2nd fl plan-survey.pdf

PDF 445 KB Posted

Attached to
F108--620-26-206 Asbestos Abatement
Solicitation number
36C24227R0010
Issued by

About this file

This document is an architectural floor plan for the second floor of a facility managed by Trine Environmental, Inc. The plan depicts a comprehensive medical and dental facility layout with detailed room designations and spatial organization. The facility includes multiple operatories (rooms 237-247, 252), exam rooms (243, 205, 209C, 225), administrative spaces (offices 206-219, 232-235), support services (dental laboratory 228, training room 229, panoramic x-ray 248, dark room 249), and patient amenities (waiting areas 220, 233, 252, group offices). Infrastructure elements include elevator lobbies, stairwells (SH 02-05), corridors, mechanical closets, server rooms, and utility areas such as soiled and clean rooms.

The plan identifies Trine Environmental, Inc. as the primary consultant with SBA (U.S. Small Business Administration) involvement noted in the document footer. The architectural plan is designated as drawing number 03-03A and indicates an asbestos abatement project scope. The layout demonstrates a functional healthcare delivery environment with segregation between clinical treatment areas, administrative functions, and support services, typical of a Veterans Affairs or federal medical facility renovation project.

View the file

Other files

File Type Posted
RFI3.docx DOCX document
36C24227R0010 0005.docx DOCX document
bldg3-2nd fl-ACM table.pdf PDF
36C24227R0010 0004.docx DOCX document
Additional RFI responses.docx DOCX document
CASTLE POINT 2025.pdf PDF
36C24227R0010 0003.docx DOCX document
RFI Responses Asbestos 3PT.docx DOCX document
2nd fl plan-ACM survey.pdf PDF
MR-003-02-PTR-6-10-26 HA101-rev1.pdf PDF
bldg3-2nd fl-ACM survey.pdf PDF
36C24227R0010 0002.docx DOCX document
36C24227R0010 0001.docx DOCX document
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
Drawing MR-003-02-PTR-HA101.pdf PDF
WAGE DETERMINATIONS.pdf PDF
Specs _ Traditional Asbestos Abatement.pdf PDF
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document
36C24227R0010_1.docx DOCX document
Specs _ Project 620-26-206 _ General Requirements.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE

LE

. C L.

ELEV. NO. 2

ELEV. NO. 1

GROUP OFFICE

244A

VISUAL

FIELD

ROOM

243A

EXAM ROOM

EXAM ROOM

EXAM

ROOM

EXAM ROOMEXAM ROOM

OFFICE

206MY HEALTHY VET

207B1

OFFICE

208A1

GROUP OFFICE

208A2

OFFICE

208A3

TREATMENT

ROOM

209A2

TOILET

209A2A

MECH. CL.

EXAM ROOM

209C

SERVER

ROOM

NORTH

STAIR

HALL

SH 02

OFFICE

OFFICE

OFFICE

DISPEMSING

ROOM

MED.

CLERK

EXAM ROOM

WAITING

AREA

220 EMS CL.

MOP BAL.

222A

STOR. CL.

SOUTH

STAIR

HALL

SH 03

ELEV.

LOBBY

TOILET

202B

COR.

247Z

SOUTHWEST

STAIR

HALL

SH 05

SOUTHEAST

STAIR

HALL

SH 04

9A

207A

209B

WOMENS

LOCKER

OFFICE

TOILET

220B

PIPE CL.

220A

STOR. CL.

WAITING

ROOM

2A

2A

WOMENS

TOILET

231A

MENS

LOCKER

MENS

TOILET

230A

OPERATORY

OPERATORY

STAFF

DENTIST

RESIDENTS/

INTERNS

OPERATORY

OPERATORY

OPERATORY

STAFF

DENTIST

SERVICE

CHIEF

RECORDS

/ FILES

RECEPTION

234A

WAITING

AREA

WAITING

AREA

OFFICE

SUPPLIES

DENTAL

LABORATORY

TRAINING

ROOM

OPERATORY

OPERATORY

OPERATORY

OPERATORY

PANORAMIC

X-RAY

DARK

ROOM

CLEAN

ROOM

SOILED

ROOM

ACCESSABLE

OPERATORY

WAITING

AREA

OFFICE

209A

OFFICE

209A1

OFFICE

208A4

ENTRY

WAITING

AREA

207B

GROUP OFFICE

208A

CORRIDOR

246Z

CORRIDOR

248Z

C O

R R

ID

O

R

9Z

OFFICE

214A

SERVER

AREA

TRINE ENVIRONMENTAL, INC.

File details come from the government source that posted it. Updated .