASSAGE

MECH

STAIR

MENS LOCKER

PATIENT TOILET

PIPE CHASE

HAC

BED RM - ISOLATION

PATIENT

SHOWER

BED RM - ISOLATIONPATIENT

SHOWER

ALCOVE

BED RM - 2 BEDPATIENT

SHOWER

CLEAN UTILITYSOILED UTILITY

STORAGE

STAIRBED RM - 2 BEDPATIENT

SHOWER

PATIENT

SHOWERBED RM - 2 BED

LOUNGE

LOUNDRYNOURISHMENT

MEDICATION RM

IT CLOSET

UNISEX TOILET

STAIR

PUBLIC

ELEVATOR

SERVICE

ELEVATOR 3

ELEVATOR LOBBY

HEAD

NURSE

OFFICE

OFFICE

ELECTRICAL CLOSET

STAIR - 2

C5-20

591504

592A

C5-21 C5-19 C5-18

575C5-17

540C

517B

521B

500C3-1

509516 515 514 513 512 511 510

517517A

526525523522521 520519518

517D517C

572X

C5-1

C5-14 500C2-1

500A

593 593

585A

582A

C5-24

581A

580A

578A

577A

540F

540B 540A 540D

540E

541A

576A

574A

C5-16

573A

572571

568567 567A566A566

565563

C5-15

560533

C5-10 531530

521A

521C

FEC

FEC

FEC

DN

UP

DN.

UP

DN.UP

DN.

UP

UP

UP

FEC

001-MP-105

(E)CD

(E)CHWR

(E)CHWS (E)CHWS

(E)CHWR

(E)CD

(E )C

W (E

)D H

W

3/4" CHWS

3/4" CHWR

3/4" CD

3/4" CD

1/2" CW

HUM

FCU-CC

CLEAN UTILITY

SOILED UTILITY

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:3

A

M

001-MP-105

BUILDING 1 - FIFTH FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

Bldg 01-05 FIFTH FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 01-05 FIFTH FLOOR PIPING

PLAN - ROOM 572

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 CONNECT NEW FCU PIPING CONNECT TO EXISTING PIPING.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING.

3 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

DN

DN

DN

DN

SOILED UTILITY

CLEAN UTILITY

TOILET

AH-4-105

SF-4-105

HP-4-105

HUM

RS/RL

R S

/R L

3/4" CD

1/ 2"

C W

3/ 4"

C D

3/4" CD

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:3

A

M

004-MP-101

BUILDING 4 - FIRST FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/4" = 1'-0"

Bldg 04-01 FIRST FLOOR PIPING PLAN - ROOM 105

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 1/2" CW PIPING CONNECT TO EXISTING PIPING IN WALL.

2 3/4" CONDENSATE DRAIN DOWN AND TERMINATE TO OSD WITH AIR GAP

3 MOUNT HEAT PUMP ON CONCRETE PAD.

LEVEL FLOOR

EX SLOPE

LOUVER

60" x 96"H.

TRANSPORTERS

ALCOVE

RECEPTION

CLEAN LINEN

SOILED UTILITY

ELECTRICAL CLOSET

ELECTRICAL

ELECTRICAL CLOSET

FEC

WELCOME DESK

MHV OFFICE

BREAK RM

EXPANDED RETAIL

STOCK RM

CORRIDOR

HALL-01

LOUNGE/

CONCESSION

CORRIDOR

ROTUNDA

CONCESSION

SEATING-02

CHECK-OUT

SEATING-01

ATRIUM

SEATING

SERVING LINE-01

SERVING LINE - 02

FOOD

COURT- 01

FOOD

COURT-02

KITCHEN

KITCHEN

DISH WASH

WALK-IN

REFRIGERATOR

FREEZER

DRY

GOOD

STORAGE

STAFF

LOCKERS

HAC

HALL-02

SHARED OFFICE

OFFICE-2

OFFICE-1

ELECTRICAL

VENDING

RETAIL

STORAGE

CORRIDOR

LOADING DOCK

HALL

BREAK RMOFFICEOFFICE

TRIAGE

TRIAGE

EXAM RMEXAM RMEXAM RMEXAM RM

CAFE

COFFEE

SHOP

CORRIDOR

LOBBY

VESTIBULE

CHECK-IN KIOSKS

CORRIDOR

CORRIDOR

RETAIL OUTLET

STORAGE

UNISEX

TOILET

MECH

HAC UNISEX

TOILET

VESTIBULEOFFICE OFFICE OFFICE

PHARMACY

OFFICE

CLOSETSTORAGE

PHARMACY WAITING

HAC

OFFICE

INTERVIEW ALCOVES

COPY/FAX ALCOVE

OFFICE (

LEAD CLERKS)

ENROLLMENT OFFICE

BILLING OFFICE

MECH

ELECTRICAL

BILLING OFFICE

FLOAT

OFFICE

MEANS

TEST OFFICE

PHOTO

CLERK OFFICE

OFFICE

(VETERANS B C)

TRAVEL

AND FUNDS

DESCENDANT AFFAIRS

R.O.I. OFFICE

PATIENT

ADVOCATE

CASHIER

STAIR

WOMENS TOILET

MENS TOILET

DAV OFFICE

STAIR

ELEVATORELEVATOR ELEVATOR

STAIR

STAIR

PULMONARY

RECEPTION/

WAITING RM

123C 123D

123D

123B 123A

102B

102A

1C-02

1A-14

1B-10

1B-09

1C-01

1B-11

1B-12

1A-13

1A-12

1A-10

1A-09

1A-11

1B-13

1A-08

1A-07

1A-06

1A-03

1A-02

1A-01

1B-01

1B-03

1B-04

1B-05

1B-14

1B-08

1B-07

1B-06

1B-02

123M

123B123E123F

123L

123K

123J123I123H123G

1C-03

100C3

100C2

1C-04

123C

123A

86 7

123M

DN DN

UP

DN

DN

UP

DN

DN

UP

UP

ROLLING SECURITY

DOOR

ROLLING SECURITY DOOR

OVERHEAD ROLLING DOOR

STORAGE

VESTIBULE

017-MP-101

017-MP-101

017-MP-101

NO PIPING WORK

FOR THIS SPACE

VESTIBULE

STORAGE

PHARMACY

NO PIPING WORK

FOR THIS SPACE

OFFICE

OFFICE

OFFICE

OFFICE

CLOSET

STORAGE

PHARMACY

NO PIPING

WORK FOR

THIS SPACE

(E)FCU

(E)CHWR

(E)CHWS(E)CD

PULMONARY

RECEPTION /

WAITING ROOM

RECEPTION

123M

STORAGE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:4

A

M

017-MP-101

BUILDING 17 - FIRST FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

Bldg 17-01-FIRST FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 17-01-FIRST FLOOR PIPING PLAN - ROOM 138

1/8" = 1'-0"

Bldg 17-01-FIRST FLOOR PIPING PLAN - ROOM 137

1/4" = 1'-0"

Bldg 17-01-FIRST FLOOR PIPING

PLAN - ROOM 123M

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

CORRIDOR

EXAM

RM

UNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

STAIR

CORRIDOR

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RMUNISEX TOILETUNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

CORRIDOR

EXAM

RM

STAIRELEVATOR

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

DUMBWAITER

ELEVATORELEVATOR

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

UNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

LAB

UNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

UNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

LAB

LAB

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

STAIR

EXAM

RM

UNISEX TOILET

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

UNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

UNISEX TOILET

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM RM

EXAM RM

220A

220B

283B204A

227226

222A

216 215

214A

239238

234233

201A

250A

204B

291203

277278

283A

294A

267 268 269

270271272

272A

256A

259258

257 260

UPPER ROOF EDGE

DN.

UP

DN. UP DN.UP

017-MP-102

017-MP-102

C.O.

(E)FCU

3/4" CD

DEH

(E

)C D

(E )C

H W

R

(E )C

H W

S

(TYP.)

CLEAN STORAGE

CORRIDOR

HUM

STORAGE

TOILET

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:4

A

M

017-MP-102

BUILDING 17 - SECOND FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

BID DEDUCT 1 - Bldg 17-02-SECOND FLOOR PIPING PLAN

1/4" = 1'-0"

BID DEDUCT 1 - Bldg

17-02-SECOND FLOOR PIPING

PLAN - ROOM 209

1/4" = 1'-0"

BID DEDUCT 1 - Bldg

17-02-SECOND FLOOR PIPING

PLAN - ROOM 264

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 3/4" CONDENSATE DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING IN WALL.

3 3/4" HUMIDIFIER DRAIN DOWN IN WALL AND TERMINATE TO OSD UNDER LAVATORY

WITH AIR GAP.

4 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

# Revisions Date

1 BID DEDUCT #1 03/02/2026

MEDICATION

RM

NURSE

STATIONNURSE

STATION

HAC

EXAM

RM

NURSE

STATION

UNISEX TOILETUNISEX TOILET

CONFERENCE

HAC

EXAM

RM

HAC

VESTIBULE

CLOSET

UNISEX TOILET WAITING

ELECTRICAL

CLOSET

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

ELECTRICAL

CLOSET

ELECTRICAL

CLOSET

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM RM

EXAM RM

STAIR

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

OFFICE

UNISEX

TOILET

EXAM

RM EXAM

RM

HAC

DUMBWAITER

BREAK

RM

ELEVATORELEVATOR

STORAGE

ELEVATOR

STAIR

CORRIDOR

UNISEX TOILET

STORAGE

UNISEX TOILET

UNISEX TOILET

CORRIDOR

EXAM

RM

EXAM

RM

CORRIDORCORRIDOR

IT

CLOSET

HAC

ELECTRICAL

CLOSET WAITING

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

ALCOVE

WAITING

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

EXAM

RM

STAIR

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RMCORRIDOR

CORRIDOR

CORRIDOR

OFFICE

OFFICE

STORAGE

WAITING

VESTIBULE

FILE RM

UNISEX

TOILET

UNISEX

TOILET

EXAM RM

EXAM RMEXAM RM EXAM RM

336 342 343

340A

339A

365A

372 373 374

386 384

378 377 376

398A

396A

350B

350A

398B

307 305 303B

303A 302

317 316 315

320318 319

DN.

UP

DN. UP DN.UP

017-MP-103

017-MP-103

HUM

FCU-A

(E)CW

(E)DHW

(E)CW

(E)DHW

(E)CHWS

(E)CHWR

(E)CD (E)CD

(E)CHWR

(E)CHWS

3/4" CD

1/2" CW

(E)CD

1" CHWR

1" CHWS

3/4" CD

(E)1"CD DOWN

EXAM ROOM

EXAM ROOM

CORRIDOR

C.O.

(E)FCU

FCU-A

HUM

3/4" CHWR

3/4" CHWS

3/4" CD

3/4" CD

1/2" CW

(E)DHW

(E)CW

(E )C

H W

R

(E )C

H W

S

(E)DHW

(E)CW

(E)CHWS

(E)CD

STORAGE

NURSE STATION

CORRIDOR

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:4

A

M

017-MP-103

BUILDING 17 - THIRD FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

BID DEDUCT 1 - Bldg 17-03 THIRD FLOOR PIPING PLAN

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-03 THIRD

FLOOR PIPING PLAN - ROOM 320

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-03 THIRD

FLOOR PIPING PLAN - ROOM 369

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 1/2" CW PIPING CONNECT TO EXISTING PIPING.

2 3/4" CONDENSATE DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

3 3/4" CHWS/R PIPING CONNECT TO EXISTING PIPING.

4 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

# Revisions Date

1 BID DEDUCT #1 03/02/2026

NURSE

STATION

EXAM RMOFFICE

CORRIDOR

LAB

OFFICE

OFFICE

OFFICE

VESTIBULE

MEDICATION

RM

UNISEX

TOILET

STAIR

HALL

UNISEX TOILET

UROLOGY EXAM

RM

BREAK

RM

UNISEX TOILET

ELEVATOR

IT

CLOSET

OFFICEOFFICE

ELEVATORELEVATOR

EXAM

RMEXAM

RM

EXAM

RM

UNISEX TOILET

UNISEX TOILET

OFFICE

OFFICE

LAB

LAB

EXAM

RM

OFFICE

STAIR

EXAM

RM

EXAM

RM

STORAGE

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

HAC

STORAGE

ELECTRICAL

CLOSET

UNISEX

TOILET

EXAM RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

FILE

RM

VESTIBULE

WAITING

EXAM

RM

ELECTRICAL

CLOSET

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

CORRIDOR

EXAM

RM

EXAM

RM

STAIR

HALL

EXAM

RM

EXAM

RM

DUMBWAITER

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

LOBBY

CORRIDOR

EXAM

RM

CORRIDOR

ELECTRICAL

CLOSET

CORRIDOR

STORAGE

EXAM

RM

EXAM

RM EXAM

RM

CORRIDOR

NURSE

STATION

CORRIDOR

EXAM

RM

EXAM

RM

CORRIDOR

CORRIDOR

EXAM RM

EXAM RM

OFFICE

EXAM RM

EXAM RM

EXAM RM

UNISEX

TOILET

EXAM RM EXAM RM

EXAM RM

EXAM RMCONSULT

OFFICE

OFFICE

CORRIDOR

456C

456B

447A

444A

443E443D

443C 443B

443A

438A

469A

473474

490A

490491

400401402

404405

413414

415A

442424

463 464

466469

456A

485A

DN.UP

DN.

UP

DN. UP

017-MP-104

017-MP-104

017-MP-104

(E)CW

(E)DHW

(E)CD

(E)CD

(E)CD

(E)CD

(E )C

H W

R

(E )C

H W

S

(E )C

H W

R

(E )C

D

(E )C

H W

R

FCU-A

HUM

3/4" CD

1/2" CW

3/4" CD

3/4" CHWS

3/4" CHWR

(E)DHW

(E)CW

OFFICE

EXAM ROOM

CORRIDOR

FCU-A

HUM

1/2" CW

3/4" CD

(E )C

H W

R 1/

2" C

W

(E )C

D

(E )C

H W

S

(E )C

H W

R

(E)DHW

(E)CW

STORAGE

FCU-CC

HUM

3/4" CD

1/2" CW

(E)CW

(E)DHW

(E)CW

(E)DHW

(E)CD

(E)CHWS

(E)CHWR

(E)CD

(E)CHWR

(E)DHW

(E)CW

(E)CHWS

(E)CHWR

(E)CD

(E)FCU (E)FCU

EXAM ROOM

STORAGE

CORRIDOR

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:5

A

M

017-MP-104

BUILDING 17 - FOURTH FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

BID DEDUCT 1 - Bldg 17-04 FOURTH FLOOR PIPING PLAN

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-04 FOURTH FLOOR PIPING PLAN - ROOM 426 1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-04 FOURTH

FLOOR PIPING PLAN - ROOM 460

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-04 FOURTH

FLOOR PIPING PLAN - ROOM 472

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 3/4" CONDENSATE DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

2 3/4" CHWS/R PIPING CONNECT TO EXISTING PIPING.

3 1/2" CW PIPING CONNECT TO EXISTING PIPING.

4 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

# Revisions Date

1 BID DEDUCT #1 03/02/2026

526A

555E

555C

592593

555F

555D

555G

500C1

501C 501D

500C12

567B

567A

562A

500C9

500C8

500C11

500C10

578 579 580

555A

557533 534

540A

540B

540C

531530

529 532

549A

505A

555B

557A

DUMBWAITER

DIGITAL

RAD

EQUIPMENT

RM

STORAGE

STORAGE

FEC

ELECTRICALELECTRICAL

ELECTRICAL CLOSET

ELECTRICAL CLOSET

BREAK RM

CORRIDOR

SLEEP

SLEEP

STORAGE

WAITING

LOBBY

CHECK IN/

CHECK OUT ALCOVE

STORAGE

GROUP RM

CORRIDOR

MEDICATION RM

EQUIP

STORAGE

UNISEX TOILET

UNISEX TOILET

HAC

EXAM RM

ALCOVE

EXAM RM

CORRIDOR

HAC

EXAM RM

CORRIDOR

UNISEX TOILET

UNISEX TOILET

CORRIDOR

HAC

UNISEX TOILET

STAIR HALL - 3

CORRIDOR

TRIAGE

SOILED UTILITY

EXAM RM

STAFF

TOILET

EXAM RM

CLEAN/STERILE STORAGE

EXAM RM

EXAM RM

STAFF

TOILET

EXAM RM

CLEAN

STORAGE OFFICE OFFICE

WORK RM

SOILED UTILITY

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

BED RM

STAFF

LOUNGE/LOCKER

PODIATRY STORAGE

STORAGE

EXAM RM

ORAL

SURGERY

CHIEF

OF

DENTAL

STORAGE

STORAGE

FEMALE DECON

BULK

STORAGE

MALE

DECON

CORRIDOR

EXAM RM

CLINICIAN ALCOVE

PATIENT TOILET

SOILED LINEN

RECEPTION

CORRIDOR

STAIRHALL

ELEVATOR 6

WORK

STATION

PORCELAIN RM

BAILOUT RM

HAC

MALE

DECON

STAFF

TOILET

OPERATORYOPERATORY

CLINICIAN ALCOVE CORRIDOR

OPERATORY

OPERATORY

PANORAMIC

CLEAN

INSTRUMENT

OPERATORY

OPERATORY

CLINICIAN ALCOVE

OPERATORY

OPERATORY

DENTAL

HYGIENE

CONSULT

DENTAL

SECRETARY

OFFICE

STAFF

TOILET

PATIENT TOILET

CORRIDOR

EXAM RM

CORRIDOR

EEG LAB

ELEVATOR 7 ELEVATOR 8

STAIR HALL - 1

STORAGE

DN

DOWN DOWN

UP

017-MP-105

017-MP-105

017-MP-105

017-MP-105

3/4" CD

1/2" CW

HUM

3/4" CD

(E )C

W (E

)D H

W

(E )C

H W

S

(E )C

H W

R

(E )C

H W

R

(E )C

D

FCU-B

(E )C

D

(E )C

H W

R

(E )C

H W

R

(E )C

H W

S

STERILE STORAGE

(E )C

H W

R

(E )C

H W

S (E

)C H

W S

(E )C

D

(E )C

H W

R

FCU-B

3/4" CD

3/4" CHWS

3/4" CHWR

STORAGE

CAV-17-555

HUM

(E)CD(E)CD

(E )C

W

(E )D

H W

1/2" CW

3/ 4"

C D

3/4" HWS

3/4" HWR

555G

STORAGE

505A

CORRIDOR

(E)HWR

(E)HWS

(E)HWR

(E)HWS

3/ 4"

C D

1/ 2"

C W

(E )C

D (E

)C H

W S

(E )C

H W

R

(E )C

W

(E )C

D

(E)CD

(E)CHWS

(E)CHWR

1/2" CW

(E)CD

(E)CW

(E)FCU(E)FCU

HUM

CLEAN STORAGE

OFFICE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:5

A

M

017-MP-105

BUILDING 17 - FIFTH FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

BID DEDUCT 1 - Bldg 17-05 FIFTH FLOOR PIPING PLAN

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-05 FIFTH

FLOOR PIPING PLAN - ROOM 521

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-05 FIFTH

FLOOR PIPING PLAN - ROOM 536

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-05 FIFTH

FLOOR PIPING PLAN - ROOM 555G

1/4" = 1'-0"

BID DEDUCT 1 - Bldg 17-05 FIFTH

FLOOR PIPING PLAN - ROOM 578

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 3/4" CONDENSATE DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING.

3 3/4" CHWS/R PIPING CONNECT TO EXISTING PIPING.

4 3/4" HUMIDIFIER DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

5 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

6 3/4" HWS/R PIPING CONNECT TO EXISTING PIPING.

# Revisions Date

1 BID DEDUCT #1 03/02/2026

1 1 1

D.F D.F

ROOF

WS 18WS 17

WS 14WS 13

WS 10

WS 9

WS 11

WS 20WS 19

WS 16WS 15

WS 12

WS 6WS 5

WS 2WS 1

WS 8WS 7

WS 4WS 3

WS 6

WS 2

WS 7

WS 6

WS 5

WS 4

WS 3

418B 432B

434A

443A

448A450A

410A

442A/D

452451

418A

432A

409A

409D

409C 409B

416B

416A415414

402403404

405A

405B406A

406B

421420

448449

445446447

434B

439/440

436A

435A

STORAGE

CLOSET

PATIENT

SHOWER

CLOSET

HAC

ELECTRICAL CLOSET

LINEN

CLOSET

UNISEX

TOILET

UNISEX

TOILET

LINEN

CLOSET

CLOSET

ELECTRICAL CLOSET

LAUNDRY CHUTE

FEC

FEC

FEC

WORKSTATIONS

CORRIDOR

ELEVATOR LOBBY

CORRIDORCORRIDOR

MENS

TOILET

WOMENS TOILET

CORRIDOR

OFFICE

STAFF

TOILET

SOILED

UTILITY

STORAGE

NUORISHMENT

VISITORS ALCOVE

STORAGE

OFFICE

OFFICE OFFICE

CONFERENCE

STORAGE

PATIENT

SHOWERLOUNGEOFFICE

STAIR

HALL - 2

HAC

STORAGE

WOMENS TOILET

PIPE CHASE

OFFICE

OFFICE

OFFICEOFFICEOFFICE

OFFICE

STAIR HALL -

SERVICE ELEVATOR

ELEVATOR

ELEVATOR

STORAGE

SOILED LINEN

FUTURE UTILITY RM

HAC

MOP

BALCONYSTUDENTS

INTERVIEW

RM

EXAM RM

(DERM)

EXAM RM

(DERM)

EXAM RM (DERM)

EXAM RM

(DERM)EXAM RM

(DERM)

MENS

TOILET

STORAGE

OFFICE(OCC)OFFICE(OCC)BREAK RM

STORAGE

OFFICE(OCC)

WORKSTATIONS

STAIR

HALL - 3

VESTIBULE VESTIBULE

OFFICE

CLEAN

SUPPLY

HAC

OFFICE(OCC)

EXAM RM

1 (DERM)

EXAM RM

1 (DERM) EXAM RM 2

(DERM)

EXAM RM

3 (DERM)

STAFF TOILET MECH

ELECTRICAL CLOSET

UP

UP

DN.

DN

UP

DN.

018-MP-104

(E)FCU

DEH

3/ 4"

C D

(E )C

D

(E )C

H W

R (E

)C H

W S

CLEAN SUPPLY

STAFF TOILET

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:5

A

M

018-MP-104

BUILDING 18 - FOURTH FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

Bldg 18-04 FOURTH FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 18-04 FOURTH FLOOR PIPING

PLAN - ROOM 431

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 3/4" CONDENSATE DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

2 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

CORRIDOR

CORRIDOR

ELECTRICAL

CLOSET

ELECTRICAL

CLOSET

HAC

EXAM

RM STAIR

HALL

OFFICE

TOILET

TOILET

OFFICE OFFICE

TOILET

TOILET

OFFICE

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM

EXAM

RM OFFICE

STORAGE

EXAM

RM

EXAM

RM EXAM

RM

UNISEX TOILET

PATIENT

RM

UNISEX TOILET

UNISEX TOILET

PATIENT

RM

ELECTRICAL

CLOSET

ELECTRICAL

CLOSET

EXAM

RM

UNISEX TOILET

ELECTRICAL CLOSET

EXAM

RM

EXAM

RM

UNISEX TOILET

EXAM

RM

EXAM

RM

UNISEX TOILET

EXAM

RM

VESTIBULE

UNISEX TOILET

EXAM

RM

HAC

STAIR

HALL

EXAM

RM

UNISEX TOILET

UNISEX TOILET

EXAM

RM

EXAM

RM

UNISEX TOILET

EXAM

RM

EXAM

RM

EXAM

RM

STAIR

HALL

CORRIDOR

SERVICE

ELEVATOR

ELEVATOR

ELEVATOR

WOMENS

TOILET

MENS TOILETBATH

RM

STAFF TOILET

HAC

HAC

EXAM

RM

STAFF

TOILET

STAFF

TOILET

EXAM

RM

BATH

RM

BATH

RM

PATIENT SHOWER

EXAM

RM

EXAM

RM

EXAM RM

518B

510A

509D

509C 509B

509A

507 506 505

504B

504A

503 502

501C

501D 501

501B 501A

554A

552A

553A

548A

546A

545A

540A

537536

535A

536A

535534

534A

532531

526525

518A

516B

516A

515514 517A

D.FD.F

UP

UP

DN.

DN.

UP

DN.

018-MP-105

1/ 2"

C W

(E)FCUHUM

1/2" CW

(E)CD

(E)CHWS

(E)CHWR

3/4" CD

517A

EXAM ROOM

CORRIDOR

STAFF TOILET

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:5

A

M

018-MP-105

BUILDING 18 - FIFTH FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

Bldg 18-05 FIFTH FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 18-05 FIFTH FLOOR PIPING

PLAN - ROOM 517A

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 1/2" CW PIPING CONNECT TO EXISTING PIPING IN WALL.

2 3/4" HUMIDIFIER DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

3 EXISTING PERIMETER HEATING CONVECTORS (WHERE APPLICABLE) -

FIELD-VERIFY WHETHER SYSTEM IS STEAM OR HOT WATER. REPLACE EXISTING

CONVECTOR VALVE WITH NEW CONTROL VALVE, WIRED TO AND CONTROLLED BY

SAME THERMOSTAT AS THE COOLING-ONLY FCU.

UP

(E)FCU-1

(E)FCU-3

(E)FCU-5 (E)FCU-6

(E)FCU-4

(E)FCU-2

(E)CD

(E)LPS

(E)LPC

(E)CHWS

(E)CHWR

(E)LPC

(E)LPS

(E)CD

(E)CHWR

(E)CHWS

(E)LPC

(E)LPS

(E)LPC

(E)LPS

(E)CD

(E)CHWR

(E)CHWS

(E)LPC

(E)LPS

(E )C

H W

R

(E )C

H W

S

(E )C

D

(E )L

P C

(E )L

P S

(E )C

H W

R

(E )C

H W

S

(E )C

D

(E )C

D

(E )C

H W

R

(E )C

H W

S

(E )L

P C

(E )L

P S

(E )L

P S

(E )L

P C

(E )C

H W

S

(E )C

H W

R

(E )C

D

DEH DEH

DEH DEH

3/4" CD 3/4" CD

3/4" CD

3/4" CD

(E)RISERS UP TO TOILET RMS ABOVE:

- (E)1-1/2" CW

- (E)3/4" HW

- (E)1/2" HW-R

- (E)4" SAN

(E)PIPING UP (E)CAPPED PIPING(E)PIPING UP

(E)PIPING UP(E)PIPING UP

STORAGE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:0

A

M

022-MP-101

BUILDING 22 - FIRST FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/4" = 1'-0"

Bldg 22-01-FIRST FLOOR PIPING PLAN - ROOM 109

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

2 3/4" CONDENSATE DRAIN CONNECT TO EXISTING CONDENSATE DRAIN PIPING.

OFFICE

MULTI-PURPOSE

EQUIPMENT

WORK AREA

ELECTRICAL

CLOSET

CORR.

204A

CHASE

206B

ELECTRICAL CLOSET

216A

CONTROL A

R E

F

UP DN

DN UP

UP

DN

LOBBY

HAC

UTILITIES

MENS TOILET

SIM. LAB - A

OFFICE

OFFICE

OFFICE

IT

SIM LAB - B

TRAINING ROOM - A

224A

TRAINING ROOM - C

TRAINING ROOM - B

224B

CONTROL B

EQUIPMENT

STORAGE/

EQUIPMENT

COMPUTER ROOM

WOMENS TOILET

232STORAGE

BREAK ROOM

208 ELEV.

STORAGE

232C

CHANGING ROOM

206A

CHANGING ROOM

232A

MULTI-PURPOSE

H.A.C.

CORRIDOR

CORR.

204B

CORR.

204C

CORRIDOR

CHASE

232B

CORRIDOR

EXIST IT

ST-1

ST-2

ST-3

EXISTING

ROOF

BELOW

022-MP-102

(E)CAV

DEH

HUM

(E)VAV

(E)VAV

1/ 2"

C W

3/ 4"

C D

3/ 4"

C D

3/4" CD

ELEC. CLO

EQUIPMENT

204A

CORRIDOR

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:0

A

M

022-MP-102

BUILDING 22 - SECOND FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/8" = 1'-0"

Bldg 22-02-SECOND FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 22-02-SECOND FLOOR PIPING PLAN - ROOM 216

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 3/4" CONDENSATE DRAIN DOWN IN CHASE AND TERMINATE TO OSD WITH AIR GAP.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING IN CHASE

CAFE PATIO

OPENING

ABOVE

FIREPLACE

UP

DN

1A02B

1A151A11

1A12

1A29

1A18

1A01

1A00

1A21

1A14

1A06

1A10

1A17

1A20

1A23

1A24

1A30

1A28

1A31

1A32 1A33 1A35

1A41 1A40

1A39

1A36

1A38

1A37

1A34

1A22

1A16

1A13

1A09

1A04

1A08

1A04A

1A02A

1A02

1A05

1A27

CART

STORAGE

CORRIDOR

ELEVATORELECTRICAL

ELEVATOR

MACHINE RM

VESTIBULE

PATIO

STORAGE

LOBBY

VESTIBULE

CORRIDOR

ELEVATOR LOBBY

CAFE

CAFE

STORAGE

MENS TOILET

HAC

IT CLOSET

WOMENS TOILET

STAIR-2

CORRIDOR

LARGE

CLASS RM

OFFICE/

CONSULT

OFFICE/

CONSULT

OFFICE/

CONSULT

TRAINING

DINING

MEDICATION RM

CORRIDOR

STORAGE

LARGE

CLASS RM

OFFICE/

CONSULT

OFFICE/

CONSULT

OFFICE/

CONSULT

OFFICE/

CONSULT

OFFICE/

CONSULT

LARGE

CLASS RM

OFFICE/

CONSULT

STORAGE

CART

STORAGE

COMPUTER RM

STAIR-1

CHASE

037-MP-101

CAV-37-1A10

(E)VAV

HUM

1/2" CW

3/4" CD

3/4" CD(E

)C

W

(E )D

H W

(E )H

W -R

(E )C

W

(E)CW

(E)DHW

(E)HW-R

(E)HWS

(E)HWR

(E)HWR

(E)HWS

3/4" HWS

3/4" HWR

1A10

STORAGE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:0

A

M

037-MP-101

BUILDING 37 - FIRST FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/8" = 1'-0"

Bldg 37-01-FIRST FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 37-01-FIRST FLOOR PIPING

PLAN - ROOM 1A10

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 1/2" CW PIPING CONNECT TO EXISTING PIPING.

2 3/4" HUMIDIFIER DRAIN DOWN IN WALL AND TERMINATE TO OSD UNDER LAVATORY

WITH AIR GAP.

SLOPE 12" OVER 68'-0"

164A

XDR01

XCTC1

140A

100C2

100C3

106105

131B

131A

14510 0C

100C11

145A

145B

142A

XCTS1

100C9

100C5

100C4

111 113

124125

100C6

163A

163B

100C1

DECON.

HAMPER

STAFF

TOILET

SINK

ALCOVE

SINK

ALCOVE

DIALYSIS MACHINE

ELECTRICAL CLOSET

RADIOLOGY

CONTROL RM

BED RM - 1 BED

CORRIDOR

NURSE

STATION

CORRIDOR

CLEAN LINENSTAFF

TOILET

UNISEX TOILET

MEDICATION ALCOVE

CLEAN

SUPPLY

NURSE

STATION

SOILED UTILITY

TELEPHONE CLOSET

EQUIP

STORAGE

NOURISHMENT

STAFF

SHOWER

ELECTRICAL

NURSE MGR

OFFICE

RESPIRATORY THERAPY

NURSES' STATION

C O

R R

ID

O

R

CORRIDOR

CLEAN LINEN

OBSERVATION RM

CLEAN

SUPPLY

CHIEF OF

URGENT CARE

CONFERENCE

STORAGE

H.A.C.

CT SCANNING

CORRIDOR

CORRIDOR

CORRIDOR

ALCOVE

VESTIBULE

PATIENT RM PATIENT RM

PATIENT RM

PATIENT RM

PATIENT RM

PATIENT RM

ANTE RM

PATIENT RM

HAC

PATIENT RM

PATIENT RM

PATIENT RMPATIENT RM

WAITING

CORRIDOR

TELEPHONE CLOSET

TREATMENT 1

TREATMENT 2

DECON RM

VESTIBULE

UNISEX TOILET

DECON.

SHOWER

DECON RM

FAST TRACK

TREATMENT 8

FAST TRACK

TREATMENT 7

TREATMENT 6

TREATMENT 5

TREATMENT 4

TREATMENT 3

SOILED UTILITY

EGRESS

CORRIDOR ONLY

101-MP-101

101-MP-101

101-MP-101

4 101-MP-101

CAV-101-104

1/2" HWS

1/2" HWR

(E )H

W S

(E )H

W R

HUM

CLEAN SUPPLY

TOILET

DHC-101-132

HUM

(E

)H W

S

(E )H

W R

(E )H

W S

(E )H

W R

(E )H

W R

(E )H

W S

(E )H

W R

(E )H

W S

(E)HWR

(E)HWS

(E) 3/4" HWR

(E) 3/4" HWS

(E)HWR

(E)HWS

3/4" CD

(E)CW

3/4" CD

(E)DHW

(E)CW

1/2" CW

(E)CW

(E)DHW

(E )C

W

(E )D

H W

(E )H

W -R

(E )C

W

(E )D

H W

(E )H

W -R

3/ 4"

C D

MEDICATION

ALCOVE

SOILED UTILITY

CLEAN SUPPLY

HUM

1/2" CW3/4" CD

CONFERENCE

145B

CLEAN SUPPLY

DHC-101-163

3/4" HWS

3/4" HWR

(E)HWS

(E)HWR

HUM

3/ 4"

C D

1/ 2"

C W

3/ 4"

C D

1/ 2"

C W

(E )C

W

(E )D

H W

(E)HW-R

STORAGE

163B

STORAGE

163A

STORAGE

TOILET

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:1

A

M

101-MP-101

BUILDING 101 - FIRST FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/8" = 1'-0"

Bldg 101-01-FIRST FLOOR PIPING PLAN

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR PIPING

PLAN - ROOM 104

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR PIPING PLAN - ROOM 132

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR PIPING

PLAN - ROOM 145B

1/4" = 1'-0"

Bldg 101-01-FIRST FLOOR PIPING

PLAN - ROOM 163, 163A, 163B

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 1/2" HWS/R PIPING CONNECT TO EXISTING PIPING.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING IN WALL.

3 3/4" HUMIDIFIER DRAIN DOWN IN WALL AND TERMINATE TO OSD UNDER LAVATORY

WITH AIR GAP.

4 3/4" HWS/R PIPING CONNECT TO EXISTING PIPING.

5 1/2" CW PIPING CONNECT TO EXISTING PIPING.

6 3/4" HUMIDIFIER DRAIN DOWN IN WALL AND TERMINATE TO OSD UNDER LAVATORY

WITH AIR GAP.

CONC.

RAMP

DN

NEW

GENERATOR

PAD

MORGUE COOLER SLAB

102A

100C5

100C4 100C3

104I

104H

110B

110A

124A

126A

109112

104A

104B

104C

104D

104E

104F

104G

104J

RECEPTION

CONSULT CLOSET

THERAPY GYM

WAITING

SOILED UTILITY

CORRIDOR

CORRIDOR CORRIDOR

STAFF

TOILET

STAFF

TOILET

STAFF

TOILET

STAFF

TOILET

PHYSIATRIST

OFFICE/EXAM RM

PROSTHETICS WORK AREA

ELECTRICAL CLOSET

PHYSIATRIST OFFICE/ EXAM RM

PHYSIATRIST OFFICE/ EXAM RM

HAC PIPE

CHASE

UNISEX TOILET

UNISEX TOILET

CLEAN LINEN

DRESSING RM

BREAK RM

BREAK RM

SUPV OF

PROSTHETICS

P.T. SUPV

OFFICE

IT

CLOSET

HYDROTHERAPY

PATIENT TOILET

OXYGEN STORAGE RM

KITCHEN

SOILED UTILITY

TREATMENT

TREATMENT

TREATMENT

PREP AREA

TREATMENT

TREATMENT

TREATMENT

STAFF

CHARTING

EQUIP

STORAGE

PHYSIATRIST

OFFICE/

EXAM RM

PROSTHETIC

RECEIVING AND

STORAGE RM

PHYSIATRIST

OFFICE/

EXAM RM

PHYSIATRIST

OFFICE/

EXAM RM

FEC

FEC

FEC

FEC

FEC

FEC

DN

DN

102-MP-101

CAV-102-110

HUM

(E)HWR

(E)HWS

3/4" HWR

3/4" HWS

(E)CW

3/4" CD

3/4" CD (E)CW

(E)DHW

1/2" CW

(E)WALL HYDRANT

110B

PHYSIATRIST

OFFICE / EXAM RM

110C

STORAGE ROOM

PHYSIATRIST

OFFICE / EXAM RM

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

AE Works, LTD.

418 Beaver Street

Sewickley, PA 15143

Phone: 412-287-7333 www.ae-works.comAE WORKS®

A u to d e s k D o c s /V

L E

B -0

S te ri le

S to ra g e I m p ro v e m e n ts /V

L E

B -0

-M E

P

.r v t

/2

/2

:3

:1

A

M

102-MP-101

BUILDING 102 - FIRST FLOOR PIPING PLAN STERILE STORAGE IMPROVEMENTS

1700 S LINCOLN AVE, LEBANON, PA 17042

VLEB-016

11.17.25 TS AC

BID DOCUMENTS

1/16" = 1'-0"

Bldg 102-01-FIRST FLOOR PIPING PLAN 1/4" = 1'-0"

Bldg 102-01-FIRST FLOOR PIPING PLAN - ROOM 110

HYDRONIC GENERAL NOTES

1 REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND

SPECIFICATION SECTION 01 35 26 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION.

2 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE MUST. A DETAILED

JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.

3 REFER TO ARCHITECTURAL FOR ADDITIONAL REQUIREMENTS.

4 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.

5 ALL BRANCH PIPING IS 3/4-IN UNLESS OTHERWISE NOTED EXCLUDING REFRIGERANT PIPING.

REFRIGERANT PIPING SIZING MUST BE COMPLETED BY CONTRACTOR BASED ON

MANUFACTURER'S RECOMMENDATIONS.

6 PROVIDE EXPANSION LOOPS, JOINTS, Z BENDS AND PIPING OFFSETS TO ACCOMMODATE

THERMAL AND OTHER PIPING MOVEMENT.

7 CONTRACTOR RESPONSIBLE TO REMOVE EXISTING CEILING, REUSE AND REINSTALL TO

GREATEST EXTENT POSSIBLE FOR LAY IN CEILINGS. GYP CEILINGS TO BE CUT AND

PATCHED TO MATCH EXISTING. ALL SYSTEMS IN EXISTING CEILING TO REMAIN IN WORKING

ORDER, ALL SPRINKLERS AND FIRE ALARMS IN AREA OF WORK TO REMAIN ACTIVE AT ALL

TIMES.

KEYNOTES

1 1/2" HWS/R PIPING CONNECT TO EXISTING PIPING.

2 1/2" CW PIPING CONNECT TO EXISTING PIPING.

3 3/4" HUMIDIFIER DRAIN DOWN IN WALL AND TERMINATE TO OSD UNDER LAVATORY

WITH AIR GAP.

DICTATION

HAND

WASH

HAND

WASH

MEDS

NOURISH

COFFEE BAR

21'-0 1_

1 _ 4

19'-11 3_

3 _ 4

This is the start of the file's text. The full file is on GovTribe.