These documents contain a series of comprehensive tamper inspection reports for multiple buildings across two inspection periods (April and October 2025). The inspections were primarily conducted by technicians Leidhecker, Eisenhour, Sanders, and McCabe, covering 20+ buildings including Buildings 1-19, 22-24, 34-37, 99-106, 136, 144, Primary Care, and New Lab.

Each building's inspection report follows a consistent format, tracking various devices such as tampering points, backflow systems, fire pumps, crawl spaces, and mechanical areas. The reports systematically log whether each device passed or failed inspection, with most buildings showing perfect pass rates (0 failures) across both inspection periods. The inspections occurred on specific dates in 2025, with most taking place on dates between 4/30/2025 and 5/13/2025 for the April period, and around 10/27/2025 for the October period. The total number of devices inspected per building ranged from 1-33, with a typical inspection covering 2-10 specific devices or locations within each building.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

AA X

5A X 4A X 3A X 2A X 1A X

GA X

GA ROOM 2 X

A CRAWL SPACE X

AB X

5B X 4B X 3B X 2B X 1B X

GB X

GB SOUTHEAST X

BB CRAWLSPACE X

PC X

6C X 5C X 4C X 3C X 2C X 1C X

GC X

GC SPS GLYCOL X

BACKFLOW IN X

BACKFLOW OUT X

FIRE PUMP #1 X

FIRE PUMP #2 X

BLDG 1 TAMPER (APRIL)

FIRE PUMP #3 X

BC X

TOTAL DEVICES 33

PASS 33

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

AA X

5A X 4A X 3A X 2A X 1A X

GA X

GA ROOM 2 X

A CRAWL SPACE X

AB X

5B X 4B X 3B X 2B X 1B X

GB X

GB SOUTHEAST X

BB CRAWLSPACE X

PC X

6C X 5C X 4C X

LEIDHECKER/MCCABE

5/13/2025

BLDG 1 TAMPER (OCTOBER)

3C X 2C X 1C X

GC X

GC SPS GLYCOL X

BACKFLOW IN X

BACKFLOW OUT X

FIRE PUMP #1 X

FIRE PUMP #2 X

FIRE PUMP #3 X

BC X

TOTAL DEVICES 33

PASS 33

FAIL 0

TECHNICIAN

DATE 11/4/2025

LEIDHECKER

TAMPER X

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

TAMPER X

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 1 RADI TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG 1 RADI TAMPER (OCTOBER)

DRY SYSTEM X

WET SYSTEM X

MAIN X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

DRY SYSTEM X

WET SYSTEM X

MAIN X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 1 SOUTH TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG 1 SOUTH TAMPER (OCTOBER)

ATTIC X

4TH FLOOR NORTH X

4TH FLOOR SOUTH X

3RD FLOOR NORTH X

3RD FLOOR SOUTH X

2ND FLOOR NORTH X

2ND FLOOR SOUTH X

1ST FLOOR ANITFREEZE X

1ST FLOOR NORTH X

1ST FLOOR SOUTH X

SERVICE ROOM MAIN X

BACKFLOW IN X

BACKFLOW OUT X

OUTSIDE HOSE CONNECTION X

TEST LOOP #1 X

TEST LOOP #2 X

BY PASS IN X

BY PASS OUT X

JOCKEY PUMP IN X

JOCKEY PUMP OUT X

FIRE PUMP RUN X

FIRE PUMP LOSS OF POWER X

TOTAL DEVICES 22

PASS 22

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BLDG 2 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

4/30/2025

BLDG 2 TAMPER (OCTOBER)

4TH FLOOR NORTH X

4TH FLOOR SOUTH X

3RD FLOOR NORTH X

3RD FLOOR SOUTH X

2ND FLOOR NORTH X

2ND FLOOR SOUTH X

1ST FLOOR ANITFREEZE X

1ST FLOOR NORTH X

1ST FLOOR SOUTH X

SERVICE ROOM MAIN X

BACKFLOW IN X

BACKFLOW OUT X

OUTSIDE HOSE CONNECTION X

TEST LOOP #1 X

TEST LOOP #2 X

BY PASS IN X

BY PASS OUT X

JOCKEY PUMP IN X

JOCKEY PUMP OUT X

FIRE PUMP RUN X

FIRE PUMP LOSS OF POWER X

TOTAL DEVICES 22

PASS 22

FAIL 0

TECHNICIAN

MAIN TAMPER X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

MAIN TAMPER X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 3 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

BLDG 3 TAMPER (OCTOBER)

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

MAIN TAMPER X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 4 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/7/2025

BLDG 4 TAMPER (OCTOBER)

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

MAIN TAMPER X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 5 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/7/2025

BLDG 5 TAMPER (OCTOBER)

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 6 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 6 TAMPER (OCTOBER)

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 7 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 7 TAMPER (OCTOBER)

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 8 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 8 TAMPER (OCTOBER)

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 9 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 9 TAMPER (OCTOBER)

5A X 4A X 3A X 2A X

1A NORTH STAIR X

A CRAWLSPACE RISER X

A CRAWLSPACE BYPASS X

A CRAWL SPACE BACKFLOW IN X

A CRAWL SPACE BACKFLOW OUT X

A CRAWL SPACE BACKFLOW IN X

A CRAWL SPACE FRONT EXT TAMPER X

5B X 4B X 3B X 2B X

1B SOUTH STAIR X

B CRAWLSPACE RISER X

5C X 4C X 3C X 2C X

CANTEEN TAMPER X

BC X

C CRAWLSPACE RISER X

FIRE PUMP #1 X

FIRE PUMP #2 X

FIRE PUMP#3 X

TOTAL DEVICES 28

PASS 28

FAIL 0

BLDG 17 TAMPER (APRIL)

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

ATTIC X

5A X 4A X 3A X 2A X

1A NORTH STAIR X

A CRAWLSPACE RISER X

A CRAWLSPACE BYPASS X

A CRAWL SPACE BACKFLOW IN X

A CRAWL SPACE BACKFLOW OUT X

A CRAWL SPACE BACKFLOW IN X

A CRAWL SPACE FRONT EXT TAMPER X

5B X 4B X 3B X 2B X

1B SOUTH STAIR X

B CRAWLSPACE RISER X

5C X 4C X 3C X 2C X

CANTEEN TAMPER X

BC X

C CRAWLSPACE RISER X

FIRE PUMP #1 X

FIRE PUMP #2 X

LEIDHECKER/EISENHOUR/SANDERS

5/1/2025

BLDG 17 TAMPER (OCTOBER)

FIRE PUMP#3 X

TOTAL DEVICES 28

PASS 28

FAIL 0

TECHNICIAN

5A X 4A X 3A X 2A X 1A X

BA X

5B X 4B X 3B X 2B X 1B X

BB X

5C X 4C X 3C X

2C X FAILED TO INITIATE SUPERVISORY #872 5/13/2025

1C X

SC X

SC ZONE C X

BACKFLOW #1 REMOVED FROM LOGS ON 5/6/25

BACKFLOW#2 REMOVED FROM LOGS ON 5/6/25

FIRE PUMP #1 REMOVED FROM LOGS ON 5/6/25

FIRE PUMP #2 REMOVED FROM LOGS ON 5/6/25

SC SPRINKLER X ADDED TO LOGS ON 5/6/25

BYPASS X ADDED TO LOGS ON 5/6/25

BACKFLOW X ADDED TO LOGS ON 5/6/25

FIRE PUMP SPRINKLER X ADDED TO LOGS ON 5/6/25

TOTAL DEVICES 24

PASS 23

FAIL 1

BLDG 18 TAMPER (APRIL)

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

ATTIC X

5A X 4A X 3A X 2A X 1A X

BA X

5B X 4B X 3B X 2B X 1B X

BB X

5C X 4C X 3C X 2C X 1C X

SC X

SC ZONE C X

SC SPRINKLER X

BYPASS X

BACKFLOW X

FIRE PUMP SPRINKLER X

TOTAL DEVICES 24

PASS 24

FAIL 0

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 18 TAMPER (OCTOBER)

DATE 11/3/2025

AC X

3A X 2A X 1A X

1A ELEV. #14 X

A CRAWLSPACE X

3B X 2B X 1B X

BC X

B CRAWLSPACE X

FIRE PUMP #1 X

FIRE PUMP #2 X

FIRE PUMP #3 X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 16

PASS 16

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

AC X

3A X 2A X 1A X

1A ELEV. #14 X

A CRAWLSPACE X

BLDG 19 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/1/2025

BLDG 19 TAMPER (OCTOBER)

3B X 2B X 1B X

BC X

B CRAWLSPACE X

FIRE PUMP #1 X

FIRE PUMP #2 X

FIRE PUMP #3 X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 16

PASS 16

FAIL 0

TECHNICIAN

DATE 10/27/2025

3B TAMPER X

2B TAMPER X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

3B TAMPER X

2B TAMPER X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 22 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

4/30/2025

BLDG 22 TAMPER (OCTOBER)

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 23 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

4/30/2025

BLDG 23 TAMPER (OCTOBER)

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 24 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/1/2025

BLDG 24 TAMPER (OCTOBER)

1ST FLOOR X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

ATTIC X

1ST FLOOR X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 34 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/7/2025

BLDG 34 TAMPER (OCTOBER)

1ST FLOOR WEST X

1ST FLOOR MECH ROOM X

MAIN TOP X

MAIN BOTTOM X

TOTAL DEVICES 5

PASS 5

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

ATTIC X

1ST FLOOR WEST X

1ST FLOOR MECH ROOM X

MAIN TOP X

MAIN BOTTOM X

TOTAL DEVICES 5

PASS 5

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 35 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/7/2025

BLDG 35 TAMPER (OCTOBER)

1ST FLOOR WEST STAIR X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

ATTIC X

1ST FLOOR WEST STAIR X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 36 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/7/2025

BLDG 36 TAMPER (OCTOBER)

2ND FLOOR X

1ST FLOOR X

1ST FLOOR FIREPLACE X

BASEMENT MAIN X

BASEMENT X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 8

PASS 8

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

ATTIC X

2ND FLOOR X

1ST FLOOR X

1ST FLOOR FIREPLACE X

BASEMENT MAIN X

BASEMENT X

BACKFLOW IN X

BACKFLOW OUT X

TOTAL DEVICES 8

PASS 8

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 37 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/7/2025

BLDG 37 TAMPER (OCTOBER)

BACKFLOW TAMPER INLET X

BACKFLOW TAMPER OUTLET X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW TAMPER INLET X

BACKFLOW TAMPER OUTLET X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 99 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 99 TAMPER (OCTOBER)

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

TAMPER X

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 100 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/6/2025

BLDG 100 TAMPER (OCTOBER)

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

MAIN TAMPER X

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 101 TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG 101 TAMPER (OCTOBER)

MAIN X

DRY SYSTEM X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

MAIN X

DRY SYSTEM X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 102 TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG 102 TAMPER (OCTOBER)

2ND FL NORTH X ADDED TO LOGS ON 5/13/2025

2ND FL SOUTH X

MECH SPACE X

MECH SPACE NORTH X

1ST FL STAIR 2 X

1ST FL SOUTHEAST EXIT X

RM 0502 MAIN X

BASEMENT X

BACKFLOW #1 X

BACKFLOW #2 X

TOTAL DEVICES 10 CHANGED FROM 9 TO 10 ON 5/13/2025

PASS 10

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

2ND FL SOUTH X

MECH SPACE X

MECH SPACE NORTH X

1ST FL STAIR 2 X

1ST FL SOUTHEAST EXIT X

RM 0502 MAIN X

BASEMENT X

BACKFLOW #1 X

BACKFLOW #2 X

TOTAL DEVICES 9

PASS 9

FAIL 0

BLDG 104 TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG 104 TAMPER (OCTOBER)

BACKFLOW TAMPER OUTLET X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW TAMPER INLET X

BACKFLOW TAMPER OUTLET X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 106 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/1/2025

BLDG 106 TAMPER (OCTOBER)

Tamper 1 Added to logs on 10/21/25 Tamper 2 Added to logs on 10/21/25 Tamper 3 Added to logs on 10/21/25

TOTAL DEVICES 3

PASS 0

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

Tamper 1 X Added to logs on 10/21/25 Tamper 2 X Added to logs on 10/21/25 Tamper 3 X Added to logs on 10/21/25

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE 10/27/2025

BLDG 106 TAMPER (APRIL)

BLDG 106 TAMPER (OCTOBER)

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

TAMPER X

TOTAL DEVICES 1

PASS 1

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 136 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/1/2025

BLDG 136 TAMPER (OCTOBER)

TAMPER 1 X

TAMPER 2 X

TAMPER 3 X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

TAMPER 1 X

TAMPER 2 X

TAMPER 3 X

TOTAL DEVICES 3

PASS 3

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG Primary Care TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG Primary Care TAMPER (OCTOBER)

TAMPER 1 X

TAMPER 2 X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

TAMPER 1 X

TAMPER 2 X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG New Lab TAMPER (APRIL)

LEIDHECKER/MCCABE

5/13/2025

BLDG New Lab TAMPER (OCTOBER)

BACKFLOW TAMPER OUTLET X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE

DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED

BACKFLOW TAMPER INLET X

BACKFLOW TAMPER OUTLET X

TOTAL DEVICES 2

PASS 2

FAIL 0

TECHNICIAN

DATE 11/4/2025

BLDG 144 TAMPER (APRIL)

LEIDHECKER/EISENHOUR/SANDERS

5/1/2025

BLDG 144 TAMPER (OCTOBER)

BLDG 1 TAMPER
BLDG 1 RADI TAMPER
BLDG 1 SOUTH TAMPER
BLDG 2 TAMPER
BLDG 3 TAMPER
BLDG 4 TAMPER
BLDG 5 TAMPER
BLDG 6 TAMPER
BLDG 7 TAMPER
BLDG 8 TAMPER
BLDG 9 TAMPER
BLDG 17 TAMPER
BLDG 18 TAMPER
BLDG 19 TAMPER
BLDG 22 TAMPER
BLDG 23 TAMPER
BLDG 24 TAMPER
BLDG 34 TAMPER
BLDG 35 TAMPER
BLDG 36 TAMPER
BLDG 37 TAMPER
BLDG 99 TAMPER
BLDG 100 TAMPER
BLDG 101 TAMPER
BLDG 102 TAMPER
BLDG 104 TAMPER
BLDG 106 TAMPER
BLDG 123 TAMPER
BLDG 136 TAMPER
BLDG Primary Care TAMPER
BLDG New Lab TAMPER
BLDG 144 TAMPER