This document is a Pre-Proposal Request for Information (RFI) for the Upgrade Fire Alarm System project at the Canandaigua VA Medical Center. The RFI contains 25 questions and responses from AE Works Ltd. to the VA, covering technical details, project requirements, and clarifications about the fire alarm system upgrade for 11 buildings (4, 5, 6, 7, 8, 10, 11, 16, 36, 37, 118). Key details include upgrading existing fire alarm control panels by replacing modems with new network cards and audio controllers, replacing fiber optic connectors from ST to SC type, connecting AED enclosures to the fire alarm system, and performing potential asbestos abatement.
The project involves establishing an addressable fire alarm system meeting current codes, with a one-year warranty and potential for off-hours work to minimize operational impact. Significant requirements include using the Autodesk Construction Cloud platform, completing mandatory training within 12 calendar days of contract award, and submitting comprehensive documentation within 30 days of award. The solicitation is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated value between $1,000,000 and $5,000,000, and a 180-day performance period from the Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System-7-16-2025.pdf | ||
| 36C24225B0037 0008.docx | DOCX document | |
| VA Medical Center - Canandaigua - Fire Alarm Upgrades.pdf | ||
| 36C24225B0037 0007.docx | DOCX document | |
| RFI QUESTIONS AND ANSWERS.pdf | ||
| 36C24225B0037 0006.docx | DOCX document | |
| Fire Alarm Spec-7-8-2025.pdf | ||
| 36C24225B0037 0005.docx | DOCX document | |
| UPDATED WAGE RATES.pdf | ||
| 36C24225B0037 0004.docx | DOCX document | |
| RFI ANSWERS.pdf | ||
| FA panel.jpg | JPG image | |
| 36C24225B0037 0003.docx | DOCX document | |
| FA Panel .jpg | JPG image | |
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System.pdf | ||
| SITE VISIT SIGN IN SHEET.pdf | ||
| 30x42 full size set.pdf | ||
| 36C24225B0037 0002.docx | DOCX document | |
| 36C24225B0037 0001.docx | DOCX document | |
| 36C24225B0037_1.docx | DOCX document | |
| S02-DRAWINGS.pdf | ||
| S02-SPECS_BID DOCS new.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: 528A5-21-504 Project Title: Upgrade Fire Alarm System Contract No.: 36C24225B0037
Date RFI's Submitted: 7/8/2025
Contract Officer: Nicholas Winne
RFI No. Request for Information: (A/E ,AE Works )/ VA -provided Response:
1 The drawings posted at SAM.gov on 6/10/2025 are 8½ x 11. This does not allow us to print full-size drawings.
Can you arrange to have full-size drawings posted asap to give us time to use them well before the bid due date?
There is no issue with the drawing, They can print the full size drawings by adjusting the print settings from "Actual Size." To "Fit to Page”.
2 Please confirm this scope is panel rebuild and device changeouts only. Please reply with the brand of FA panel as they are not shown nor mentioned on drawings.
As shown in the SOW this project is to upgrade the existing fire alarm control panels by replacing the existing modems in each FACP with new network cards and audio controllers to establish the ES network. To establish the addressable fire alarm system and meet latest code for 11 buildings (4,5,6,7,8,10,11 16,36,37,118).
The FA panel brand is Simplex 4100U as shown in the pictures attached.
3 Could you please clarify if there is a need to establish communication between the buildings FAS inside the scope of this phase ( 4, 5, 6, 7, 8, 10, 11, 16, 36, 37, 118) and those buildings from future phases (1,2,3,9,51,54,55,56,57,58,59,60,61,62)
There is no Phase 2 this project is only for 11 buildings (4,5,6,7,8,10,11 16,36,37,118).
4 Specification section 01 35 26-13 states that the SSHO has to be a separate qualified individual from the Prime contractor's superintendent. This requirement is sometimes waived; can you please confirm the requirement for a SSHO who is not the Superintendant? If the SSHO is not permitted to also serve asthe project superintendent, can the SSHO have additional duties that are not the Superintendant?
The VA may waive the requirement for separate SSHO and Superintendent if the individual meets the requirements of both roles. This waiver does not apply to other roles such as the super and QAQC manager which must remain separate. If at any time the VA feels that a combined super and SSHO is not performing one or both roles to the satisfaction of the COR and CO, the waiver will be revoked and the contractor will be responsible for providing a qualified separate SSHO and Superintendent at no additional cost.
5 28 31 00-5 Subsection 1.5 states that the warranty period is one year. Subsection 1.6 states that the Guaranty Period Services are to performed by a factory authorized representative and inlcudes inspections, testing, maintenance and repairs services for a period of 5 years. The work detailed in subsection 1.6 appears to be for inspecting, repairing and maintaining the fire alarm for a 5 year period.
Please confrim if this section is applicable to this project.
Yes, Subsection 1.6 is applicable to the project along with Subsection 1.5
6 28 31 00-16, subsection 2.12 B & C list spare parts and requires a spare parts cabinet be furnished, please confirm this requirement for this project.
Yes, spare parts are required for this project for any new devices or equipment being installed. Refer to Subsection 2.12A for quantities (if a device listed is not being utilized on this project, spares are not required for it). For Subsection 2.12C of 28 31 00, AEW is deferring to the VA. The requirement states "Furnish and install a storage cabinet of sufficient size and suitable for storing spare equipment. Doors shall include a pad locking device. Padlock to be provided by the VA. Location of cabinet to be determined by the COR later." If the VA would like an additional storage cabinet for spare components from this project, then the specifications should be followed as written. If there is already storage space available or a cabinet is not needed, this requirement can be waived.
1. General Questions/Comments
Pre-Proposal - Request for Information 1 AE Works Ltd.
Project No.: 528A5-21-504 Project Title: Upgrade Fire Alarm System Contract No.: 36C24225B0037
Date RFI's Submitted: 7/8/2025
Contract Officer: Nicholas Winne
RFI No. Request for Information: (A/E ,AE Works )/ VA -provided Response:
1. General Questions/Comments 7 Fire Alarm Sheet Note 2 on sheet FAS100 calls for replacing the fiber optic ST connectors with SC, we interpret this as all fiber terminations listed on the fiber repair schedule which is also on sheet FAS100 and not just the connections listed as failed. Please confirm if this is correct or clarify the requirement if not all terminations are required to be replaced.
Yes, this interpretation is correct. Replace all ST connectors with SC connectors. Preliminary test results did not indicate breaks and therefore the intent is that replacing connectors will resolve the issues as well as prevent future ones. This shall be determined by retesting all links.
8 Will the sign-in sheet from site visit be available in addendum? The sign in sheet was uploaded on 6/20/2025
9 Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? Refer to question number 4 responds.
10 If no to the question above, will the SSHO need to be full-time for this project? Refer to question number 4 responds.
11 Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Refer to question number 4 responds.
12 If no to the question above, will the QA/QC need to be full time for this project? Refer to question number 4 responds.
13 Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? Refer to question number 4 responds.
14 Please confirm if tax should be included in our proposal? Refer to FAR part 29.30329.303 Application of State and local taxes to Government contractors and subcontractors.
(a) Prime contractors and subcontractors shall not normally be designated as agents of the Government for the purpose of claiming immunity from State or local sales or use taxes b) When purchases are not 15 Please provide the latest wage determination for this project’s county. Uploaded
16 Please confirm if the current prevailing wages will be consistent for the life of the project with no escalation?
Wage rate stays the same after award
17 Please update the wage determination to "General Decision Number: NY20250032 06/20/2025” I'll determine the correct wage determination
18 It appears all the 1.3 Related work in spec section 28 31 00 FIRE DETECTION AND ALARM is missing and seems to be relevant to this project.
All specification related to this project are outlined in the specification table of content . Updated spec will be attached.
20 Is there a brand name or equal justification to this requirement? Rest of campus is Simplex, BOD is required for this project to maintain consistency. Refer to question two for panel details.
21 It appears that 02 82 13.13 GLOVEBAG ASBESTOS ABATEMENT, specification is missing in its entirely. Please provide asbestos survey if available.
Updated spec will be attached.
22 Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? This needs to be a submittal once the project is awarded.
23 Will shutdowns be required to be done during off hours or weekends? All shutdowns need to be coordinated with the COR, if schedule deems necessary they will be done off hours and weekends.
24 Is there a particular vendor or contractor currently servicing and maintaining the Fire Alarm System? Simplex is currently servicing our fire alarm system.
25 Is there a particular vendor or contractor currently servicing and maintaining the Security Alarm System N/A
Pre-Proposal - Request for Information 2 AE Works Ltd.
Proposal RFIs
File details come from the government source that posted it. Updated .