Attachment 2. Questions_Answers. Ashtabula.pdf

PDF 115 KB Posted

Attached to
X1DZ--Space for Lease at Ashtabula, OH for a CBOC 16, 218 RSF/ 13, 815 ABOA/ 12, 013 NUSF
Solicitation number
36C24424R0066
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a Request for Lease Proposal (RLP) for the Erie VA Medical Center in Ashtabula, Ohio, solicitation number 36C24424R0066. The Q&A addresses 17 vendor questions covering submission requirements, document formatting, exhibit completions, and technical specifications. Key clarifications include: files must be emailed under 25MB, each proposal volume should be a separate PDF, Exhibit M and D-1 have been uploaded, a Phase I Environmental Site Assessment is not currently required, and additional documents can be submitted as Volume 4. Technical details specify a 175 sf IT room is required, LEED Silver checklist compliance is expected (without mandatory certification), and the page limit for certain sections has been extended to 5 pages. The government's intention is to award to the offer presenting the best value, with construction following the lease section 4.01, and all offers must be received by the date listed in the RLP to be considered for award.

View the file

Other files

File Type Posted
Questions_Answers 2. Ashtabula.pdf PDF
36C24424R0066_4.docx DOCX document
36C24424R0066 0003.pdf PDF
Attachment 1. Ashtabula OH Pre-Proposal Presentation.pdf PDF
36C24424R0066_3.docx DOCX document
Exhibit D-1 VA Provision Addendum Alternate Protest Procedure - Real Property Lease Procurements.pdf PDF
Exhibit M-Tenant-Improvements-Cost-Summary--TICS--Table--Oct-2024-.xlsx XLSX spreadsheet
36C24424R0066 0002.pdf PDF
36C24424R0066_2.docx DOCX document
Attachment 1 Pre-Proposal Meeting- Ashtabula OH.pdf PDF
Attachment 2. Questions_Answers. Ashtabula OH.pdf PDF
36C24424R0066 0001.pdf PDF
Attachment 1. Past Performance Questionnaire. Ashtabula County, OH.pdf PDF
Exhibit P FAR 52.204-24 Representation Digital Rev 10 20. FAR 52.204-24 Representation Digital Rev 10 20.pdf PDF
Exhibit N - Contract Submittal Schedule.pdf PDF
Exhibit J DOL Wage Determination.pdf PDF
Exhibit C VA LEASE SECURITY REQUIREMENTS FOR FSL II.pdf PDF
36C24424R0066_1.docx DOCX document
Exhibit E 3517B General Clauses Oct. 2023.pdf PDF
Exhibit B. Agency Specific Requirements Ashtabula CBOC.pdf PDF
Global Request for Lease Proposal RLP R100 March 2025- Ashtabula CBOC Final.pdf PDF
Exhibit Q Interior and Exterior Signage.pdf PDF
Exhibit L - Unit Price List.xlsx XLSX spreadsheet
Exhibit K Addendum to SAM Rep and Cert.pdf PDF
Exhibit F Form 1364 Proposal to Lease Space Jan. 2023 REVISED 2024.pdf PDF
Global Lease Template L100- Ashtabula CBOC- final Mar. 2025.pdf PDF
EXHIBIT R SPACE PLAN - DEFINING SPACE REQUIREMENT.pdf PDF
Exhibit O Government Typical Layout.pdf PDF
Exhibit I Building Security Unit Price List FSL II Jun. 2022.xlsx XLSX spreadsheet
Exhibit H Prelease FPLS Evaluation Form 12000 Part A Part B May 2015.pdf PDF
Exhibit G. Form 1217 - Lessor_s Annual Cost Statement.pdf PDF
Exhibit D 3516 Solicitation Provisions Oct. 2023.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Lease Proposal / Solicitation # 36C24424R0066 | Ashtabula, OH CBOC

Erie VA Medical Center

Questions and Answers

Number Vendor Question Government Response

1 RLP Page 15, 3.02 A(1) references how to submit response if including multiple emails. Is there a MB limit to files or to the email? Will ShareFile be accepted?

Files must be emailed and sized under 25MB. Multiple emails are acceptable.

2 Should each Volume be a separate PDF?

Each Volume should be a separate document or if combined, must be separated by a divider page clearly marked with the Volume title. All document requirements within a Volume must be contained within that Volume and not submitted separately.

VA understands that due to the size of the Volume, this might result in two or more PDF documents for a Volume.

3 Exhibit M, Tenant Improvement Costs Summary (TICS table) is not included as an attachment. Is this required at this stage?

Exhibit M has been uploaded as part of RLP Amendment P0002

4 Exhibit D-1 GSA 3516, Addendum Solicitation Provisions is mentioned in the RLP (Page 6 - 1.07) but not provided. Will this be uploaded to SAM?

Exhibit D-1 has been uploaded as part of RLP Amendment P0002

5 RLP Page 13, 2.11 A - Is a Phase I Environmental Site Assessment (ESA) required at this time?

Phase 1 is not required at this time. The need would have to be identified and the expectation would be for it to be completed prior to award.

6 Where should forms not mentioned in the referenced volumes from section 4.07 be included? (ex. Exhibit A, B, D, E, J, O, Q, R ) Should these be included in Volume 1 in a "Section 6 - Additional Requirements"? Or should there be a "Volume 4 - Additional Requirements"?

Any documents not referenced in the Volumes can be submitted as Volume 4 – Additional Documents

7 RLP Page 21, 4.05 - States "Past performance information provided by Offeror and/or obtained by any other means determined reasonable by the Lease Contracting Officer (LCO) is considered." - Please confirm this means previously PPQ's are acceptable and new PPQ's are not required.

The VA will review all the PPQ’s submitted by the offeror.

8 Should the Exhibit I, Building Security Unit Price List be completed at this stage?

Yes, this should be part of the proposal.

9 Should the Exhibit L, Unit Price List be completed at this stage?

Yes, this should be part of the proposal.

10 LEED Silver Requirement. Are offerors to design to the checklist and not apply for the certification? Or is the LEED certification a requirement?

LEED Silver Requirement intent is to build to the checklist and certification is not required.

11. You mentioned during the pre-proposal the other day the anticipated award date and start of construction. I know these dates change all the time, but can you tell me again what the anticipated schedule is

An anticipated award date was not provided. The intention is to award to the offer that presents best value to the Government. The construction would follow Lease Section 4.01.

12. Please confirm if there are generator requirements

There are no generator requirements.

13. Is a specific LEED level required? If yes, is it just designed to or formally attained paid for by the Lessor

The intent is to build to the LEED Silver Requirement checklist and certification is not required.

14. The design team’s opinion is that 175sf IT room is in excess of typically necessary. Would 120sf IT be accepted

The Government is requesting 175 sf.

15. RLP Page 23, Volume 1, Section 4 says “V1-S4.A Narrative or documentation – understanding and maintaining schedule;

plan to coordinate with VA for activation.

NTE 3 pages, (single sided; >8pt font)” - Would you consider extending the page limit to 5 pages?

Page limit has been extended to 5 pages.

16. Do you have an estimated date for when answers to questions will be released?

Some of the questions asked or missing forms may cause a large amount of changes to the response, so just want to make sure there will be enough time to complete a thorough proposal response

Answers have been posted and the closing date has been extended.

17. RLP Page 23, Volume 1, Section 4 (V1- S4.D) & 5 (V1-S5.A) both have “Program Management & Response Plan” – Should this be removed out of one of the sections or is it intentionally repeated?

V1-S4.D is for the build out phase. V1-S5.A is for the Lease Administration and Operational

Phase.

All offers must be received by date listed in RLP to be considered for award.