This document is a Request for Information (RFI) for the Upgrade Fire Alarm System project at the Canandaigua VA Medical Center, Contract No. 36C24225B0037. The RFI addresses seven technical questions from AE Works Ltd. regarding project specifications, including drawing sizes, fire alarm panel details, project scope, warranty periods, spare parts requirements, and fiber optic connector replacements. Key clarifications include confirmation that the project involves upgrading fire alarm control panels in 11 buildings by replacing modems with new network cards and audio controllers, establishing an addressable fire alarm system, and replacing ST fiber optic connectors with SC connectors. The VA provided detailed responses to each query, offering flexibility on certain requirements such as the Site Safety and Health Officer (SSHO) role and spare parts storage, while maintaining specific technical expectations for the fire alarm system upgrade.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VA Medical Center - Canandaigua - Fire Alarm Upgrades.pdf | ||
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System-7-16-2025.pdf | ||
| 36C24225B0037 0008.docx | DOCX document | |
| 36C24225B0037 0007.docx | DOCX document | |
| 36C24225B0037 0006.docx | DOCX document | |
| RFI QUESTIONS AND ANSWERS.pdf | ||
| UPDATED WAGE RATES.pdf | ||
| 36C24225B0037 0005.docx | DOCX document | |
| Pre-Bid RFI answers and questions.pdf | ||
| Fire Alarm Spec-7-8-2025.pdf | ||
| 36C24225B0037 0004.docx | DOCX document | |
| FA panel.jpg | JPG image | |
| FA Panel .jpg | JPG image | |
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System.pdf | ||
| 36C24225B0037 0003.docx | DOCX document | |
| 30x42 full size set.pdf | ||
| 36C24225B0037 0002.docx | DOCX document | |
| SITE VISIT SIGN IN SHEET.pdf | ||
| 36C24225B0037 0001.docx | DOCX document | |
| 36C24225B0037_1.docx | DOCX document | |
| S02-DRAWINGS.pdf | ||
| S02-SPECS_BID DOCS new.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: 528A5-21-504
Project Title: Upgrade Fire Alarm System
Contract No.: 36C24225B0037
Date RFI's Submitted: 7/7/2025
Contract Officer: Nicholas Winne
RFI No. Request for Information: (A/E ,AE Works )/ VA -provided Response:
(A/E ,AE Works+A8:C13 )/ VA -provided Response:The drawings posted at SAM.gov on 6/10/2025 are 8½ x 11. This does not allow us to print full-size drawings.
Can you arrange to have full-size drawings posted asap to give us time to use them well before the bid due date?
There is no issue with the drawing, They can print the full size drawings by adjusting the print settings from "Actual Size." To "Fit to Page”.
2 Please confirm this scope is panel rebuild and device changeouts only. Please reply with the brand of FA panel as they are not shown nor mentioned on drawings.
As shown in the SOW this project is to upgrade the existing fire alarm control panels by replacing the existing modems in each FACP with new network cards and audio controllers to establish the ES network. To establish the addressable fire alarm system and meet latest code for 11 buildings
(4,5,6,7,8,10,11 16,36,37,118).
The FA panel brand is Simplex 4100U as shown in the pictures attached.
3 Could you please clarify if there is a need to establish communication between the buildings FAS inside the scope of this phase ( 4, 5, 6, 7, 8, 10, 11, 16, 36, 37, 118) and those buildings from future phases (1,2,3,9,51,54,55,56,57,58,59,60,61,62)
There is no Phase 2 this project is only for 11 buildings (4,5,6,7,8,10,11 16,36,37,118).
4 Specification section 01 35 26-13 states that the SSHO has to be a separate qualified individual from the Prime contractor's superintendent. This requirement is sometimes waived; can you please confirm the requirement for a SSHO who is not the Superintendant? If the SSHO is not permitted to also serve asthe project superintendent, can the SSHO have additional duties that are not the Superintendant?
The VA may waive the requirement for separate SSHO and Superintendent if the individual meets the requirements of both roles. This waiver does not apply to other roles such as the super and QAQC manager which must remain separate. If at any time the VA feels that a combined super and SSHO is not performing one or both roles to the satisfaction of the COR and CO, the waiver will be revoked and the contractor will be responsible for providing a qualified separate SSHO and Superintendent at no additional cost.
5 28 31 00-5 Subsection 1.5 states that the warranty period is one year. Subsection 1.6 states that the
Guaranty Period Services are to performed by a factory authorized representative and inlcudes inspections, testing, maintenance and repairs services for a period of 5 years. The work detailed in subsection 1.6 appears to be for inspecting, repairing and maintaining the fire alarm for a 5 year period.
Please confrim if this section is applicable to this project.
Yes, Subsection 1.6 is applicable to the project along with Subsection 1.5
6 28 31 00-16, subsection 2.12 B & C list spare parts and requires a spare parts cabinet be furnished, please confirm this requirement for this project.
Yes, spare parts are required for this project for any new devices or equipment being installed. Refer to
Subsection 2.12A for quantities (if a device listed is not being utilized on this project, spares are not required for it). For Subsection 2.12C of 28 31 00, AEW is deferring to the VA. The requirement states
"Furnish and install a storage cabinet of sufficient size and suitable for storing spare equipment. Doors shall include a pad locking device. Padlock to be provided by the VA. Location of cabinet to be determined by the COR later." If the VA would like an additional storage cabinet for spare components from this project, then the specifications should be followed as written. If there is already storage space available or a cabinet is not needed, this requirement can be waived.
1. General Questions/Comments
Pre-Proposal - Request for Information 1 AE Works Ltd.
Project No.: 528A5-21-504
Project Title: Upgrade Fire Alarm System
Contract No.: 36C24225B0037
Date RFI's Submitted: 7/7/2025
Contract Officer: Nicholas Winne
RFI No. Request for Information: (A/E ,AE Works )/ VA -provided Response:
1. General Questions/Comments
7 Fire Alarm Sheet Note 2 on sheet FAS100 calls for replacing the fiber optic ST connectors with SC, we interpret this as all fiber terminations listed on the fiber repair schedule which is also on sheet FAS100 and not just the connections listed as failed. Please confirm if this is correct or clarify the requirement if not all terminations are required to be replaced.
Yes, this interpretation is correct. Replace all ST connectors with SC connectors. Preliminary test results did not indicate breaks and therefore the intent is that replacing connectors will resolve the issues as well as prevent future ones. This shall be determined by retesting all links.