This document is an amendment to a Request for Lease Proposal (RLP) issued by the Department of Veterans Affairs for the Berk County Community-Based Outpatient Clinic (CBOC). The amendment provides responses to various questions from vendors regarding the RLP, including details on operating cost estimates, lease term options, tenant improvement payments, and the required concept floor plan. Key details include:
The RLP submission deadline is October 10, 2024. The VA has a funded requirement and will only award if proposals are received at a fair and reasonable price. The lease term is 10 years firm, and the VA will not renegotiate operating costs. Tenant improvement costs can be amortized up to 6% interest, and the VA may make lump-sum payments at acceptance. Offerors must provide a concept floor plan and site plan as part of their proposal, but official CAD drawings are not required. The VA has provided sample PACT design guides but no specific concept plans for this requirement.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
AMENDMENT TO REQUEST FOR LEASE PROPOSAL (RLP)
1. RLP No.
2. Amendment No.
3. Effective Date 4.
Page Of
5. ISSUED BY
6. Description of Amendment Except as provided herein, all terms and conditions of the document referenced in Item 1, as heretofore changed, remains unchanged and in full force and effect
7. Name and Title of Signer (Type or Print)
8. Name and Title of Contracting Officer (Type or Print)
9. Offerer
10. Date Signed
11. United States of America
12. Date Signed By (Signature of Person Authorized to Sign) (Signature of Contracting Officer) 36C24424R0033 00244 Department of Veterans Affairs Network Contracting Office 4 1010 Delafield Road Bldg.32 Pittsburgh PA 15218 The purpose of this amendment is:
1. Provide questions and answers raised.
Doretha Jordan Request for Lease Proposal/Solicitation #36C24424R0033 | Berk County Community Base Outpatient Clinic (CBOC) Question and Answers
| Number |
| Vendor Question |
| Government Response |
| 1 |
| Exhibit G – Operating Costs. Since this is a new building, and S.F and usage drive the energy costs. Can estimate the cost of Energy and will the VA permit an annual reconciliation of Cost to budget? |
| No, the VA will not renegotiate the operating costs. Lessor should examine the market and make an accurate estimate for operating costs. |
| 2 | |
| The RFP has been extended several times. | |
| a. | Confirm the submittal date is October 10, 2024. |
| b. | What assurances does the Bidder have that the VA will complete the RFP process and Issue an award? The preparation of a submission is a costly endeavor. |
| a. Yes, Proposals are due: October 10 ,2024 by 4:30PM. |
b. The VA has a funded requirement. In order to award the VA must receive proposals from responsive, responsible offerors at a Fair and Reasonable (F&R) price. Award will not be made if proposals are not F&R.
| 3 |
| Lease Term Requested is 5 Years (Hard) & 5 Years (Soft) – will the VA accept a 10-year lease proposal in exchange for Rental savings? |
| VA requirement is 10 years firm. |
| 4 |
| Before the government accepts the space, the lessor shall complete all building improvements as identified in the design and contained in VA-approved construction drawings. How long after the Certificate of Occupancy is delivered does the VA have to inspect, approve & accept the Space? |
| Reference draft lease section 4 for inspection and acceptance. |
| 5 |
| In accordance with the paragraph entitled “Adjustment for Vacant Premises,” if the Government fails to occupy or vacates the entire or any portion of the Premises prior to expiration of the term of the Lease, the operating costs paid by the Government as part of the rent shall be reduced by $XX.XX per NUSF of Space vacated by the Government. |
A. Is this term negotiable? The Landlord will still have costs associated with the “Abandon Space” Insurance, taxes, and Maintenance remain regardless of occupancy. The potential abandonment will impact the LL’s budget and create a loss to LL.
B. Will the parking requirement be reduced proportionately as part of any “Space Reduction” ?
A. This is negotiable.
B. Parking requirement is not reduced by the vacant space terms of the lease.
| 6 |
| Tenant Improvements - 1.08(c) That part of the TI amortized in the rent shall be The Government may elect to make lump sum payments for any or all work covered by the TI scope. reduced accordingly. At any time after occupancy and during the Firm Term of the Lease, the Government, at its sole discretion, may elect to pay lump sum for any part or all of the remaining unpaid amortized balance of the TI. If the Government elects to make a lump sum payment for the TI after occupancy, the payment of the TI by the Government will result in a decrease in the rent according to the amortization rate over the Firm Term of the Lease. |
a. Will the Government make a lump sum payment due upon acceptance of the Space?
b. The Cost to amortize the Tenant Improvements “Must” be identified before the work commences.
c. What Interest Rate may the LL charge to Amortize the Cost of the Tenant Improvements?
d. If the Government “Abandons” any portion of the Leased space – Will the Government still Pay for the Improvements lump-sum for the portion of the space abandoned?
A. The Government intends to pay TI in lump sum at completion and acceptance of space but reserves the right to amortize TI.
B. The percentage to amortize is usually 4% but may go up to 6%.
C. Up to 6%.
D. The VA pays TI at the price stated in the lease.
| 7 |
| Does the VA have a Previously designed concept Floor Plan to share with the Landlord? |
| There are concept designs in the PACT design guide to show typical Government layout. However, these concepts do not specifically pertain to this requirement and are given as examples of PACT design. The Offeror provides a concept floor plan, that includes all required rooms, as part of the Proposal. This does not have to be official CAD drawings; it is a concept only (test-fit). |
| 8 |
| Test Fit – In order to bid the RFP is an Architectural “Test-Fit” acceptable? |
| Yes. |
| 9 |
| Site Plan – Is a Site Plan required as part of the RFP submittal? |
| Yes. Similar to the floor plan, it does not have to be a CAD or show elevations, etc. |