This document is an Asbestos Materials Re-Assessment report for Building 3, detailing floor removal costs and abatement requirements for 2025. The assessment identifies asbestos-containing building materials (ACBM) across 54 functional spaces on the first and second floors of Building 3, categorizing materials into four primary types: VCT/Mastic (non-friable miscellaneous), Transite/Panel Radiator, TSI/Fittings, and Caulk. The report maps materials to specific room locations using 2019 and 2025 nomenclature and quantifies removal scope in square feet (SF), linear feet (LF), and equipment units (Ea.).
The total removal cost for all identified asbestos materials is $147,422.00. VCT/Mastic accounts for 16,330 SF of flooring requiring removal, with individual room costs ranging from $6.00 to $9,054.00. Transite/Panel Radiator components total 97 units across multiple spaces, while TSI/Fittings measure 4,086 LF. The assessment includes AHERA (Asbestos Hazard Emergency Response Act) material classifications (Categories 1-7) indicating the condition and friability status of each material type, enabling prioritization of response actions. Notable high-cost abatement areas include the Server Room (214) at $9,054.00 and Room 208A at $5,604.00. The document provides a comprehensive inventory suitable for contracting purposes, funding requests, or project planning for asbestos abatement operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI3.docx | DOCX document | |
| 36C24227R0010 0005.docx | DOCX document | |
| 36C24227R0010 0004.docx | DOCX document | |
| 2nd fl plan-survey.pdf | ||
| Additional RFI responses.docx | DOCX document | |
| CASTLE POINT 2025.pdf | ||
| 36C24227R0010 0003.docx | DOCX document | |
| RFI Responses Asbestos 3PT.docx | DOCX document | |
| 2nd fl plan-ACM survey.pdf | ||
| MR-003-02-PTR-6-10-26 HA101-rev1.pdf | ||
| bldg3-2nd fl-ACM survey.pdf | ||
| 36C24227R0010 0002.docx | DOCX document | |
| 36C24227R0010 0001.docx | DOCX document | |
| FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| Drawing MR-003-02-PTR-HA101.pdf | ||
| WAGE DETERMINATIONS.pdf | ||
| Specs _ Traditional Asbestos Abatement.pdf | ||
| VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx | DOCX document | |
| 36C24227R0010_1.docx | DOCX document | |
| Specs _ Project 620-26-206 _ General Requirements.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR REMOVAL COST 2025
Condition (Approximated)
2019 2025 Qty. Unit Qty. Unit Qty. Unit Qty. Unit
ASBESTOS MATERIALS RE-ASSESSMENT 2025
TSI/Fittings*** VCT/Mastic* Transite/Panel Radiator ** Caulk
AHERA MATERIAL
BUILDING 3
FUNCTIONAL SPACE/ROOM
1st 114 114 1 Ea. 20 LF 206.00$ 1st 115 115 149 SF 1 Ea. 60 LF 1,500.00$ 1st 116 116 147 SF 1 Ea. 888.00$ 1st 117 117 140 SF 1 Ea. 846.00$ 1st 117A 117A 102 SF 1 Ea. 20 LF 818.00$ 1st 118 118 175 SF 1 Ea. 20 LF 1,256.00$ 1st 118A 118A 4 SF 24.00$ 1st 119 119 57 SF 342.00$ 1st 121 121 278 SF 1 Ea. 120 LF 2,874.00$ 1st 121A 121A 13 SF 78.00$ 1st 123 123 140 SF 1 Ea. 40 LF 1,246.00$ 1st 124 124 140 SF 1 Ea. 80 LF 1,646.00$ 1st 125 125 146 SF 1 Ea. 882.00$ 1st 126 SH-03 1 Ea. 6.00$ 1st 135 148 166 SF 1 Ea. 1,002.00$ 1st 136 149 158 SF 1 Ea. 20 LF 1,154.00$ 1st 137 151 161 SF 1 Ea. 20 LF 1,172.00$ 1st 138 152 191 SF 1 Ea. 1,152.00$ 2nd 201A 201A 3 Ea. 18.00$ 2nd 203 203 28 SF 168.00$ 2nd 204 204 166 SF 1 Ea. 1,002.00$ 2nd 205 205 175 SF 1 Ea. 1,056.00$ 2nd 206 206 177 SF 1 Ea. 1,068.00$ 2nd 207 207 8 SF 48.00$ 2nd 207A 207A 6 SF 36.00$ 2nd 207B 130 SF 1 Ea. 786.00$
Bldg. 3 FDR
2019 2025 Qty. Unit Qty. Unit Qty. Unit Qty. Unit
ASBESTOS MATERIALS RE-ASSESSMENT 2025
TSI/Fittings*** VCT/Mastic* Transite/Panel Radiator ** Caulk
AHERA MATERIAL
BUILDING 3
FUNCTIONAL SPACE/ROOM
2nd 207B1 260 SF Ea. 1,560.00$ 2nd 208 110 SF Ea. 660.00$ 2nd 208A 928 SF 6 Ea. 5,604.00$ 2nd 208A1 175 SF 1 Ea. 1,056.00$ 2nd 208A3 175 SF 1 Ea. 1,056.00$ 2nd 208A4 150 SF 1 Ea. 906.00$ 2nd 209A1 150 SF 1 Ea. 906.00$ 2nd 209 209 2 Ea. 8 LF 92.00$ 2nd 209A 209A 1 Ea. 6.00$ 2nd 209C 209C 1 Ea. 6.00$ 2nd 214 Server Area/Server Room (214) 1500 SF 9 Ea. 9,054.00$ 2nd 214A 214A 1 Ea. 6.00$ 2nd 215 North Stair Hall SH 02 1 Ea. 6.00$ 2nd 216 216 154 SF 1 Ea. 12 LF 1,050.00$ 2nd 217 217 157 SF 1 Ea. 948.00$ 2nd 218 218 137 SF 1 Ea. 828.00$ 2nd 218A 218A 6 SF 1 Ea. 42.00$ 2nd 219 219 274 SF 2 Ea. 1,656.00$ 2nd 220A 220A 14 LF 140.00$ 2nd 220B 220B 1 Ea. 6.00$ 2nd 221 221 55 SF 330.00$ 2nd 223 223 136 SF 1 Ea. 822.00$ 2nd 224 224 164 SF 1 Ea. 12 LF 1,110.00$ 2nd 225 225 142 SF 1 Ea. 858.00$ 2nd 226 South Stair Hall SH 03 1 Ea. 6.00$ 2nd 230 42 SF 252.00$
2019 2025 Qty. Unit Qty. Unit Qty. Unit Qty. Unit
ASBESTOS MATERIALS RE-ASSESSMENT 2025
TSI/Fittings*** VCT/Mastic* Transite/Panel Radiator ** Caulk
AHERA MATERIAL
BUILDING 3
FUNCTIONAL SPACE/ROOM
2nd 242 252 100 SF 600.00$ 2nd 242A 5 SF 30.00$ 2nd 242B 8 SF 48.00$ 2nd 243 243 210 SF 1 Ea. 1,266.00$ 2nd 243A 243A 111 SF 1 Ea. 672.00$ 2nd 244 244 1 Ea. 6.00$ 2nd 245 & 201 245 3 Ea. 18.00$ 2nd COR239Z COR247Z 325 SF 1,950.00$ 2nd COR240Z COR246Z 422 SF 2,532.00$ 2nd COR220Z 220 200 SF 1 Ea. 1,206.00$
16330 97 4086 TOTAL 147,422.00$
LF = linear feet AHERA Category
SF = square feet 1 = damaged or significantly damaged thermal system insulation ACM
NF = non-friable 2 = damaged friable surfacing ACM
F= friable 3 = significantly damaged friable surfacing ACM
4 = damaged or significantly damaged friable miscellaneous ACM
5 = ACBM with potential for damage
6 = ACBM with potential for significant damage
7 = any remaining friable ACBM or friable suspected ACBM
VCT/Mastic: Miscellaneous (NF)
LEGEND
Material AHERA Classification Response Action