This solicitation is for the renovation of the fire department at Building 19 at the Hudson Valley Healthcare System Montrose Veterans Affairs Medical Center in Montrose, New York. The contractor will be responsible for providing all labor, materials, tools, equipment, and supervision to complete the renovation in accordance with the statement of work, specifications and drawings. The completion time is 300 calendar days from notice to proceed. The magnitude of construction is between $500,000 and $1,000,000. A prebid site visit is scheduled for October 14, 2021. Questions regarding the solicitation must be submitted by October 20, 2021 and bids are due by November 3, 2021. The solicitation is set aside for Service Disabled Veteran Owned Small Businesses and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION: MONTROSE, NEW YORK DRAWING INDEX:
HUDSON VALLEY HEALTH CARE SYSTEM
620-20-206
FIREHOUSE ENHANCEMENT
FRANKLIN DELANO ROOSEVELT
HOSPITAL
2094 ALBANY POST ROAD
MONTROSE, NY 10548
DEPARTMENT OF VETERAN AFFAIRS
MONTROSE & WAPPINGERS FALLS,
NEW YORK
GENERAL INFORMATION DRAWINGS:
GI 000 01 of 61 COVERSHEET
GI 001 02 of 61 GENERAL NOTES & REQUIREMENTS
GP 100 03 of 61 GENERAL PHASING PLANS
LS 100 04 of 61 CRITICAL PATH & LIFE SAFETY NOTES
SITE DRAWINGS:
SP 100 05 of 61 SITE AND UTILITY PLAN
ASBESTOS ABATEMENT DRAWINGS:
1 HA 100 06 of 61 ASBESTOS ABATEMENT PLAN - ROOF
1 HA 101 07 of 61 ASBESTOS ABATEMENT PLAN -
GROUND FLOOR
1 HA 102 08 of 61 ASBESTOS ABATEMENT DIAGRAM
AND NOTES
ARCHITECTURAL DRAWINGS:
AD 000 09 of 61 ARCH. NOTES, ABBREV., & SYMBOLS
LEGEND
AD 100 10 of 61 ARCHITECTURAL ROOF DEMOLITION
PLAN
AD 101 11 of 61 ARCHITECTURAL INTERIOR
DEMOLITION
AD 102 12 of 61 REFLECTED CEILING DEMOLITION
AD 201 13 of 61 EXTERIOR ELEVATIONS DEMOLITION
AI 100 14 of 61 NEW ROOF PLAN
AI 101 15 of 61 NEW ARCHITECTURAL INTERIOR
PLAN
AI 102 16 of 61 NEW REFLECTED CEILING PLAN
AI 200 17 of 61 NEW INTERIOR ELEVATIONS
AI 201 18 of 61 NEW EXTERIOR ELEVATIONS
AI 400 19 of 61 NEW ENLARGE PLANS
AI 500 20 of 61 NEW ROOF DETAILS
AI 501 21 of 61 NEW ARCHITECTURAL PARTITION
DETAILS
AI 502 22 of 61 NEW ARCH. DOOR SCHEDULE, ELEVATIONS, & DOOR FRAMING
DETAILS
AI 600 23 of 61 NEW FINISH SCHEDULE
MECHANICAL DRAWINGS:
MI 000 24 of 61 MECH. NOTES, ABBREV., & SYMBOLS
LEGEND
MD 100 25 of 61 EXISTING STEAM DISTRIBUTION AND
HEATING DEMOLITION PLAN
MD 101 26 of 61 EXISTING HVAC DEMOLITION PLAN
MD 102 27 of 61 EXISTING EQUIPMENT DEMO. PLAN
MD 500 28 of 61 EXISTING STEAM DISTRIBUTION
SYSTEM DETAILS
ME 100 29 of 61 NEW STEAM DISTRIBUTION PLANS
ME 101 30 of 61 NEW HVAC PLAN
ME 102 31 of 61 NEW EQUIPMENT LOCATION PLAN
ME 500 32 of 61 NEW STEAM DIST. DETAILS
ME 501 33 of 61 NEW HVAC DETAILS
ME 502 34 of 61 NEW HVAC CONTROLS INFORMATION
ME 600 35 of 61 NEW HVAC SCHEDULES
ELECTRICAL DRAWINGS:
EI 000 36 of 61 ELECTRICAL NOTES, ABBREV., & SYMBOLS LEGEND
ED 100 37 of 61 ELECTRICAL POWER DEMOLITION
PLAN
ED 101 38 of 61 ELECTRICAL LIGHTING DEMOLITION
ED 600 39 of 61 ELECTRICAL DEMOLITION ONE-LINE
DIAGRAM
ED 601 40 of 61 ELECTRICAL DEMOLITION EXISTING
PANEL SCHEDULE
EP 100 41 of 61 NEW ELECTRICAL POWER
DISTRIBUTION PLAN
EP 120 42 of 61 NEW ELECTRICAL RECEPTACLE
WIRING PLAN
EP 130 43 of 61 NEW ELECTRICAL LIGHTING WIRING
PLAN
EP 140 44 of 61 NEW ELECTRICAL EMERGENCY
POWER WIRING PLAN
EP 600 45 of 61 NEW ELECTRICAL ONE-LINE DIAGRAM
EL 100 46 of 61 ELECTRICAL LIGHTING PLAN
ES 601 47 of 61 NEW PANEL SCHEDULES
PLUMBING DRAWINGS:
MI 000 48 of 61 MECH. NOTES, ABBREV., & SYMBOLS
LEGEND
PD 100 49 of 61 EXISTING SANITARY DEMOLITION
PLAN
PD 101 50 of 61 EXISTING DOMW DEMOLITION PLAN
PD 200 51 of 61 EXISTING DOMW INTERIOR
SECTION ELEVATION DEMOLITION
PD 300 52 of 61 EXISTING DETAILS
PL 100 53 of 61 NEW SANITARY PLAN
PL 101 54 of 61 NEW DOMW PLAN
PL 500 55 of 61 NEW PLUMBING DETAILS
FIRE PROTECTION & SUPPRESSION DRAWINGS:
FI 000 56 of 61 FIRE PROTECTION ABBREV. &
SYMBOLS LEGEND
FI 001 57 of 61 FIRE PROTECTION GENERAL NOTES
FD 100 58 of 61 FIRE ALARM DEMOLITION PLANS
FD 101 59 of 61 FIRE SUPPRESSION DEMOLITION
PLAN & SITE DETAILS
FA 100 60 of 61 NEW FIRE ALARM PLANS
FX 100 61 of 61 NEW FIRE SUPPRESSION PLAN
Drawing Title
Approved: Facility Director , VAHVHCS:
Project Title
Date
Location
Checked
Building(s) Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:
Revisions: Date:
Approved: John Cliffe, Facility Chief of Engineering
N
S
W
E
08-17-2021Bid Documents
08-16-2021100% Working Drawing Submission
05-21-202195% Working Drawing Submission
02-26-202165% Working Drawing Submission
02-26-202135% Working Drawing Submission
10-30-2020100% Preliminary Design Submission
APPROVED:
APPROVED:
APPROVED:
Dwg. 01 of 61
GI 000
AMI
Montrose, New York
08-17-2021
620-20-206
APPROVED:
APPROVED:
APPROVED:
APPROVED:
APPROVED:
LS
Cover Sheet
Firehouse Enhancement at
FDR
KEY PLAN
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text S
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text N 16%%D00'N 490'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN. = NTS
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text Engineering Service
AutoCAD SHX Text Bid Documents Submission GI 000
GENERAL REQUIREMENTS
1. ALL WORK SHALL CONFORM TO ALL FEDERAL, STATE LOCAL RULES, LAWS,
REGULATIONS, VETERANS AFFAIRS (VA) SPECIFICATION. ALL PLUMBING WORK SHALL
CONFORM TO NATIONAL PLUMBING CODE, ALL ELECTRICAL WORK SHALL CONFORM
TO NATIONAL ELECTRICAL CODE, AND ALL HEATING AND VENTILATING WORK SHALL
COMPLY WITH AMERICAN SOCIETY OF HEATING, REFRIGERATING AND
AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARDS.
2. BEFORE BEGINNING ANY CUTTING OR DEMOLITION WORK, THE CONTRACTOR SHALL
CAREFULLY SURVEY THE EXISTING CONDITIONS AND DETERMINE THE EXTENT OF
THE WORK TO BE DONE. THE CONTRACTOR SHALL INSURE THAT STRUCTURAL ITEMS
ARE NOT WEAKENED AND SHALL BE RESPONSIBLE FOR INCREASING OR ADDING
STRUCTURAL SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING,
REMOVAL OR DEMOLITION WORK.
3. CONTRACTOR SHALL REMOVE COMPLETELY AND/OR TERMINATE ALL EXPOSED
MECHANICAL, ELECTRICAL OR PLUMBING ITEMS NOT INDICATED OR NECESSARY FOR
THE FUNCTION ABILITY OF THE NEW DESIGNS.
4. CONTRACTOR SHALL PROVIDE AND COORDINATE THE LOCATION OF ALL NEW
OPENINGS IN ANY EXISTING WALLS OR FLOORS AS INDICATED ON THESE DRAWINGS
OR AS NECESSARY FOR THE COMPLETION OF NEW WORK SHOWN OR IMPLIED.
5. SHUT-DOWN AND TIE-INS: 48 HOUR MINIMUM NOTICE SHALL BE GIVEN THE
CONTRACTING OFFICER IN WRITING FOR ALL SHUT-DOWNS OR TIE-INS. SHUT-DOWNS
AND TIE-INS SHALL BE DONE AT SUCH TIMES AND HOURS SO AS NOT TO INTERFERE
WITH THE VETERANS AFFAIRS OPERATION. ALL OVERTIME EXPENSES REQUIRED FOR
SHUT-DOWNS AND TIE-INS SHALL BE BORNE BY THE CONTRACTOR.
6. CONTRACTOR SHALL CAREFULLY COORDINATE THE LOCATION OF ALL NEW
OPENINGS TO BE CUT IN EXISTING WALLS OR FLOORS.
7. REMOVALS SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT RETAINED
WORK, HOWEVER WHERE SUCH WORK IS DAMAGED, THE CONTRACTOR SHALL
PATCH, REPAIR OR OTHERWISE RESTORE DAMAGED ITEMS TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD.
DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND DRAWINGS AND/OR
SPECIFICATIONS SHALL BE REPORTED TO THE CONTRACTING OFFICER IN WRITING
FOR CLARIFICATION. WORK SHALL NOT PROCEED UNTIL SUCH CLARIFICATION HAS
BEEN RECEIVED.
9. SHOULD UNFORESEEN CONDITIONS OR OTHER CAUSES NECESSITATE
CONSTRUCTION DETAILS NOT IN ACCORDANCE WITH THESE PLANS, THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND SUBMIT HIS DETAILS
SHOWING THE PROPOSED METHODS TO ACCOMPLISH THE REQUIRED RESULTS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING, REPAIRING AND
FINISHING OF ALL DISTURBED AREAS. PATCHING OF SURROUNDING AREAS SHALL BE
WITH MATERIALS TO MATCH EXISTING.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND
PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE,
COLLAPSE, DISTORTIONS AND MISALIGNMENT ACCORDING TO APPLICABLE CODES,
STANDARDS AND PRACTICE.
12. THE CONTRACTOR SHALL CARRY NEW WALL FINISHING WORK (PAINTING,
WAINSCOAT, MOLDING, COVEBASE, ETC.) TO AN APPROPRIATE STOPPING POINT
(CHANGE IN WALL DIRECTION).
13. PROTECTION OF PERSONNEL: WHERE THE SAFETY OF PEDESTRIANS AND DRIVERS
ARE ENDANGERED IN THE AREA OF REMOVAL WORK, BARRICADES FOR TRAFFIC
SHALL BE USED AND ADVANCED NOTICE SHALL BE GIVEN TO THE CONTRACTING
OFFICER PRIOR TO BEGINNING ANY SUCH WORK.
14. THE CONTRACTOR SHALL CLEAN UP AND REMOVE DEBRIS FROM THE WORK SITE
DAILY.
15. THE CONTRACTOR SHALL MAINTAIN ACCESS TO EXISTING EXITS OR CREATE NEW
EXITS AS REQUIRED BY THE CONTRACTING OFFICER FOR THE SAFETY OF BUILDING
OCCUPANTS.
16. CONTRACTOR RESTRICTIONS: THE CONTRACTOR SHALL CHECK WITH AND RECEIVE
APPROVAL FROM THE CONTRACTING OFFICER FOR ROUTES OF ACCESS AND SUPPLY
STORAGE REGARDING THE GENERAL WORK AREA WITHIN THIS CONTRACT. V.A. DOES
NOT PROVIDE STORAGE OUSIDE OF COTRACT AND CONTRACT AREA.
17. SUBSTITUTION OF MATERIALS: WHERE EXISTING MATERIALS OF ANY KIND MUST BE
REPLACED FOR ANY REASON AS A RESULT OF THE WORK HERE UNDER AND EXACT
DUPLICATES ARE NOT AVAILABLE, THEIR FUNCTIONAL EQUIVALENTS MAY BE
SUBSTITUTED UPON RECEIPT OF PRIOR WRITTEN APPROVAL FROM THE
CONTRACTING OFFICER.
18. DRAWING DIMENSIONS ARE TO AND ARE ACTUAL METAL STUD SIZE.
19. ENSURE THAT ALL WALLS, CEILING AND ROOF STRUCTURE ARE PROPERLY BRACED
AND SUPPORTED PRIOR TO REMOVAL OF ANY STRUCTURAL ELEMENTS. ALL WALLS
TO BE REMOVED TO FULL HEIGHT UNLESS OTHERWISE INDICATED.
20. THE GENERAL CONTRACTOR SHALL MODIFY THE EXISTING ELECTRICAL AND EXISTING
MECHANICAL SYSTEMS TO CONFORM TO NEW DESIGN CONDITIONS.
21. ALL BIDDERS AND CONTRACTORS ARE RECOMMENDED TO VISIT THE SITE BEFORE
SUBMITTING BIDS, TO INSPECT THE PREMISES AND VIEW THE EXISTING CONDITIONS
TO VERIFY ALL CONDITIONS, SIZES AND QUANTITIES. PLANS ARE FURNISHED TO
INDICATE THE SCOPE OF THE INTENDED CONTRACT WORK. EXISTING CONDITIONS
WHICH MIGHT PRECLUDE OR INTERFERE WITH THE PROPOSED WORK AS DRAWN OR
SPECIFIED SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER
FOR RESOLVING. RELOCATIONS MUST BE CHECKED TO VERIFY THEIR FEASIBILITY IN
ACCORDANCE WITH THE NEW REQUIREMENTS.
22. ALL NEW PENETRATIONS THRU EXISTING CONSTRUCTION SHALL BE PERFORMED IN A
NEAT AND WORKMANLIKE MANNER. CARE SHALL BE TAKEN TO PROVIDE STRAIGHT
AND CLEAN CUTS. PATCH TO MATCH EXISTING ADJACENT CONSTRUCTION. PROVIDE
NEW WATERPROOFING TO MATCH EXISTING AS REQUIRED.
23. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK MUST BE
ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY ALSO BE
NECESSARY IN AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE TO
CHANGES AFFECTING EXISTING MECHANICAL, ELECTRICAL, PLUMBING, OR OTHER
SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THIS CONTRACT. INSPECT
THOSE AREAS, AND ASCERTAIN WORK NEEDED, AND DO THAT WORK IN
ACCORDANCE WITH THE CONTRACT REQUIREMENTS, AT NO ADDITIONAL COST.
24. TRADE, PRODUCT, OR MANUFACTURER'S NAMES OR CATALOG NUMBERS SHOWN ON
THE DRAWINGS FOR NEW PRODUCTS ARE TO ESTABLISH QUALITY REQUIRED. IN
EACH CASE ADD, BY INFERENCE, AFTER TRADE, PRODUCT, OR MANUFACTURER'S
NAME, THE PHRASE "OR APPROVED EQUAL".
25. EXCEPT IN SPACES WHERE NO WORK UNDER THIS CONTRACT IS REQUIRED,
ENCLOSE EXISTING AND NEW CONDUITS, DUCTS, PIPES, AND SIMILAR ITEMS IN
FURRING WHERE SUCH ITEMS PASS THROUGH FINISHED SPACES WHETHER OR NOT
FURRING IS INDICATED. REFER TO DETAILS ON PARTITION SHEET AI500.
26. WHERE CONDUITS, DUCTS, PIPES AND SIMILAR ITEMS ARE SHOWN TO BE INSTALLED
IN EXISTING WALLS OR PARTITIONS, NEATLY CHASE THE WALLS OR PARTITIONS,
INSTALL THE ITEMS, AND PATCH THE WALLS OR PARTITIONS TO MAKE THE
INSTALLATION NOT DISCERNIBLE IN THE FINISHED WORK.
27. SEAL TIGHT AND PROTECT WITH FIRE SAFING EXISTING AND NEW SLEEVES AND
OPENINGS THROUGH FLOORS. FIRE SAFING SHALL BE A MINIMUM 2 HOUR RATED FOR
ALL APPLICATIONS AND LOCATIONS.
28. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL NEW CONDUITS AND PIPES IN
EVERY CASE, AND NEW DUCTS WHERE POSSIBLE, ABOVE THE EXISTING CEILING.
REMOVE EXISTING CEILING AS NECESSARY. AFTER INSTALLATION OF CONCEALED
WORK, REINSTALL REMOVED CEILING AND PATCH AND REFINISH TO MATCH
ADJACENT UNREMOVED CEILINGS.
29. FURR TO CONCEAL HORIZONTAL DUCTS PASSING THROUGH EXISTING OR NEW
SPACES WHERE IT IS NOT POSSIBLE TO INSTALL THE DUCTS ABOVE THE CEILING.
USE GYPSUM BOARD FOR SUCH FURRING.
30. PROTECT EXISTING AND COMPLETED WORK FROM DAMAGE.
31. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO MATCH ADJACENT
EXISTING FINISHES, THOSE EXISTING SURFACES DAMAGED OR NEWLY EXPOSED
DURING PERFORMANCE OF THE WORK UNDER THIS CONTRACT.
32. WHERE PERMANENT REMOVAL OF EXISTING MILLWORK, CASEWORK,CABINETWORK,
ACCESSORIES, EQUIPMENT OR FURNISHINGS IS REQUIRED, AND PREVIOUSLY
CONCEALED SURFACES ARE TO REMAIN EXPOSED, PATCH PREVIOUSLY CONCEALED
SURFACES TO MATCH ADJACENT EXPOSED SURFACES. WHERE SUCH SURFACES
ARE SCHEDULED TO RECEIVE NEW FINISHES, PREPARE THE SURFACES TO RECEIVE
THE NEW FINISHES.
33. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF EXISTING FINISHES IS
REQUIRED TO PERFORM THE WORK UNDER THIS CONTRACT, AND A NEW FINISH IS
NOT INDICATED, FILL RESULTING OPENINGS AND PATCH THE SURFACE AFTER DOING
THE WORK, AND FINISH TO MATCH ADJACENT EXISTING SURFACES.
34. ALL WORK SHALL BE PERFORMED, MONDAY THRU FRIDAY, DURING NORMAL
BUSINESS HOURS OF 8:00AM - 4:30PM, EXCEPT SATURDAY, SUNDAY AND HOLIDAYS,
EXCEPT AS APPROVED BY THE CONTRACTING OFFICER AND AS REQUIRED. THE
CONTRACTOR SHALL BE REQUIRED TO WORK PRIME TIME AND OVERTIME TO
COMPLETE OR CONSTRUCT PORTIONS OF THIS WORK. THIS SHALL BE AS DIRECTED
BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT. ALL
WORK ON BUILDING 19 WILL BE PERFORMED DURING NIGHT AND WEEKEND HOURS.
35. CONTRACTOR SHALL ABIDE BY THEIR OWN EXPENSE TO THE LATEST EDITIONS OF
ALL OSHA REGULATIONS AND REQUIREMENTS.
36. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN IN THE FIELD, ALL
EXISTING UTILITIES, EXISTING CONDITIONS, FIELD MEASUREMENTS, DIMENSIONS,
QUANTITIES, RELATED TO THE PROJECT.
37. IT IS RECOMMENDED THAT THE CONTRACTOR PERFORM A DOCUMENTED SITE VISIT
PRIOR TO BID.
38. CONTRACTOR SHALL SUBMIT FOR APPROVAL ALL MATERIALS USED FOR
CONSTRUCTION AND ALL EQUIPMENT INTENDED FOR INSTALLATION IN THIS PROJECT.
39. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN THE
LOCATION, DIRECTION, SIZE, OF ANY AND ALL UTILITIES EXISTING IN THE GENERAL
VICINITY OF THE WORK AREA.
40. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR ANY UTILITY
DISRUPTED, BROKEN, OR OTHERWISE RENDERED NON-FUNCTIONABLE DUE TO THE
WORK PERFORMED AT NO ADDITIONAL COST TO THE GOVERNMENT DURING THIS
COURSE OF WORK.
41. THE CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR
TO THE START OF WORK TO THE CONTRACTING OFFICER. IDENTIFICATION OF SUCH
AFTER THE START OF WORK SHALL BE DEEMED AS DISTURBED/DAMAGED BY THE
CONTRACTOR AND SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
42. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROPERLY SUPPORT ANY
UTILITY ENCOUNTERED IN THE COURSE OF THIS WORK.
43. THE CONTRACTOR SHALL LEAVE THE WORK SITE CLEAN AND SECURED AT THE END
OF EACH WORKING DAY. THE WORK SITE SHALL NOT BE LEFT UNATTENDED AT ANY
TIME BY THE CONTRACTOR, UNLESS THE WORK AREA IS PROPERLY SECURED BY THE
CONTRACTOR.
44. THE CONTRACTOR IS ADVISED THAT THEY ARE SOLELY RESPONSIBLE FOR THE
SAFETY OF THE WORK SITE AND TAKE ALL ACTIONS TO ELIMINATE ANY SAFETY
HAZARDS THAT SHALL EXIST AND POSE A THREAT OF HARM TO PATIENTS,
EMPLOYEES OF THE GOVERNMENT, EMPLOYEES OF THE CONTRACTOR OR OTHER(S).
IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO TAKE IMMEDIATE
ACTION TO ALLEVIATE ANY SAFETY HAZARD THAT MAY EXIST WITHOUT DIRECTION
FROM THE CONTRACTING OFFICER OR HIS DESIGNEE. THE CONTRACTOR SHALL TAKE
IMMEDIATE CORRECTIVE ACTION TO ALLEVIATE ANY SAFETY HAZARD, CONDITION,
ETC., AS INDICATED BY THE CONTRACTING OFFICER.
45. THERE SHALL BE NO CLAIMS AGAINST THE DEPARTMENT OF VETERANS AFFAIRS FOR
WORK STOPPAGES DUE TO ACTS OF GOD, WEATHER CONDITIONS, STOP WORK
ORDERS (VERBAL AND/OR WRITTEN), UNDERESTIMATION OF WORK, ESTIMATED
QUANTITIES, MATERIALS, SUPPLIES, TOOLS, CORRECTION OF SAFETY PROBLEMS, OR
ANY OTHER REASON.
46. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE TO THE
VETERANS AFFAIRS A "AS CONSTRUCTED DRAWING" FOR THE WORK. THIS DRAWING
SHALL BE SUBMITTED ON 30" BY 42", COMPLETE WITH 2 COPIES. THIS DRAWING
SHALL BE TECHNICALLY CORRECT AND DRAWN ACCORDING TO SOUND ENGINEERING
PRINCIPLES. THIS SHALL SHOW ALL ELEVATIONS, DISTANCES, DIAMETERS,
SCHEDULES, MATERIALS INSTALLED, SEQUENCE OF OPERATIONS OF ANY AND ALL
ITEMS TO THE DEPARTMENT OF VETERANS AFFAIRS. CONTRACTOR IS ADVISED THAT
THEY ARE RESPONSIBLE TO MAINTAIN ALL MEASUREMENTS DURING THE COURSE OF
THIS PROJECT AND DIMENSIONS MISSING ON THE AS-BUILT DRAWINGS SHALL NOT BE
ACCEPTABLE. FINAL PAYMENT SHALL NOT BE PROVIDED UNTIL THIS DRAWING IS
SUBMITTED AND APPROVED. A COMPLETE, ACCEPTABLE, SEPARATE, ENGINEERING
"AS CONSTRUCTED DRAWING" IS REQUIRED FOR EACH UTILITY.
47. CONTRACTOR SHALL SAW CUT WITH PROPER BLADE ANY CONCRETE ENCOUNTERED
IN THE COURSE OF THIS WORK. ALL HOLES SHALL BE CORED DRILLED WITH DIAMOND
CORE BITS. THE USE OF JACK HAMMERS IS PROHIBITED.
48. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY AND ALL DEBRIS FROM THE
MEDICAL CENTER DAILY AND DISPOSE OF SAME OFF THE BASE IN ACCORDANCE WITH
ALL LOCAL AND STATE REGULATIONS.
49. CONTRACTOR SHALL PROVIDE FOR OWN STORAGE SPACE AND SECURITY FOR SAME.
CONTRACTOR SHALL BE PROHIBITED FROM USING VA SPACE FOR
STORAGE.LOCATION TO BE COORDINATED WITH COTR AFTER NOTICE TO PROCEED
HAS BEEN ISSUED.
50. ALL WORK SHALL BE PERFORMED BY THOSE WHO ARE SKILLED IN THEIR TRADE,
JOURNEYMEN MECHANICS, TO PRODUCE A FIRST CLASS JOB. THE CONTRACTOR IS
ADVISED THAT WORK DEEMED UNSUITABLE, UNACCEPTABLE, SECOND CLASS IN
NATURE, BY THE VETERANS AFFAIRS SHALL BE DEEMED NON-ACCEPTABLE AND THE
CONTRACTOR SHALL REMOVE, REPLACE, RE-DO, TO THE SATISFACTION OF THE
DEPARTMENT OF VETERANS AFFAIRS, THE UNACCEPTABLE WORK AT NO ADDITIONAL
COST TO THE GOVERNMENT. THERE SHALL BE NO ADDITIONAL CLAIMS AGAINST THE
DEPARTMENT OF VETERANS AFFAIRS FOR THE ABOVE.
51. THE CONTRACTOR SHALL BE RESPONSIBLE TO REROUTE ANY UTILITY ENCOUNTERED
IN THE COURSE OF THIS PROJECT. THE CONTRACTOR IS ADVISED THAT THE
VETERANS AFFAIRS HAS MADE THE ATTEMPT TO IDENTIFY MAJOR UTILITIES TO BE
REROUTED.
52. ALL QUANTITIES SHOWN ON THE DRAWING ARE ESTIMATED QUANTITIES ONLY. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY AND
ASCERTAIN ALL EXISTING CONDITIONS, DIMENSIONS AND QUANTITIES.
53. THE GOVERNMENT SHALL NOT BE LIABLE FOR EXTRA PAYMENT SHOULD THE
CONTRACTOR UNDERESTIMATE QUANTITIES OF MATERIALS.
54. CONTRACTOR SHALL INSTALL AND MAINTAIN DUST BARRIERS OR TEMPORARY
CONSTRUCTION WALLS AS DIRECTED BY THE CONTRACTING OFFICER. REFER TO
DEMOLITION PLAN ON SHEET AS-1 AND ABATEMENT DRAWINGS FOR DUST BARRIER
OR TEMPORARY CONSTRUCTION WALL DETAILS AND LOCATIONS.
55. THE GOVERNMENT SHALL NOT BE LIABLE TO THE CONTRACTOR FOR DELAYS DUE TO
NON-DELIVERY OF MATERIALS, WEATHER DELAYS, MANPOWER SHORTAGE,
SUBMITTAL DELAYS, SUBMITTAL RETURNS, WORK STOPPAGES BY REPRESENTATIVES
OF THE GOVERNMENT, FOR ANY REASON, SAFETY DELAYS, REMOVAL AND
REPLACEMENT OF WORK DEEMED NON-ACCEPTABLE BY THE GOVERNMENT.
56. PRIOR TO ANY WELDING, CUTTING, BRAZING, SOLDERING, THE CONTRACTOR SHALL
OBTAIN A "HOT WORK PERMIT" FROM THE DEPARTMENT OF VETERANS AFFAIRS FIRE
DEPARTMENT. WITHOUT THIS PERMIT, HOT WORK SHALL NOT BE PERMITTED BY THE
GOVERNMENT.
57. THE CONTRACTOR SHALL MAINTAIN SECURITY FOR THE WORK AREA AND PROVIDE
KEYS TO THE CONTRACTING OFFICER FOR ACCESS.
58. THE CONTRACTOR SHALL MAINTAIN THE WORK SITE IN A NEAT AND CLEAN
CONDITION. THE WORK SITE SHALL BE BROOM CLEANED AT THE END OF EACH
WORKING DAY.
59. THE CONTRACTOR SHALL NOT LEAVE THE WORK AREA UNATTENDED FOR ANY
REASON, UNLESS SAFETY PARTITIONS, SAFETY FENCING ARE INSTALLED AND
SECURED.
60. THE CONTRACTOR SHALL PARK IN APPROVED PARKING SPACES ONLY.
61. THE CONTRACTOR SHALL BE ADVISED THAT THERE MAY BE ASBESTOS
ENCOUNTERED AT ANY TIME ON THE SITE. THE CONTRACTOR SHALL BE ADVISED
THAT IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY ASBESTOS
ENCOUNTERED AND DISPOSE OF IT PROPERLY OFF THE SITE AND IN ACCORDANCE
WITH ALL LOCAL, CITY, STATE, FEDERAL, VA RULES REGULATIONS, LAWS, STATUTES
AND OTHERS.
62. THE CONTRACTOR SHALL TURN OVER, TO THE GOVERNMENT, AND END USER WASTE
DISPOSAL MANIFEST.
CARPENTRY
1. REFER TO DEMOLITION PLANS AND/OR ASBESTOS ABATEMENT PLANS FOR DUST
BARRIER AND/OR TEMPORARY CONSTRUCTION WALL DETAILS AND LOCATIONS. DUST
BARRIERS AND/OR TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE TIGHT AND
SHALL EXTEND FROM FLOOR TO CEILING DECK.
2. PLASTIC BARRIERS, MINIMUM OF 3 MILS THICK, SHALL BE USED AS TEMPORARY DUST
BARRIERS AND FURNITURE COVERINGS, AS/OR DIRECTED BY THE VA CONTRACTING
OFFICER. UNLESS OTHERWISE NOTED ON PLANS.
3. CONTRACTOR SHALL USE ONLY MATERIALS ,WHICH ARE CLASS A FIRE RATED ,IN ALL
NEW FINISH WORK.
4. CONTRACTOR SHALL PROTECT ALL SURFACES, NEW AND/OR EXISTING, FROM
DAMAGE DUE TO OR CAUSED BY CONSTRUCTION.
5. ALL DOOR HARDWARE AS MANUFACTURED BY "CORBIN RUSSWIN".
6. CONTRACTOR SHALL FURNISH AND INSTALL WELDED STEEL DOOR FRAMES,
THICKNESS AS INDICATED IN THE CONTRACT SPECIFICATIONS .CONTRACTOR SHALL
BE PROHIBITED FROM USING AND INSTALLING KNOCK DOWN FRAMES.
7. CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE VA, COMPLETE DOOR, FRAME,
HARDWARE SUBMITTAL, AND COMPLETE SHOP DRAWINGS FOR DOORS INSTALLED AS
PART OF THIS CONTRACT.
8. CONTRACTOR SHALL PERFORM ALL WORK BY THOSE WHO ARE SKILLED IN THEIR
TRADE PRODUCING A FIRST CLASS JOB. -NOTE: THIS IS APPLICABLE TO ALL TRADES.
PLUMBING
1. CONTRACTOR SHALL PERFORM ALL PLUMBING IN ACCORDANCE WITH THE LATEST
EDITION OF THE NATIONAL PLUMBING CODE, ALL FEDERAL, STATE LOCAL RULES,
LAWS, REGULATIONS, VETERANS AFFAIRS (VA) SPECIFICATION.
2. CONTRACTOR SHALL INSTALL "K" COPPER, DRAWN, FOR ALL DOMESTIC WATER LINES
INSTALLED AS PART OF THIS PROJECT, UNLESS SPECIFICALLY DESIGNATED
ELSEWHERE IN THE PLANS, SPECIFICATIONS, OR BY THE CONTRACTING OFFICER.
3. CONTRACTOR SHALL SOLDER USING LEAD FREE SOLDER ONLY.
4. CONTRACTOR SHALL CORE DRILL ANY OPENING THRU CONCRETE WITH DIAMOND
CORE DRILL. CONTRACTOR SHALL SUPPLY, PROVIDE AND USE APPROPRIATE WET
VACS, DROP CLOTHS, OR ANY OTHER DEVICE TO PROTECT GOVERNMENT PROPERTY
DURING THIS OPERATION. THE CONTRACTOR SHALL BE FURTHER ADVISED THAT
THIS PROTECTION IS EXTENDED TO THE FLOOR BELOW.
5. CONTRACTOR SHALL INSTALL SLEEVES (BLACK IRON) IN ALL CONCRETE OPENINGS.
THIS SLEEVE SHALL BE WIDE ENOUGH SUCH THAT INSULATION WILL BE CONTINUOUS
THRU THE SLEEVE.
6. CONTRACTOR SHALL INSULATE ALL HOT WATER, COLD WATER, STEAM, CONDENSATE
RETURN, HOT WATER RETURN PIPING, INCLUDING ALL FITTINGS WITH SPECIFIED
INSULATION. ELBOWS, TEE'S, SHALL BE INSULATED WITH PLASTIC COVERS FILLED
WITH FIBERGLASS INSULATION. JACKET SHALL BE ASJ, BANDED AND STAPLED,
EXCEPT AS OTHERWISE NOTED ON THE PLANS AND SPECIFICATIONS.
7. CONTRACTOR SHALL LABEL ALL PIPING TO INDICATE FLOW DIRECTION AND CONTENT.
8. CONTRACTOR SHALL INSTALL 3 PIECE FULL PORT BALL VALVES FOR SHUTOFFS.
9. CONTRACTOR SHALL NUMBER AND LABEL ALL VALVES INSTALLED AS PART OF THIS
CONTRACT WITH BRASS TAGS. NUMBERS SHALL BE AS DESIGNATED BY THE
CONTRACTING OFFICER. CONTRACTOR SHALL SUBMIT TO THE CONTRACTING
OFFICER A TYPED LIST (4 COPIES) OF ALL VALVES INSTALLED AS PART OF THIS
PROJECT. THIS LIST SHALL BE INCLUSIVE AND INCLUDE, AS A MINIMUM, THE
FOLLOWING INFORMATION IN TABULAR FORM: VALVE
MARK-LOCATION-SIZE-TYPE-MANUFACTURER-FUNCTION.
10. CONTRACTOR SHALL INSTALL ALL PIPING IN A NEAT, PROFESSIONAL MANNER,
INDEPENDENTLY SUPPORTED FROM OTHER UTILITIES.
11. CONTRACTOR SHALL USE EXPANSION BOLTS (DRILLED) ONLY WHEN ANCHORING INTO
CONCRETE. USE OF EXPLOSIVE SHOTS ARE PROHIBITED WHEN ANCHORING INTO
CONCRETE.
12. CONTRACTOR SHALL SAW CUT ANY INTERIOR OR EXTERIOR CONCRETE OR ASPHALT
BEFORE REMOVING SAME.
13. CONTRACTOR SHALL INSTALL KEYLESS SHUTOFF VALVES ON ALL NEW FIXTURES AND
TURN OVER TO THE CONTRACTING OFFICER 2 SETS OF KEYS FOR EACH FIXTURE.
14. CONTRACTOR SHALL, PRIOR TO THE INSTALLATION OF ANY FIXTURE, TRIM, CARRIER,
SUBMIT FOR APPROVAL, MANUFACTURERS LITERATURE FOR ALL ITEMS.
15. CONTRACTOR SHALL TEST, IN THE PRESENCE OF THE VA CONTRACTING OFFICER,
ALL PIPING AND SUBMIT TO THE CONTRACTING OFFICER 4 COPIES OF THE TESTING
REPORT. TESTING SHALL BE AS INDICATED IN THE CONTRACT SPECIFICATIONS.
16. CONTRACTOR SHALL SUPPLY AND INSTALL UNIONS ON ALL VALVES, GAUGES,
THERMOMETERS, ETC., FOR EASY REMOVAL.
17. CONTRACTOR SHALL INSTALL DIELECTRIC FITTINGS ON ALL DISSIMILAR METALS AND
ON ALL FERROUS, NON-FERROUS PIPING.
18. CONTRACTOR SHALL ADVISE THE CONTRACTING OFFICER, IN WRITING A MINIMUM OF
48 HOURS PRIOR TO THE SHUTOFF OF ANY PLUMBING SYSTEM. THE CONTRACTOR
SHALL BE ADVISED THAT THE VETERANS AFFAIRS IS RESPONSIBLE FOR OPERATING
ANY EXISTING UTILITY VALVE. THE CONTRACTOR SHALL BE RESPONSIBLE TO
REPLACE ANY FAILED VALVE AT NO ADDITIONAL COST TO THE GOVERNMENT,
SHOULD THE CONTRACTOR EXERCISE VALVES WITHOUT THE PROPER
AUTHORIZATION.
Drawing Title
Approved: Facility Director , VAHVHCS:
Project Title
Date
Location
Checked
Building(s) Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:
Revisions: Date:
Approved: John Cliffe, Facility Chief of Engineering
N
S
W
E
08-17-2021Bid Documents
08-16-2021100% Working Drawing Submission
05-21-202195% Working Drawing Submission
02-26-202165% Working Drawing Submission
06-25-201835% Working Drawing Submission
10-05-2017100% Preliminary Design Submission
APPROVED:
APPROVED:
APPROVED:
Dwg. 02 of 61
GI 001
AMI
Montrose, New York
08-17-2021
620-20-206
APPROVED:
APPROVED:
APPROVED:
APPROVED:
APPROVED:
LS
General Notes and
Requirements
Firehouse Enhancement
KEY PLAN
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text Engineering Service
Bid Documents Submission GI 001
NOT IN CONTRACT (N.I.C.)
NOT IN CONTRACT (N.I.C.)
AREA PART OF ELECTRICAL WORK.
SEE DRAWINGS FOR DETAILS
NOT IN CONTRACT (N.I.C.)
Drawing Title
Approved: Facility Director , VAHVHCS:
Project Title
Date
Location
Checked
Building(s) Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:
Revisions: Date:
Approved: John Cliffe, Facility Chief of Engineering
N
S
W
E
08-17-2021Bid Documents
08-16-2021100% Working Drawing Submission
05-21-202195% Working Drawing Submission
02-26-202165% Working Drawing Submission
06-25-201835% Working Drawing Submission
10-05-2017100% Preliminary Design Submission
APPROVED:
APPROVED:
APPROVED:
Dwg. 03 of 61
GP 100
AMI
Montrose, New York
08-17-2021
620-20-206
APPROVED:
APPROVED:
APPROVED:
APPROVED:
APPROVED:
LS
General Phasing Plans
Firehouse Enhancement
KEY PLAN
BLDG. 19 PHASE I - ROOF
SCALE:
" = 1'-0"
BLDG. 19 PHASE II - GROUND FLOOR
SCALE:
" = 1'-0"
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text 7D
AutoCAD SHX Text 7C
AutoCAD SHX Text 7Z
AutoCAD SHX Text
TRANSFORMER ROOM 16
AutoCAD SHX Text
LOUNGE 7A
AutoCAD SHX Text
OFFICE 7F
AutoCAD SHX Text
M & R GARAGE 1
AutoCAD SHX Text
COMMUNICATIONS 7E
AutoCAD SHX Text
OFFICE 7F1
AutoCAD SHX Text
STORAGE 6
AutoCAD SHX Text
GARAGE 7
AutoCAD SHX Text
KITCHEN 9
AutoCAD SHX Text
- 5A
AutoCAD SHX Text
- 1A
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR 2Z
AutoCAD SHX Text
QUARTERS 5
AutoCAD SHX Text
CORRIDOR 9Z
AutoCAD SHX Text
MAIN. AND REPAIR SHOP -
AutoCAD SHX Text
TOILET -
AutoCAD SHX Text
FIRE DEPT. GARAGE -
AutoCAD SHX Text
SHOWER RM 10
AutoCAD SHX Text
TOILET RM 8
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text R.D.
AutoCAD SHX Text
BUILT-UP ROOF
AutoCAD SHX Text
18" DIA. VENTILATION
AutoCAD SHX Text
PHASE I - AREA OF WORK
AutoCAD SHX Text
PHASE I - AREA OF WORK
AutoCAD SHX Text
PHASE I - AREA OF WORK
AutoCAD SHX Text
18" DIA. VENTILATION
AutoCAD SHX Text
A/C INLET
AutoCAD SHX Text
A/C INLET
AutoCAD SHX Text
24" DIA. VENTILATION
AutoCAD SHX Text
24" DIA. VENTILATION
AutoCAD SHX Text
A/C UNIT
AutoCAD SHX Text
A/C UNIT
AutoCAD SHX Text
00/AD-100
AutoCAD SHX Text
00/AD-100
AutoCAD SHX Text
PHASE I - AREA OF WORK
AutoCAD SHX Text
NOT IN CONTRACT (N.I.C.)
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text Engineering Service
Bid Documents Submission GP 100
NOT IN CONTRACT (N.I.C.)
AREA PART OF ELECTRICAL WORK.
SEE DRAWINGS FOR DETAILS
NOT IN CONTRACT (N.I.C.)
NOT IN CONTRACT (N.I.C.) NOT IN CONTRACT (N.I.C.)
NOT IN CONTRACT (N.I.C.)
NOT IN CONTRACT (N.I.C.)
AREA PART OF ELECTRICAL WORK.
SEE DRAWINGS FOR DETAILS
EXIT 01
EXIT 02
LIFE SAFETY SYMBOLS
DEAD-END PATH OF TRAVEL
EXIT LIGHTING
1i
FIRE EXTINGUISHER
CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT
DETECTOR
SMOKE
DETECTOR
DIRECTION OF EGRESS
50'-0"
AGGRAGATE DISTANCE
WIDTH PROVIDED
P:XX"
R:XX"
WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT,
FIRE RESISTANT, OR BOTH FIRE AND SMOKE
RESISTANT ARE SHOWN GRAPHICALLY ON PLANS
WITH HATCH PATTERNS.
CRITICAL PATH OF TRAVEL
FEC-#
RECESSED:
SURFACE MNT:
SEE: (C2/A-722)
SEE: (F8/A-722)TYPE
C
LIFE SAFETY CODE REQUIREMENTS:
MIXED BUILDING OCCUPANCY TYPE:
PRIMARY - LODGING (EXISTING) OCCUPANCY PER
CHAPTER 26; SECONDARY - STORAGE (EXISTING) ,
OCCUPANCY PER CHAPTER 42.
6.1.14.1.3 Where incidental to another occupanct, areas
used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the
Code that apply to the predominant occupancy:
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most
restrictive requirements of the occupancies involved, unless separate safeguards are approved.
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference
degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
26.1 The travel distance between any point in a room
and an exit shall not exceed 150 ft.
26.2 The maximum travel distance.shall be permitted to
be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
LODGING OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
26.1.1.1 Occupant Load. The requirements of this
chapter shall apply to buildings that provide sleeping accommodations for 16 or fewer persons on either a transient or permanent basis, with or without meals, but with separate cooking facilities for individual occupants, except as provided for Chapter 24.
CALCULATED OCCUPANT LOADS
PROJECT AREA = 15 TOTAL OCCUPANTS
MEANS OF EGRESS:
26.2 Capacity of Means of Egress.
26.2.1.1.1 Every sleeping room and living area shall have
access to a primary means of escape complying with Chapter 24 and located to provide safe path of travel to the outside.
24.2.2.1.1 In dwellings or dwelling units of two rooms or
more, every sleeping room and every living area shall have not less than one primary means of escape and one secondary means of escape.
24.2.2.1.2 A secondary means of escape shall not be
required where one of the following conditions is met...
(1) The bedroom or living area has a door leading directly to the outside of the building at or to the finished ground level
(2) The dwelling unit is protected throughout by an approved automatic sprinkler system in accordance with 24.3.5..
PROTECTION FROM HAZARDS:
26.3.2 Protection from Hazards. Alcohol based
hand-rub dispensers in accordance with 8.7.33 shall be permitted.
DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS
26.3.4.1.2 A fire alarm system in accordance with Section
9.6 shall not be required in existing lodging and rooming houses that have an existing smoke detection system meeting or exceeding the requirements of 26.3.4.5.1 where that detection system includes not less one manual fire alarm box per floor arranged to initiate the smoke detection alarm.
26.3.4.2. Initiation of the required fire alarm system shall
be by manual means in accordance with 9.6.2 or by alarm initiation in accordance with 9.6.2.1
(3) in buildings protected throughout by an approved automatic sprinkler system.
26.3.4.3. Notification Occupant notification shall be
provided automatically in accordance with 9.6.3, as modified by 26.3.4.3.1 and 26.3.4.3.2.
26.3.4.5 SMOKE ALARMS
26.23.4.5.1 Approved smoke alrms, other than existing smoke
alarms meeting the requirements of 26.3.4.5.3 shall be installed in acordance with 9.6.2.10 in every sleeping room.
26.3.4.6 CARBON MONOXIDE ALARMS AND CARBON
MONOXIDE DETECTION SYSTEM
26.3.4.6.1 Carbon monoxide alarms or carbon monoxide
detectors in accordance with Section 9.12 and
26.3.4.6 shall be provided in new lodging or rooming houses where either of the following conditions exist:
(1) Lodging or rooming houses with communicating attached garage, unless otherwise exempted by 26.3.4.6.3.
26.3.4.6.2 Where required by 26.3.4.6.1, carbon monoxide
detectors alarms or carbon monoxide detectors shall be installed in the following locations:
(1) Outside of each separate sleeping area in the immediate vicinity of the sleeping rooms.
26.3.4.6.3 Carbon monoxide alarms and carbon monoxide
detectors as specified in 26.3.4.6.1.(1) shall not be required in the following locations:
(1) In garages
(2) Within lodging and rooming houses with communicating attached garages that are open parking structures as defined by the building code
(3) Within lodging or rooming houses with communicating attached garages that are mechanically ventilated in accordance with the mechanical code.
26.3.5 SEPARATION OF SLEEPING ROOMS
26.3.5.1 All sleeping rooms shall be separated from escape
route corrdiors by smoke partitions in accordance with Section 8.4.
26.3.5.5 Doors shall be provided with latches or other
mechanisms suitable for keeping doors closed.
26.3.5.6 Doors shall not be arranged to prevent the
occupant from closing the door.
26.7 OPERATING FEATURES
26.7.2 Integrated Fire protection and Life Safety Systems -
Integrated fire protection and life safety systems shall be tested in accordance with 9.11.4.1.
APPLICABLE BUILDING CODES
a. 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72
NATIONAL FIRE ALARM AND SIGNALING CODE &
2016 NFPA 13 STANDARD FOR INSTALLATION OF
SPRINKLER SYSTEMS. EXCEPTION OF NFPA 5000
AND NFPA 900
b. 2021 INTERNATIONAL MECHANICAL CODE (IPC)
c. OCCUPATIONAL, SAFETY AND HEALTH
ADMINISTRATION (OSHA) STANDARDS.
d. VA SEISMIC DESIGN REQUIREMENTS, H-18-8
e. 2020 NATIONAL ELECTRICAL CODE (NEC)
f. 2021 INTERNATIONAL PLUMBING CODE (IPC)
g. ASME BOILER AND PRESSURE VESSEL CODE
h. ASME CODE FOR PRESSURE PIPING
i. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,
BARRIER FREE DESIGN GUIDE (PG-18-13)
j. BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
k. MANUAL OF STEEL CONSTRUCTION, LOAD AND
RESISTANCE.
l. STANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN
INSTITUTE OF STEEL CONSTRUCTION (AISC)
m. ENERGY POLICY ACT OF 2005 (EPACT)
n. DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND
MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS
AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10
CFR PARTS 433, 434 AND 435.
o. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
p. EXECUTIVE ORDER 13834: STRENGTHENING
FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT
q. THE PROVISIONS FOR CONSTRUCTION AND SAFETY
SIGNS. STATED IN THE GENERAL REQUIREMENTS
SECTION 01 00 00 AND 01 35 26 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
r. VENTILATION FOR ACCEPTABLE INDOOR AIR
QUALITY - ASHRAE STANDARD 62.1-2019; MEDICAL
SPACES - ASHRAE 170-2017, NON-MEDICAL SPACES
- ASHRAE 62.1-2019; ASHRAE 90.1-2019; ASHRAE
189.1-2017.
s. SAFETY STANDARD FOR REFRIGERATION SYSTEMS
- ASHRAE STANDARD 15-2019
t. 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE
DIRECTED BY VA STANDARDS
u. UNLESS NOTED OTHERWISE, CURRENT EDITION OF
APPLICABLE STANDARD OR CODE SHALL BE USED.
APPLICABLE BUILDING GUIDES
a. VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION
(2015)
CONSTRUCTION TYPE:
TYPE II (111) PER NFPA 220, Chapter 4
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 0 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 0 HOURS
FLOORS 0 HOURS
ROOFS/ CEILINGS 0 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA &
NFPA 101) FIRE RESISTANCE RATING REQUIREMENTS
FOR SPACES BY FUNCTION:
ELECTRICAL CLOSETS
(DEPENDENT ON EQUIPMENT SIZE) 1 HOUR
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS
STORAGE 2 HOURS
CLASSIFICATION OF OCCUPANCY:
EXISTING: LODGING Occupancy per Chapter 25.
EXISTING: STORAGE - LOW HAZARD Occupancy per
Chapter 42.
LOCKING OF EGRESS DOORS:
LOCKING OF EGRESS DOORS ARE NOT FOR CLINICAL
NEED. DELAYED EGRESS PROVIDED PER 18.2.2.2.4 &
7.2.1.6.1
PROTECTION OF VERTICAL OPENINGS:
18.3.1 Protection of Vertical Openings.
18.3.1.1 Any vertical opening shall be enclosed or
protected in accordance with Section 8.6, unless otherwise permitted.
COMMON PATH OF TRAVEL
DISTANCE TABLE
DEAD-END PATH #1 25'-2"
DEAD-END PATH #2 24'-8"
COMMON PATH 19'-9"
CRITICAL PATH 53'-5"
Drawing Title
Approved: Facility Director , VAHVHCS:
Project Title
Date
Location
Checked
Building(s) Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:
Revisions: Date:
Approved: John Cliffe, Facility Chief of Engineering
N
S
W
E
08-17-2021Bid Documents
08-16-2021100% Working Drawing Submission
05-21-202195% Working Drawing Submission
02-26-202165% Working Drawing Submission
06-25-201835% Working Drawing Submission
10-05-2017100% Preliminary Design Submission
APPROVED:
APPROVED:
APPROVED:
Dwg. 04 of 61
LS 100
AMI
Montrose, New York
08-17-2021
620-20-206
APPROVED:
APPROVED:
APPROVED:
APPROVED:
APPROVED:
LS
Critical Path and Life Safety
Notes
Firehouse Enhancement
KEY PLAN
DEMOLITION PLAN
SCALE:
" = 1'-0"
NEW CONSTRUCTION PLAN
SCALE:
" = 1'-0"
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text 7D
AutoCAD SHX Text 7C
AutoCAD SHX Text 7Z
AutoCAD SHX Text
TRANSFORMER ROOM 16
AutoCAD SHX Text
LOUNGE 7A
AutoCAD SHX Text
OFFICE 7F
AutoCAD SHX Text
M & R GARAGE 1
AutoCAD SHX Text
COMMUNICATIONS 7E
AutoCAD SHX Text
OFFICE 7F1
AutoCAD SHX Text
STORAGE 6
AutoCAD SHX Text
GARAGE 7
AutoCAD SHX Text
KITCHEN 9
AutoCAD SHX Text
- 5A
AutoCAD SHX Text
- 1A
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR 2Z
AutoCAD SHX Text
QUARTERS 5
AutoCAD SHX Text
CORRIDOR 9Z
AutoCAD SHX Text
MAIN. AND REPAIR SHOP -
AutoCAD SHX Text
TOILET -
AutoCAD SHX Text
FIRE DEPT. GARAGE -
AutoCAD SHX Text
SHOWER RM 10
AutoCAD SHX Text
TOILET RM 8
AutoCAD SHX Text
NOT IN CONTRACT (N.I.C.)
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text D.S.
AutoCAD SHX Text
TRANSFORMER ROOM (23)
AutoCAD SHX Text
FIRE DEPT. GARAGE 08
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BUNK 06 17
AutoCAD SHX Text
BUNK 02 12
AutoCAD SHX Text
BUNK 03 13
AutoCAD SHX Text
BUNK 04 14
AutoCAD SHX Text
BUNK 05 15
AutoCAD SHX Text
CHIEF OFFICE 01A
AutoCAD SHX Text
BUNK 08 19
AutoCAD SHX Text
BUNK 07 18
AutoCAD SHX Text
BUNK 01 11
AutoCAD SHX Text
CHIEF BUNK 16
AutoCAD SHX Text
TELECOMM. CLOSET 16A
AutoCAD SHX Text
STEAM CLOSET 16B
AutoCAD SHX Text
FIRE SUPP. CL. 16C
AutoCAD SHX Text
CORRIDOR E C05
AutoCAD SHX Text
CORRIDOR C C03
AutoCAD SHX Text
CORRIDOR D C04
AutoCAD SHX Text
CORRIDOR A C01
AutoCAD SHX Text
COMM. RM. 01
AutoCAD SHX Text
KITCHEN 03
AutoCAD SHX Text
W. SHOWER 04
AutoCAD SHX Text
W. TOILET 05
AutoCAD SHX Text
M. TOILET 06
AutoCAD SHX Text
M. SHOWER 07
AutoCAD SHX Text
ELECTRICAL RM. 09A
AutoCAD SHX Text
LAUNDRY AND UTILITY RM. 09
AutoCAD SHX Text
AMBULANCE BAY 10
AutoCAD SHX Text
COMMUNITY ROOM 02
AutoCAD SHX Text
CORRIDOR B C02
AutoCAD SHX Text
STORAGE (20)
AutoCAD SHX Text
HAMPER ALCOVE
AutoCAD SHX Text
TOWEL STORAGE
AutoCAD SHX Text
DW
AutoCAD SHX Text
RANGE
AutoCAD SHX Text
REFRIGE
AutoCAD SHX Text
HW
AutoCAD SHX Text
EXTRAC.
AutoCAD SHX Text
WASHER
AutoCAD SHX Text
DRYER
AutoCAD SHX Text
M & R GARAGE 21
AutoCAD SHX Text
NEW MAIN. AND REPAIR AREA -
AutoCAD SHX Text
FUTURE PANEL
AutoCAD SHX Text
NEW
AutoCAD SHX Text
NEW
AutoCAD SHX Text
NEW
AutoCAD SHX Text
B19-MDP
AutoCAD SHX Text
NEW B-19 EDPB
AutoCAD SHX Text
NEW ATS #2
AutoCAD SHX Text
LP
AutoCAD SHX Text
DP
AutoCAD SHX Text B19-G-L
AutoCAD SHX Text B-19-G-10G
AutoCAD SHX Text
EXISTING ATS #1
AutoCAD SHX Text
PP-03 (B-19-G-R)
AutoCAD SHX Text
PP-04 (B-19-G-L)
AutoCAD SHX Text
DEADEND #2 TRAVEL: 24'-8"
AutoCAD SHX Text
CRITICAL PATH OF TRAVEL TO EXIT: 53'-5"
AutoCAD SHX Text
COMMON PATH OF TRAVEL: 19'-9"
AutoCAD SHX Text
NOT IN CONTRACT (N.I.C.)
AutoCAD SHX Text
DEADEND TRAVEL #1: 25'-2"
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text Engineering Service
Bid Documents Submission LS 100
LOT "H"
SPACES: 54
SITE GENERAL NOTES:
Drawing Title
Approved: Facility Director , VAHVHCS:
Project Title
Date
Location
Checked
Building(s) Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: NORTH:
Revisions: Date:
Approved: John Cliffe, Facility Chief of Engineering
N
S
W
E
Firehouse Enhancement at FDR
08-17-2021Bid Documents
08-16-2021100% Working Drawing Submission
05-21-202195% Working Drawing Submission
02-26-202165% Working Drawing Submission
06-25-201835% Working Drawing Submission
10-05-2017100% Preliminary Design
APPROVED:
APPROVED:
APPROVED:
Dwg 05 of 61
SP 100
AMI
Montrose, New York
08-30-2021
620-17-000
APPROVED:
APPROVED:
APPROVED:
APPROVED:
APPROVED:
LS
Existing Utilities and Site Plan
Ground Floor
Scale: As Noted
EXISTING SITE & UTILITY PLAN
SCALE: 1" = 20'-0"
KEY PLAN
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
MH #68
AutoCAD SHX Text
MH #69
AutoCAD SHX Text
MH #70
AutoCAD SHX Text
MH #66
AutoCAD SHX Text
MH #65
AutoCAD SHX Text
MH #71
AutoCAD SHX Text
MH #62
AutoCAD SHX Text
SMH #36
AutoCAD SHX Text
SMH #33
AutoCAD SHX Text
SMH #35
AutoCAD SHX Text
SMH #15
AutoCAD SHX Text
FH #07
AutoCAD SHX Text
FH #08
AutoCAD SHX Text
PIV-16
AutoCAD SHX Text
PIV-12
AutoCAD SHX Text
PIV-19
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 12"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text
SMH #32
AutoCAD SHX Text #26
AutoCAD SHX Text #25
AutoCAD SHX Text #27
AutoCAD SHX Text #29
AutoCAD SHX Text #30
AutoCAD SHX Text #28
AutoCAD SHX Text
AutoCAD SHX Text #31
AutoCAD SHX Text
ELMH 09
AutoCAD SHX Text L55
AutoCAD SHX Text L54
AutoCAD SHX Text
ELMH 08
AutoCAD SHX Text
APPROXIMATE TEMPORARY OFFICE TRAILOR LOCATION.
AutoCAD SHX Text
APPROXIMATE DUMPSTER LOCATION.
AutoCAD SHX Text
1. CONTRACTOR SHALL INSTALL FENCING AROUND PERIMETER CONTRACTOR SHALL INSTALL FENCING AROUND PERIMETER OF STAGING AND WASTE AREAS. 2. PRIOR TO START OF WORK, THE CONTRACTOR SHALL PRIOR TO START OF WORK, THE CONTRACTOR SHALL PROVIDE A TEMPORARY OFFICE CONTAINER EQUIVALENT TO THE 8'-0" x 40'-0" OFFICE CONTAINER AVAILABLE FROM "MOBILE MODULAR PORTABLE STORAGE, 499 HOLLYWOOD AVENUE, S. PLAINFIELD, N.J. 07080. 3. CONTRACTOR SHALL BE RESPONSABLE FOR THE COSTS CONTRACTOR SHALL BE RESPONSABLE FOR THE COSTS FOR DELIVERY AND RENTAL OF THE CONTAINER FOR THE DURATION OF THE PROJECT. 4. APPROXIMATE LOCATION OF THE TRAILOR IS SHOWN ON APPROXIMATE LOCATION OF THE TRAILOR IS SHOWN ON SHEET "SP 100". THE FINAL LOCATION OF THE TEMPORARTY OFFICE CONTAINER SHALL BE COORDINATED WITH THE V.A. COR. 5. CONTRACTOR SHALL BE RESPONSABLE FOR ALL LABOR, CONTRACTOR SHALL BE RESPONSABLE FOR ALL LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION REQUIRED TO CONNECT THE TEMPORARY OFFICE CONTAINER TO AN EXISTING V.A. PANEL (SEE ELECTRICAL PLANS) PER THE INSTRUCTIONS FROM THE CONTAINER MANUFACTURER. 6. CONTRACTOR SHALL REMOVE EXISTING CIRCUIT BREAKERS CONTRACTOR SHALL REMOVE EXISTING CIRCUIT BREAKERS IN THE EXISTING PANEL SERVING CIRCUITS NO LONGER NEEDED IN SPACE TO BE RENOVATED TO ACCOMMODATE THE NEW CIRCUIT BREAKER TO BE FURNISHED AND INSTALLED BY THE CONTRACTORFOR THE NEW ELECTRICAL FEEDER THE THE TEMPORARY TRAILOR. 7. CONTRACTOR SHALL FURNISH AND INSTALL A "NEMA 4X" CONTRACTOR SHALL FURNISH AND INSTALL A "NEMA 4X" DESCONNECT SWITCH ON THE EXTERIOR WALL IN THE VACINITY OF THE TEMPORARY OFFICE CONTAINER. 8. CIRCUIT BREAKER AND DISCONNECT SWITCH SHALL BE CIRCUIT BREAKER AND DISCONNECT SWITCH SHALL BE SIZED ACCORDING TO THE CONTAINER MANUFACTURER'S SPECIFICATIONS. 9. TEMPORARY ACCESS CABLE FROM THE EXISTING TEMPORARY ACCESS CABLE FROM THE EXISTING ELECTRICAL PANEL TO THE OUTSIDE "NEMA 4X" DISCONNECT SWITCH AND FROM THE OUTSIDE DISCONNECT SWITCH TO THE CONNECTION ON THE TEMPORARY OFFICE CONTAINER SHALL HAVE COPPER, NOT ALUMINUM, NOT ALUMINUM, , CONDUCTORS, AND SHALL BE INSTALLED NEATLY AND SAFELY WITHOUT ANY POSSIBLE TRIPPING HAZARDS. 10. CONTRACTOR SHALL CORE DRILL AND FIRESTOP/WATER CONTRACTOR SHALL CORE DRILL AND FIRESTOP/WATER SEAL OPENING IN EXTERIOR WALL WHERE ACCESS CABLE PENETRATES EXTERIOR WALL. 11. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL AT THE END OF THE PROJECT, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DISCONNECT SWITCH, CIRCUIT BREAKER, AND ALL CABLING BACK TO THE SOURCE PANEL.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .