RFI3.docx

DOCX document 17 KB Posted

Attached to
F108--620-26-206 Asbestos Abatement
Solicitation number
36C24227R0010
Issued by

About this file

This is a Request for Information (RFI) document addressing clarifications and inquiries regarding an asbestos abatement project at Montrose Veterans Affairs Medical Center (VAMC).

The project scope centers on abatement work in Building 3, specifically in rooms 209, Conference Room, 208, and 208A, covering approximately 3,000 square feet. The work includes abatement of Friable Thermal insulation (FT) and mastic, removal of transite panels, abatement of Thermal System Insulation (TSI) and fittings, and associated demolition as necessary, with wall abatement included where indicated. All work requirements are referenced in Drawing HA-101 Revision 1 and the Statement of Work (SOW). The RFI clarifies that contractors may proceed with abatement in a single mobilization or multiple phases at their discretion, provided all work complies with applicable regulations and VA policies. Regarding waste management, asbestos waste may remain onsite between shifts in a secured, VA-approved dumpster, provided all containment systems and waste handling procedures comply with applicable regulations and project requirements. The document also addresses requests for complete drawing sets and reports from the 2025 Asbestos Resurvey, noting that only Building 3-related materials are applicable to this project scope.

View the file

Other files

File Type Posted
36C24227R0010 0005.docx DOCX document
bldg3-2nd fl-ACM table.pdf PDF
36C24227R0010 0004.docx DOCX document
2nd fl plan-survey.pdf PDF
Additional RFI responses.docx DOCX document
CASTLE POINT 2025.pdf PDF
36C24227R0010 0003.docx DOCX document
RFI Responses Asbestos 3PT.docx DOCX document
2nd fl plan-ACM survey.pdf PDF
MR-003-02-PTR-6-10-26 HA101-rev1.pdf PDF
bldg3-2nd fl-ACM survey.pdf PDF
36C24227R0010 0002.docx DOCX document
36C24227R0010 0001.docx DOCX document
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
Drawing MR-003-02-PTR-HA101.pdf PDF
WAGE DETERMINATIONS.pdf PDF
Specs _ Traditional Asbestos Abatement.pdf PDF
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document
36C24227R0010_1.docx DOCX document
Specs _ Project 620-26-206 _ General Requirements.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The "Caste Point" drawing legend sheet "CS" (drawing #1 of 72) and the "2025 Asbestos Resurvey" diagram "03-03A" (drawing #4 of 8) are from different sets of drawings. Is it possible to obtain the entire set of drawings from each survey, or at least the corresponding legend & diagrams from each one to match-up the details?

The survey section that was provided covers Building 3 only. The remainder of the survey relates to other buildings and is not applicable to this project. Therefore, it would be inappropriate to share the full survey when it is not needed.

Is it possible to also obtain the entire report that is related to the "Building 3 ACM table"?

Same as above

The scope of work to be priced is as follows . Abatement of FT and Mastic in rooms 209, Conference room,208 and 208A (approx 3,000SF) . Transite panels in those rooms . TSI/Fittings in those rooms . Demo as necessary . As per drawing HA-101 Rev 1

Yes, please refer to Drawing HA-101 Rev. 1 and the Statement of Work (SOW) for the complete scope requirements. The scope includes all identified abatement work and any associated demolition necessary to complete the project. Please note that wall abatement is also included where indicated.

The scope of work to be priced is as follows

· Abatement of FT and Mastic in rooms 209,Conference room,208 and 208A (aprox 3,000SF)

· Transite panels in those rooms

· TSI/Fittings in those rooms

· Demo as necessary

· As per drawing HA-101 Rev 1

Not the quantities and areas listed on the full 2025 asbestos materials re assessment and show on Trine Environmental 2025 Asbestos Resurvey drawing outside of the quantities listed above.

Yes, please refer to Drawing HA-101 Rev. 1 and the Statement of Work (SOW) for the complete scope requirements. The scope includes all identified abatement work and any associated demolition necessary to complete the project. Please note that wall abatement is also included where indicated.

Can the abatement proceed in one mobilization, or will the VA require separate phases that require the contractor to demobilize and return?

The contractor may proceed with the abatement in a single mobilization or in multiple phases, at their discretion, provided that all work complies with applicable regulatory requirements, project specifications, safety guidelines, and VA policies.

Can asbestos waste remain onsite between shifts in the secured, VA-approved dumpster, or must it be hauled off at the end of each shift?

Yes, asbestos waste may remain onsite between shifts in a secured, VA-approved dumpster, provided the contractor ensures that all containment systems and waste handling procedures are implemented and maintained in full compliance with applicable regulations, project requirements, and VA policies.

File details come from the government source that posted it. Updated .