This document is a series of flow test records for multiple buildings, documenting bi-annual (April and October) fire protection system tests in 2025. The records track various devices and systems across approximately 20 different buildings, including Building 1, Building 2, Building 17, Building 18, Building 19, and others. Each building's flow test sheet includes a list of specific devices or locations, with a standardized format indicating whether each device passed or failed the test.
The tests were primarily conducted by technicians Leidhecker, Eisenhour, Sanders, and McCabe between April and November 2025. Most test sheets show perfect pass rates, with all devices passing (marked with an "X" in the PASS column). One notable exception is Building 18's April test, which shows one device (2C) failed to initiate an alarm, with a work order (#872) generated on 5/13/2025. The documents also show some buildings had their device lists modified during the year, such as Building 22 and Building 104, which had devices removed or added to their logs. The tests appear to be part of a systematic maintenance and safety verification process for fire protection systems across a complex of buildings.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
AA X
5A X 4A X 3A X 2A X 1A X
GA X
GA LAB X
GA RADIOLOGY X
GA CONNECTING CORRIDOR X
AB X
5B X 4B X 3B X 2B X 1B X
GB X
GB WEST SIDE X
GB SOUTHEAST X
PC X
6C X 5C X 4C X 3C X 2C X 1C X
GC X
Service Room X
TOTAL 28
PASS 28
FAIL 0
BLDG 1 FLOW (APRIL)
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
AA X
5A X 4A X 3A X 2A X 1A X
GA X
GA LAB X
GA RADIOLOGY X
GA CONNECTING CORRIDOR X
AB X
5B X 4B X 3B X 2B X 1B X
GB X
GB WEST SIDE X
GB SOUTHEAST X
PC X
6C X 5C X 4C X 3C X 2C X 1C X
GC X
LEIDHECKER/MCCABE
5/13/2025
BLDG 1 FLOW (OCTOBER)
Service Room X
TOTAL 28
PASS 28
FAIL 0
TECHNICIAN
DATE 11/4/2025
LEIDHECKER
ATTIC X
4TH FLOOR NORTH X
4TH FLOOR SOUTH X
3RD FLOOR NORTH X
3RD FLOOR SOUTH X
2ND FLOOR NORTH X
2ND FLOOR SOUTH X
1ST FLOOR NORTH X
1ST FLOOR SOUTH X
BASEMENT MAIN X
TOTAL DEVICES 10
PASS 10
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
ATTIC X
4TH FLOOR NORTH X
4TH FLOOR SOUTH X
3RD FLOOR NORTH X
3RD FLOOR SOUTH X
2ND FLOOR NORTH X
2ND FLOOR SOUTH X
1ST FLOOR NORTH X
1ST FLOOR SOUTH X
BASEMENT MAIN X
TOTAL DEVICES 10
BLDG 2 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
4/30/2025
BLDG 2 FLOW (OCTOBER)
PASS 10
FAIL 0
TECHNICIAN
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 3 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 3 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 4 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 4 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 5 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 5 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 6 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG 6 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 7 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG 7 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 8 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG 8 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 9 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG 9 FLOW (OCTOBER)
5A X 5B X 5C X 4A X 4B X 4C X 3A X 3B X 3C X 2A X 2B X 2C X
1ST FLOOR NORTH STAIR X
1B SOUTH STAIR X
CANTEEN X
BC X
TOTAL DEVICES 17
PASS 17
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
ATTIC X
5A X 5B X 5C X
BLDG 17 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/1/2025
BLDG 17 FLOW (OCTOBER)
4A X 4B X 4C X 3A X 3B X 3C X 2A X 2B X 2C X
1ST FLOOR NORTH STAIR X
1B SOUTH STAIR X
CANTEEN X
BC X
TOTAL DEVICES 17
PASS 17
FAIL 0
TECHNICIAN
AC DRY SYSTEM X
5A X 4A X 3A X 2A X 1A X 5B X 4B X 3B X 2B X 1B X 5C X 4C X 3C X
2C X FAILED TO INITIATE ALARM #872 5/13/2025
1C X
BC X
SC X
TOTAL DEVICES 18
PASS 17
FAIL 1
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
AC DRY SYSTEM X
5A X 4A X 3A X
BLDG 18 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG 18 FLOW (OCTOBER)
2A X 1A X 5B X 4B X 3B X 2B X 1B X 5C X 4C X 3C X 2C X 1C X
BC X
SC X
TOTAL DEVICES 18
PASS 18
FAIL 0
TECHNICIAN
DATE 11/3/2025
AC X
3A X 2A X 1A X
ELEVATOR #14 X
3B X 2B X 1B X
BC X
TOTAL DEVICES 9
PASS 9
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
AC X
3A X 2A X 1A X
ELEVATOR #14 X
3B X 2B X 1B X
BC X
TOTAL DEVICES 9
PASS 9
FAIL 0
TECHNICIAN
BLDG 19 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/1/2025
BLDG 19 FLOW (OCTOBER)
DATE 10/27/2025
3A X 3B X
2ND FLOOR FLOW X
2B LAB AREA REMOVED FROM LOGS ON 4/30/25
1A X 1B X
TOTAL DEVICES 5 CHANGED FROM 6 TO 5 ON 4/30/25
PASS 5
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
3A X 3B X
2ND FLOOR FLOW X
2B LAB AREA REMOVED FROM LOGS ON 4/30/25
1A X 1B X
TOTAL DEVICES 5 CHANGED FROM 6 TO 5 ON 4/30/25
PASS 5
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 22 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
4/30/2025
BLDG 22 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG 23 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
4/30/2025
BLDG 23 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 24 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/1/2025
BLDG 24 FLOW (OCTOBER)
1ST FLOOR X
ATTIC X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
1ST FLOOR X
ATTIC X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 34 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 34 FLOW (OCTOBER)
MAIN X
1ST FLOOR WEST STAIR X
1ST FLOOR MECH ROOM X
ATTIC X
TOTAL DEVICES 4
PASS 4
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
MAIN X
1ST FLOOR WEST STAIR X
1ST FLOOR MECH ROOM X
ATTIC X
TOTAL DEVICES 4
PASS 4
FAIL 0
TECHNICIAN
DATE 10/27/2025
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 35 FLOW (APRIL)
BLDG 35 FLOW (OCTOBER)
WEST STAIR X
ATTIC X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
WEST STAIR X
ATTIC X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 36 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 36 FLOW (OCTOBER)
2ND FLOOR X
1ST FLOOR X
BASEMENT MAIN X
BASEMENT X
TOTAL DEVICES 5
PASS 5
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
ATTIC X
2ND FLOOR X
1ST FLOOR X
BASEMENT MAIN X
BASEMENT X
TOTAL DEVICES 5
PASS 5
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 36 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/7/2025
BLDG 36 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 99 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG99 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 100 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/6/2025
BLDG 100 FLOW (OCTOBER)
MAIN FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
MAIN FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG 101 FLOW (APRIL)
LEIDHECKER/MCCABE
5/13/2025
BLDG 101 FLOW (OCTOBER)
MAIN FLOW X
DRY SYSTEM X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
MAIN FLOW X
DRY SYSTEM X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG 102 FLOW (APRIL)
LEIDHECKER/MCCABE
5/13/2025
BLDG 102 FLOW (OCTOBER)
2ND FLOOR SOUTH X
MECH SPACE NORTH X
MECH SPACE X
GROUND FLOOR STAIR 2 X
GROUND FLOOR SOUTHEAST X
0502 MAIN X
BASEMENT X
TOTAL DEVICES 7
PASS 7
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATE W.O. COMPLETED
2ND FLOOR NORTH X ADDED TO LOGS ON 11/4/2025
2ND FLOOR SOUTH X
MECH SPACE NORTH X
MECH SPACE SOUTH X
GROUND FLOOR STAIR 2 X
GROUND FLOOR SOUTHEAST X
ELEVATOR LEFT X ADDED TO LOGS ON 11/4/2025
ELEVATOR RIGHT X ADDED TO LOGS ON 11/4/2025
0502 MAIN X
BASEMENT X
TOTAL DEVICES 10 Changed from 7 to 10 on 11/4/2025
PASS 10
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG 104 FLOW (APRIL)
LEIDHECKER/MCCABE
5/13/2025
BLDG 104 FLOW (OCTOBER)
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 11/4/2025
LEIDHECKER/EISENHOUR/SANDERS
5/1/2025
BLDG 106 FLOW (APRIL)
BLDG 106 FLOW (OCTOBER)
Sprinkler-Flow Added to logs on 10/21/2025 Preaction-Waterflow Added to logs on 10/21/2025
TOTAL DEVICES 2
PASS 0
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
Sprinkler-Flow X Added to logs on 10/21/2025 Preaction-Waterflow X Added to logs on 10/21/2025
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE 10/27/2025
BLDG 123 FLOW (APRIL)
BLDG 123 FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG 136 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/1/2025
BLDG 136 FLOW (OCTOBER)
FLOW 1 X
FLOW 2 X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
FLOW 1 X
FLOW 2 X
TOTAL DEVICES 2
PASS 2
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG New Lab FLOW (APRIL)
LEIDHECKER/MCCABE
5/13/2025
BLDG New Lab FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG Primary Care FLOW (APRIL)
LEIDHECKER/MCCABE
5/13/2025
BLDG Primary Care FLOW (OCTOBER)
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE
DEVICES PASS FAIL COMMENTS WORK ORDER DATER W.O. COMPLETED
FLOW X
TOTAL DEVICES 1
PASS 1
FAIL 0
TECHNICIAN
DATE 11/4/2025
BLDG 144 FLOW (APRIL)
LEIDHECKER/EISENHOUR/SANDERS
5/1/2025
BLDG 144 FLOW (OCTOBER)
| BLDG 1 FLow |
| BLDG 2 Flow |
| BLDG 3 Flow |
| BLDG 4 Flow |
| BLDG 5 Flow |
| BLDG 6 Flow |
| BLDG 7 Flow |
| BLDG 8 Flow |
| BLDG 9 Flow |
| BLDG 17 FLOW |
| BLDG 18 FLOW |
| BLDG 19 FLOW |
| BLDG 22 FLOW |
| BLDG 23 Flow |
| BLDG 24 Flow |
| BLDG 34 Flow |
| BLDG 35 Flow |
| BLDG 36 Flow |
| BLDG 37 Flow |
| BLDG 99 Flow |
| BLDG 100 Flow |
| BLDG 101 Flow |
| BLDG 102 Flow |
| BLDG 104 Flow |
| BLDG 106 Flow |
| BLDG 123 Flow |
| BLDG 136 Flow |
| BLDG New Lab Flow |
| BLDG Primary Care Flow |
| BLDG 144 Flow |