2nd fl plan-ACM survey.pdf
PDF 445 KB Posted
- Attached to
- F108--620-26-206 Asbestos Abatement
- Solicitation number
- 36C24227R0010
About this file
This document is an architectural floor plan for a Second Floor of a medical facility, specifically depicting a dental clinic layout prepared by Trine Environmental, Inc. for a Small Business Administration (SBA) project related to asbestos abatement. The plan illustrates the spatial organization of multiple clinical and administrative areas across the floor, including numerous operatories (dental treatment rooms numbered 237-247), exam rooms (205, 209C, 225, 243), waiting areas (202, 207B, 208, 220, 233, 252), administrative offices, a dental laboratory (228), training room (229), panoramic x-ray facility (248), dark room (249), clean room (250), soiled room (251), records/files (235), reception (234), and support spaces such as mechanical closets, storage areas, and toilet facilities. The layout also designates accessible facilities and includes stairwells (SH 02-05) and elevator access points (No. 1-2) for vertical circulation.
The plan is marked with cross-hatching to indicate areas designated for renovation or remediation work. The document footer identifies the consultants as Trine Environmental, Inc., with SBA oversight noted, and references project number 03-03A related to 2005 asbestos resumey activities. No specific procurement terms, response dates, pricing information, or contract vehicle details are evident from this architectural drawing, which serves primarily as a spatial reference document for the facility project scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI3.docx | DOCX document | |
| 36C24227R0010 0005.docx | DOCX document | |
| bldg3-2nd fl-ACM table.pdf | ||
| 36C24227R0010 0004.docx | DOCX document | |
| 2nd fl plan-survey.pdf | ||
| Additional RFI responses.docx | DOCX document | |
| CASTLE POINT 2025.pdf | ||
| 36C24227R0010 0003.docx | DOCX document | |
| RFI Responses Asbestos 3PT.docx | DOCX document | |
| MR-003-02-PTR-6-10-26 HA101-rev1.pdf | ||
| bldg3-2nd fl-ACM survey.pdf | ||
| 36C24227R0010 0002.docx | DOCX document | |
| 36C24227R0010 0001.docx | DOCX document | |
| FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| Drawing MR-003-02-PTR-HA101.pdf | ||
| WAGE DETERMINATIONS.pdf | ||
| Specs _ Traditional Asbestos Abatement.pdf | ||
| VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx | DOCX document | |
| 36C24227R0010_1.docx | DOCX document | |
| Specs _ Project 620-26-206 _ General Requirements.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE
LE
. C L.
ELEV. NO. 2
ELEV. NO. 1
GROUP OFFICE
244A
VISUAL
FIELD
ROOM
243A
EXAM ROOM
EXAM ROOM
EXAM
ROOM
EXAM ROOMEXAM ROOM
OFFICE
206MY HEALTHY VET
207B1
OFFICE
208A1
GROUP OFFICE
208A2
OFFICE
208A3
TREATMENT
ROOM
209A2
TOILET
209A2A
MECH. CL.
EXAM ROOM
209C
SERVER
ROOM
NORTH
STAIR
HALL
SH 02
OFFICE
OFFICE
OFFICE
DISPEMSING
ROOM
MED.
CLERK
EXAM ROOM
WAITING
AREA
220 EMS CL.
MOP BAL.
222A
STOR. CL.
SOUTH
STAIR
HALL
SH 03
ELEV.
LOBBY
TOILET
202B
COR.
247Z
SOUTHWEST
STAIR
HALL
SH 05
SOUTHEAST
STAIR
HALL
SH 04
9A
207A
209B
WOMENS
LOCKER
OFFICE
TOILET
220B
PIPE CL.
220A
STOR. CL.
WAITING
ROOM
2A
2A
WOMENS
TOILET
231A
MENS
LOCKER
MENS
TOILET
230A
OPERATORY
OPERATORY
STAFF
DENTIST
RESIDENTS/
INTERNS
OPERATORY
OPERATORY
OPERATORY
STAFF
DENTIST
SERVICE
CHIEF
RECORDS
/ FILES
RECEPTION
234A
WAITING
AREA
WAITING
AREA
OFFICE
SUPPLIES
DENTAL
LABORATORY
TRAINING
ROOM
OPERATORY
OPERATORY
OPERATORY
OPERATORY
PANORAMIC
X-RAY
DARK
ROOM
CLEAN
ROOM
SOILED
ROOM
ACCESSABLE
OPERATORY
WAITING
AREA
OFFICE
209A
OFFICE
209A1
OFFICE
208A4
ENTRY
WAITING
AREA
207B
GROUP OFFICE
208A
CORRIDOR
246Z
CORRIDOR
248Z
C O
R R
ID
O
R
9Z
OFFICE
214A
SERVER
AREA
TRINE ENVIRONMENTAL, INC.
File details come from the government source that posted it. Updated .