This document is a Request for Information (RFI) for a VA fire alarm system upgrade project at the Canandaigua VA Medical Center. The project involves upgrading fire alarm systems in 11 buildings (specifically buildings 4, 5, 6, 7, 8, 10, 11, 16, 36, 37, and 118), which includes replacing existing fire alarm control panel modems with new network cards and audio controllers, upgrading fire alarm devices like speaker strobes, replacing fiber optic connectors from ST to SC type, connecting AEDs to the fire alarm system, and installing new door contacts. The project also includes asbestos abatement in the basement of Building 4 and requires the use of the Autodesk Construction Cloud platform for project management.
Key technical details include using Simplex 4100U fire alarm panels, retesting existing fiber optic cables, installing IDNAC repeaters in Buildings 10 and 11, and connecting the master fire alarm control panel to the fire department radio system. The project has a total duration of 180 days, with specific requirements for submittals within 30 days of award, including a draft project schedule, safety plan, quality control plan, and waste management plan. The solicitation number is 36C24225B0037, and the project is being conducted by the Department of Veterans Affairs Veterans Health Administration for the Finger Lakes Health Care System.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System-7-16-2025.pdf | ||
| 36C24225B0037 0008.docx | DOCX document | |
| VA Medical Center - Canandaigua - Fire Alarm Upgrades.pdf | ||
| 36C24225B0037 0007.docx | DOCX document | |
| 36C24225B0037 0006.docx | DOCX document | |
| Pre-Bid RFI answers and questions.pdf | ||
| Fire Alarm Spec-7-8-2025.pdf | ||
| 36C24225B0037 0005.docx | DOCX document | |
| UPDATED WAGE RATES.pdf | ||
| 36C24225B0037 0004.docx | DOCX document | |
| RFI ANSWERS.pdf | ||
| FA panel.jpg | JPG image | |
| 36C24225B0037 0003.docx | DOCX document | |
| FA Panel .jpg | JPG image | |
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System.pdf | ||
| SITE VISIT SIGN IN SHEET.pdf | ||
| 30x42 full size set.pdf | ||
| 36C24225B0037 0002.docx | DOCX document | |
| 36C24225B0037 0001.docx | DOCX document | |
| 36C24225B0037_1.docx | DOCX document | |
| S02-DRAWINGS.pdf | ||
| S02-SPECS_BID DOCS new.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: 528A5-21-504 Project Title: Upgrade Fire Alarm System Contract No.: 36C24225B0037
Date RFI's Submitted: 7/9/2025
Contract Officer: Nicholas Winne
Request for Information: (A/E ,AE Works )/ VA -provided Response:
1 The drawings posted at SAM.gov on 6/10/2025 are 8½ x 11. This does not allow us to print full-size drawings.
Can you arrange to have full-size drawings posted asap to give us time to use them well before the bid due date?
There is no issue with the drawing, They can print the full size drawings by adjusting the print settings from "Actual Size." To "Fit to Page”.
2 Please confirm this scope is panel rebuild and device changeouts only. Please reply with the brand of FA panel as they are not shown nor mentioned on drawings.
As shown in the SOW this project is to upgrade the existing fire alarm control panels by replacing the existing modems in each FACP with new network cards and audio controllers to establish the ES network. To establish the addressable fire alarm system and meet latest code for 11 buildings (4,5,6,7,8,10,11 16,36,37,118).
The FA panel brand is Simplex 4100U as shown in the pictures attached. BOD is required for this project
3 Could you please clarify if there is a need to establish communication between the buildings FAS inside the scope of this phase ( 4, 5, 6, 7, 8, 10, 11, 16, 36, 37, 118) and those buildings from future phases (1,2,3,9,51,54,55,56,57,58,59,60,61,62)
There is no Phase 2 this project is only for 11 buildings (4,5,6,7,8,10,11 16,36,37,118).
4 Specification section 01 35 26-13 states that the SSHO has to be a separate qualified individual from the Prime contractor's superintendent. This requirement is sometimes waived; can you please confirm the requirement for a SSHO who is not the Superintendant? If the SSHO is not permitted to also serve asthe project superintendent, can the SSHO have additional duties that are not the Superintendant?
The VA may waive the requirement for separate SSHO and Superintendent if the individual meets the requirements of both roles. This waiver does not apply to other roles such as the super and QAQC manager which must remain separate. If at any time the VA feels that a combined super and SSHO is not performing one or both roles to the satisfaction of the COR and CO, the waiver will be revoked and the contractor will be responsible for providing a qualified separate SSHO and Superintendent at no additional cost.
5 28 31 00-5 Subsection 1.5 states that the warranty period is one year. Subsection 1.6 states that the Guaranty Period Services are to performed by a factory authorized representative and inlcudes inspections, testing, maintenance and repairs services for a period of 5 years. The work detailed in subsection 1.6 appears to be for inspecting, repairing and maintaining the fire alarm for a 5 year period.
Please confrim if this section is applicable to this project.
Section 1.6 to be REMOVED from the specification and the scope the 5 year test inspaction has been waived.
6 28 31 00-16, subsection 2.12 B & C list spare parts and requires a spare parts cabinet be furnished, please confirm this requirement for this project.
YES, spare parts are required for this project for any new devices or equipment being installed.
Refer to Subsection 2.12A for quantities (if a device listed is not being utilized on this project, spares are not required for it). For Subsection 2.12C of 28 31 00, AEW is deferring to the VA. The requirement states "Furnish and install a storage cabinet of sufficient size and suitable for storing spare equipment. Doors shall include a pad locking device. Padlock to be provided by the VA.
Location of cabinet to be determined by the COR later." If the VA would like an additional storage cabinet for spare components from this project, then the specifications should be followed as written. If there is already storage space available or a cabinet is not needed, this requirement can be waived.THIS REQUIREMENT HAS BEEN WAIVED THE VA WILL PROVIDE THE SPARE CABINENT.
7 JCI/Simplex requires CAD floor plans for their use in creating FA drawings, will the VA provide these to the contractor post award?
YES,The VA will provide the CAD floor plans upon award of the contract.
1. General Questions/Comments
Pre-Proposal - Request for Information 1 AE Works Ltd.
Contract No.: 36C24225B0037
Date RFI's Submitted: 7/9/2025
Contract Officer: Nicholas Winne
Request for Information: (A/E ,AE Works )/ VA -provided Response:
1. General Questions/Comments 8 Fire Alarm Sheet Note 2 on sheet FAS100 calls for replacing the fiber optic ST connectors with SC, we interpret this as all fiber terminations listed on the fiber repair schedule which is also on sheet FAS100 and not just the connections listed as failed. Please confirm if this is correct or clarify the requirement if not all terminations are required to be replaced.
YES, this interpretation is correct. Replace all ST connectors with SC connectors. Preliminary test results did not indicate breaks and therefore the intent is that replacing connectors will resolve the issues as well as prevent future ones. This shall be determined by retesting all links.
9 Will the sign-in sheet from site visit be available in addendum? The sign in sheet was uploaded on 6/20/2025
10 Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? Refer to question number 4 responds.
11 If no to the question above, will the SSHO need to be full-time for this project? Refer to question number 4 responds.
12 Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Refer to question number 4 responds.
13 If no to the question above, will the QA/QC need to be full time for this project? Refer to question number 4 responds.
14 Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? Refer to question number 4 responds.
15 Please confirm if tax should be included in our proposal? Refer to FAR part 29.30329.303 Application of State and local taxes to Government contractors and subcontractors.
(a) Prime contractors and subcontractors shall not normally be designated as agents of the Government for the purpose of claiming immunity from State or local sales or use taxes. b) When purchases are not made by the Government itself, but by a prime contractor or by a subcontractor under a prime contract, the right to an exemption of the transaction from a sales or use tax may not rest on the Government’s immunity from direct taxation by States and localities. It may rest instead on provisions of the particular State or local law involved, or, in some cases, the transaction may not in fact be expressly exempt from the tax. The Government’s interest shall be protected by using the procedures in 29.101 If the State offers an exemption for contractors purchasing for the Federal government, the applicable State should offer an appropriate form specifically calling out Federal government.
16 Please provide the latest wage determination for this project’s county. Uploaded
17 Please confirm if the current prevailing wages will be consistent for the life of the project with no escalation?
Wage rate stays the same after award
18 Please update the wage determination to "General Decision Number: NY20250032 06/20/2025” I'll determine the correct wage determination
19 It appears all the 1.3 Related work in spec section 28 31 00 FIRE DETECTION AND ALARM is missing and seems to be relevant to this project.
All specification related to this project are outlined in the specification table of content . Updated spec will be attached.
20 Is there a brand name or equal justification to this requirement? Rest of campus is Simplex, BOD is required for this project to maintain consistency. Refer to question 2 response for panel details.
Pre-Proposal - Request for Information 2 AE Works Ltd.
Contract No.: 36C24225B0037
Date RFI's Submitted: 7/9/2025
Contract Officer: Nicholas Winne
Request for Information: (A/E ,AE Works )/ VA -provided Response:
1. General Questions/Comments 21 It appears that 02 82 13.13 GLOVEBAG ASBESTOS ABATEMENT, specification is missing in its entirely. Please provide asbestos survey if available.
Updated spec will be attached.
22 Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? This needs to be a submittal once the project is awarded.
23 Will shutdowns be required to be done during off hours or weekends? All shutdowns need to be coordinated with the COR, if schedule deems necessary they will be done off hours and weekends.
24 Is there a particular vendor or contractor currently servicing and maintaining the Fire Alarm System? Simplex is currently servicing our fire alarm system.
25 Is there a particular vendor or contractor currently servicing and maintaining the Security Alarm System N/A
26 The RFI 006 response does not state whether the VA has an existing spare parts cabinet and says if the VA does not, then a cabinet shall be furnished by the contractor. Can you confirm whether the VA has an existing spare parts cabinet for FA parts?
Refer to the RFI 6 updated response.
27 The RFI 005 response states the Fire Alarm spec section 1.6 for 5 years of inspections testing and maintenance by a factory authorized service provider applies. I talked with Jason Kimmel from Simplex/JCI and as of now they (JCI/Simplex) are still not planning on including this in their quote. Jason Kimmel spoke with the Canandaigua VA fire chief who is Chad Powers and Chad said that he does not want this. There is also the complication that per the spec JCI/Simplex is the only provider that could do this service because of the requirement for a factory authorized provider. To summarize the issue, there is no way for any of the contractors to provide this service as specified.
Refer to the RFI 5 updated responed
28 The RFI 006 response does not state whether the VA has an existing spare parts cabinet and says if the VA does not, then a cabinet shall be furnished by the contractor. Can you confirm whether the VA has an existing spare parts cabinet for FA parts?
Refer to the RFI 6 updated response.