36C24419R0047-0002000.docx
DOCX document 18 KB Posted
- Attached to
- 503-314 Expand for Specialty Clinic on 3rd Floor
- Solicitation number
- 36C24419R0047
About this file
36C24419R0047 0002 36C24419R0047 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419R0047-0003000.docx | DOCX document | |
| 36C24419R0047-0001001.pdf | ||
| 36C24419R0047-0001000.docx | DOCX document | |
| 36C24419R0047-047.pdf | ||
| 36C24419R0047-056.pdf | ||
| 36C24419R0047-051.pdf | ||
| 36C24419R0047-055.pdf | ||
| 36C24419R0047-066.docx | DOCX document | |
| 36C24419R0047-059.pdf | ||
| 36C24419R0047-069.docx | DOCX document | |
| 36C24419R0047-048.pdf | ||
| 36C24419R0047-049.pdf | ||
| 36C24419R0047-053.pdf | ||
| 36C24419R0047-067.docx | DOCX document | |
| 36C24419R0047-063.pdf | ||
| 36C24419R0047-064.pdf | ||
| 36C24419R0047-065.docx | DOCX document | |
| 36C24419R0047-068.docx | DOCX document | |
| 36C24419R0047-045.docx | DOCX document | |
| 36C24419R0047-050.pdf | ||
| 36C24419R0047-058.pdf | ||
| 36C24419R0047-061.pdf | ||
| 36C24419R0047-062.pdf | ||
| 36C24419R0047-057.docx | DOCX document | |
| 36C24419R0047-060.pdf | ||
| 36C24419R0047-070.docx | DOCX document | |
| 36C24419R0047-046.pdf | ||
| 36C24419R0047-052.pdf | ||
| 36C24419R0047-054.pdf | ||
| 36C24419R0047-030.docx | DOCX document | |
| 36C24419R0047-000.docx | DOCX document |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-17-2019 503-314 00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24419R0047
X X X
X 36C24419R0047 | Expand for Speciality Care on 3rd Floor
Please see page 2 for answers to questions sent in response to the solicitation.
Question 1: Please note that the manufacturer of the nursecall system is ASCOM, US. (Paul Heatherington-Area Sale Director). Intelligent Electronic Systems (IES) is no longer the manufacturer's representative within the territory of the Altoona VAMC. Newtech Systems, Inc. (Duane Trippett-304-539-6934) is the Ascom Strategic Partner/Territory Manufacturer's Representative.
Answer 1: The Sole Source document attached to the RFP is for Ascom. Please use the manufacturer Ascom.
Question 2: On print 1-3-21 where the storefront schedule calls out the window designations to get shades it shows an additional 2 windows labeled S26 and S27 as areas to get roller shades, however these 2 window designations are not called out on the floor print or electrical call outs for power. Would you please confirm or disconfirm that these 2 window designations are to get shades?
Answer 2: Windows S26 and S27 do not require window shades. These windows will get limited direct sun due to the positioning of new and existing mechanical equipment. The area they serve is also a Lobby and not work or patient area.
Question 3: Reference Details: 3, 6, 10 & 14 on Drawing 1-3-14 and Details: 3, 6, 10 & 13 on Drawing 1- 3-15. Details indicate 09 30 13.A3 Bullnose Tile being “picture-framed” around mirror. Should the Ceramic Wall Field Tile continue behind mirror.
Answer 3: Please continue tile behind the mirror.
Question 4: Where Ceramic Tile Floors meet Ceramic Tile Walls, details do not show any type of trim. Is a caulk joint acceptable at this intersection or should an aluminum cove strip (ie: Schluter “DILEX”) be installed?
Answer 4: Please use an aluminum cove strip such as Schluter DILIX or similar.
Question 5: Specification Section 09 30 13 – Ceramic/Porcelain Tile, Paragraph 2.7 Grouting Materials indicates both Portland Cement and Epoxy Grout. Which Grout should be used? If Epoxy Grout is utilized this will eliminate the need to seal the grout post-installation.
Answer 5: Please use epoxy grout.