RFI Responses Asbestos 3PT.docx
DOCX document 55 KB Posted
- Attached to
- F108--620-26-206 Asbestos Abatement
- Solicitation number
- 36C24227R0010
About this file
This file is a compilation of Responses to Requests for Information (RFI) regarding asbestos abatement work at Montrose VA Medical Center under Solicitation Number 36C24227R0010. The document clarifies scope of work, labor classifications, scheduling, and operational requirements for the abatement project.
The scope includes removal of asbestos-containing floor tiles and mastic, demolition of identified walls to access affected flooring, removal and preservation of radiators, removal of asbestos-containing panels behind radiators, and disposal of all abatement-generated debris at approved facilities. The contractor must apply appropriate Davis-Bacon labor classifications (Hazardous Material Handler or Laborers Group 7 - Asbestos and Toxic Waste Laborer) based on actual work performed. Work is restricted to 8:00 AM to 4:30 PM, Monday through Friday, excluding Federal holidays, with no evening or weekend work required. The contractor is responsible for providing temporary electrical infrastructure, running enclosed conduit from the VA-supplied 100-amp, 3-phase service in Room 9A to the work area, and protecting suspended ceiling systems during demolition. Mastic removal must be performed mechanically rather than through manual wet scraping. The VA permits rooftop decontamination units with window-based access and egress provided all regulatory and safety requirements are met. The abatement area is approximately 3,000 square feet. Proposals were originally due November 13th but were rescheduled to November 27, 2026, by 12:00 PM EST via email to dany.humphreys2@va.gov, with no hard copies accepted. The contractor is responsible for all waste handling, transportation, and disposal at certified facilities, and ongoing access through corridor 247Z to the adjacent data center must be maintained throughout the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI3.docx | DOCX document | |
| 36C24227R0010 0005.docx | DOCX document | |
| bldg3-2nd fl-ACM table.pdf | ||
| 36C24227R0010 0004.docx | DOCX document | |
| 2nd fl plan-survey.pdf | ||
| Additional RFI responses.docx | DOCX document | |
| CASTLE POINT 2025.pdf | ||
| 36C24227R0010 0003.docx | DOCX document | |
| 2nd fl plan-ACM survey.pdf | ||
| MR-003-02-PTR-6-10-26 HA101-rev1.pdf | ||
| bldg3-2nd fl-ACM survey.pdf | ||
| 36C24227R0010 0002.docx | DOCX document | |
| 36C24227R0010 0001.docx | DOCX document | |
| FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| Drawing MR-003-02-PTR-HA101.pdf | ||
| WAGE DETERMINATIONS.pdf | ||
| Specs _ Traditional Asbestos Abatement.pdf | ||
| VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx | DOCX document | |
| 36C24227R0010_1.docx | DOCX document | |
| Specs _ Project 620-26-206 _ General Requirements.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1: Streamlined Market Research Report Template
Questions:
1. Please confirm all areas highlighted in yellow and marked with scope note 1 are to be included in the SOW yes, all the area marked is in the scope
1. Please clarify whether the mastic is to be abated along with floor tile or only the floor tile is positive – the mastic and the floor tiles both needs to be abated yes, both the tiles & the mastic are positive
1. Please confirm that if floor tile and mastic go under the walls highlighted in orange we are to remove the wall and underlying tile yes, contractor has to remove mastic, underlying floor tiles and walls.
1. Please confirm whether the standpipe and hose connection in the room marked 207A and highlighted in blue can be used for water No, The water source should be taken from Room 209B (Mechanical Room) or from the plumbing fixtures located in Toilet Room 209B.
1. Please clarify which labor classification is to be used for this project Hazardous material handler or laborers group 7 asbestos and toxic waste labor The applicable Davis-Bacon wage determination is included in the solicitation. The Contractor is responsible for determining and applying the appropriate labor classifications and corresponding prevailing wage rates based on the actual work performed. The wage determination identifies both Hazardous Material Handler and Laborers Group 7 – Asbestos and Toxic Waste Laborer classifications. The Hazardous Material Handler classification specifically addresses the removal of insulation materials from mechanical systems. The Contractor shall evaluate the scope of work, including the asbestos-containing materials identified in the contract documents, and apply the appropriate labor classifications in accordance with the applicable wage determination and Davis-Bacon labor standards requirements.
1. Please confirm proposals are to be submitted to you November 13th via email as well as a sealed copy to the network contracting office in Montrose Proposals are now due 11/27/2026 by 12:00N EST via email to dany.humphreys2@va.gov. No hard copies will be accepted.
1. Will the radiators be disconnected and removed by others before abatement begins?
No, removal of the radiators is included in the contractor’s scope of work, the radiators must be disconnected and removed prior to the start of abatement activities. They are to be preserved in good condition for VA reuse. The ACM-containing panels located behind the radiators shall be removed, and the affected area shall be thoroughly cleaned following abatement.
1. Regarding our earlier shaft-wall question, please specifically confirm whether the shaft walls in Room 209B will be demolished to access the asbestos flooring shown on the drawings, and who is responsible for that demolition? Yes, the walls to be removed are identified and highlighted on the drawings. Demolition of the indicated walls is included in the contractor's scope of work as required to complete the asbestos abatement. The contractor is responsible for removing, handling, transporting, and disposing of all abatement-generated debris at an approved disposal facility in accordance with applicable regulations.
1. If wall removal is required for abatement and will disturb the existing ceiling systems, will the affected suspended ceilings be removed by others before abatement?
No, The contractor is responsible for the securing and protecting the affected suspended ceiling systems prior to demolition and abatement activities. Any necessary measures to maintain ceiling stability and safety during the work shall be included in the contractor’s scope.
1. Please confirm whether Offices 209C and Computer Lab 208A are excluded from the abatement scope shown on drawing H101.
209C(office), 209A(toilet) are excluded, also note that the adjacent data center (214-214A) will need access through the corridor 247Z at all times
1. What power and water sources will be available for contractor use, and where are the connection points?
The contractor shall provide a temporary electrical panel. The VA will provide access to a 100A, 3-phase electrical service located in Room 9A on the Ground Floor. The contractor is responsible for running all temporary power wiring in enclosed conduit from the connection point to the work area, including routing the conduit through the building as required.
1. Is manual wet scraping with chemical mastic removers permitted for floor-mastic abatement, or is mechanical removal required?
Mastic to be removed by mechanical method
1. Are there any required phases, work hours, or scheduling restrictions beyond the SOW’s requirement to anticipate some evening or weekend work?
Work hours are from 8am to 4:30pm, Monday to Friday, excluding Federal holidays
1. The drawing appears to show asbestos flooring extending beneath existing walls. What are these walls made of, and will they be demolished by others down to the kickplate before abatement? Please clarify responsibility for this demolition and the required sequence?
The walls identified and highlighted on the drawings are to be demolished as part of the project scope. The contractor is responsible for performing the required demolition necessary to access and remove the asbestos-containing flooring underneath it in accordance with the contract documents and applicable regulations.
The contractor is also responsible for removing, handling, transporting, and disposing of all abatement-generated waste and demolition debris at a certified and approved disposal facility. Demolition of the indicated walls shall be completed as necessary to facilitate the abatement work and allow for the full removal of the asbestos-containing materials.
1. Is the mechanical shaft wall CMU, and does the asbestos flooring stop at the wall or extend beneath it?
REF#14
1. Could you please send:
A• The full asbestos survey report, including lab results and sample locations Survey sent
B• Material types and quantities for each area (friable and non-friable) see Specs
C• More detail on the 100 sq ft of radiator heat shielding?
refer to RFI#7
D• Any lead or other hazardous material findings in the work area-?
No
1. I’d also like to know whether a site walkthrough has already been held?
Yes
1. Does all work and waste have to go through the building? Would the VA allow us to build the decon units on the rooftop, enclosing the containment around a window, so that workers, equipment and waste enter and exit through the window from the roof?
Yes, The VA will allow the use of rooftop decontamination units and a rooftop access/egress approach through a window, provided the setup complies with all applicable regulatory requirements, project specifications, safety guidelines, and VA policies.
The contractor is responsible for ensuring that the containment system, worker access, equipment movement, and waste handling procedures are designed and implemented in accordance with all governing regulations and VA requirements.
1. The spec limits work to 8:00 AM–4:30 PM, Monday–Friday, but the SOW says evening or weekend work may be required?
Refer to RFI#13
1. Will after-hours work be required, and will the adjacent PT/Sleep Study spaces be occupied during abatement?
No, Work hours are from 8am to 4:30pm, Monday to Friday, excluding Federal holidays.
Note that the adjacent data center (214-214A) will need access through the corridor 247Z at all times
1. The SOW lists 100 SF of radiator heat shielding and the spec lists 100 LF. Which is correct? Also, are the radiators to be disposed of or reinstalled, and does "site restoration" include new flooring?- 100 sf of radiator heat shielding, refer to RFI#7
1. Is there an asbestos report available?
Survey sent
1. Because of the short notice, is a second job walk possible? I am based in Westchester County and very flexible on time/date if so?
NO
1. Who is responsible to remove any furniture, fixtures or equipment in the spaces to be abated?
The abated debris and Equipment is the responsibility of the contractor
1. Can you confirm whether the requirements of Section 1.6.a.1.c must be met by prime contractor personnel or whether subcontractor personnel can be proposed?
Unclear where this information is or what it entails, cannot provide response. Please submit follow up to dany.humphreys2@va.gov
1. Is it possible to get a list of attendees from the 11/5 site inspection?
NO
1. Please note abatement area increase to ~3000sf