About this file

This is Amendment A0001 to solicitation 36C10F24R0075, extending the RFQ response deadline to February 17, 2025, at 4:00 PM PST and providing answers to bidders' questions. The amendment is for a Design-Build construction project for a new animal research facility at the VA Greater Los Angeles Healthcare System in Sepulveda, CA, replacing buildings 47 and 103.

The amendment clarifies several requirements through Q&A responses: previously completed PPQs and CPARS evaluations will be considered and not count against page limits; offerors must submit 3-5 completed/ongoing construction projects from the past 7 years for both Factor I and II evaluation; subcontractor information should be provided from ongoing/completed projects; table of contents will not count toward page limits; and electronic submissions should include the RFQ number, company name, and business type in file naming. The project has a magnitude of $20-50M and falls under NAICS code 236220. The contracting officer is Ferdinand Gawaran, and the project will be administered by the VA Office of Construction and Facilities Management in Washington DC.

View the file

Other files

File Type Posted
36C10F24R0075 A0008.docx DOCX document
CA20250022 10-03-2025.pdf PDF
36C10F24R0075 A0007_1.docx DOCX document
36C10F24R0075 - A0007.docx DOCX document
Building 7 Retrofits 2.pdf PDF
Building 7 Retrofits 1.pdf PDF
Building 7 Retrofits 3.pdf PDF
Building 103 Animal Research 1985.pdf PDF
Building 47 Combined Files.pdf PDF
Building 7 -basement.pdf PDF
Building 7 - 2000 Seismic Correction.pdf PDF
Building 7 - Canopy Structural Architectural.pdf PDF
36C10F24R0075 A0006.pdf PDF
Bldg 103 Drawings.pdf PDF
Building 7 1994 Consolidated Research.pdf PDF
36C10F24R0075 A0006_1.docx DOCX document
Combined Reports.pdf PDF
Building 7 -first floor.pdf PDF
TemplateSubcontractingPlan.docx DOCX document
36C10F24R0075 P0005_1.docx DOCX document
VAAR Class Dev - 822_852 Compliance with E.O. 13899.pdf PDF
Wage Determination CA20250022.docx DOCX document
36C10F24R0075 A0004.docx DOCX document
36C10F24R0075 A0003.docx DOCX document
36C10F24R0075 A0003_1.docx DOCX document
36C10F24R0075 A0002.docx DOCX document
36C10F24R0075 PHASE I REQUEST FOR QUALIFICATION.pdf PDF
PPQ - 36C10F24R0075.docx DOCX document
36C10F24R0075_2.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Design Build Construction for animal research facility to replace bldgs. 47 and 103, RFI Listing

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
91343
SOLICITATION NUMBER*
36C10F24R0075
RESPONSE DATE/TIME/ZONE
02-17-2025 4pm PACIFIC TIME, LOS ANGELES, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
Y1DB
NAICS CODE*
236220
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Office of Construction and Facilities Management (003C4E) 400 Mare Island Wat, Suite 100 Washington DC 20001

POINT OF CONTACT*

Contracting Officer Ferdinand Gawaran ferdinand.gawaran@va.gov 707-227-8342

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

VA Greater Los Angeles Healthcare System

Sepulveda VA Medical Center

16111 Plummer Street

Sepuleveda CA

POSTAL CODE
91343-2036
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL
https://www.cfm.va.gov/
URL DESCRIPTION
VA CFM

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

DESCRIPTION

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A0001 02-05-2025 691-903 003C4E Department of Veterans Affairs Office of Construction and Facilities Management (003C4E) 400 Mare Island Way, Suite 100 Vallejo CA 94503 101F Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001 To all Offerors/Bidders

36C10F24R0075 01-17-2025

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-17-2025 4pm PST This solicitation is amended to provide responses to the attached Request for Information. RFQ due date is extended to Feb 17, 2025/at 4PM/PST. All other provisions of the solicitation remain unchanged.

Page 1 of

CONTINUATION PAGE

RFI #
Question/Answer
1
Paragraph 3.9.6 Bullet2 notes that Offerors shall request a PPQ completed by previous owners and submitted directly to Contracting Officer. If the offeror already has a completed PPQ or CPARS evaluation, is it acceptable to submit these as an addendum to this RFQ submission in lieu of burdening past owners who have already evaluated the project with the need to re-evaluate and submit? In recent years this approach has generally been accepted by other federal contracting agents.

Answer: All previously completed PPQ and CPARS evaluations will be considered and will not count against page limitation.

2
On page 19 of 77 of the RFQ, under the description for Factor I Technical Approach, it requests that 3 to 5 Design-Build projects within the past 7 years be presented. However, Factor II, Sub-Factor A.i, requests this information. Please confirm that the respondents are to use Factor II, Sub-Factor A.i as the guide for submitting Design-Build project experience by the various members of the Design-Build Team.

Answer: The requested information applies to both factors I and II in the RFQ submission. The offeror should submit a minimum of three (3) and a maximum of five (5) completed or ongoing construction projects within the last seven (7) years to demonstrate technical approach and technical qualifications to include specialized experience and technical competence.

3
On section 3.9.4 bullet point number two on page 20 of 77. Please advise what copies of degrees are needed if we are not submitting key personnel resumes in Phase I. This requirement seems appropriate for Phase II.

Answer: The offeror shall describe the company's general job-related specialized experienced and competence to include any awards received. Phase II can focus on key personnel qualifications such as degrees, certificates and credentials.

4
On section IV. Safety Record. The website provided does not produce a report. Please advise.

Answer: The site is operational and may need a secure access. The VA can acquire an OSHA report for each offeror prior to evaluation. Your Experience Modification Rate (EMR) can be found in your Workers' Compensation rating pages. If you have been in business for less than 3 years or if you are a smaller company, you will not have an EMR.

5
On the bottom of page 19 of 77. Will projects under and over the $20M - $50M range be considered acceptable?

Answer: Projects that are under $20M or greater than $50M could be considered if similar in scope but it is company's business decision to include such projects.

6
On section 3.9.3 bullet point number one on page 20 of 77. It is very difficult to get major subcontractors involved and committed during a Phase I proposal. Please consider moving this requirement to Phase II.

Answer: Provide information of subcontractors and project organization charts of ongoing and previously completed projects.

7
On section 3.9.5 bullet point number one on page 20 of 77. It is very difficult to get major subcontractors involved and committed during a Phase I proposal. Please consider moving this requirement to Phase II.

Answer: Provide information of subcontractors and project organization charts of ongoing and previously completed projects.

8
Will a table of contents be excluded from the page limitation (similar to cover and index pages)?

Answer: Table of Content will be excluded from page limitation provided that it contains no other information.

9
In what part of the Phase I proposal are the SF1442 and potential amendments to be provided to show our acknowledgement?

Answer: Provide front and back copies of SF 1442 as part of your package. They will not count on your page limitation. Acknowledge amendments in Box 19 with completion of Box 20a, 20b and 20c.

10
Is there a preferred or required file naming scheme for the electronic submission?

Answer: Files should be labeled with RFQ number, company name, and business type. Title/subject email should read "36C10F24R0075 RFQ Submission - Replace Seismically Deficient Animal Research Buildings 47 and 103."

File details come from the government source that posted it. Updated .