RFIs for CFM AE IDIQ for National Cemetery Projects 06-16-2026.pdf
PDF 249 KB Posted
- Solicitation number
- 36C10F26R0001
About this file
This document is an RFI Log containing questions and answers regarding solicitation 36C10F26R0001 for CFM AE Services IDIQ for VA National Cemetery Projects.
The IDIQ contract is specifically scoped to VA National Cemetery Administration (NCA) projects, including construction, renovation, repairs, and commissioning of national cemeteries, buildings, roadways, and infrastructure throughout the United States and territories. The solicitation requires submission of SF 330 forms by June 30, 2026, at 10:00 AM EDT. Offerors must provide 5 to 10 relevant example projects completed within the past five years, with relevant projects defined as those with construction costs of $15 million or higher (reduced from the original $20 million threshold for SDVOSB consideration). Projects may include VA/NCA cemetery projects, state/local/private cemetery projects, golf courses, parks, recreation-oriented land development, and projects requiring cemetery-typical features such as memorials, turf placement, landscape material, civil works, irrigation systems, environmental remediation, and GIS installation. The submission shall not exceed 120 single-sided pages, with exclusions for Part II SF 330 forms, certificates, PPQs, licenses, CPARS, proof of AE firm registration, joint venture agreements, and tabs/dividers. Font requirements are minimum 11-point Calibri. Key personnel requirements include 20 positions such as architects, engineers (civil, electrical, mechanical, structural), cost estimators, interior designers, environmental engineers, and historical preservation professionals. LEED accredited professionals are no longer required. Single resumes per key personnel position are acceptable, though additional resumes may be submitted if multiple personnel are proposed for any discipline. Email submissions have a maximum file size limit of 40MB per individual email, with multiple emails permitted. The submission deadline was extended from June 15 to June 30, 2026.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI LOG
36C10F26R0001
CFM AE SERVICES IDIQ FOR VA NATIONAL CEMETERY PROJECTS
RFI
Question VA Response
1 Page 16 of the Request for SF330 document mentions an AE Liaison. Is this a role of which we need to supply a resume?
No
2 Please confirm that the manpower matrix is for information purposes only and not meant to indicate every role that must be included as part of the submission.
a. Essentially, is it correct/acceptable to only supply the roles from the Key Personnel document?
The Manpower Matrix includes key personnel and other disciplines that may be required for task orders.
Refer to the Factors for Key Personnel requirements.
3 Page 2 of the Request for SF330 document mentions the “Well Underway” definition (at least 50% completed by submission date). Is this design complete or construction complete?
At least 50% design complete.
See Amendment 0001 which updates the Well Underway definition.
4 Very few SDVOSBs have relevant design experience within the last 5 years at construction values over $20M. In reference to the definition of ‘relevant’ (page 22/32 in the Request for SF330), will you consider lowering the Construction Costs to $10M or higher?
See Relevant Definition in Amendment 0001. The construction cost in the Relevant definition is changed to $15 Million or higher.
5 In the “Request for SF330s” document, it states 15 tasks are required under this IDIQ and that each project in Section F should identify which task were performed. However, “Attachment 3 Manpower Matrix” states 16 tasks, with quite a few differing from the “Request for SF330s” list.
Can the government clarify the final list of tasks Offerors should reference?
See Amendment 0001 with Manpower Matrix (Revision 1).
6 On page 28 of the “Request for SF330s” document, it states that the 120 pages does not include “certificates, PPQs, licenses, cover sheets, dividers, or other requested documentation (e.g., joint venture agreement, proof of AE firm registration, cover pages, Rable of Contents, index pages, dividers, or CPARS). However, on page 29 of the same document is states the 120 pages “includes the cover letter SF330 letter, tabs, dividers, letter of transmission, front and back covers, appendices, attachments, enclosures, index, table of contents, pictures, reference letters, charts, graphs, maps, flow charts…” etc. Can the Government please clarify what is NOT included in the 120-page limit?
See Amendment 0001 which corrects the typographical error on Page 29 to “the 120 pages excludes the cover letter SF330 letter, tabs, dividers, letter of transmission, front and back covers, appendices, attachments, enclosures, index, table of contents, pictures, reference letters, charts, graphs, maps, flow charts…”
7 Can the Government confirm that Part IIs are not included in the 120-page limit?
Confirmed. Not included.
8 Requests an extension of the June 15 submission deadline to June 23, 2026, to allow for appropriate coordination and
See Amendment 0001. Due date is extended to June 30, 2026, at 10:00
AM EDT.
capacity to fully prepare the CFM VA National Cemetery IDIQ qualifications package.
Given the magnitude of the 120-page submittal, coordination among multiple subconsultants, and the inclusion of a federal holiday within the current response period, additional time would support a more thorough and compliant submission.
9 Page 28 specifically states, "The 120 pages does not include certificates, PPQs, licenses, nor does the page limit include cover sheets, dividers, or other requested documentation (e.g., joint venture agreement, proof of AE firm registration, cover pages, Table of Contents, index pages, tabs, dividers, or CPARS." On page 29, the paragraph beginning, "Limit submissions to a total ..." states that all of those items are included in the 120-page limitation. Would the government please identify the correct requirement?
See VA response to RFI 6.
10 At the bottom of page 28, the order of the SF330 sections indicates there are to be tabs. Is the government requesting that the PDF submission contains a blank page (save for the Tab #) between each section as indicated?
No.
11 On page 28, the font requirement listed is a minimum of 11 pt Times New Roman. The SF330 form itself uses 7 pt Arial throughout. Will the government allow text for all captions, page headers, and page footers, and for tables or matrices used in Section H to be reduced to Arial 9 pt? Example:
The font size is a minimum of 11 point Calibri.
12 Page 24 states, “Current professional registration, certification, or licensure as applicable.” Does the government require a copy or screen capture of each professional registration and/or license, or is it acceptable to provide the number and state (if applicable) on the Section E resume form?
State and license numbers are sufficient.
13 Page 24 states, “Section E: Provide Resumes for each key person, who will participate in this contract, grouped by firm (prime first).” Is one resume per Key Personnel role acceptable, or is the Government asking us to supply more than one resume per role in order to demonstrate capacity and depth?
Key Personnel. Provide one resume for each key person.
14 Page 24 states, “Section E: Provide Resumes for each key person…” Is it acceptable to combine Key Personnel roles?
For example, #23 is for a LEED-certified professional, but could that be combined with #3 Architect or with any of the Engineer roles?
Key Personnel. Provide one resume for each key person.
15 On Attachment 1 (Key Personnel Qualifications), the list skips position numbers 5, 19, and 20. Will there be a revised attachment showing all of the positions?
See Amendment 0001, revised Attachment 1.
16 On page 3 of Attachment 1 (Key Personnel Qualifications), position #22 is for a Land Surveyor. Our work with NCA on new cemeteries and cemetery expansion design has taught us that there is a preference for a licensed professional land surveyor that has knowledge of the project area. Will the government consider removing this key personnel position with the stipulation that task orders for projects needing land surveyor services will show that the proposed surveyor for the specific project meets these requirements?
No. Provide the Key Personnel for the position of Land Surveyor as identified in Key Personnel.
17 On page 3 of Attachment 1 (Key Personnel Qualifications), position #23 is for a LEED Accredited Professional. The Army recently discontinued the use of the LEED rating system; it now utilizes the Council on Environmental Quality (CEQ) Guiding Principles for Sustainable Federal Buildings checklists. A similar recommendation is pending approval at DVA Headquarters. In the event DVA sustainability requirements change over the course of this contract, the Contractor would need to review the new requirements and provide an impact analysis and advisory memorandum evaluating the technical, contractual, cost, schedule, and compliance implications of transitioning future project’s sustainability requirement from LEED Silver certification to the new federal sustainability framework. In light of the current regulatory environment regarding LEED certification, would the government waive this requirement for projects and Key Personnel qualifications?
Provide a LEED accredited professional as required.
VA Clarification: See Amendment 0002.
LEED accredited professionals are not required.
18 Attachment 3 (Manpower Staffing Matrix) shows a task list that does not match the tasks in the RFP and the Disciplines listed do not match Attachment 1. Will this attachment be corrected and reissued or removed from the solicitation?
See Amendment 0001, containing revisions to Attachment 1.
19 QUESTION 1 — Factor 2 Project Cap for Joint Ventures Without JV-Performed Projects (Section 8 and Section 11)
Section 11 (Evaluation Procedures), Factor 2 requires "a minimum of five (5) and no more than ten (10) relevant projects." Section 8 (Basis for Contract Award) states that if the joint venture has no JV-performed projects, projects may be submitted for either joint venture partner, "not to exceed a total of five (5) projects." For a JV with no JV-performed projects:
See Amendment 0001, Factor 2.
(a) Is the total number of eligible partner projects capped at five (5) for the JV as a whole, or may the JV submit up to the Factor 2 maximum of ten (10) partner projects in aggregate?
(b) May projects performed by proposed subconsultants on the JV team be submitted in Section F, and if so, do they count toward either cap?
20 Task List Discrepancy: Solicitation vs. Manpower Staffing Matrix (Sections 1, 11, and Attachment 3)
Sections 1 and 11 identify 15 A/E IDIQ tasks (Task 1 through Task 15). However, Attachment 3 (Manpower Staffing Matrix) displays 16 task columns. For purposes of the Section F task-mapping requirement in Factor 2, which task list governs — the 15-task list in the solicitation body or the 16-column matrix in Attachment 3?
See Amendment 0001, containing revisions to Attachment 1.
21 Page Count Applicability of SF 330 Part II (Section 12)
Section 12 states that Part I shall not exceed 120 single-sided pages and identifies certain documents excluded from that count. However, the solicitation does not expressly address SF 330 Part II. Are SF 330 Part II forms submitted for the prime, joint venture partners, and subconsultants included within or excluded from the 120-page limit?
See VA response to RFI 6.
The 120 pages excludes Part II.
22 Formatting Requirements for Page-Limit-Excluded Attachments (Section 12)
Section 12 excludes certain attachments from the 120-page limit, including certificates, PPQs, licenses, CPARS, proof of A/E firm registration, and the joint venture agreement. Must these excluded attachments comply with the 11-point font, ½-inch margin, and single-sided formatting requirements that apply to the 120-page Part I, or are they exempt from those formatting standards as well?
23 Number of Resumes Required for Key Personnel Positions Listed in the Plural (Attachment 1)
Attachment 1 (Key Personnel and Minimum Qualifications) identifies several positions with a plural "(s)" suffix, including I.02 Regional Project Manager(s), I.03 Architect(s), I.04 Civil Site/Sanitary Engineer(s), I.06 Electrical Engineer(s), I.07 Mechanical Engineer(s), I.08 Structural Engineer(s), I.09 Cost Estimator(s), I.10 Interior Designer(s), and I.12 Environmental Engineer(s). Does submission of a single resume per listed position satisfy the minimum requirement for each position, or are multiple resumes expected for each pluralized role?
Yes, single resumes that meet the minimum experience requirements.
VA Response clarified dated 06/16/2026.
Attachment 1 uses pluralized position titles such as Architect(s), and Engineer(s) to indicate that one or more qualified individuals may be proposed for each discipline as needed. However, submission of a single resume for each listed position is acceptable to demonstrate compliance with the minimum qualification requirements. If the proposer intends to provide multiple personnel for any discipline, each additional individual should be supported by a separate resume showing compliance with the stated minimum qualifications.
24 Dual Qualification: Single Individual for Multiple Key Personnel Positions (Attachment 1)
Attachment 1 identifies 20 distinct key personnel positions. If a proposed individual meets the minimum qualifications for two or more positions, may a single person be designated to fill more than one key personnel position, or must each listed position be filled by a separate individual?
Individual resumes are required for each Key Personnel position.
25 Definition of "Region" and Expected Number of Regional Project Manager Resumes (Attachment 1, Position I.02)
Attachment 1, position I.02 (Regional Project Manager(s)), does not define what constitutes a
Regional Project Manager is deleted from Appendix III, Minimum In House Primary Key Personnel and Consultant Qualifications per Amendment 0001.
"region" or indicate how many regions are anticipated under this contract. Please clarify: (a) whether "regions" correspond to VA CFM organizational regions, NCA geographic regions, or another defined framework; and (b) how many Regional Project Manager resumes are expected in the SF 330 submission.
26 Maximum File Size for Email Submission (Section 12)
Section 12 requires SF 330 submissions to be submitted by email to Athena.jackson@va.gov.
What is the maximum allowable file size for the email submission? If the submission exceeds the email system's file size limit, is an alternative submission method available?
The maximum individual email size limit is 40MB.
If necessary, submit multiple emails.
27 Subconsultant Projects in Section F (Sections 8 and 11)
Section 8 addresses example projects performed by the joint venture and its partners. Section 11, Factor 2 requires five to ten relevant example projects but does not specify whether projects performed by named subconsultants on the proposed team are eligible. May Section F include projects performed by named subconsultants in addition to projects performed by the JV or JV partners? If so, does any cap apply to the number or percentage of Section F projects that may be drawn from subconsultant performance history?
Subconsultant example projects may be included provided the subconsultant provided projects meet the relevant definition requirements.
28 Acceptability of Non-Federal PPQs and Alternative PPQ Formats (Section 11, Factor 3)
Section 11, Factor 3 states that PPQs must be sent directly by the client to Athena.jackson@va.gov prior to the closing date when CPARS is
Question a: Yes.
VA Response to question 28a clarification dated 0616/2026:
Yes. The qualifications listed in Appendix III – Minimum In-House Primary Key Personnel and mailto:Athena.jackson@va.gov mailto:Athena.jackson@va.gov unavailable. (a) Are PPQs from non-Federal clients
— such as state agencies, local governments, or private owners — acceptable when CPARS is unavailable for a given project? (b) Is any PPQ format other than Attachment 2 acceptable, or must all PPQ submissions use the Attachment 2 form exclusively?
Section: Appendix III – Minimum In House Primary Key Personnel and Consultant Qualifications:
a. Question: Please confirm that the requirements listed in Appendix III are the requirements expected of the combined Prime Consultant and their Subconsultant team.
b. Question: Does the VA want to see resumes in Section E for all key personnel roles listed in Appendix III?
i. Question: If yes, does the VA want to see more than one resume for each key personnel role listed in Appendix III?
c. Question: I.03 Architect: Please confirm the requirement to have experience with LEED Silver certification on cemeteries
d. Question: I.06 Electrical: Please confirm the requirement to have experience with LEED Silver certification on federal facilities
e. Question: I.07 Mechanical: Please confirm the requirement to have experience with LEED Silver certification on cemeteries
f. Question: I.08 Structural Engineer:
Please confirm that a Bachelor’s Degree in Structural Engineering is acceptable.
g. Question: I.10 Interior Design: Please confirm the requirement to have
Consultant Qualifications are intended to be met by the proposed team as a whole, including the Prime Consultant and any Subconsultants.
Question b. Yes VA Response to question 28b clarification on 06/16/2026:
Attachment 1 MINIMUM IN HOUSE
PRIMARY KEY PERSONNEL AND
CONSULTANT QUALIFICATIONS
uses pluralized position titles such as Architect(s), and Engineer(s) to indicate that one or more qualified individuals may be proposed for each discipline as needed. However, submission of a single resume for each listed position is acceptable to demonstrate compliance with the minimum qualification requirements. If the proposer intends to provide multiple personnel for any discipline, each additional individual should be supported by a separate resume showing compliance with the stated minimum qualifications.
Question b1: Yes VA Response to question 28b1 clarification
• Requirements in Attachment 1
MINIMUM IN HOUSE
PRIMARY KEY PERSONNEL
AND CONSULTANT
QUALIFICATIONS apply to the combined prime and subconsultant team.
• Yes, provide resumes in Section E for all key roles listed in Attachment 1.
• One resume per listed role is sufficient; if the proposer experience with LEED Silver certification
h. Question: For I.03 Architect, I.06 Electrical, I.07 Mechanical, and I.10 Interior design: We have designed several cemetery projects to LEED Certification standards but the VA (or other agency) opted not to pursue certification. Is it acceptable to include projects that were designed to LEED Silver Certification but not officially certified?
intends to provide multiple personnel for any discipline, each additional individual should be supported by a separate resume showing compliance with the stated minimum qualifications.
VA Response to question 28 c – e clarification. See Amendment 0002.
Question c: Architect is amended to read: Architect(s) – Shall be a registered architect, with a minimum of 10 years’ experience as a design architect with facility design experience for LEED Silver certification, shall have a Bachelor’s Degree in Architecture, have a working knowledge of the Uniform Building Code (UBC), Life Safety Code (NFPA 101), Uniform Federal Accessibility Standards (UFAS), The Americans with Disability Act (ADA), OSHA and ASTM standards.
Question d: Requires experience with LEED Silver certification.” for Federal facilities is deleted”.
Question e: Mechanical Engineer:
Delete the word “cemetery”.
Requires experience with LEED Silver certification.
Question f: The Structural Engineer is required to have the necessary degree in Structural Engineering for licensure. Provide the state requirement for licensure.
Question g: Interior Design.
Confirmed LEED Silver Certified Facilities.
Question h: Yes.
29 Section: Attachment 3 – Manpower matrix:
i. Question: Please confirm the requirement to include the following disciplines on the team:
i. GIS
ii. Physical Security
iii. Industrial Hygienist
iv. Sr. Health Care Facility
Planner
v. Traffic/Transportation
Engineer
vi. Commissioning
Question i: Delete the following from the Manpower Matrix:
Industrial Hygienist, Sr. Health Care Facility Planner, Traffic/Transportation Engineer
See Amendment 0001 with Manpower Matrix (Revision 1).
30 Section: DEFINITIONS:
j. In the solicitation, “Recent” is defined as “projects completed or well underway.” Question: Does this refer to design or construction being completed or well underway?
k. In the solicitation, “Well underway” is defined as “at least 50% completed by the submission date of the SF330.”
Question: Does this refer to design or construction being 50% completed?
Question J: Refers to design.
Question k: Refers to 50% design completed
31 Sections: Selection Criteria & Joint Venture
l. Joint Venture section states: “If the firm is a joint venture, projects performed by the joint venture should be submitted; however, if there are no projects performed by the joint venture, projects may be submitted for either joint venture partner, not to exceed a total of five (5) projects.
Failure to submit experience for all JV
Question l
Question i: minimum number of relevant projects are five and maximum number of relevant projects are 10.
partners may be evaluated less favorably.”
Selection Criteria, Factor 2 states “Provide a minimum of five (5) and no more than ten (10) relevant projects completed within the past five (5 years).
i. Question: Please confirm whether the maximum number of projects is (5) five or ten (10).
ii. Question: Please confirm if JV partner firms are limited to 5 projects total across the two firms or 5 projects total for each member of the JV.
m. Factor 1, Section E: the solicitation states in parenthesis “(general titles such as ‘Electrical Engineer’ are insufficient)”. Question: Please clarify what is meant by this requirement.
n. Factor 3, Past Performance:
Question: is it acceptable to include a Past Performance Questionnaire (PPQ) that was completed previously rather than requesting a new PPQ from the client?
Question ii: 10
Question m: For each project, provide a detailed description of the specific services performed relevant to their proposed role in this contract.
Question n: No.
32 Section: SF330 SUBMISSION REQUIREMENT:
o. The solicitation requires “11-point
Times New Roman” font. Question: Is it acceptable for charts/tables/graphics to have font smaller than 11-point font?
p. The solicitation states: “Firms must submit proof that they are permitted by law to practice the professions of architecture of engineering.”
Question: Confirm that this applies only to the prime firm(s).
Question o: size 11 font Calibri.
Question p: The prime contractor
33 Section: 11. EVALUATION PROCEDURES, Technical Evaluation: Factor 1, Factor 2
q. The solicitation defines relevant projects as:
Projects with a Construction Cost of $20 Million or higher; projects of similar size, scope, and complexity to the Sources Sought Notice. Relevant complexity aspects are identified as the examples in the bullets below. All examples identified below are of equal relevance.
“• VA/NCA National Cemetery projects
• State/local/private cemetery projects
• Golf courses; national, state, and regional parks; multiple sports-fields complexes or multi-phased recreation-oriented land development projects
• Projects requiring the construction of multiple features typical to a National Cemetery such as memorials or memorial walls that utilize natural stone, turf (sod) placement, establishment and maintenance, the placement, establishment and maintenance of landscape material including but not limited to trees and shrubs, civil works and land development projects including but not limited to retaining walls, excavation, earthwork and grading, roadway construction, irrigation systems with mainlines exceeding 4-inch in diameter, irrigation central control systems, wetlands and environmental remediation or restoration and GIS installation.
Questions q.
i: Yes.
ii: See VA response to RFI #4.
Question r.
i: Yes.
• Building construction, building remodel.”
i. Question: Please confirm whether or not projects from other federal agencies, such as the Bureau of Reclamation, US Army Corps of Engineers, National Parks Service, will be considered relevant.
ii. Question: We have several VA NCA projects that are less than $20M. Please confirm whether or not smaller VA NCA projects (>5M$) will be considered relevant.
r. Section 11, Evaluation Procedures Factor 2 Specialized Experience (SF 330 Part I, Section F) pg 24 of 32: Paragraph states, "The evaluation board will assess the proposed team's demonstrated specialized experience performing work relevant to the AE/IDIQ tasks under this contract."
i. Question: To clarify, could an offeror submit projects demonstrating relevant and specialized experience of major teaming subconsultants?
34 We would like to request clarification regarding the SF330 page count requirements for Solicitation No.
36C10F26R0001. The language on pages 28 and 29 appears inconsistent regarding what is included in the 120-page limit.
Page 28 states that the 120-page limit does not include certificates, PPQs, licenses, cover sheets, dividers, other requested documentation, joint venture agreement, proof of A/E firm registration, cover pages, Table of Contents, index pages, tabs, dividers, or
CPARS.
However, page 29 states that the 120-page limit does include the cover letter, SF330 letter, tabs, dividers, letter of transmission, front and back covers, appendices, attachments, enclosures, index, Table of Contents, and other materials.
Could you please clarify which items are excluded from the 120-page limit?
35 The definitions state that for a project to be considered “well underway,” it must be at least 50% completed by the submission date of the SF330. If the company is providing design and Construction Period Services for a project, is the 50% completion requirement in reference to the design or construction phase of the project?
Design complete
36 Please clarify what pages do not count towards the 120-page limit. Item 12. “SF330 Submission Requirement” states on page 28 that the 120-page limit does not include cover sheets, dividers, cover pages, table of contents, etc., while page 29 states that the 120-page limit does include dividers, covers, table of contents, etc.
37 Would you waive the bachelor's degree requirement for the Cost Estimator? The experience and certification carry the day in our view.
No.
38 Upon review of the answers provided to the RFIs for the subject project, there is an apparent discrepancy between the answers to Question 23 and Question 28.b.1 for positions listed with a plural (“s”) suffix. Can you please clarify how many resumes are required for these positions? If only one resume is required, will submissions that include multiple resumes for these positions be rated more favorably?
See VA Response to question 28b1 clarification.
39 1. Response to RFI 23 and 24 clearly states one resume per key and essential discipline. Response to RFI 28 B.i. states yes to multiple resumes required.
See VA Response to question 28b clarification:
Please clear this up. Multiple resumes or single resumes per key and essential position?
40 2. I know you extended the due date. Request you push it out even further. The volume of responses to the government has increased substantially.
No additional time extension.
41 The solicitation documents states the Historical Preservation key personnel must have a Bachelor’s Degree in Architecture; however, 36 CFR 61 establishes professional qualification standards for historic preservation personnel based on education and experience. Can the Government please clarify whether a historic preservation professional who meets 36 CFR 61 would be acceptable?
Historical Preservation. Provide the qualifications identified in Attachment 1, Minimum In House Primary Key Personnel and Consultant Qualifications.
42 Request you delete the requirement to have LEED Silver requirement. The VA has very few LEED Certified buildings and cemeteries let alone Silver Rated. We would have to non-VA projects to consider which we believe defeats the purpose. We believe that having LEED accredited personnel only is sufficient to meet your needs.
See Amendment 0002.
LEED accredited professionals are not required.
43 In Section 11 (EVALUATION PROCEDURES), under "DEFINITIONS", It states "Relevant: Projects with a construction cost of $20 Million or higher..." Would you consider lowering the construction cost threshold?
See VA response to RFI 4.
44 In Section 12 (SF 330 SUBMISSION REQUIREMENT) it states that licenses will not count within the page count.
Are we expected to provide licenses? Can we just include each professional license with accompanying state and number for each individual on the SF 330 Section E Resumes? Otherwise this makes for very large file sizes.
See VA response to RFI 12.
45 We have evaluated your contract opportunity VA CFM AE Services IDIA for VA National Cemetery Projects (36C10F26R0001). Can you please confirm that your contract is specifically for future cemetery projects only and will not be utilized for infrastructure, NRMs, clinical or other VA facility-type projects?
This IDIQ 36C10F26R0001 is specifically scoped to VA National Cemetery Administration (NCA) projects, including construction, renovation, repairs, and commissioning of national cemeteries, buildings, roadways, and infrastructure located throughout the United States and its territories.