This synopsis of changes document outlines modifications made to specifications for the renovation of the fire department at Building 19 of the Hudson Valley Healthcare System Montrose Veterans Affairs Medical Center in Montrose, New York. Sections and subsections were changed to note that certain specifications were not relevant to the work. References to unrelated specifications were also corrected.

The related federal contract opportunity is a solicitation for the renovation of the fire department at Building 19 of the Montrose VAMC. Prospective contractors must attend a mandatory pre-bid site visit on October 14, 2021 and submit any questions by October 20, 2021. Sealed bids are due by November 3, 2021 with bid bonds and original bids to follow within two weeks. The renovation magnitude is between $500,000 to $1,000,000. This is a set-aside for Service-Disabled Veteran-Owned Small Businesses. The work must comply with VA, federal, state and local regulations and be completed within 300 calendar days of the notice to proceed.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS OF CHANGES MADE ON 10-29-21

1) Old version of General Requirements spec which was updated per previous amendment has been removed

2) Specification 23 09 23 Direct Digital Control System for HVAC has been added per previous amendment

3) Specification 06 10 00 Section 1.2 Subsection B changed to NA. Specification 06 20 00 is not related work.

4) Specification 06 10 00 Section 1.2 Subsection D changed to NA. Specification 06 16 63 is not related work.

5) Specification 23 05 93 Section 3.9 Subsection D sub-subsection 3 changed to NA. Specification 23 65 00 is not related work and removed from the paragraph.

6) Specification 23 09 23 Section 2.12 Subsection B changed to NA. Specification 23 05 21 is not related work and the paragraph removed.

7) Specification 23 37 00 Section 1.2 Subsection B changed to NA. Specification 08 90 00 is not related work.

8) Specification 26 24 16 Section 2.4 Subsection A changed to NA. Specification 26 43 13 is not related work and the paragraph removed.

9) Specification 26 24 16 Section 1.5 Subsection A sub-subsection 10 reference to 26 05 21 corrected to read 26 05 19

10) Specification 27 15 00 Section 1.2 Subsection F,G and H removed. Section 2.2 subsection A also removed. Specification 27 31 00 and 27 31 31 are not related work.

11) Specification 28 05 00 Section 1.2 Subsection D changed to NA. Specification 10 14 00 is not related work.

12) Specification 28 05 00 Section 1.2 Subsection F changed reference from 26 05 21 to 26 05 19

13) Specification 28 05 00 Section 1.2 Subsection J changed to NA.

14) Specification 28 05 00 Section 1.2 Subsection K changed to NA. Specification 28 08 00 is not related work.

15) Specification 28 05 00 Section 1.2 Subsection L changed to NA. Specification 28 13 00 is not related work.

16) Specification 28 05 00 Section 1.2 Subsection M changed to NA. Specification 28 13 16 is not related work.

17) Specification 28 05 00 Section 1.2 Subsection N changed to NA. Specification 28 23 00 is not related work.

18) Specification 28 05 00 Section 1.2 Subsection O changed to NA. Specification 28 26 0 is not related work.

19) Specification 28 05 00 Section 1.6 Subsection E sub-subsection 1 changed to NA. Specification 26 43 13 is not related work and the paragraph removed.

20) Specification 28 08 00 - Specification 26 08 00 is not related work and the following paragraphs removed. SECTION 3.3 in its entirety; Also section 3.4 subsection E

21) Specification 28 05 13 Section 1.2 Subsection F changed to NA. Specification 28 08 00 is not related work.

22) Specification 28 05 26 Section 1.2 Subsection D changed to NA. Specification 28 08 00 is not related work.

23) Specification 28 05 26 Section 1.2 Subsection I changed to NA. Specification 28 08 00 is not related work.

24) Specification 28 05 26 section 1.5 subsection D removed. Specification 28 08 00 is not related work.

25) Specification 28 05 26 section 3.9 FOR Commissioning removed, 28 08 00 is not related work.