This document is a Pre-Proposal Request for Information (RFI) for the Upgrade Fire Alarm System project at the Canandaigua VA Medical Center. The RFI, associated with Contract No. 36C24225B0037, was submitted on 6/26/2025 and addresses key technical questions about the project scope. The project involves upgrading fire alarm systems for 11 specific buildings, including replacing existing fire alarm control panel modems with new network cards and audio controllers to establish an addressable fire alarm system that meets the latest code requirements.
The RFI includes responses from the VA clarifying three main points: (1) drawing size can be adjusted by changing print settings, (2) the project involves upgrading existing Simplex 4100U fire alarm control panels with new network components, and (3) the project is limited to the 11 specified buildings with no planned communication with buildings in future phases. The overall project aims to improve the existing fire alarm infrastructure, including upgrading devices, replacing connectors, connecting AEDs to the fire alarm system, and performing necessary abatement work in Building 4.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid RFI_528A5-21-504 -Upgrade Fire Alarm System-7-16-2025.pdf | ||
| 36C24225B0037 0008.docx | DOCX document | |
| VA Medical Center - Canandaigua - Fire Alarm Upgrades.pdf | ||
| 36C24225B0037 0007.docx | DOCX document | |
| RFI QUESTIONS AND ANSWERS.pdf | ||
| 36C24225B0037 0006.docx | DOCX document | |
| Pre-Bid RFI answers and questions.pdf | ||
| Fire Alarm Spec-7-8-2025.pdf | ||
| 36C24225B0037 0005.docx | DOCX document | |
| UPDATED WAGE RATES.pdf | ||
| 36C24225B0037 0004.docx | DOCX document | |
| RFI ANSWERS.pdf | ||
| FA panel.jpg | JPG image | |
| 36C24225B0037 0003.docx | DOCX document | |
| FA Panel .jpg | JPG image | |
| SITE VISIT SIGN IN SHEET.pdf | ||
| 30x42 full size set.pdf | ||
| 36C24225B0037 0002.docx | DOCX document | |
| 36C24225B0037 0001.docx | DOCX document | |
| 36C24225B0037_1.docx | DOCX document | |
| S02-DRAWINGS.pdf | ||
| S02-SPECS_BID DOCS new.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: 528A5-21-504
Project Title: Upgrade Fire Alarm System
Contract No.: 36C24225B0037
Date RFI's Submitted: 6/26/2025
Contract Officer: Nicholas Winne
RFI No. Request for Information: (A/E ,AE Works )/ VA -provided Response:
(A/E ,AE Works+A8:C13 )/ VA -provided Response:The drawings posted at SAM.gov on 6/10/2025 are 8½ x 11. This does not allow us to print full-size drawings.
Can you arrange to have full-size drawings posted asap to give us time to use them well before the bid due date?
There is no issue with the drawing, They can print the full size drawings by adjusting the print settings from "Actual Size." To "Fit to Page”.
2 Please confirm this scope is panel rebuild and device changeouts only. Please reply with the brand of FA panel as they are not shown nor mentioned on drawings.
As shown in the SOW this project is to upgrade the existing fire alarm control panels by replacing the existing modems in each FACP with new network cards and audio controllers to establish the ES network. To establish the addressable fire alarm system and meet latest code for 11 buildings
(4,5,6,7,8,10,11 16,36,37,118).
The FA panel brand is Simplex 4100U as shown in the pictures attached.
3 Could you please clarify if there is a need to establish communication between the buildings FAS inside the scope of this phase ( 4, 5, 6, 7, 8, 10, 11, 16, 36, 37, 118) and those buildings from future phases (1,2,3,9,51,54,55,56,57,58,59,60,61,62)
There is no Phase 2 this project is only for 11 buildings (4,5,6,7,8,10,11 16,36,37,118).
1. General Questions/Comments
Pre-Proposal - Request for Information 1 AE Works Ltd.
File details come from the government source that posted it. Updated .