This document provides details on a federal contract opportunity for demolition and paving work at the Jefferson Barracks Division Campus of the St Louis VA Medical Center. The Department of Veterans Affairs seeks a Service-Disabled Veteran-Owned Small Business contractor to provide all labor, materials, tools and equipment for the abatement and demolition of Buildings 61 and 63 as well as related site work including excavation, earthwork, utilities, fencing, pavements, and landscaping. The estimated value of the contract is between $10-20 million and work must be completed within 530 calendar days of receiving the notice to proceed. A pre-proposal conference will be held on-site with the proposal due date tentatively set for May 29, 2020. Questions should be directed to the contracting officer listed. This opportunity is designated for CVE-verified SDVOSBs only.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of
Veterans Affairs
Hig hway
Koch Rd
Koch Rd South
E ntra nce
Jefferson Dr
E C ir cl e D r
M ill er S t
G ra v e s
S t
Dugan St
JB
N at'l C em
JB
N at 'l
C em
JB
N at 'l C em
Mississippi River
DEMOLISHED BUILDING
TRUEPLAN
Drawing Title
Approved: Project Director
Project Title
Revisions
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofNo.
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t
B
A
E th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
5 6 87
F
D
C
94321
5 6 87 94321
B
A
E
F
D
C
JEFFERSON BARRACKS DIVISION
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
PRINTED ON ORIGINAL SIZE OF SHEET IS 30" X 42"
Department of Veterans Affairs
Date
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
SAINT LOUIS, MO 63146-4235
PHONE: (314) 991-2633
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD, SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 000842
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
SAINT LOUIS, MO 63103
PHONE: (314) 862 5344
CAMPUS DEMOLITION & PAVING
(NORTH)
29 OCTOBER 2012
657-313H
GI001-N
KGHWM
COVER SHEET
CAMPUS DEMOLITION & PAVING
(NORTH)
VOLUME 2 OF 6
LOCATION MAP
Medical Facility Improvements and NCA Expansion VA Project 657-313H
DRAWING INDEX
COVER SHEET
00 GI001-N COVER SHEET 1 of 89
GENERAL
00 GC100 DIAGRAM FOR OVERALL CONSTRUCTION SEQUENCING 2 of 89
00 GC101 DIAGRAM FOR CONTRUCTION SEQUENCING - SOUTH CAMPUS AREA 3 of 89
00 GC102 OVERALL PROJECT BOUNDARY PLAN 4 of 89
00 GC103 SAMPLE CPM NETWORK 5 of 89
CIVIL
C-100-N GENERAL NOTES, LEGEND AND EROSION CONTROL DETAILS 47 of 89
C-101-N DEMOLITION PLAN 48 of 89
C-102-N DEMOLITION PLAN 49 of 89
C-103-N SITE AND GRADING PLAN 50 of 89
C-104-N SITE AND GRADING PLAN 51 of 89
C-105-N ENLARGED GRADING PLAN 52 of 89
C-106-N SITE UTILITY PLAN 53 of 89
C-107-N SITE UTILITY PLAN 54 of 89
C-108-N SITE GEOMETRIC AND LAYOUT PLAN 55 of 89
C-109-N SITE GEOMETRIC AND LAYOUT PLAN 56 of 89
C-110-N GRAVES STREET PROFILE 57 of 89
C-111-N CONSTRUCTION DETAILS 58 of 89
C-112-N CONSTRUCTION DETAILS 59 of 89
C-113-N SEWER PROFILES 60 of 89
C-114-N HYDRAULIC DATA SHEET 15-YR, 20-MIN STORM EVENT 61 of 89
C-115-N HYDRAULIC DATA SHEET 100-YR, 20-MIN STORM EVENT 62 of 89
C-116-N SEWER DETAILS 63 of 89
C-117-N SEWER DETAILS 64 of 89
C-118-N BIORETENTION DETAILS 65 of 89
C-119-N BIORETENTION DETAILS 66 of 89
C-120-N BIORETENTION DETAILS 67 of 89
C-121-N EROSION CONTROL PLAN 68 of 89
C-122-N EROSION CONTROL PLAN 69 of 89
C-123-N STAGING AND CONSTRUCTION ACCESS PLAN 70 of 89
C-124-N WATER QUALITY PLAN 71 of 89
C-125-N DRAINAGE AREA MAPS FOR PIPE HYDRAULICS 72 of 89
HAZARDOUS MATERIAL ABATEMENT
00 HA001-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS 6 of 89
00 HA002-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS 7 of 89
00 HA003-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS 8 of 89
00 HA004-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS 9 of 89
00 HA005-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS 10 of 89
00 HA006-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS 11 of 89
00 HA007-N ASBESTOS CONTROL NOTES 12 of 89
BUILDING 61 DEMOLITION
61 HA101-N FIRST FLOOR FLOORING MATERIAL TO BE ABATED PRIOR TO DEMOLITION 14 of 89
61 HA110-N FIRST FLOOR SURFACING MATERIAL TO BE ABATED PRIOR TO DEMOLITION 15 of 89
61 HA111-N SECOND FLOOR SURFACING MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
61 HA112-N ATTIC FLOOR SURFACING MATERIAL TO BE ABATED PRIOR TO DEMOLITION 17 of 89
61 HA120-N SERVICE ROOM AND PIPE SPACE THERMAL SYSTEM INSULATION TO BE
ABATED PRIOR TO DEMOLITION
61 HA121-N FIRST FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
61 HA122-N SECOND FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
61 HA123-N ATTIC FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
61 HA130-N SERVICE ROOM AND PIPE SPACE MISCELLANEOUS MATERIAL TO BE ABATED
PRIOR TO DEMOLITION
61 HA131-N FIRST FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
61 HA132-N SECOND FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
61 HA133-N ATTIC FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
61 HA140-N FIRST FLOOR HAZARDOUS AND NON-HAZARDOUS MATERIAL TO BE ABATED 26 of 89
61 HA141-N SECOND FLOOR HAZARDOUS AND NON-HAZARDOUS MATERIAL TO BE
ABATED
61 AD161-N DEMOLITION PLANS AND PHOTOS 28 of 89
BUILDING 63 DEMOLITION
63 HA101-N. FIRST FLOOR FLOORING MATERIAL TO BE ABATED PRIOR TO DEMOLITION 29 of 89
63 HA110-N. SERVICE ROOM AND PIPE SPACE THERMAL SYSTEM INSULATION TO BE
ABATED PRIOR TO DEMOLITION
63 HA111-N. FIRST FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
63 HA120-N. SERVICE ROOM AND PIPE SPACE MISCELLANEOUS MATERIAL TO BE ABATED 32 of 89
63 HA121-N. FIRST FLOOR MISCELLANEOUS MATERIAL TO BE ABATED 33 of 89
63 HA130-N. SERVICE AND PIPE SPACE HAZARDOUS AND NON-HAZARDOUS MATERIAL TO
BE ABATED
63 HA131-N. FIRST FLOOR HAZARDOUS AND NON-HAZARDOUS MATERIAL TO BE ABATED 35 of 89
63 AD163-N DEMOLITION PLANS AND PHOTOS 36 of 89
LANDSCAPE ARCHITECTURE
LP101-N LANDSCAPE PLANTING PLAN 73 of 89
LP401-N LARGE SCALE LANDSCAPE PLANTING PLANS 74 of 89
LP501-N LANDSCAPE DETAILS 75 of 89
LS101-N LANDSCAPE SITE HARDSCAPE PLAN 76 of 89
LS501-N SITE HARDSCAPE DETAILS 77 of 89
LS502-N SITE HARDSCAPE DETAILS 78 of 89
ARCHITECTURE
AE105-N PLANS AND DETAILS TO INFILL OPENING AT PEDESTRIAN CORRIDOR
FROM DEMOLISHED BLDG 63
ELECTRICAL
E-000-N ELECTRICAL COVER SHEET 82 of 89
DES102-N DEMOLITION PLAN SITE LIGHTING 83 of 89
ES102-N SITE LIGHTING PLAN 84 of 89
ES201-N SITE LIGHTING PHOTOMETRIC PLAN 85 of 89
MECHANICAL
MS100-N MECHANICAL COVER SHEET 80 of 89
MS102-N MECHANICAL SITE PLAN 81 of 89
SURVEY
V-100 SITE SURVEY COVER SHEET 37 of 89
V-101A SITE SURVEY BOUNDARY MAP 38 of 89
V-101B SITE SURVEY BOUNDARY MAP 39 of 89
V-102 SITE SURVEY 40 of 89
V-103 SITE SURVEY 41 of 89
V-104 SITE SURVEY 42 of 89
V-105 SITE SURVEY 43 of 89
V-106 SITE SURVEY 44 of 89
V-107 SITE SURVEY 45 of 89
V-108 SITE SURVEY SEWER INFORMATION 46 of 89
TECHNOLOGY
TS000-N TECHNOLOGY COVER SHEET 86 of 89
DTS102-N DEMOLITION SITE PLAN TECHNOLOGY 87 of 89
TS102-N TECHNOLOGY SITE PLAN 88 of 89
TS300-N TECHNOLOGY DETAILS AND RISERS 89 of 89
FIRE ALARM DEMOLITION
61/63 FD101-N BUILDING 61/63 BASE WIDE LOOP DEMOLITION PLAN 13 of 89
SOUTH CAMPUS AREA
REFER TO SHEET GC101 FOR
SEQUENCING INFORMATION
WEST CAMPUS AREA
SEQUENCING OF WORK
WITHIN THE PROJECT
BOUNDARY TO BE AS
DETERMINED BY
CONTRACTOR AND APPROVED
BY RESIDENT ENGINEER
PERIMETER FENCE
SEQUENCE OF WORK AROUND
THE CAMPUS SHALL BE AS
DETERMINED BY
CONTRACTOR AND APPROVED
BY RESIDENT ENGINEER
N O
T I C
E
T
O
P
R O
C E
E D
N
T P
GENERAL NOTES:
1. SEQUENCING THE PERFORMANCE OF ALL
WORK TO ACHIEVE CONTINUOUS AND
UNINTERRUPTED PROGRESS TO COMPLETE
THE ENTIRE WORK OF THE PROJECT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY. SUCH
SEQUENCING BY THE CONTRACTOR SHALL BE
SUBJECT TO THE APPROVAL OF THE
RESIDENT ENGINEER AND MEDICAL CENTER
DIRECTOR.
2. IT IS THE GOVERNMENT'S INTENT THAT THE
CONTRACTOR TAKE ADVANTAGE OF
REASONABLE OPPORTUNITIES FOR WORK TO
BE PERFORMED WITHIN TWO OR MORE
PROJECT BOUNDARY AREAS CONCURRENTLY.
SUBJECT TO CONSTRAINTS NOTED AND
MAINTAINING MEDICAL CENTER OPERATIONS,
CONCURRENT WORK COULD INCLUDE, BUT
NOT BE LIMITED TO, THE FOLLOWING:
A: PERFORMANCE OF ABATEMENT AND
DEMOLITION OF BUILDINGS 61 AND 63
CONCURRENT WITH PERFORMANCE OF WORK
IN THE SOUTH CAMPUS AREA.
B: PERFORMANCE OF PERIMETER FENCE
WORK IN CAMPUS AREAS NOT AFFECTED BY
THE SOUTH, NORTH OR WEST AREAS OF
WORK COULD OCCUR CONCURRENTLY WITH
WORK IN THE SOUTH, NORTH AND WEST
AREAS OF THE CAMPUS.
C: PERFORMANCE OF WEST CAMPUS
AREA WORK CONCURRENT WITH
PERFORMANCE OF NORTH CAMPUS AREA
WORK.
3. THE PRIMARY CONSTRAINTS FOR THE
START OF WORK WITHIN CERTAIN CAMPUS
AREAS ARE AS FOLLOWS:
A: START OF WORK IN THE NORTH
CAMPUS AREA IS CONTINGENT ON THE
MEDICAL CENTER VACATING BUILDINGS 61
AND 63 TO ALLOW FOR THEIR ABATEMENT
AND DEMOLITION.
B: START OF WORK IN THE WEST
CAMPUS AREA IS CONTINGENT ON
CONTRACTOR'S COMPLETION OF THE SOUTH
CAMPUS AREA WORK TO RESTORE MEDICAL
CENTER PARKING AND NO NEED TO MAINTAIN
THE WEST CAMPUS AREA FOR TEMPORARY
PARKING.
4. THE PERFORMANCE OF WORK IN MORE
THAN ONE CAMPUS AREA IS CONTINGENT ON
MAINTAINING MEDICAL CENTER OPERATIONS
ACROSS THE ENTIRE CAMPUS AND
MAINTAINING ONE ROUTE FOR VEHICULAR
ACCESS TO THE EAST SIDE OF THE CAMPUS
AT ALL TIMES.
5. THE CONTRACTOR'S PLAN FOR
SEQUENCING THE PERFORMANCE OF ALL
WORK IS SUBJECT TO THE APPROVAL OF THE
RESIDENT ENGINEER AND MEDICAL CENTER
DIRECTOR. IN THIS REGARD, THE
CONTRACTOR SHALL SUBMIT A PRELIMINARY
SEQUENCING PLAN AFTER CONTRACT AWARD
AND PRIOR TO NOTICE TO PROCEED.
CONTRACTOR'S FINAL SEQUENCING PLAN
SHALL BE SUBMITTED TO THE RESIDENT
ENGINEER NOT LATER THAN 30 CALENDAR
DAYS FOLLOWING NOTICE TO PROCEED
6. CONTRACTOR'S SEQUENCING PLAN
APPROVED BY THE RESIDENT ENGINEER
SHALL ESTABLISH THE BASIS FOR THE
CONTRACTOR'S CONSTRUCTION SCHEDULE.
THE CONTRACTOR'S SEQUENCING PLAN AND
CONSTRUCTION SCHEDULE SHALL NOT BE
MODIFIED EXCEPT BY RESIDENT ENGINEER
APPROVAL.
NORTH CAMPUS AREA
GENERAL CONSTRAINT:
MAINTAIN VEHICULAR ACCESS
ALONG EXISTING NORTH
ROADWAY DURING
PERFORMANCE OF WORK
SEQUENCE 1 AND 2
SEQUENCE 1
ABATEMENT AND DEMOLITION
OF BUILDING 61 AND 63
NOTE: ABATEMENT AND
DEMOLITION TO OCCUR
CONCURRENTLY WITH SOUTH
CAMPUS AREA WORK
SUBJECT TO BUILDING HAVING
BEEN VACATED BY THE
MEDICAL CENTER
SEQUENCE 2
STORM SEWER
STRUCTURES 1 TO 7 AND 9 TO
EX1
WATER
INSTALL NEW 8" LINE ALONG
RELOCATED GRAVES STREET
FROM B53 LOADING DOCK TO
NORTH END OF B53
CONSTRAINT
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO CONNECTING NEW WATER
LINE TO EXISTING
DEMO EXISTING UTILITIES
SITE GRADING
ELECTRICAL UNDERGROUND
UTILITIES FOR RE TRAILER
SUBGRADE AND BASE,
BIO-RETENTION
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL LIGHTING
FINAL PAVEMENT
LANDSCAPE
SEQUENCE 3
RELOCATE AND REMOVE RE
TRAILERS
REMOVE EXISTING NORTH
ROADWAY AND EXISTING
TRAILER SITE
FINAL GRADING
CONSTRAINT 1:
START OF WORK IS
CONTINGENT ON
CONTRACTOR'S COMPLETION
OF ALL WORK IN SOUTH
CAMPUS AREA AND MEDICAL
CENTRAL NO LONGER
NEEDING WEST CAMPUS AREA
FOR TEMPORARY PARKING
CONSTRAINT 2:
CONTRACTOR SHALL
MAINTAIN ONE LANE OF
JEFFERSON DRIVE OPEN TO
VEHICULAR TRAFFIC DURING
PERFORMANCE OF THE WORK
CONSTRAINT 3:
CONTRACTOR SHALL
MAINTAIN ACCESS TO NORTH
AND SOUTH ENTRANCE
DRIVES DURING
PERFORMANCE OF THE
WORK. IF TEMPORARY
SHUTDOWN OF DRIVES
CANNOT BE AVOIDED, ONLY
ONE DRIVE SHALL BE SHUT
DOWN AT ANY GIVEN TIME
MANDATORY CONTRACT
REQUIREMENT:
AS INDICATED ON SHEET
GC102, CONTRACTOR SHALL
SEQUENCE THE WORK TO
COMPLETE THE FENCE ALONG
THE NORTH AND EAST SIDES
OF THE CAMPUS AS PART OF
THE NORTH CAMPUS WORK
CONSTRAINT 1:
FOR GATE INSTALLATIONS AT
THE NORTH AND SOUTH
CAMPUS ENTRANCES,
CONTRACTOR SHALL
MAINTAIN CAMPUS ACCESS
THROUGH ONE ENTRANCE AT
ALL TIMES.
CONSTRAINT 2:
INSTALLATION OF THE NORTH
AND SOUTH CAMPUS
ENTRANCE GATES IS
CONTINGENT ON JEFFERSON
DRIVE BEING OPEN FOR
TWO-WAY TRAFFIC FLOW
7. PLAN WORK TO MAINTAIN EMERGENCY
EGRESS FROM ALL EXISTING BUILDINGS AT
ALL TIMES. COORDINATE EXIT LOCATIONS FOR
EACH BUILDING WITH RESIDENT ENGINEER
AND MEDICAL CENTER.
8. MAINTAIN AT LEAST ONE MEANS OF
PEDESTRIAN AND VEHICULAR ACCESS TO
EACH BUILDING AT ALL TIMES FOR MEDICAL
CENTER OPERATIONS AND EMERGENCY
VEHICLES.
9. PROVIDE TEMPORARY CONCRETE
WALKWAYS WHERE REQUIRED WHEN
EXISTING WALKWAYS AND BUILDING
ENTRANCES OR EXITS ARE IMPACTED BY
CONSTRUCTION. REMOVE TEMPORARY
WALKWAYS WHEN EXISTING WALKWAYS ARE
RESTORED FOR USE OR NEW WALKWAYS ARE
CONSTRUCTED AND AVAILABLE FOR USE.
10. PROVIDE AND MAINTAIN TEMPORARY
SIGNAGE, BARRICADES, TRENCH COVERS,
ETC. TO RE-DIRECT TRAFFIC FLOW, PARKING,
ETC. INCLUDING PEDESTRIAN TRAFFIC.
11. WORK THAT CANNOT BE PERFORMED SO
AS TO MAINTAIN MEDICAL CENTER
OPERATIONS, EMERGENCY VEHICLE ACCESS,
ETC. SHALL BE SCHEDULED WITH THE
RESIDENT ENGINEER AND MEDICAL CENTER
AS APPROVED SHUT DOWNS OR PERFORMED
DURING OTHER THAN NORMAL WORK HOURS
TO MAINTAIN NORMAL MEDICAL CENTER
WORK HOUR OPERATIONS.
12. PORTIONS OF EXISTING STORM AND
SANITARY SEWERS THAT NEED TO REMAIN IN
PLACE AND ACTIVE, PRIOR TO THE
COMPLETION OF RE-ROUTING THE ENTIRE
UTILITY SERVICE, SHALL BE TEMPORARILY
CONNECTED TO THEIR NEW CONSTRUCTION
OR BY-PASS PUMP TO THEIR NEW
CONSTRUCTION FOR THE DURATION THE
EXISTING PORTIONS HAVE TO REMAIN IN
PLACE AND ACTIVE.
13. ALL MAJOR UTILITY SHUTDOWNS
REQUIRED TO CONNECT NEW UTILITY
SERVICES SHALL BE COORDINATED WITH THE
RESIDENT ENGINEER NOT LESS THAN FIFTEEN
(15) CALENDAR DAYS PRIOR TO THE
SHUTDOWN OCCURRING. CONTRACTOR
SHALL COORDINATE ALL REQUIRED UTILITY
SHUTDOWNS WITH THE RESIDENT ENGINEER
TO ESTABLISH THOSE WHICH REQUIRE 15
CALENDAR DAYS NOTICE PRIOR TO WORK
BEING PERFORMED.
14. CONTRACTOR TO MAINTAIN TRAFFIC FLOW
TO AND AROUND ALL EXISTING BUILDINGS
AND PARKING AT ALL TIMES FOR THE
DURATION OF THE PROJECT. TEMPORARY
DISRUPTIONS SHALL BE APPROVED BY THE
RESIDENT ENGINEER AND MEDICAL CENTER
PRIOR TO WORK BEING PERFORMED IN THE
VICINITY OF THESE BUILDINGS.
CONSTRUCTION DURATION
(530 CALENDAR DAYS)
NOTE: THIS DIAGRAM IS INTENDED TO SET FORTH THE GENERAL
SEQUENCING OF ALL WORK OF THE PROJECT. IT IS NOT INTENDED TO
DICTATE CONTRACTOR MEANS AND METHODS, BUT THE GENERAL
NOTES ARE INTENDED TO CONVEY THE ABILITY FOR THE CONTRACTOR
TO PERFORM WORK CONCURRENTLY AS APPROVED BY THE RESIDENT
ENGINEER.
Acoustical Ceiling Submittals
REFER TO GENERAL NOTE 2B
THIS SHEET
STEAM MANHOLE REPAIRS
REFER TO SHEET GC101 FOR
ADDITIONAL INFORMATION
DIAGRAM FOR OVERALL
CONSTRUCTION SEQUENCING
GC100
CMU/SBCMU
2 57 No. Date Revisions
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: CAMPUS DEMOLITION &
PAVING
657-313H Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL (S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 2011014429
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL
CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
ofDwg.
29 OCTOBER 2012
SEQUENCE 1B
REMOVE SITE LIGHTING
DEMO EXISTING PAVING
SEQUENCE 1C
STORM SEWER
MH-1 TO MH-4
MH-2 TO INLET 9, MH-11
MH-4 TO INLET 12
DEMO EXISTING UTILITIES
SEQUENCE 1E
ELECTRICAL AND
TECHNOLOGY UNDERGROUND
SERVICES
RETAINING WALL
SITE GRADING
SUBGRADE AND BASE
SEQUENCE 1F
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL PAVING
ENERGENCY CALL STATIONS
AND ACCESS CONTROL GATES
LANDSCAPING AND
BIO-RETENTION
SEQUENCE 1G
FINAL INSPECTION AND
ACCEPTANCE
SEQUENCE 3A
REMOVE SITE LIGHTING AT
B-25 AND REPLACE WITH NEW
N O
T I C
E
T
O
P
R O
C E
E D
N
T P
CONSTRAINT
TURN OVER SEQUENCE 1 TO
MEDICAL CENTER PRIOR TO
STARTING SEQUENCE 2
CONSTRAINT
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO CONNECTING NEW WATER
LINES TO EXISTING AND B2
SEQUENCE 2E
SITE GRADING
ELECTRICAL AND
TECHNOLOGY UNDERGROUND
SERVICES
SUBGRADE AND BASE
SEQUENCE 2F
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL PAVING
EMERGENCY CALL STATIONS
LANDSCAPING AND
BIO-RETENTION
SEQUENCE 2G
FINAL INSPECTION AND
ACCEPTANCE
CONSTRAINT
TURN OVER SEQUENCE 2 TO
MEDICAL CENTER PRIOR TO
STARTING SEQUENCE 3
SEQUENCE 3B
REMOVE EXISTING SITE
LIGHTING
DEMO EXISTING PAVING AND
ELECTRICAL
ELECTRICAL UNDERGROUND
SERVICE
SUBGRADE AND BASE
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL PAVING
LANDSCAPING
CONSTRAINT
RE-ROUTE TRAFFIC FLOW TO
MAINTAIN ACCESS FROM
JEFFERSON DRIVE TO GRAVES
STREET
COORDINATE RE-ROUTING OF
ACCESS TO B-1 WITH
RESIDENT ENGINEER AND
MEDICAL CENTER. ESTABLISH
A TEMPORARY
DROP-OFF/PICK UP LOCATION
FOR PATIENTS
SEQUENCE 3C
FINAL INSPECTION AND
ACCEPTANCE
GENERAL NOTES - STEAM MANHOLE REPAIRS:
1. REFER TO THE CAMPUS STEAM SYSTEM
MANHOLE REPAIR DRAWINGS FOR
ADDITIONAL INFORMATION.
2. STEAM SYSTEM INTERRUPTIONS AND
MANHOLE ACCESS FOR PERFORMANCE
OF THE MANHOLE REPAIR WORK IS
SEASON AND TEMPERATURE DEPENDENT
AND SUBJECT TO THE APPROVAL OF THE
RESIDENT ENGINEER AND MEDICAL
CENTER AT ALL TIMES. THE MEDICAL
CENTER'S OPERATIONS AND NEED FOR
THE STEAM SYSTEM TO BE OPERATIONAL
SHALL TAKE PRECEDENCE AND DICTATE
WHEN THE STEAM SYSTEM CAN BE SHUT
DOWN FOR THE MANHOLE REPAIR WORK
TO BE PERFORMED. ALL STEAM SYSTEM
SHUTDOWNS SHALL BE SCHEDULED WITH
THE RESIDENT ENGINEER AND MEDICAL
CENTER NOT LATER THAN TEN (10) WORK
DAYS PRIOR TO WHEN THE CONTRACTOR
NEEDS THE STEAM SYSTEM SHUT DOWN.
FAILURE OF THE CONTRACTOR TO
SCHEDULE SHUTDOWNS IN ADVANCE
SHALL NOT ENTITLE THE CONTRACTOR TO
ADDITIONAL COMPENSATION OR AN
EXTENSION OF CONTRACT TIME.
3. THE CONTRACTOR SHALL COMMENCE
PERFORMANCE OF THE STEAM MANHOLE
REPAIR WORK UPON NOTICE TO PROCEED
AND SHALL COMPLETE AS MANY REPAIRS
AS CAN BE ACCOMPLISHED BY OCTOBER
15, 2020 AFTER WHICH THE GOVERNMENT
ANTICIPATES THAT STEAM SYSTEM
OPERATION CANNOT BE INTERRUPTED
DUE TO NEED FOR HEATING CAMPUS
FACILITIES. THOSE MANHOLE REPAIRS
NOT COMPLETED PRIOR TO THIS DATE
SHALL BE COMPLETED AT THE EARLIEST
OPPORTUNITY AFFORDED BY MEDICAL
CENTER OPERATIONS AND DAILY
TEMPERATURES FORECASTED TO REMAIN
ABOVE 55 DEGREES FAHRENHEIT
THROUGHOUT ANY REQUIRED STEAM
OUTAGES NECESSARY TO FACILITATE
WORK. CONTRACTOR SHALL ANTICIPATE
THAT COMPLETION OF ALL MANHOLE
REPAIRS MAY BE INTERRUPTED AND HAVE
TO BE POSTPONED DUE TO SEASONAL
AND TEMPERATURE DEMAND FOR THE
STEAM SYSTEM TO BE OPERATIONAL FOR
MEDICAL CENTER OPERATIONS.
4. AFTER CONTRACT AWARD AND NOT
LATER THAN FIVE (5) WORK DAYS AFTER
NOTICE TO PROCEED, CONTRACTOR
SHALL SUBMIT, FOR REVIEW AND
APPROVAL BY THE RESIDENT ENGINEER
AND MEDICAL CENTER, A SEQUENCING
AND SCHEDULING PLAN FOR
PERFORMANCE OF THE MANHOLE REPAIR
WORK. SUCH PLAN SHALL INCLUDE, BUT
NOT BE LIMITED TO, ESTABLISHING THE
FIRST MANHOLE TO BE REPAIRED AND
PROGRESSION OF THE REPAIR WORK BY
MANHOLE AROUND THE CAMPUS; DATES
WHEN STEAM SYSTEM SHUTDOWNS NEED
TO OCCUR FOR EACH MANHOLE TO BE
REPAIRED; MANHOLE SHUTDOWNS
REQUIRED TO ISOLATE A SPECIFIC
MANHOLE FOR PERFORMANCE OF THE
REPAIR WORK; DURATION FOR
PERFORMANCE OF THE REPAIR WORK IN
EACH MANHOLE; DATES OR PERIOD OF
TIME WHEN THE STEAM SYSTEM CAN BE
RE-ENERGIZED FOR OPERATION; AND ANY
OTHER DEFINITIVE AND SPECIFIC
INFORMATION REQUIRED BY THE
RESIDENT ENGINEER OR MEDICAL
CENTER FOR SEQUENCING AND
SCHEDULING THE PERFORMANCE OF ALL
MANHOLE REPAIR WORK. CONTRACTOR'S
SEQUENCING AND SCHEDULING PLAN
SHALL ACCOUNT FOR A REASONABLE
AMOUNT OF FLOAT TIME IN ANTICIPATION
OF UNEXPECTED DELAYS DUE TO
INCLEMENT WEATHER OR OTHER CAUSE
FOR DELAY THAT CAN BE ANTICIPATED BY
THE CONTRACTOR TO OCCUR, INCLUDING
POSTPONEMENT OF WORK DUE TO
SEASONAL DEMAND FOR THE STEAM
SYSTEM TO BE OPERATIONAL.
CONTRACTOR SHALL NOT BE ENTITLED
TO ADDITIONAL COMPENSATION OR AN
EXTENSION OF CONTRACT TIME IF
REASONABLE FLOAT TIME IS NOT
INCLUDED IN THE CONTRACTOR'S
SEQUENCING AND SCHEDULING PLAN.
CONTRACTOR'S SEQUENCING AND
SCHEDULING PLAN SHALL BE
PERIODICALLY UPDATED BY THE
CONTRACTOR AS REQUIRED BY THE
RESIDENT ENGINEER.
5. UPON COMPLETION OF REPAIRS IN EACH
MANHOLE AND UPON COMPLETION OF
REPAIRS IN ALL MANHOLES, CONTRACTOR
SHALL REQUEST OF THE RESIDENT
ENGINEER AND MEDICAL CENTER THAT
THE STEAM SYSTEM BE RE-ENERGIZED TO
TEST THE REPAIRS MADE. SUCH TESTING
SHALL BE WITNESSED BY THE RESIDENT
ENGINEER, MEDICAL CENTER AND
CONTRACTOR AND DEFICIENCIES
OBSERVED SHALL BE NOTED TO BE
REPAIRED BY THE CONTRACTOR AND AT
THE CONTRACTOR'S EXPENSE PRIOR TO
ACCEPTANCE OF ALL MANHOLE REPAIRS
BY THE GOVERNMENT. CONTRACTOR
SHALL WARRANTY THE MANHOLE REPAIR
WORK FOR A PERIOD OF TIME THAT
COVERS FULL OPERATION OF THE STEAM
SYSTEM OVER TWO (2) HEATING SEASON
PERIODS AFTER ACCEPTANCE OF ALL
MANHOLE REPAIR WORK BY THE
GOVERNMENT.
SEQUENCE 1A
INSTALL NEW 8" WATER LINE
BEHIND B2 AND B18 AND
RESTORE EXISTING
CONDITIONS
CONSTRAINT
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO CONNECTING NEW LINE TO
EXISTING LINES AND B2 AND
B18
SEQUENCE 1D
CONSTRUCT MH-S19 AND
INSTALL HPS PIPING SOUTH
TO JUST OUTSIDE B18
INSTALL HPS PIPING FROM
MH-S19 TO JUST OUTSIDE B3
EXTEND HPS PIPING NORTH
FROM MH-S19 AND CAP FOR
EXTENDING IN SEQUENCE 2
CONSTRAINT
NEW HPS CONNECTIONS TO
B3 AND B18 CANNOT OCCUR
UNTIL HPS PIPING IS
COMPLETE IN MH-S6 DURING
SEQUENCE 2
SEQUENCE 2B
EXTEND HPS PIPING FROM
MH-S19 TO MH-S6
MAKE HPS CONNECTIONS IN
MH-S6, MH-S19, AT B3 AND B18
CONSTRAINT
ALL HPS CONNECTIONS HAVE
TO OCCUR CONCURRENTLY
ALL HPS CONNECTIONS TO BE
PERFORMED DURING WARM
WEATHER CONDITIONS AS
DETERMINED BY RESIDENT
ENGINEER
SCHEDULE SHUTDOWN WITH
RESIDENT ENGINEER PRIOR
TO MAKING CONNECTIONS.
SEQUENCE 2C
CONSTRUCT MH-S20 AND
INSTALL HPS PIPING FROM
MH-S6 TO JUST OUTSIDE B1
AND B24
MAKE CONNECTION IN MH-S6,
AT B1 AND AT B24
CONSTRAINT
ALL HPS CONNECTIONS HAVE
TO OCCUR CONCURRENTLY
ALL HPS CONNECTIONS TO BE
PERFORMED DURING WARM
WEATHER CONDITIONS AS
DETERMINED BY RESIDENT
ENGINEER
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO MAKING HPS
CONNECTIONS.
SEQUENCE 2A
REMOVE SITE LIGHTING
DEMO EXISTING PAVING
SEQUENCE 2D
STORM SEWER
MH-4 TO MH-5
MH-5 TO INLET 6, INLET 7
MH-5 TO INLET 10
INLET 8 TO INLET EX-1
WATER
INSTALL NEW 8" LINE EAST TO
WEST INCLUDING NEW FIRE
HYDRANTS AND CONNECTION
TO B2
INSTALL NEW 8" LINE ON EAST
SIDE WEST OF FISCHER
HOUSE
STEAM MANHOLE REPAIRS
REFER TO CAMPUS STEAM
SYSTEM MANHOLE REPAIR
DRAWINGS FOR ADDITIONAL
INFORMATION
REFER TO GENERAL NOTES
THIS SHEET
DIAGRAM FOR CONSTRUCTION
SEQUENCING - SOUTH CAMPUS AREA
GC101
CMU/SBCMU
2 57 No. Date Revisions
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: CAMPUS DEMOLITION &
PAVING
657-313H Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL (S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 2011014429
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL
CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
ofDwg.
29 OCTOBER 2012
CONSTRUCTION
ENTRANCE
WEST CAMPUS
PROJECT
BOUNDARY
CURRENT
CONSTRUCTION
UNDER SEPARATE
CONTRACT
NORTH CAMPUS
PROJECT BOUNDARY
PORTION OF PERIMETER FENCE TO
BE COMPLETED WITH NORTH
CAMPUS (REFER TO CIVIL DRAWINGS
FOR REMAINDER OF FENCE WORK)
CONTRACTOR'S
STAGING AREA
(TO BE RESTORED BY
CONTRACTOR UPON
COMPLETION OF ALL
WORK)
CURRENT
CONSTRUCTION UNDER
SEPARATE CONTRACT
SEQUENCE 3
SEQUENCE 2
SEQUENCE 1
SOUTH CAMPUS
PROJECT
BOUNDARY
SEQUENCE 3
SEQUENCE 2
SEQUENCE 1
CEMETERY PROPERTY
(CONSTRUCTION UNDER
SEPARATE CONTRACT)
PORTION OF
PERIMETER FENCE
TO BE COMPLETED
WITH NORTH
CAMPUS (REFER TO
CIVIL DRAWINGS
FOR REMAINDER OF
FENCE WORK)
REFER TO CIVIL DRAWINGS
FOR ROUTING OF NEW
PERIMETER FENCE
START
FENCE
WORK
LEGEND
EXISTING BUILDING
PROPERTY LINE
BUILDING NUMBER
PROJECT BOUNDARY
PLAN TRUE
No. Date Revisions
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: CAMPUS DEMOLITION & PAVING 657-313H Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL (S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 2011014429
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL
CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
OVERALL PROJECT BOUNDARY PLAN
GC102
CMU/SBCMU29 OCTOBER 2012
AutoCAD SHX Text
AutoCAD SHX Text
NORTH GATE ENTRANCE DRIVE
AutoCAD SHX Text
KOCH ROAD
AutoCAD SHX Text
SOUTH GATE ENTRANCE DRIVE
AutoCAD SHX Text
JEFFERSON DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 53T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1CC
AutoCAD SHX Text
1CC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 51T
AutoCAD SHX Text 60T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 90T
AutoCAD SHX Text
EXISTING TRAILER
AutoCAD SHX Text 101T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3T
AutoCAD SHX Text 8.45'
AutoCAD SHX Text
BUS STOP
AutoCAD SHX Text
SHELTER
AutoCAD SHX Text 12.2'
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text
WV
AutoCAD SHX Text
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
JEFFERSON BARRACKS DIVISION
CAMPUS DEMOLITION & PAVING
(NORTH)
657-313H Office of Construction and Facilities Management
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD, SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
MECHANICAL/ELECTRICAL/PLUMBING/TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
ST. LOUIS, MO 63146-4235
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862-5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL CONSULTING, LLC
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 000842
AutoCAD SHX Text
HAZARDOUS MATERIAL
AutoCAD SHX Text
ABATEMENT SPECIFICATIONS
AutoCAD SHX Text
HA001-N
AutoCAD SHX Text
LNW
AutoCAD SHX Text
RBR
AutoCAD SHX Text 06 89
AutoCAD SHX Text HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS MEDICAL FACILITY IMPROVEMENTS AND NCA EXPANSION PROJECT #657-313H PART 1 - GENERAL PROJECT NAME IS MEDICAL FACILITY IMPROVEMENTS AND MEDICAL FACILITY IMPROVEMENTS AND NCA EXPANSION LOCATED AT THE VAMC JEFFERSON LOCATED AT THE VAMC JEFFERSON BARRACKS DIVISION IN ST. LOUIS, MISSOURI. THE VA PROJECT NUMBER IS 657-313H AND CONTRACT NUMBER IS VA101(183B4)-P-0023. 1.1 SUMMARY OF THE WORK SUMMARY OF THE WORK 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS DRAWINGS, GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND OTHER DIVISION 01 SPECIFICATIONS, SHALL APPLY TO THE WORK OF THIS SECTION. THE CONTRACT DOCUMENTS SHOW THE WORK TO BE DONE UNDER THE CONTRACT AND RELATED REQUIREMENTS AND CONDITIONS IMPACTING THE PROJECT. RELATED REQUIREMENTS AND CONDITIONS INCLUDE APPLICABLE CODES AND REGULATIONS, NOTICES AND PERMITS, EXISTING SITE CONDITIONS AND RESTRICTIONS ON USE OF THE SITE, REQUIREMENTS FOR PARTIAL OWNER OCCUPANCY DURING THE WORK, COORDINATION WITH OTHER WORK AND THE PHASING OF THE WORK. IN THE EVENT THE ASBESTOS ABATEMENT CONTRACTOR DISCOVERS A CONFLICT IN THE CONTRACT DOCUMENTS AND/OR REQUIREMENTS OR CODES, THE CONFLICT MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER FOR RESOLUTION. WHENEVER THERE IS A CONFLICT OR OVERLAP IN THE REQUIREMENTS, THE MOST STRINGENT SHALL APPLY. ANY ACTIONS TAKEN BY THE CONTRACTOR WITHOUT OBTAINING GUIDANCE FROM THE CONTRACTING OFFICER SHALL BECOME THE SOLE RISK AND RESPONSIBILITY OF THE ASBESTOS ABATEMENT CONTRACTOR. ALL COSTS INCURRED DUE TO SUCH ACTION ARE ALSO THE RESPONSIBILITY OF THE ASBESTOS ABATEMENT CONTRACTOR. 1.1.2 EXTENT OF WORK A. THIS WORK IS REQUIRED DUE TO THE MEDICAL THIS WORK IS REQUIRED DUE TO THE MEDICAL FACILITY IMPROVEMENTS AND NCA EXPANSION AT THE VAMC JEFFERSON BARRACKS DIVISION IN ST. LOUIS, MISSOURI. THE BUILDINGS THAT ARE SCHEDULED FOR DEMOLITION ARE PROVIDED BELOW: BUILDING 61 BUILDING 63 ALL BUILDINGS HAVE ASBESTOS-CONTAINING MATERIALS (ACM) AND OTHER HAZARDOUS MATERIALS THAT REQUIRE REMOVAL. THE FOLLOWING TABLES PROVIDE THE ASBESTOS-CONTAINING BUILDING MATERIALS THAT WILL REQUIRE ABATEMENT PRIOR TO DEMOLITION OF THESE BUILDINGS. PLEASE NOTE THESE QUANTITIES AND LOCATIONS ARE SHOWN ON ALL THE DRAWINGS.
AutoCAD SHX Text
HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
AutoCAD SHX Text OTHER HAZARDOUS MATERIALS WERE SURVEYED IN EACH BUILDING. THESE INCLUDED BALLASTS, FLUORESCENT FIXTURES AND LAMPS, MERCURY VAPOR LIGHTS, FIRE EXTINGUISHERS, SMOKE DETECTORS, EMERGENCY LIGHTS WITH BATTERY PACKS, WATER FOUNTAINS, HVAC COMPRESSOR, AND REFRIGERATION UNITS. REPRESENTATIVE BALLASTS WERE ASSESSED FROM EACH FLOOR. PLEASE NOTE NOT ALL BALLASTS WERE INSPECTED AND IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HANDLE THESE BALLASTS IN ACCORDANCE WITH THE REGULATIONS AND SPECIFICATIONS. THE DRAWINGS IN THIS SUBMITTAL PROVIDE THE LOCATIONS AND DESCRIPTIONS OF EQUIPMENT FOR BIDDING PURPOSES. WORK PROCEDURES ARE ALSO PROVIDED FOR HANDLING THESE ITEMS DURING THE REMOVAL AND DISPOSAL PROCESS. LEAD-BASED PAINT IS NOT INCLUDED IN THIS PHASE SINCE ALL THE BUILDINGS ARE BEING DEMOLISHED. FEDERAL AND STATE REGULATIONS WILL ALLOW ANY LEAD-BASED PAINT TO BE REMOVED WITH THE DEMOLITION DEBRIS. THE FOLLOWING TABLES PROVIDE THE MATERIALS AND EQUIPMENT THAT WERE LOCATED IN EACH BUILDING.
AutoCAD SHX Text
1.4.2 GLOSSARY (CONT.) ASBESTOS - INCLUDES CHRYSOTILE, AMOSITE, - INCLUDES CHRYSOTILE, AMOSITE, CROCIDOLITE, TREMOLITE ASBESTOS, ANTHOPHYLLITE ASBESTOS, ACTINOLITE ASBESTOS, AND ANY OF THESE MINERALS THAT HAVE BEEN CHEMICALLY TREATED OR ALTERED. ASBESTOS ALSO INCLUDES PACM, AS DEFINED BELOW. ASBESTOS-CONTAINING MATERIAL (ACM) - ANY MATERIAL - ANY MATERIAL CONTAINING MORE THAN ONE PERCENT OF ASBESTOS. ASBESTOS CONTAMINATED ELEMENTS (ACE) - BUILDING - BUILDING ELEMENTS SUCH AS CEILINGS, WALLS, LIGHTS, OR DUCTWORK THAT ARE CONTAMINATED WITH ASBESTOS. ASBESTOS-CONTAINING WASTE MATERIAL - - ASBESTOS-CONTAINING MATERIAL OR ASBESTOS CONTAMINATED OBJECTS REQUIRING DISPOSAL. ASBESTOS WASTE DECONTAMINATION FACILITY - A SYSTEM - A SYSTEM CONSISTING OF DRUM/BAG WASHING FACILITIES AND A TEMPORARY STORAGE AREA FOR CLEANED CONTAINERS OF ASBESTOS WASTE. USED AS THE EXIT FOR WASTE AND EQUIPMENT LEAVING THE REGULATED AREA. IN AN EMERGENCY, IT MAY BE USED TO EVACUATE PERSONNEL. AUTHORIZED PERSON - ANY PERSON AUTHORIZED BY THE - ANY PERSON AUTHORIZED BY THE VA, THE CONTRACTOR, OR GOVERNMENT AGENCY AND REQUIRED BY WORK DUTIES TO BE PRESENT IN REGULATED AREAS. AUTHORIZED VISITOR - ANY PERSON APPROVED BY THE - ANY PERSON APPROVED BY THE VA; THE CONTRACTOR; OR ANY GOVERNMENT AGENCY HAVING JURISDICTION OVER THE REGULATED AREA. BARRIER - ANY SURFACE THE ISOLATES THE REGULATED - ANY SURFACE THE ISOLATES THE REGULATED AREA AND INHIBITS FIBER MIGRATION FROM THE REGULATED AREA. CONTAINMENT BARRIER - AN AIRTIGHT BARRIER - AN AIRTIGHT BARRIER CONSISTING OF WALLS, FLOORS, AND/OR CEILINGS OF SEALED PLASTIC SHEETING WHICH SURROUNDS AND SEALS THE OUTER PERIMETER OF THE REGULATED AREA. CRITICAL BARRIER - THE BARRIER RESPONSIBLE FOR - THE BARRIER RESPONSIBLE FOR ISOLATING THE REGULATED AREA FROM ADJACENT SPACES, TYPICALLY CONSTRUCTED OF PLASTIC SHEETING SECURED IN PLACE AT OPENINGS SUCH AS DOORS, WINDOWS, OR ANY OTHER OPENING INTO THE REGULATED AREA. PRIMARY BARRIER - BARRIERS PLACED OVER CRITICAL - BARRIERS PLACED OVER CRITICAL BARRIERS AND EXPOSED DIRECTLY TO ABATEMENT WORK. SECONDARY BARRIER - ANY ADDITIONAL SHEETING USED - ANY ADDITIONAL SHEETING USED TO ISOLATE AND PROVIDE PROTECTION FROM DEBRIS DURING ABATEMENT WORK. BREATHING ZONE - THE HEMISPHERE FORWARD OF THE - THE HEMISPHERE FORWARD OF THE SHOULDERS WITH A RADIUS OF ABOUT 150 - 225 MM (6 - 9 INCHES) FROM THE WORKER'S NOSE. BRIDGING ENCAPSULANT - AN ENCAPSULANT THAT FORMS - AN ENCAPSULANT THAT FORMS A LAYER ON THE SURFACE OF THE ACM. BUILDING/FACILITY OWNER - THE LEGAL ENTITY, INCLUDING - THE LEGAL ENTITY, INCLUDING A LESSEE, WHICH EXERCISES CONTROL OVER MANAGEMENT AND RECORDKEEPING FUNCTIONS RELATING TO A BUILDING AND/OR FACILITY IN WHICH ASBESTOS ACTIVITIES TAKE PLACE. BULK TESTING - THE COLLECTION AND ANALYSIS OF - THE COLLECTION AND ANALYSIS OF SUSPECT ASBESTOS CONTAINING MATERIALS. CERTIFIED INDUSTRIAL HYGIENIST (CIH) - ONE CERTIFIED IN - ONE CERTIFIED IN PRACTICE OF INDUSTRIAL HYGIENE BY THE AMERICAN BOARD OF INDUSTRIAL HYGIENE. AN INDUSTRIAL HYGIENIST CERTIFIED IN COMPREHENSIVE PRACTICE BY THE AMERICAN BOARD OF INDUSTRIAL HYGIENE. CLASS I ASBESTOS WORK - ACTIVITIES INVOLVING THE - ACTIVITIES INVOLVING THE REMOVAL OF THERMAL SYSTEM INSULATION (TSI) AND SURFACING ACM AND PRESUMED ASBESTOS CONTAINING MATERIAL (PACM). CLASS II ASBESTOS WORK - ACTIVITIES INVOLVING THE - ACTIVITIES INVOLVING THE REMOVAL OF ACM WHICH IS NOT THERMAL SYSTEM INSULATION OR SURFACING MATERIAL. THIS INCLUDES, BUT IS NOT LIMITED TO, THE REMOVAL OF ASBESTOS-CONTAINING WALLBOARD, FLOOR TILE AND SHEETING, ROOFING AND SIDING SHINGLES, AND CONSTRUCTION MASTIC. CLEAN ROOM/CHANGING ROOM - AN UNCONTAMINATED - AN UNCONTAMINATED ROOM HAVING FACILITIES FOR THE STORAGE OF EMPLOYEE'S STREET CLOTHING AND UNCONTAMINATED MATERIALS AND EQUIPMENT. CLEARANCE SAMPLE - THE FINAL AIR SAMPLE TAKEN - THE FINAL AIR SAMPLE TAKEN AFTER ALL ASBESTOS WORK HAS BEEN DONE AND VISUALLY INSPECTED. PERFORMED BY THE VA'S INDUSTRIAL HYGIENE CONSULTANT (VPIH/CIH. CLOSELY RESEMBLE - THE MAJOR WORKPLACE - THE MAJOR WORKPLACE CONDITIONS WHICH HAVE CONTRIBUTED TO THE LEVELS OF HISTORIC ASBESTOS EXPOSURE, ARE NO MORE PROTECTIVE THAN CONDITIONS OF THE CURRENT WORKPLACE. COMPETENT PERSON - IN ADDITION TO THE DEFINITION IN - IN ADDITION TO THE DEFINITION IN 29 CFR 1926.32(F), ONE WHO IS CAPABLE OF IDENTIFYING EXISTING ASBESTOS HAZARDS IN THE WORKPLACE AND SELECTING THE APPROPRIATE CONTROL STRATEGY FOR ASBESTOS EXPOSURE, WHO HAS THE AUTHORITY TO TAKE PROMPT CORRECTIVE MEASURES TO ELIMINATE THEM, AS SPECIFIED IN 29 CFR 1926.32(F); IN ADDITION, FOR CLASS I AND II WORK WHO IS SPECIALLY TRAINED IN A TRAINING COURSE WHICH MEETS THE CRITERIA OF EPA'S MODEL ACCREDITATION PLAN (40 CFR 763) FOR SUPERVISOR.
AutoCAD SHX Text
1.2 VARIATIONS IN QUANTITY THE QUANTITIES AND LOCATIONS OF ACM AS INDICATED ON THE DRAWINGS AND THE EXTENT OF WORK INCLUDED IN THIS SECTION ARE ESTIMATED WHICH ARE LIMITED BY THE PHYSICAL CONSTRAINTS IMPOSED BY OCCUPANCY OF THE BUILDINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY QUANTITIES, LOCATIONS, AND ACCESSIBILITY REQUIREMENTS OF ALL ASBESTOS-CONTAINING MATERIALS WITHIN THE BUILDINGS. 1.3 STOP ASBESTOS REMOVAL IF THE CONTRACTING OFFICER OR THEIR FIELD REPRESENTATIVE PRESENTS A WRITTEN STOP ASBESTOS STOP ASBESTOS REMOVAL ORDER, THE ABATEMENT , THE ABATEMENT CONTRACTOR/PERSONNEL SHALL IMMEDIATELY STOP ALL ASBESTOS REMOVAL AND ADEQUATELY WET ANY EXPOSED ACM. THE CONTRACTOR SHALL NOT RESUME ANY ASBESTOS REMOVAL ACTIVITY UNTIL AUTHORIZED TO DO SO BY THE VA REPRESENTATIVE. A STOP ASBESTOS REMOVAL ORDER MAY BE ISSUED AT ANY TIME THE VA REPRESENTATIVE DETERMINES ABATEMENT CONDITIONS/ ACTIVITIES ARE NOT WITHIN SPECIFICATION REQUIREMENTS. WORK STOPPAGE SHALL CONTINUE UNTIL CONDITIONS HAVE BEEN CORRECTED TO THE SATISFACTION OF THE VA REPRESENTATIVE. STANDBY TIME AND COSTS FOR CORRECTIVE ACTIONS SHALL BE BORNE BY THE ABATEMENT CONTRACTOR, INCLUDING THE INDUSTRIAL HYGIENIST'S TIME. THE OCCURRENCE OF ANY OF THE FOLLOWING EVENTS SHALL BE REPORTED IMMEDIATELY BY THE ABATEMENT CONTRACTOR IN WRITING TO THE VA REPRESENTATIVE AND SHALL REQUIRE THE CONTRACTOR TO IMMEDIATELY STOP ASBESTOS REMOVAL ACTIVITIES AND INITIATE FIBER REDUCTION ACTIVITIES: A. =/> 0.01 F/CC OUTSIDE A REGULATED AREA; =/> 0.01 F/CC OUTSIDE A REGULATED AREA; B. BREACH/BREAK IN REGULATED AREA BARRIER(S); BREACH/BREAK IN REGULATED AREA BARRIER(S); C. SERIOUS INJURY/DEATH WITHIN THE REGULATED AREA; SERIOUS INJURY/DEATH WITHIN THE REGULATED AREA; D. FIRE/SAFETY EMERGENCY WITHIN THE REGULATED FIRE/SAFETY EMERGENCY WITHIN THE REGULATED AREA; E. RESPIRATORY PROTECTION SYSTEM FAILURE; RESPIRATORY PROTECTION SYSTEM FAILURE; F. POWER FAILURE; OR POWER FAILURE; OR G. EXCESSIVE AIRBORNE FIBERS (>0.5 F/CC) IN THE EXCESSIVE AIRBORNE FIBERS (>0.5 F/CC) IN THE REGULATED AREA WHEN WET METHODS ARE BEING USED. 1.4 DEFINITIONS 1.4.1 GENERAL DEFINITIONS AND EXPLANATIONS HERE ARE NEITHER COMPLETE NOR EXCLUSIVE OF ALL TERMS USED IN THE CONTRACT DOCUMENTS, BUT ARE GENERAL FOR THE WORK TO THE EXTENT THEY ARE NOT STATED MORE EXPLICITLY IN ANOTHER ELEMENT OF THE CONTRACT DOCUMENTS. DRAWINGS MUST BE RECOGNIZED AS DIAGRAMMATIC IN NATURE AND NOT COMPLETELY DESCRIPTIVE OF THE REQUIREMENTS INDICATED THEREIN. 1.4.2 GLOSSARY ABATEMENT - PROCEDURES TO CONTROL FIBER RELEASE - PROCEDURES TO CONTROL FIBER RELEASE FROM ASBESTOS-CONTAINING MATERIALS, TYPICALLY DURING REMOVAL. INCLUDES REMOVAL, ENCAPSULATION, ENCLOSURE, DEMOLITION, AND RENOVATION ACTIVITIES RELATED TO ASBESTOS. ACE - ASBESTOS CONTAMINATED ELEMENTS. - ASBESTOS CONTAMINATED ELEMENTS. ACM - ASBESTOS CONTAINING MATERIAL. - ASBESTOS CONTAINING MATERIAL. AEROSOL - SOLID OR LIQUID PARTICULATE SUSPENDED - SOLID OR LIQUID PARTICULATE SUSPENDED IN AIR. ADEQUATELY WET - SUFFICIENTLY MIXED OR PENETRATED - SUFFICIENTLY MIXED OR PENETRATED WITH LIQUID TO PREVENT THE RELEASE OF PARTICULATES. IF VISIBLE EMISSIONS ARE OBSERVED COMING FROM THE ACM, THEN THAT MATERIAL HAS NOT BEEN ADEQUATELY WETTED. AGGRESSIVE METHOD - REMOVAL OR DISTURBANCE OF - REMOVAL OR DISTURBANCE OF BUILDING MATERIAL BY SANDING, ABRADING, GRINDING, OR OTHER METHOD THAT BREAKS, CRUMBLES, OR DISINTEGRATES INTACT ACM. AGGRESSIVE SAMPLING - EPA AHERA DEFINED - EPA AHERA DEFINED CLEARANCE-SAMPLING METHOD USING AIR-MOVING EQUIPMENT SUCH AS FANS AND LEAF BLOWERS TO AGGRESSIVELY DISTURB AND MAINTAIN IN THE AIR RESIDUAL FIBERS AFTER ABATEMENT. AHERA - ASBESTOS HAZARD EMERGENCY RESPONSE ACT. - ASBESTOS HAZARD EMERGENCY RESPONSE ACT. ASBESTOS REGULATIONS FOR SCHOOLS ISSUED IN 1987. AIRCELL - PIPE OR DUCT INSULATION MADE OF - PIPE OR DUCT INSULATION MADE OF CORRUGATED CARDBOARD WHICH CONTAINS ASBESTOS. AIR MONITORING - THE PROCESS OF MEASURING THE - THE PROCESS OF MEASURING THE FIBER CONTENT OF A KNOWN VOLUME OF AIR COLLECTED OVER A SPECIFIED PERIOD OF TIME. THE NIOSH 7400 METHOD, ISSUE 2 IS USED TO DETERMINE THE FIBER LEVELS IN AIR. AIR SAMPLE FILTER - THE FILTER USED TO COLLECT - THE FILTER USED TO COLLECT FIBERS WHICH ARE THEN COUNTED. THE FILTER IS MADE OF MIXED CELLULOSE ESTER MEMBRANE FOR PCM (PHASE CONTRAST MICROSCOPY) AND POLYCARBONATE FOR TEM (TRANSMISSION ELECTRON MICROSCOPY). AMENDED WATER - WATER TO WHICH A SURFACTANT - WATER TO WHICH A SURFACTANT (WETTING AGENT) HAS BEEN ADDED TO INCREASE THE PENETRATING ABILITY OF THE LIQUID.
AutoCAD SHX Text D. (CONT.) UPON COMPLETION OF THE ABATEMENT AND (CONT.) UPON COMPLETION OF THE ABATEMENT AND UPON COMPLETION OF THE ABATEMENT AND REMOVAL SCOPE OF WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND PRIOR TO APPLICATION FOR DEMOLITION PERMITS FROM ST. LOUIS COUNTY AND/OR PERFORMANCE OF ANY DEMOLITION ACTIVITIES, THE BUILDINGS AND UTILITIES SHALL BE SUBJECTED TO A FINAL INSPECTION PERFORMED BY THE CONTRACTOR'S LICENSED ASBESTOS INSPECTOR WITHIN THE STATE OF MISSOURI FOR THE PRESENCE OF REMAINING SUSPECT ASBESTOS OR HAZARDOUS MATERIALS. THE INSPECTION FOR REMAINING SUSPECT ASBESTOS OR HAZARDOUS MATERIALS SHALL BE CONDUCTED IN ACCORDANCE TO 40 CFR PART 763 - SUBPART E - ASBESTOS-CONTAINING MATERIALS IN SCHOOLS RULE. IN ADDITION TO THE SAMPLING PROTOCOL WITHIN 40 CFR PART 763, SUBPART E, THE INSPECTION SHALL CONSIST OF A MINIMUM OF THREE (3) SAMPLES OF EACH SUSPECT MATERIAL FOUND DURING THIS FINAL INSPECTION. IF ANY SUSPECT MATERIALS ARE FOUND DURING THIS FINAL INSPECTION, A WRITTEN REPORT SHALL BE PROVIDED BY THE CONTRACTOR'S LICENSED INSPECTOR AND SUBMITTED WITH THE DEMOLITION PERMIT APPLICATION THAT SHALL ESTABLISH THE RESULTS FOUND DURING THIS FINAL INSPECTION AND CERTIFY THIS FINAL INSPECTION MEETS THE STANDARDS SET FORTH BY ST. LOUIS COUNTY AIR POLLUTION CONTROL PROGRAM, (A) ST. LOUIS COUNTY ORDINANCE 612.530, (B) ST. LOUIS COUNTY DEPARTMENT OF PUBLIC HEALTH ASBESTOS ABATEMENT RULES AND REGULATIONS - REGISTRATION, NOTIFICATION AND PERFORMANCE REQUIREMENTS TO SATISFY ST. LOUIS COUNTY REQUIREMENTS FOR DEMOLITION PERMITS. ANY SUSPECT MATERIALS IDENTIFIED DURING THIS FINAL INSPECTION AS ASBESTOS CONTAINING MATERIAL (ACM) OR ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) OR HAZARDOUS MATERIAL SHALL BE ABATED AND REMOVED IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. IF NO SUSPECT MATERIALS ARE FOUND DURING THIS FINAL INSPECTION, A LETTER OF NEGATIVE DECLARATION SHALL BE WRITTEN BY THE CONTRACTOR'S LICENSED INSPECTOR TO ACCOMPANY THE WRITTEN REPORT AS DESCRIBED ABOVE TO DOCUMENT NO SUSPECT MATERIALS BEING FOUND AND SUBMITTED WITH THE DEMOLITION PERMIT APPLICATION TO DOCUMENT THE FINAL INSPECTION CONDITIONS TO SATISFY ST. LOUIS COUNTY REQUIREMENTS FOR DEMOLITION PERMITS. S. E. THE FOLLOWING TECHNICAL SPECIFICATIONS ARE TO BE THE FOLLOWING TECHNICAL SPECIFICATIONS ARE TO BE FOLLOWED DURING THE ASBESTOS ABATEMENT ACTIVITIES. PLEASE SEE THE HAZARDOUS MATERIAL CONTROL NOTES FOR ADDITIONAL CONTROL METHODS. 1.1.3 RELATED WORK PLEASE SEE THE GENERAL, FIRE ALARM DEMOLITION, BUILDING 61 DEMOLITION, BUILDING 63 DEMOLITION, SURVEY, CIVIL, LANDSCAPE ARCHITECTURE, ARCHITECTURE, MECHANICAL, ELECTRICAL AND TECHNOLOGY PLANS FOR FURTHER INFORMATION FOR THIS PROJECT. 1.1.4 TASKS THE WORK TASKS ARE SUMMARIZED BRIEFLY AS FOLLOWS: A. PRE-ABATEMENT ACTIVITIES INCLUDING PRE-ABATEMENT ACTIVITIES INCLUDING PRE-ABATEMENT MEETING(S), INSPECTION(S), NOTIFICATIONS, PERMITS, SUBMITTAL APPROVALS, WORK-SITE PREPARATIONS, EMERGENCY PROCEDURES ARRANGEMENTS, AND STANDARD OPERATING PROCEDURES FOR ASBESTOS ABATEMENT WORK. B. ABATEMENT ACTIVITIES INCLUDING REMOVAL, CLEANUP ABATEMENT ACTIVITIES INCLUDING REMOVAL, CLEANUP AND DISPOSAL OF ACM WASTE, RECORD-KEEPING, SECURITY, MONITORING, AND INSPECTIONS. C. CLEANING AND DECONTAMINATION ACTIVITIES INCLUDING CLEANING AND DECONTAMINATION ACTIVITIES INCLUDING FINAL VISUAL INSPECTION, AIR MONITORING, AND CERTIFICATION OF DECONTAMINATION. 1.1.5 CONTRACTORS USE OF PREMISES A. THE CONTRACTOR AND CONTRACTOR'S PERSONNEL THE CONTRACTOR AND CONTRACTOR'S PERSONNEL SHALL COOPERATE FULLY WITH THE VA REPRESENTATIVE/CONSULTANT TO FACILITATE EFFICIENT USE OF BUILDINGS AND AREAS WITHIN BUILDINGS. THE CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH THE VA SPECIFICATIONS, DRAWINGS, PHASING PLAN AND IN COMPLIANCE WITH ANY/ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS AND REQUIREMENTS. B. THE CONTRACTOR SHALL USE THE EXISTING FACILITIES THE CONTRACTOR SHALL USE THE EXISTING FACILITIES IN THE BUILDING STRICTLY WITHIN THE LIMITS INDICATED IN CONTRACT DOCUMENTS AS WELL AS THE APPROVED PRE-ABATEMENT WORK PLAN. ASBESTOS ABATEMENT DRAWINGS OF PARTIALLY OCCUPIED BUILDINGS SHALL SHOW THE LIMITS OF REGULATED AREAS; THE TEMPORARY LOCATION OF BAGGED WASTE ACM; THE PATH OF TRANSPORT TO OUTSIDE THE BUILDING; AND THE TEMPORARY WASTE STORAGE AREA FOR EACH BUILDING/REGULATED AREA. ANY VARIATION FROM THE ARRANGEMENTS SHOWN ON DRAWINGS SHALL BE SECURED IN WRITING FROM THE VA REPRESENTATIVE THROUGH THE PRE-ABATEMENT PLAN OF ACTION.
AutoCAD SHX Text
1.4.2 GLOSSARY (CONT.) CONTRACTOR'S PROFESSIONAL INDUSTRIAL HYGIENIST (CPIH) - - THE ASBESTOS ABATEMENT CONTRACTOR'S AIR MONITORING PERSONNEL. THE INDUSTRIAL HYGIENIST MUST MEET THE QUALIFICATION REQUIREMENTS OF THE PIH. COUNT - REFERS TO THE FIBER COUNT OR THE - REFERS TO THE FIBER COUNT OR THE AVERAGE NUMBER OF FIBERS GREATER THAN FIVE MICRONS IN LENGTH PER CUBIC CENTIMETER OF AIR. DECONTAMINATION AREA/UNIT - AN ENCLOSED AREA - AN ENCLOSED AREA ADJACENT TO AND CONNECTED TO THE REGULATED AREA AND CONSISTING OF AN EQUIPMENT ROOM, SHOWER ROOM, AND CLEAN ROOM, WHICH IS USED FOR THE DECONTAMINATION OF WORKERS, MATERIALS, AND EQUIPMENT THAT ARE CONTAMINATED WITH ASBESTOS. DEMOLITION - THE WRECKING OR TAKING OUT OF ANY - THE WRECKING OR TAKING OUT OF ANY LOAD-SUPPORTING STRUCTURAL MEMBER AND ANY RELATED RAZING, REMOVING, OR STRIPPING OF ASBESTOS PRODUCTS. DISPOSAL BAG - TYPICALLY 6 MIL THICK SIFTPROOF, - TYPICALLY 6 MIL THICK SIFTPROOF, DUSTPROOF, LEAKTIGHT CONTAINER USED TO PACKAGE AND TRANSPORT ASBESTOS WASTE FROM REGULATED AREAS TO THE APPROVED LANDFILL. EACH BAG/CONTAINER MUST BE LABELED/MARKED IN ACCORDANCE WITH EPA, OSHA AND DOT REQUIREMENTS. DISTURBANCE - ACTIVITIES THAT DISRUPT THE MATRIX OF - ACTIVITIES THAT DISRUPT THE MATRIX OF ACM OR PACM, CRUMBLE OR PULVERIZE ACM OR PACM, OR GENERATE VISIBLE DEBRIS FROM ACM OR PACM. DISTURBANCE INCLUDES CUTTING AWAY SMALL AMOUNTS OF ACM OR PACM, NO GREATER THAN THE AMOUNT THAT CAN BE CONTAINED IN ONE STANDARD SIZED GLOVE BAG OR WASTE BAG IN ORDER TO ACCESS A BUILDING COMPONENT. IN NO EVENT SHALL THE AMOUNT OF ACM OR PACM SO DISTURBED EXCEED THAT WHICH CAN BE CONTAINED IN ONE GLOVE BAG OR DISPOSAL BAG WHICH SHALL NOT EXCEED 60 INCHES IN LENGTH OR WIDTH. DRUM - A RIGID, IMPERMEABLE CONTAINER MADE OF - A RIGID, IMPERMEABLE CONTAINER MADE OF CARDBOARD FIBER, PLASTIC, OR METAL WHICH CAN BE SEALED IN ORDER TO BE SIFTPROOF, DUSTPROOF, AND LEAKTIGHT. EMPLOYEE EXPOSURE - THE EXPOSURE TO AIRBORNE - THE EXPOSURE TO AIRBORNE ASBESTOS THAT WOULD OCCUR IF THE EMPLOYEE WERE NOT WEARING RESPIRATORY PROTECTION EQUIPMENT. ENCAPSULANT - A MATERIAL THAT SURROUNDS OR - A MATERIAL THAT SURROUNDS OR EMBEDS ASBESTOS FIBERS IN AN ADHESIVE MATRIX AND PREVENTS THE RELEASE OF FIBERS. ENCAPSULATION - TREATING ACM WITH AN ENCAPSULANT. - TREATING ACM WITH AN ENCAPSULANT. ENCLOSURE - THE CONSTRUCTION OF AN AIR TIGHT, - THE CONSTRUCTION OF AN AIR TIGHT, IMPERMEABLE, PERMANENT BARRIER AROUND ACM TO CONTROL THE RELEASE OF ASBESTOS FIBERS FROM THE MATERIAL AND ALSO ELIMINATE ACCESS TO THE MATERIAL. EQUIPMENT ROOM - A CONTAMINATED ROOM LOCATED - A CONTAMINATED ROOM LOCATED WITHIN THE DECONTAMINATION AREA THAT IS SUPPLIED WITH IMPERMEABLE BAGS OR CONTAINERS FOR THE DISPOSAL OF CONTAMINATED PROTECTIVE CLOTHING AND EQUIPMENT. FIBER - A PARTICULATE FORM OF ASBESTOS, 5 MICRONS - A PARTICULATE FORM OF ASBESTOS, 5 MICRONS OR LONGER, WITH A LENGTH TO WIDTH RATIO OF AT LEAST 3 TO 1.