This document is an Asbestos Materials Re-Assessment for Building 3, presenting a comprehensive floor removal cost analysis for 2025. The assessment identifies asbestos-containing building materials (ACBM) across the facility's first and second floors, categorizing them by functional space and room number with associated removal costs.

The document details four primary types of AHERA (Asbestos Hazard Emergency Response Act) materials: VCT/Mastic (classified as non-friable miscellaneous), Transite/Panel Radiator, TSI/Fittings, and Caulk. Quantities are documented in square footage for floor materials and linear footage or individual units for other components. The assessment covers 47 distinct functional spaces on the first floor and 50 spaces on the second floor. Individual removal costs range from $6.00 to $9,054.00 per space, with the Server Area (Room 214) representing the largest single cost at $9,054.00 for 1,500 square feet of VCT/Mastic removal with nine radiator units. The document includes a comprehensive legend defining AHERA categories 1 through 7, which classify materials based on damage level and friability status. The total asbestos material removal cost for Building 3 is $147,422.00, based on 16,330 square feet of VCT/Mastic, 97 Transite/Panel Radiator units, and 4,086 linear feet of TSI/Fittings.

View the file

Other files

File Type Posted
RFI3.docx DOCX document
36C24227R0010 0005.docx DOCX document
bldg3-2nd fl-ACM table.pdf PDF
36C24227R0010 0004.docx DOCX document
2nd fl plan-survey.pdf PDF
Additional RFI responses.docx DOCX document
CASTLE POINT 2025.pdf PDF
36C24227R0010 0003.docx DOCX document
RFI Responses Asbestos 3PT.docx DOCX document
2nd fl plan-ACM survey.pdf PDF
MR-003-02-PTR-6-10-26 HA101-rev1.pdf PDF
36C24227R0010 0002.docx DOCX document
36C24227R0010 0001.docx DOCX document
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
Drawing MR-003-02-PTR-HA101.pdf PDF
WAGE DETERMINATIONS.pdf PDF
Specs _ Traditional Asbestos Abatement.pdf PDF
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document
36C24227R0010_1.docx DOCX document
Specs _ Project 620-26-206 _ General Requirements.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOOR REMOVAL COST 2025

Condition (Approximated)

2019 2025 Qty. Unit Qty. Unit Qty. Unit Qty. Unit

ASBESTOS MATERIALS RE-ASSESSMENT 2025

TSI/Fittings*** VCT/Mastic* Transite/Panel Radiator ** Caulk

AHERA MATERIAL

BUILDING 3

FUNCTIONAL SPACE/ROOM

1st 114 114 1 Ea. 20 LF 206.00$ 1st 115 115 149 SF 1 Ea. 60 LF 1,500.00$ 1st 116 116 147 SF 1 Ea. 888.00$ 1st 117 117 140 SF 1 Ea. 846.00$ 1st 117A 117A 102 SF 1 Ea. 20 LF 818.00$ 1st 118 118 175 SF 1 Ea. 20 LF 1,256.00$ 1st 118A 118A 4 SF 24.00$ 1st 119 119 57 SF 342.00$ 1st 121 121 278 SF 1 Ea. 120 LF 2,874.00$ 1st 121A 121A 13 SF 78.00$ 1st 123 123 140 SF 1 Ea. 40 LF 1,246.00$ 1st 124 124 140 SF 1 Ea. 80 LF 1,646.00$ 1st 125 125 146 SF 1 Ea. 882.00$ 1st 126 SH-03 1 Ea. 6.00$ 1st 135 148 166 SF 1 Ea. 1,002.00$ 1st 136 149 158 SF 1 Ea. 20 LF 1,154.00$ 1st 137 151 161 SF 1 Ea. 20 LF 1,172.00$ 1st 138 152 191 SF 1 Ea. 1,152.00$ 2nd 201A 201A 3 Ea. 18.00$ 2nd 203 203 28 SF 168.00$ 2nd 204 204 166 SF 1 Ea. 1,002.00$ 2nd 205 205 175 SF 1 Ea. 1,056.00$ 2nd 206 206 177 SF 1 Ea. 1,068.00$ 2nd 207 207 8 SF 48.00$ 2nd 207A 207A 6 SF 36.00$ 2nd 207B 130 SF 1 Ea. 786.00$

Bldg. 3 FDR

2019 2025 Qty. Unit Qty. Unit Qty. Unit Qty. Unit

ASBESTOS MATERIALS RE-ASSESSMENT 2025

TSI/Fittings*** VCT/Mastic* Transite/Panel Radiator ** Caulk

AHERA MATERIAL

BUILDING 3

FUNCTIONAL SPACE/ROOM

2nd 207B1 260 SF Ea. 1,560.00$ 2nd 208 110 SF Ea. 660.00$ 2nd 208A 928 SF 6 Ea. 5,604.00$ 2nd 208A1 175 SF 1 Ea. 1,056.00$ 2nd 208A3 175 SF 1 Ea. 1,056.00$ 2nd 208A4 150 SF 1 Ea. 906.00$ 2nd 209A1 150 SF 1 Ea. 906.00$ 2nd 209 209 2 Ea. 8 LF 92.00$ 2nd 209A 209A 1 Ea. 6.00$ 2nd 209C 209C 1 Ea. 6.00$ 2nd 214 Server Area/Server Room (214) 1500 SF 9 Ea. 9,054.00$ 2nd 214A 214A 1 Ea. 6.00$ 2nd 215 North Stair Hall SH 02 1 Ea. 6.00$ 2nd 216 216 154 SF 1 Ea. 12 LF 1,050.00$ 2nd 217 217 157 SF 1 Ea. 948.00$ 2nd 218 218 137 SF 1 Ea. 828.00$ 2nd 218A 218A 6 SF 1 Ea. 42.00$ 2nd 219 219 274 SF 2 Ea. 1,656.00$ 2nd 220A 220A 14 LF 140.00$ 2nd 220B 220B 1 Ea. 6.00$ 2nd 221 221 55 SF 330.00$ 2nd 223 223 136 SF 1 Ea. 822.00$ 2nd 224 224 164 SF 1 Ea. 12 LF 1,110.00$ 2nd 225 225 142 SF 1 Ea. 858.00$ 2nd 226 South Stair Hall SH 03 1 Ea. 6.00$ 2nd 230 42 SF 252.00$

2019 2025 Qty. Unit Qty. Unit Qty. Unit Qty. Unit

ASBESTOS MATERIALS RE-ASSESSMENT 2025

TSI/Fittings*** VCT/Mastic* Transite/Panel Radiator ** Caulk

AHERA MATERIAL

BUILDING 3

FUNCTIONAL SPACE/ROOM

2nd 242 252 100 SF 600.00$ 2nd 242A 5 SF 30.00$ 2nd 242B 8 SF 48.00$ 2nd 243 243 210 SF 1 Ea. 1,266.00$ 2nd 243A 243A 111 SF 1 Ea. 672.00$ 2nd 244 244 1 Ea. 6.00$ 2nd 245 & 201 245 3 Ea. 18.00$ 2nd COR239Z COR247Z 325 SF 1,950.00$ 2nd COR240Z COR246Z 422 SF 2,532.00$ 2nd COR220Z 220 200 SF 1 Ea. 1,206.00$

16330 97 4086 TOTAL 147,422.00$

LF = linear feet AHERA Category

SF = square feet 1 = damaged or significantly damaged thermal system insulation ACM

NF = non-friable 2 = damaged friable surfacing ACM

F= friable 3 = significantly damaged friable surfacing ACM

4 = damaged or significantly damaged friable miscellaneous ACM

5 = ACBM with potential for damage

6 = ACBM with potential for significant damage

7 = any remaining friable ACBM or friable suspected ACBM

VCT/Mastic: Miscellaneous (NF)

LEGEND

Material AHERA Classification Response Action