This file contains Additional RFI Responses documenting clarifications regarding an asbestos abatement project at Montrose VAMC. The responses reference two provided drawings: a T-shaped left wing survey plan marking VAT (Vinyl Asbestos Tile) locations and all radiator positions along perimeter walls, accompanied by a 2nd floor ACM (Asbestos-Containing Material) survey plan with a legend and tables identifying rooms containing ACM, quantities, and specific material locations. A second demonstration plan uses yellow lines to indicate the flooring system to be abated, covering approximately 3,000 square feet (confirmed as the actual abatement scope). The responses clarify that all partition walls shown with hatching on the plans are designated for demolition as part of the project scope.

View the file

Other files

File Type Posted
RFI3.docx DOCX document
36C24227R0010 0005.docx DOCX document
bldg3-2nd fl-ACM table.pdf PDF
36C24227R0010 0004.docx DOCX document
2nd fl plan-survey.pdf PDF
CASTLE POINT 2025.pdf PDF
36C24227R0010 0003.docx DOCX document
RFI Responses Asbestos 3PT.docx DOCX document
2nd fl plan-ACM survey.pdf PDF
MR-003-02-PTR-6-10-26 HA101-rev1.pdf PDF
bldg3-2nd fl-ACM survey.pdf PDF
36C24227R0010 0002.docx DOCX document
36C24227R0010 0001.docx DOCX document
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
Drawing MR-003-02-PTR-HA101.pdf PDF
WAGE DETERMINATIONS.pdf PDF
Specs _ Traditional Asbestos Abatement.pdf PDF
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document
36C24227R0010_1.docx DOCX document
Specs _ Project 620-26-206 _ General Requirements.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

There are two drawings provided where one marks T-shape left wing of the bldg. with VAT plus all the radiator locations throughout the perimeter walls. It's called survey but no test results have been attached.

See attached 2nd floor ACM survey plan, the Legend and the tables that show the room that contain ACM with the number, quantity and where ACM material exists in the room

The other demo plan has some yellow lines which I would assume show the flooring system to be abated. Is this the actual 3,000 SF?

Yes, this is the actual 3000 SF

Are all partition walls in these rooms to be demolished?

The Highlighted walls (hatched) to be demolished