This federal contract opportunity notice provides information for the solicitation of construction services for the St Louis Campus Demolition and Paving project. The scope of work includes abatement and removal of hazardous materials to facilitate demolition of buildings, site improvements, earthwork, utilities work, roadways, parking, and landscaping. The contract is set aside for verified Service-Disabled Veteran-Owned Small Businesses. The Department of Veterans Affairs will issue the solicitation on or about April 24, 2020 via FedBizOpps. A pre-proposal conference will be held at the VAMC St Louis campus. Proposals are due on or about May 29, 2020. The completion period is 530 calendar days and the magnitude of construction cost is estimated between $10-20 million. The contractor must provide construction services, quality control, safety, and a detailed schedule. The work will be performed at the Jefferson Barracks Division Campus of the St Louis VA Medical Center.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Medical Facility Improvements and NCA Expansion VA Project 657-313H 36C10F20R0019
SPECIFICATIONS
CAMPUS DEMOLITION & PAVING – VOLUME 1 OF 3
VA MEDICAL CENTER
JEFFERSON BARRACKS DIVISION
ST. LOUIS, MISSOURI
RFP ISSUED: PROPOSALS DUE:
Amendment No. Date No. Date
36C10F20R0019 Campus Demolition & Paving
VAMC St. Louis, MO-JB Division
00 01 10 - 1
SECTION 00 01 10
TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - SPECIAL SECTIONS
00 01 10 Table of Contents
00 01 15 List of Drawing Sheets
Specification Seals/Signatures
00 11 21 Request for Proposal/Contractor Reference Form/Subcontractor
Plan (Refer to VA Solicitation Documents)
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements (Refer to VA Solicitation Documents)
01 31 00 Project Management and Coordination
01 32 16.17 Project Schedules
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 40 00 Quality Requirements
01 42 19 Reference Standards
01 45 29 Testing Laboratory Services
01 50 00 Temporary Facilities and Controls
01 57 19 Temporary Environmental Controls
01 73 00 Execution
01 74 19 Construction Waste Management
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance Data
01 78 39 Project Record Documents
01 79 00 Demonstration and Training
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
02 82 11 Asbestos Abatement
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring
04 43 00 Stone Masonry
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
05 50 00 Metal Fabrications
00 01 10 - 2
DIVISIONS 06 - 08
Not Used
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes
09 96 00 Special Coatings
DIVISION 10 – SPECIALTIES
10 14 00 Signage
10 75 00 Flagpoles
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment
11 12 00 Parking Control Equipment
DIVISION 12 – FURNISHINGS
12 93 00 Site Furnishings
DIVISIONS 13 - 25
VOLUME 2
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 05 41 Underground Electrical Construction
26 27 26 Wiring Devices
26 56 00 Exterior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Raceways and Boxes for Communications Systems
27 10 00 Structured Cabling
27 11 00 Communications Equipment Room Fittings
27 15 00 Communications Horizontal Cabling
27 52 31 Security Emergency Call, Duress Alarm, and Telecommunications
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
00 01 10 - 3
28 05 00 Common Work Results for Electronic Safety and Security
28 05 13 Conductors and Cables for Electronic Safety and Security
28 05 26 Grounding and Bonding for Electronic Safety and Security
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
28 13 00 Physical Access Control Systems (PACS)
DIVISIONS 29 - 30
DIVISION 31 – EARTHWORK
31 20 00 Earth Moving
31 23 19 Dewatering
31 23 23.33 Flowable Fill
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements
32 12 16 Asphalt Paving
32 13 16 Special Finish Concrete Paving
32 13 73 Concrete Paving Joint Sealants
32 14 16 Concrete Unit Paving
32 14 18 Granite Paving
32 17 23 Pavement Markings
32 31 19 Decorative Metal Fences and Gates
32 32 23 Mechanically Stabilized Earth Wall System
32 84 00 Delegated Design Planting Irrigation
32 90 00 Planting
32 90 99 Bio-Retention
32 92 02 Stone Outcropping
DIVISION 33 – UTILITIES
33 10 00 Water Utilities
33 30 00 Sanitary Sewerage Utilities
33 40 00 Storm Drainage Utilities
33 63 00 Steam Energy Distribution
VOLUME 3
APPENDICIES
APPENDIX A Activation Equipment List
APPENDIX B Geotechnical Report
1. Medical Facility Improvements and NCA Expansion 08-20-09
2. Medical Facility Improvements and NCA Expansion – Phase 2
01-06-10
3. Corrosivity Assessment Direct Buried Pipelines 3-2-10
4. Phase 3 & 4 and Detention Basin 4-28-10
00 01 10 - 4
5. Soil Infiltration Characterization 11-5-10
6. Sinkhole Assessment-Hollow Near Bldg 25 6-15-11
7. Ameren Substation Subsurface Exploration 12-28-11
APPENDIX C Report of Limited Asbestos Assessment
- - - END - - -
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below and accompanying this specification are part of the contract. Offerors shall be responsible for ensuring all work defined on the drawings and in the specifications is included in Offeror’s proposal.
INDEX OF DRAWINGS - VOLUME 1 OF 6
SHEET NUMBER SHEET NAME
GI001-S COVER SHEET
GENERAL
GC100 DIAGRAM FOR OVERALL SEQUENCING
GC101 DIAGRAM FOR CONSTRUCTION SEQUENCING – SOUTH CAMPUS AREA
GC102 OVERALL PROJECT BOUNDARY PLAN
GC103 SAMPLE CPM NETWORK
HAZARDOUS MATERIAL ABATEMENT
HA101-S MANHOLE PIPING TO BE ABATED PRIOR TO DEMOLITION
SURVEY/MAPING
V-100 SITE SURVEY COVER SHEET
V-101A SITE SURVEY BOUNDARY MAP
V-101B SITE SURVEY BOUNDARY MAP
V-102 SITE SURVEY
V-103 SITE SURVEY
V-104 SITE SURVEY
V-105 SITE SURVEY
V-106 SITE SURVEY
V-107 SITE SURVEY
V-108 SITE SURVEY SEWER INFORMATION
CIVIL
C-100-S GENERAL NOTES, LEGEND, AND EROSION CONTROL DETAILS
C-101-S DEMOLITION PLAN
C-102-S DEMOLITION PLAN
C-103-S SITE AND GRADING PLAN
00 01 15 - 2
C-104-S SITE AND GRADING PLAN
C-105-S ENLARGED GRADING PLAN
C-106-S ENLARGED GRADING PLAN
C-107-S SITE UTILITY PLAN
C-108-S SITE UTILITY PLAN
C-109-S SITE GEOMETRIC AND LAYOUT PLAN
C-110-S SITE GEOMETRIC AND LAYOUT PLAN
C-111-S CONSTRUCTION DETAILS
C-112-S CONSTRUCTION DETAILS
C-113-S SEWER AND RETAINING WALL PROFILES
C-114-S HYDRAULIC DATA SHEET 15-YR, 20-MIN STORM EVENT
C-115-S HYDRAULIC DATA SHEET 100-YR, 20-MIN STORM EVENT
C-116-S SEWER DETAILS
C-117-S BIO-RETENTION DETAILS
C-118-S BIO-RETENTION DETAILS
C-119-S STEAM PROFILES
C-120-S EROSION CONTROL PLAN
C-121-S EROSION CONTROL PLAN
C-122-S STAGING AND CONSTRUCTION ACCESS PLAN
C-123-S WATER QUALITY PLAN
C-124-S EXISTING DRAINAGE AREA PLAN
C-125-S PROPOSED DRAINAGE AREA PLAN
C-126-S DRAINAGE AREA MAP FOR PIPE HYDRAULICS
LANDSCAPE ARCHITECTURE
LP101-S LANDSCAPE PLANTING PLAN
LP102-S LANDSCAPE PLANTING PLAN
LP401-S LARGE SCALE LANDSCAPE PLANTING PLAN
LP501-S LANDSCAPE DETAILS
LS101-S LANDSCAPE SITE HARDSCAPE PLAN
LS102-S LANDSCAPE SITE HARDSCAPE PLAN
LS501-S SITE HARDSCAPE DETAILS
LS502-S SITE HARDSCAPE DETAILS
STRUCTURAL
S-001-S GENERAL NOTES
S-002-S TYPICAL DETAILS
00 01 15 - 3
S-601-S MANHOLE PLANS AND DETAILS
MECHANICAL
MS100-S MECHANICAL SITE COVER SHEET
MS101-S MECHANICAL SITE PLAN
MS501-S MANHOLE DETAILS
MS502-S MANHOLE DETAILS
ELECTRICAL
E-000-S ELECTRICAL SYMBOLS
DES101-S DEMOLITION PLAN - SITE LIGHTING
ES101-S SITE LIGHTING PLAN
ES201-S SITE LIGHTING PHOTOMETRIC PLAN
ESP101-S SITE PLAN - POWER
TECHNOLOGY
TNS-000-S TECHNOLOGY COVER SHEET
TNS-100-S TECHNOLOGY SITE PLAN
TNS-300-S TECHNOLOGY DETAILS AND RISER
TNS-600-S TECHNOLOGY MATERIAL LIST
INDEX OF DRAWINGS - VOLUME 2 OF 6
GI001-N COVER SHEET
GC101 DIAGRAM FOR CONSTRUCTION SEQUENCING – SOUTH CAMPUS AREA
HAZARDOUS MATERIAL ABATEMENT
HA001-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
HA002-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
HA003-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
00 01 15 - 4
HA004-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
HA005-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
HA006-N HAZARDOUS MATERIAL ABATEMENT SPECIFICATIONS
HA007-N ASBESTOS CONTROL NOTES
FIRE ALARM DEMOLITION
FD101-N BUILDING 61/63 BASE WIDE LOOP DEMOLITION PLAN
BUILDING 61 DEMOLITION
HA101-N FIRST FLOOR FLOORING MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA110-N FIRST FLOOR SURFACING MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA111-N SECOND FLOOR SURFACING MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA112-N ATTIC FLOOR SURFACING MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA120-N SERVICE ROOM AND PIPE SPACE THERMAL SYSTEM INSULATION TO BE
ABATED PRIOR TO DEMOLITION
HA121-N FIRST FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
HA122-N SECOND FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR
TO DEMOLITION
HA123-N ATTIC FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
HA130-N SERVICE ROOM AND PIPE SPACE MISCELLANEOUS MATERIAL TO BE
ABATED PRIOR TO DEMOLITION
HA131-N FIRST FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA132-N SECOND FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA133-N ATTIC FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA140-N FIRST FLOOR HAZARDOUS AND NON-HAZARDOUS MATERIAL TO BE
ABATED
HA141-N SECOND FLOOR HAZARDOUS AND NON-HAZARDOUS MATERIAL TO BE
ABATED
00 01 15 - 5
AD161-N DEMOLITION PLANS AND PHOTOS
BUILDING 63 DEMOLITION
HA101-N FIRST FLOOR FLOORING MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA110-N SERVICE ROOM AND PIPE SPACE THERMAL SYSTEM INSULATION TO BE
ABATED PRIOR TO DEMOLITION
HA111-N FIRST FLOOR THERMAL SYSTEM INSULATION TO BE ABATED PRIOR TO
DEMOLITION
HA120-N SERVICE ROOM AND PIPE SPACE HAZARDOUS AND NON-HAZARDOUS
MATERIAL TO BE ABATED
HA121-N FIRST FLOOR MISCELLANEOUS MATERIAL TO BE ABATED PRIOR TO
DEMOLITION
HA130-N SERVICE ROOM AND PIPE SPACE HAZARDOUS AND NON-HAZARDOUS
MATERIAL TO BE ABATED
HA131-N FIRST FLOOR HAZARDOUS AND NON-HAZARDOUS MATERIAL TO BE
ABATED
AD163-N DEMOLITION PLANS AND PHOTOS
V-101A SITE SURVEY BOUNDARY MAP
V-101B SITE SURVEY BOUNDARY MAP
V-102 SITE SURVEY
V-103 SITE SURVEY
V-104 SITE SURVEY
V-105 SITE SURVEY
V-106 SITE SURVEY
C-100-N GENERAL NOTES, LEGEND, AND EROSION CONTROL DETAILS
C-101-N DEMOLITION PLAN
C-102-N DEMOLITION PLAN
C-103-N SITE AND GRADING PLAN
C-104-N SITE AND GRADING PLAN
00 01 15 - 6
C-105-N ENLARGED GRADING PLAN
C-106-N SITE UTILITY PLAN
C-107-N SITE UTILITY PLAN
C-108-N SITE GEOMETRIC AND LAYOUT PLAN
C-109-N SITE GEOMETRIC AND LAYOUT PLAN
C-110-N GRAVES STREET PROFILE
C-111-N CONSTRUCTION DETAILS
C-112-N CONSTRUCTION DETAILS
C-113-N SEWER PROFILES
C-114-N HYDRAULIC DATA SHEET 15-YR, 20-MIN STORM EVENT
C-115-N HYDRAULIC DATA SHEET 100-YR, 20-MIN STORM EVENT
C-116-N SEWER DETAILS
C-117-N SEWER DETAILS
C-118-N BIO-RETENTION DETAILS
C-119-N BIO-RETENTION DETAILS
C-120-N BIO-RETENTION DETAILS
C-121-N EROSION CONTROL PLAN
C-122-N EROSION CONTROL PLAN
C-123-N STAGING AND CONSTRUCTION ACCESS PLAN
C-124-N WATER QUALITY PLAN
C-125-N DRAINAGE AREA MAPS FOR PIPE HYDRAULICS
LP101-N LANDSCAPE PLANTING PLAN
LP401-N LARGE SCALE LANDSCAPE PLANTING PLANS
LP501-N LANDSCAPE DETAILS
LS101-N LANDSCAPE SITE HARDSCAPE PLAN
LS501-N SITE HARDSCAPE DETAILS
LS502-N SITE HARDSCAPE DETAILS
ARCHITECTURAL
AE105-N PLANS AND DETAILS TO INFILL OPENING AT PEDESTRIAN CORRIDOR
FROM DEOLISHED BUILDING 63
MS100-N MECHANICAL COVER SHEET
MS102-N MECHANICAL SITE PLAN
00 01 15 - 7
E-000-N ELECTRICAL COVER SHEET
DES102-N DEMOLITION PLAN - SITE LIGHTING
ES102-N SITE LIGHTING PLAN
ES201-N SITE LIGHTING PHOTOMETRIC PLAN
TS000-N TECHNOLOGY COVER SHEET
DTS102-N DEMOLITION SITE PLAN TECHNOLOGY
TS102-N TECHNOLOGY SITE PLAN
TS300-N TECHNOLOGY DETAILS AND RISERS
INDEX OF DRAWINGS - VOLUME 3 OF 6
GI002-N COVER SHEET
BUILDINGS 61/63 EXISTING DRAWINGS FOR DEMOLITION REFERENCE
61-2 FIRST FLOOR PLAN
61-3 UPPER LEVEL PLAN, REFLECTED CEILING PLAN, 8 STAGE ROOF
VENTILATOR
61-4 ELEVATIONS, CATWALK PLAN 8 DETAILS
61-5 ELEVATIONS & STAIR DETAILS
61-6 SECTIONS & ROOF PLAN
61-8 LONGITUDINAL THEATER SECTION
61-9 THEATER REAR WALL ELEVATION, CONTROL WINDOW DETAILS, LIGHT
POCKET DETAILS
61-14 PLANS, DETAILS & ELEVATIONS
61-H4 HEATING & VENTILATING
61-S2 FIRST FLOOR PLAN
61-S9 CONNECTING PASSAGE DETAILS
12 REPLACE WINDOWS 11 BUILDINGS
13 REPLACE WINDOWS 11 BUILDINGS
14 REPLACE WINDOWS 11 BUILDINGS
H-3 DEMOLITION & NEW INSTALLATION
00 01 15 - 8
63-6 WINDOW DETAILS
B-2 GRADING AND LOCATION PLAN
L-1 LANDSCAPE PLAN
63-2 FIRST FLOOR PLAN
63-3 NORTH & SOUTH ELEVATIONS
63-4 EAST AND WEST ELEVATIONS ENTRANCE DETAILS
63-5 SECTIONS-WALL SECTIONS
63-S11 TRUSS DETAILS & CONNECTING CORRIDOR
15 REPLACE WINDOWS 11 BUILDINGS
16 REPLACE WINDOWS 11 BUILDINGS
61-14 CONNECTING CORRIDOR BLDG 61
INDEX OF DRAWINGS - VOLUME 4 OF 6
GI001-W COVER SHEET
GC101 DIAGRAM FOR CONSTRUCTION SEQUENCING – SOUTH CAMPUS AREA
V-101A SITE SURVEY BOUNDARY MAP
V-101B SITE SURVEY BOUNDARY MAP
V-102 SITE SURVEY
V-103 SITE SURVEY
V-104 SITE SURVEY
V-105 SITE SURVEY
V-106 SITE SURVEY
C-100-W GENERAL NOTES, LEGEND, AND EROSION CONTROL DETAILS
00 01 15 - 9
C-101-W DEMOLITION PLAN
C-102-W SITE AND GRADING PLAN
C-103-W SITE GEOMETRIC AND LAYOUT PLAN
C-104-W STORM SEWER PROFILES, DETAILS, & CONSTRUCTION DETAILS
C-105-W CONSTRUCTION DETAILS
CIVIL ALTERNATE
CX101-W ALTERNATE 1: DEMOLITION PLAN
CX102-W ALTERNATE 1: SITE AND GRADING PLAN
CX103-W ALTERNATE 1: SITE GEOMETRIC AND LAYOUT PLAN
CX104-W ALTERNATE 1: STORM SEWER PROFILES, DETAILS, & CONSTRUCTION
DETAILS
LI101-W LANDSCAPE IRRIGATION SCOPE PLAN
LI102-W LANDSCAPE IRRIGATION SCOPE PLAN
LP101-W LANDSCAPE PLANTING PLAN
LP401-W LARGE SCALE LANDSCAPE PLANTING PLAN
LP402-W LARGE SCALE LANDSCAPE PLANTING PLAN
LP501-W LANDSCAPE DETAILS
LS101-W LANDSCAPE SITE HARDSCAPE PLAN
LS401-W LARGE SCALE LANDSCAPE SITE HARDSCAPE PLAN
LS402-W LARGE SCALE LANDSCAPE SITE HARDSCAPE PLAN
LS501-W SITE HARDSCAPE DETAILS
LS502-W SITE HARDSCAPE DETAILS
LS503-W SITE HARDSCAPE DETAILS
LANDSCAPE ARCHITECTURE ALTERNATE
LPX101-W ALTERNATE 1: LANDSCAPE PLANTING PLAN
LPX401-W ALTERNATE 1: LARGE SCALE LANDSCAPE PLANTING PLAN
LPX402-W ALTERANTE 1: LARGE SCALE LANDSCAPE PLANTING PLAN
LPX501-W ALTERNATE 1: LANDSCAPE DETAILS
LSX101-W ALTERNATE 1: LANDSCAPE SITE HARDSCAPE PLAN
LSX401-W ALTERNATE 1: LARGE SCALE LANDSCAPE SITE HARDSCAPE PLAN
LSX402-W ALTERNATE 1: LARGE SCALE LANDSCAPE SITE HARDSCAPE PLAN
LSX501-W ALTERNATE 1: SITE HARDSCAPE DETAILS
LSX502-W ALTERNATE 1: SITE HARDSCAPE DETAILS
00 01 15 - 10
LSX503-W ALTERNATE 1: SITE HARDSCAPE DETAILS
E-000-W ELECTRICAL SYMBOLS
ES101-W SITE LIGHTING PLAN
ESP101-W SITE PLAN - POWER
ELECTRICAL ALTERNATE
ESX101-W ALTERNATE 1: SITE LIGHTING PLAN
ESPX101-W ALTERNATE 1: SITE PLAN - POWER
TNS000-W TECHNOLOGY COVER SHEET
TNS100-W PATH OF HONOR - TECHNOLOGY PLAN
TNS300-W TECHNOLOGY RISERS AND DETAILS
TECHNOLOGY ALTERNATE
TNSX100-W ALTERNATE 1: PATH OF HONOR - TECHNOLOGY PLAN
INDEX OF DRAWINGS - VOLUME 5 OF 6
GI001-F COVER SHEET
GC101 DIAGRAM FOR CONSTRUCTION SEQUENCING – SOUTH CAMPUS AREA
V-101A SITE SURVEY BOUNDARY MAP
V-101B SITE SURVEY BOUNDARY MAP
V-102 SITE SURVEY
V-103 SITE SURVEY
00 01 15 - 11
V-104 SITE SURVEY
V-105 SITE SURVEY
V-106 SITE SURVEY
C-100-F CAMPUS PERIMETER FENCE SITE PLAN
CIVIL ALTERNATE
CX100-F ALTERNATE 2: CAMPUS PERIMETER FENCE SITE PLAN
LS401-F LARGE SCALE LANDSCAPE SITE HARDSCAPE PLAN
LS501-F SITE HARDSCAPE DETAILS
LS503-F SITE HARDSCAPE DETAILS
LANDSCAPE ARCHITECTURE ALTERNATE
LSX401-F ALTERNATE 2: LARGE SCALE LANDSCAPE SITE HARDSCAPE PLAN
LSX502-F ALTERNATE 2: SITE HARDSCAPE DETAILS
E-000-F ELECTRICAL SYMBOLS
ESP101-F SITE PLAN - POWER
ESP102-F SITE PLAN - POWER
ESP103-F SITE PLAN - POWER
ELECTRICAL ALTERNATE
ESPX104-F ALTERNATE 2: SITE PLAN - POWER
TNS000-F TECHNOLOGY COVER SHEET
TNS100-F PERIMETER FENCE – TECHNOLOGY PLAN
TNS101-F PERIMETER FENCE - TECHNOLOGY
TNS102-F PERIMETER FENCE - TECHNOLOGY
TNS103-F PERIMETER FENCE - TECHNOLOGY
TNS300-F TECHNOLOGY DETAILS AND RISER
00 01 15 - 12
TECHNOLOGY ALTERNATE
TNSX104-F ALTERNATE 2: PERIMETER FENCE - TECHNOLOGY
INDEX OF DRAWINGS - VOLUME 6 OF 6
GI001-M COVER SHEET
GC100 DIAGRAM FOR OVERALL CONSTRUCTION SEQUENCING
GC101 DIAGRAM FOR CONSTRUCTION SEQUENCING – SOUTH CAMPUS AREA
MS100-M MECHANICAL SITE COVER SHEET
MS101-M MECHANICAL SITE PLAN
MS501-M MECHANICAL DETAILS
MS502-M MECHANICAL DETAILS
MS503-M MECHANICAL DETAILS
- - - E N D - - -
Christner Inc.
168 N. Meramec Avenue, Suite 400
St. Louis, MO 63105
Missouri State Certificate of Authority No. 000842
Sections: Sections: Sections:
00 01 10 00 01 15
01 00 00 01 31 00 01 32 16.17 01 33 23 01 35 26
01 40 00 01 42 19 01 45 29 01 50 00 01 73 00 01 74 19 01 77 00 01 78 23 01 78 39 01 79 00
Christner Inc.
168 N. Meramec Avenue, Suite 400
St. Louis, MO 63105
Missouri State Certificate of Authority No. 2011014429
Sections: Sections: Sections:
04 05 13 04 43 00
05 50 00
09 06 00 09 96 00
10 14 00 10 75 00
11 05 12 11 12 00
12 93 00
32 13 16 32 13 73 32 14 16 32 14 18 32 31 19 32 84 00 32 90 00 32 92 02
KPFF Consulting Engineers 1630 Des Peres Road, Suite 100
St. Louis, MO 63131
Missouri State Certificate of Authority No. 2001010829
Sections: Sections:
03 30 00 05 12 00
01 00 00-1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. The Campus Demolition & Paving project includes the performance of construction work in four (4) separate and distinct areas of the existing Medical Center campus. These areas include the south area, north area, west area and entire campus perimeter area as shown and defined in the Contract Drawings. Contractor shall completely prepare the site within the individual project boundary limits defined in the contract drawings and as otherwise required for complete construction operations, including, but not limited to, abatement and removal and disposal of asbestos or other hazardous materials to facilitate demolition of buildings or modifications or connections to utility systems; demolition and removal of existing Buildings 61 and 63 and individual area site improvements including features above and below ground; earth and site work, including excavation, fill and disposal of surplus excavated earth or other material; shoring and protection of existing construction to remain or as otherwise required to implement the contractor’s means and methods; abandonment, removal and/or relocation of existing underground utilities; removal and disposal of existing fencing; installation of new underground utilities, perimeter fencing, infrastructure, pavements for roadways and parking, and all other incidental related work necessary to complete construction of new campus utilities, parking, roadways, pavement markings, walkways, signage, lighting, landscaping, and related site improvements as detailed in the contract documents. The Contractor shall also provide a contractor Quality Control system; laboratory and field testing, inspections and systems testing; a safety program with regular inspection and reporting; and a baseline resource loaded construction schedule with recurring schedule updates. The contract scope shall be executed in accordance with the drawings and specifications and other requirements of the contract documents.
B. Visits to the site by Offerors, other than as scheduled by the
Contracting Officer, may be made only by pre-arranged appointment with and approval of the Senior Resident Engineer (Telephone: (314) 894-
01 00 00-2
6117). The campus is an active Medical Center and is patrolled by VA police. Site visits not scheduled and approved are prohibited.
C. Offices of Christner Inc., St. Louis, MO, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without written affirmations by Contracting Officer or his duly authorized representative. All correspondence or other engagement of the
Architect Engineers shall be pursued through the Resident Engineer.
D. Before placement and installation of work subject to tests or inspections by testing laboratory or special inspector approved by the
Contracting Officer and retained by the Contractor, the Contractor shall notify the testing laboratory or special inspector in sufficient time to enable testing laboratory or inspection personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall include concurrent notice to the
Resident Engineer not less than three (3) work days prior to tests or inspections unless otherwise designated by the Resident Engineer.
Coordinate the contract requirements for Contractor retained testing and inspection services with, but not limited to, Section 01 33 23 SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES, Section 01 40 00 QUALITY
REQUIREMENTS, Section 01 45 29 TESTING LABORATORY SERVICES and separate sections of the specifications.
E. All employees of Contractor, Subcontractors and other entities performing work on the project shall comply with the VA’s security management program and obtain site access permission of the VA Police, be identified by project and employer, and restricted from unauthorized access. Refer to Article, CONSTRUCTION SECURITY REQUIREMENTS.
1. As determined solely by the Resident Engineer or VA Police, any employee not in compliance with the VA’s security management program, not permitted by the VA Police, not identified by project and employer at all times or violating unauthorized access shall be removed from the project permanently or until remedial action is taken by the Contractor to restore and maintain compliance.
F. SAFETY REQUIREMENTS
01 00 00-3
1. Refer to Section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements for all areas of work.
G. VA TRIRIGA CPMS
1. TRIRIGA is the VA’s Construction Project Management System which the successful Offeror shall be required to use to initiate and/or transmit submittals, Requests for Information (RFI’s), Potential
Change Orders (PCOs), Correspondence, Safety Notices, Accident
Reports, Permits, Issues, etc. to the Resident Engineer, as well as respond to Requests for Proposals (RFPs), Correspondence, Notices to
Comply, Deficiency and Omission List (DOL) items, Safety Notices, Accident Investigation Reports, Submittals, Issues, Punch Lists, Inspection Tasks, etc. TRIRIGA is specifically for exchanges between the Government and the Contractor and the Government and the
Architect-Engineer but not for direct exchanges between the
Contractor and Architect-Engineers.
2. No later than 5 days after contract award, the successful Offeror shall designate, to the Senior Resident Engineer, Contractor personnel (users) who shall be required to attend VA provided training to familiarize them with TRIRIGA functions to be utilized throughout the duration of the contract. The successful Offeror shall be required to submit these names with contact information and to coordinate with the Resident Engineer to schedule the VA provided training to ensure that Contractor personnel can obtain required access to facilitate timely performance of administrative tasks for management of the work of the project.
3. The Contractor shall immediately provide written notification to the
Senior Resident Engineer or Help Desk of any personnel changes affecting user access so that security of the system is maintained.
1.2 STATEMENT OF CONTRACT LINE ITEM(S)
A. Campus Demolition & Paving
In accordance with the Request For Proposal, the contract drawings and specifications and amendments to either, the work of each Contract Line Item as defined herein in general terms includes, but is not limited to, provision of all labor, materials, tools, equipment, transportation, management, supervision, quality control and all other necessary services and performance
01 00 00-4 of all construction services and incidental related work for completion of fully functional, integrated and operational site improvements.
CLIN 1 SOUTH CAMPUS BASE PROPOSAL – GENERAL CONSTRUCTION: CLIN 1 is defined in general terms as cost for work associated with the south portion of the Medical Center campus as indicated in the contract documents including, but not limited to, demolition and removal of improvements and structures; abandonment, removal and relocation of existing utilities; earth and site work including excavation, fill and disposal of surplus excavated earth or other materials; new underground utilities, grading, drainage, sidewalks, roadways, parking, landscaping, site lighting and other site improvements.
CLIN 2 NORTH CAMPUS BASE PROPOSAL – GENERAL CONSTRUCTION: CLIN 2 is defined in general terms as cost for work associated with the north portion of the Medical Center campus as indicated in the contract documents including, but not limited to, demolition and removal of improvements and structures and Buildings 61 and 63; abandonment, removal and relocation of existing utilities; earth and site work including excavation, fill and disposal of excavated earth or other materials;
new underground utilities, grading, drainage, sidewalks, roadways, parking, landscaping, site lighting and other site improvements.
CLIN 3 WEST CAMPUS BASE PROPOSAL – GENERAL CONSTRUCTION: CLIN 3 is defined in general terms as cost for work associated with the west portion of the Medical Center campus as indicated in the contract documents including, but not limited to, demolition and removal of site improvements; earth and site work including excavation, fill and disposal of surplus earth or other materials; new underground utilities, grading, drainage, sidewalks, specialty paving, site walls, fencing, landscaping, site lighting and other improvements.
CLIN 4 FENCE BASE PROPOSAL – GENERAL CONSTRUCTION: CLIN 4 is defined in general terms as cost for work associated with new fencing for the perimeter of the Medical Center campus as indicated in the contract documents including, but not limited to, demolition and removal of existing fencing and structures; earth work including excavation and disposal of surplus earth or other materials; new underground utilities, fencing, gates, gate controls and other improvements.
CLIN 5 BASE PROPOSAL – ASBESTOS ABATEMENT: CLIN 5 is defined in general terms as cost for work required for the entire project to perform asbestos abatement associated with existing buildings, existing underground utilities or as otherwise required including, but not limited to, planning, documentation, notifications, permits, temporary protection controls, monitoring, sampling, cleaning and all
01 00 00-5 other incidental related work specific to the proper removal and disposal of asbestos and asbestos containing materials to facilitate demolition and removal of existing structures and construction and as otherwise required for execution of the work of the project.
CLIN 6 BASE PROPOSAL – HAZARDOUS MATERIALS ABATEMENT: CLIN 6 is defined in general terms as cost for work required for the entire project to perform hazardous materials abatement including, but not limited to, planning documentation, notifications, permits, temporary protection controls, monitoring, sampling, cleaning and all other incidental related work specific to the proper removal and disposal of hazardous materials (lead containing paint, ozone depleting substances (ODS), PCBs, etc.) to facilitate demolition and removal of existing structures and construction and as otherwise required for execution of the work of the project.
CLIN 7 WEST CAMPUS – DEDUCT ALTERNATE NO. 1: CLIN 7 is defined in general terms as a cost deduct to delete applicable Base Proposal costs for all general conditions, labor, material, tools, equipment, transportation, supervision, submittals, testing, inspections and all other incidental related work costs to modify the work of the project in accordance with the West Campus Alternate 1 contract drawings.
The contract specifications remain unchanged unless noted otherwise.
CLIN 7 includes deduct costs for modifications to reduce the scope of work for the development of the West Campus area including, but not limited to, reductions in site walls, sidewalks, finished paving, landscaping and as otherwise defined in the Alternate 1 contract drawings.
CLIN 8 FENCE – DEDUCT ALTERNATE NO. 2: CLIN 8 is defined in general terms as a cost deduct to delete applicable Base Proposal costs for all general conditions, labor, material, tools, equipment, transportation, supervision, submittals, testing, inspections and all other incidental related work cost to modify the work of the project in accordance with the Fence Alternate 2 contract drawings. The contract specifications remain unchanged unless noted otherwise.
CLIN 8 includes deduct costs to reduce the scope of work for the installation of the campus perimeter fence and includes, but is not limited to, a reduction in area to be enclosed on the southern portion of the existing Medical Center campus.
1.3 CONTRACT SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, the successful Offeror shall be responsible for reproducing necessary copies of specifications, drawings, and amendments
01 00 00-6 from the electronic files provided for download by the Government as part of the original Request for Proposal solicitation process.
B. The contract drawings, specifications and amendments are complimentary and the requirements of one shall be the requirements of the other.
Inconsistencies between the two shall be referred to the Resident
Engineer in writing for resolution.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Contractor Security Plan:
1. The Contractor’s security plan defines both physical and administrative security procedures that will be implemented by the
Contractor and remain effective for the entire duration of the project. Contractor shall submit a separate security plan, for each area of the campus where the work of the project will be performed, for approval by the Contracting Officer in accordance with Section 01
33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Upon notification of contract award and not later than seven (7) days prior to Notice to
Proceed, Contractor shall submit the Contractor’s security plan for the first area where work will be performed. Security plans for follow-on areas of work shall be submitted not later than thirty (30) calendar days prior to start of work in each area. Start of work in each area is contingent on Resident Engineer’s approval of
Contractor’s security plan. Such security plans shall define the
Contractor’s means and methods for securing each construction site
24-hours a day, 7 days a week for the duration of the project to prevent unauthorized access. Such unauthorized access shall include, but not be limited to, preventing access by patients, visitors and staff to ensure their safety and protection for the entire duration of the project.
2. The Contractor is responsible for assuring and enforcing that
Contractor, all Subcontractors and other entities working on the project and their employees also comply with these approved security plan regulations.
a. As determined solely by the Resident Engineer or VA Police, violators of the Contractor’s security plan will be removed from
01 00 00-7 the project permanently or until remedial action is taken by the
Contractor to restore and maintain compliance.
B. Security Procedures:
1. Contractor, Subcontractors and other entities and their employees shall not enter the project site without appropriate physical access authorization and may also be subject to inspection of their personal effects when entering, occupying or leaving the project site.
a. Physical Access Authorization Termination: An employee’s physical access authorization shall be terminated based on any of the following:
1. Unfavorable SAC or NACI background investigation results.
2. Failure to comply with all Government and approved Contractor security requirements and procedures.
3. Termination of employment by the Contractor, Subcontractors or other entities.
4. Completion of the on-site contract requirements.
2. For working outside the “regular hours” as defined in the contract, the Contractor shall give not less than three (3) work days notice to the Contracting Officer so that security, escort, or other arrangements can be provided for the construction employees. This notice is separate from any notices required for utility shutdown described later in this section. “Regular Hours” is defined as 6:00
AM to 6:00 PM, Monday through Friday, excluding observed Federal
Holidays (New Year’s Day, MLK Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving, and Christmas).
3. No photography of Medical Center premises (outside the construction boundaries of this contract), patients, visitors or staff is allowed without written permission of the Contracting Officer.
4. Government reserves the right to close or shut down all or individual project sites and order Contractor, Subcontractors and other entities and their employees off the premises in the event of a national emergency. The Contractor, Subcontractors and other entities and their employees may return to the site(s) only with the written approval of the Contracting Officer.
01 00 00-8
C. Guards:
1. The Contractor shall provide unarmed guards at each project site for the duration of the project, 24 hours per day, 7 days per week. At
Contractor’s option, guard duties may be provided by full-time
Contractor personnel working on each project site during normal working hours but shall be provided by unarmed guard service after normal working hours, including weekends. Utilizing Contractor personnel to perform guard duties at multiple project sites, when work is being performed on more than one project site, shall be subject to the approval of the Resident Engineer.
2. The guard shall have communication devices to report events as directed by VA Police 24-hours a day, 7 days a week.
3. The Contractor shall install equipment or establish approved methods for recording all 24 hours per day, 7 days per week guard rounds and maintain a log of all 24 hours per day, 7 days per week security activities to ensure systematic checking of the contract premises.
Contract premises is defined as any portion of the Medical Center occupied by the Contractor for construction of the project, including parking, storage and other areas designated for the Contractor’s use.
D. Key Control:
1. The Contractor shall provide duplicate keys and lock combinations to the Resident Engineer and VA Police for security inspections of every area of the project including tool boxes and parked machines and take any emergency action immediately when required. Such keys and lock combinations shall be identified with a durable label or tag that corresponds to the durable label or tag on the lock they serve.
E. Document Control:
1. The Contractor is responsible for safekeeping of all contract drawings, specifications, project manuals, submittals and other project documents and information. This information shall be shared only with those with a specific need-to-know to accomplish the project.
2. All paper waste or electronic media such as CD’s and DVD’s shall be shredded and destroyed in a manner acceptable to the Contracting
Officer.
01 00 00-9
F. Motor Vehicle Restrictions
1. Contractor, Subcontractor and other entity vehicles shall be contained within the designated project boundaries at all times when employees are on the Medical Center premises.
2. Resident Engineer approved vehicle authorization request shall be required for any delivery vehicle entering the Medical Center premises and such request shall be submitted not less than twenty-four (24) hours before the date and time access is required. Access shall be restricted to picking up and dropping off materials and supplies at the project site and access shall be subject to times that are least disruptive to Medical Center operations as coordinated by the Contractor with the Resident Engineer. Vehicles may be subject to inspection of contents and personal effects, when on, entering or leaving the Medical Center Campus.
3. Subject to Resident Engineer determination and Medical Center
Director’s approval for special conditions, separate permits may be issued for Contractor, Subcontractors or other entities and their employees for parking in designated areas only located outside the designated project boundary areas.
a. Vehicles improperly parked outside the designated project boundary areas without Resident Engineer written authorization or permit shall be subject to towing and reclamation at Contractor’s expense.
1.5 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises within the designated project boundary areas or other designated areas approved by the Contracting Officer for the Contractor’s use. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance on and use of the
Government’s premises.
1. Areas on Government premises not part of the work of the project and utilized by the Contractor shall be restored to their condition existing prior to Contractor’s use and at the expense of the
Contractor. Contractor shall provide photographs to the Resident
01 00 00-10
Engineer prior to starting any work on each project site in order to record the existing conditions. Such restoration shall be at the
Contractor’s expense and performed by the Contractor prior to the
Government’s final acceptance of each area of the project. In the absence of photographs to record the existing conditions, restoration shall be at the Contractor’s expense and to the extent determined by the Resident Engineer.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected and located by the Contractor within the designated project boundary areas or other designated areas only and shall be built with labor, materials, tools and equipment furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor from each area at its expense upon completion of the work and prior to acceptance of each area of the project by the Government.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. Established roadways on the Medical Center campus shall remain open at all times to facilitate Medical Center access to the east side of the campus via the north access route or south access route from the main entrance to the campus. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. Contractor vehicles are prohibited from parking on VA roads outside the designated project boundary areas. Contractor vehicles are prohibited from fully or partially blocking VA roads, parking or other areas while unloading without prior Medical Center approval. When it is necessary to cross existing curbs or sidewalks on Government premises, the Contractor shall protect them from damage. Contractor shall be responsible for maintaining all roadways used by the Contractor including, but not limited to, keeping established roadways clean and clear of mud, debris or other deposits resulting from construction activity. The Contractor shall repair or pay for the cleaning and repair of any curbs, sidewalks, 01 00 00-11 or roads damaged by his or his subcontractors’ operations or actions.
Failure of the contractor to timely maintain or repair curbs, sidewalks and roads may result in the Government acting to perform appropriate maintenance or repair, the cost of which shall be deducted from value of the contract.
D. Working space and space available for storing materials, parking and other ancillary needs of the Contractor shall be restricted to the designated project boundary areas as shown on the drawings unless otherwise approved by the Resident Engineer and Medical Center Director.
On-site space is limited to the designated project boundaries to avoid adverse impact to Medical Center operations. If the Contractor determines this space or area is insufficient for his operations, Contractor shall provide, at Contractor’s cost, space or area off-site for Contractor’s, Subcontractors’ or other entities’ use. Contractor shall furnish all transportation (to and from off-site) required by the
Contractor, Subcontractors or other entities for performance of the work.
E. All workmen are subject to Medical Center rules applicable to conduct inside and outside the project boundary. Violators of the Medical Center conduct rules at any tier of employment for performance of the work shall be permanently removed from the project and Medical Center premises if so determined by the Resident Engineer and Medical Center
Director.
F. Execute work to interfere as little as possible with normal functioning of Medical Center daily operations, including, but not limited to, its operation of utility services, fire protection systems, any existing equipment, and with work being done by others. Use of equipment, vehicles and tools that transmit vibrations and noises through existing buildings that are occupied by patients or medical center personnel are not permitted, except as permitted by the Resident Engineer where other options are proven to not be available.
1. Do not store materials and equipment in other than the designated project boundary areas.
2. Schedule delivery of materials and equipment for immediate delivery to the designated project boundary areas and in quantities that can
01 00 00-12 be maintained within the designated boundary areas. Provide unobstructed pedestrian and vehicle access at all times on Medical
Center premises to maintain Medical Center daily operations without disruption. Unavoidable disruptions to Medical Center operations shall be scheduled with and approved in writing by the Resident
Engineer and Medical Center Director not less than seventy-two (72) hours prior to such disruption needing to be implemented.
G. Sequencing: To insure compliant executions for performance of the work, Contractor shall furnish the Resident Engineer with a detailed sequencing plan and schedule of sequencing dates on which the Contractor intends to accomplish work in each specific area of the project site or portion thereof. In addition, Contractor shall notify the Resident
Engineer not less than fifteen (15) work days in advance of the proposed date of starting work in each specific area of project site or portion thereof. Arrange such sequence dates to ensure accomplishment of this work in successive sequences mutually agreeable to Medical Center
Director, Resident Engineer and Contractor. Any delay caused by
Contractor’s failure to schedule performance of any work in advance with the Resident Engineer shall not be cause for the Contractor to claim additional compensation or additional time for performance of the work.
1. After notification of contract award and not later than seven (7) days prior to Notice to Proceed and start of work, Contractor shall submit a sequencing plan to the Resident Engineer for the entire work of the project. Such sequencing plan shall define sequencing for each area of work and transitioning of work from one area to the follow-on area so as to result in continued performance of work for the duration of the project. Delays resulting from the Contractor’s failure to transition work from one area to the next to maintain continuity in the performance of the work shall not entitle the
Contractor to submit a claim for additional time or additional cost to complete the entire project within the contract time. Subject to
Resident Engineer and Medical Center approval and Contractor’s strict adherence to constraints associated with performance of the work, it is possible for the Contractor to be allowed to perform work in more than one project area (North, West and Campus perimeter areas) at a
01 00 00-13 time in order to facilitate completion of all work in a timely manner. Such sequencing plan shall be updated on a periodic basis as determined by the Resident Engineer to reflect areas where work is being performed and work delayed or work ahead of schedule for each area. The Contractor’s sequencing plan is separate and independent from the Contractor’s construction schedule but shall be demonstrated by the Contractor’s construction schedule to complete all work within the contract performance period.
2. General sequencing of work of the project and constraints associated are indicated in the contract documents. Neither the Government nor
Architect-Engineer is responsible for the orderly progression required to achieve execution of the work within the contract performance period. Contractor shall utilize the information provided as a basis for establishing the orderly progression of the work to complete the project within the contract time and/or to complete portions of the project within designated time frames. Subject to approval by the Resident Engineer and subject to compliance with constraints indicated, Contractor may alter the general sequencing indicated in the contract drawings in part or in whole to facilitate more orderly and timely completion of the work, minimize disruptions to ongoing Medical Center operations or as to otherwise provide benefit to the Government for the execution and completion of the work of the project. Alternative sequencing of the work by the
Contractor shall not result in extending the contract performance period unless approved in writing by the Contracting Officer.
Contractor’s sequencing plan shall be the basis for the Contractor’s detailed construction schedule.
3. For each area of work and for the overall project, Contractor’s sequencing plan shall be coordinated with Contractor’s construction schedule, need for submittal approvals, material orders and deliveries, and other activities that are critical to the timing for the completion of the project within the contract time.
4. Completion Priority: Completion of certain portions of the project are time sensitive and Contractor shall sequence the work of the project accordingly including performance of temporary or new
01 00 00-14 construction during hours other than normal work hours, when Medical
Center operations are least disrupted. Such portions of the project, in no specific order of priority, include:
a. Work in and around existing Buildings.
b. Work in and around vehicular and pedestrian access to existing
Buildings.
c. Work in and around parking serving existing Buildings.
d. Utility or infrastructure disruptions and/or connections/disconnections to existing Buildings.
e. Start up and completion of Campus Demolition & Paving – North.
5. Completion of the entire work for this contract award is time sensitive while being dependent in part on completion of on-going work. The sequencing diagrams in the contract drawings indicate the
Governments expected duration for completion of work in each area once work in each area is started and work flow can be maintained to complete the work in the area. It is the Government’s intent and expectation, subject to Contractor’s conformance with constraints defined, that the Contractor schedule construction resources and sequence work to allow the work to flow from one area to the next for the entire duration of the project and without delay or interruption.
H. Adjacent buildings, Medical Center campus and areas of adjacent properties will be occupied to conduct operations during performance of work.
1. Contractor shall take all measures and provide all means and material necessary for protecting existing buildings, areas and property adjacent to areas of construction, including but not limited to against noise, dust and debris, so that buildings and areas to be used in the Medical Centers operations or on adjacent property will not be hindered. Contractor shall permit and provide protected access routes (vehicular and pedestrian) to Medical Center personnel and patients at all times through or around construction areas which serve as routes of access for Medical Center operations. Coordinate work in areas occupied or utilized by Medical Center personnel so that Medical Center operations will continue without interruption during the construction period. Protected access routes shall be
01 00 00-15 temporary concrete paved construction provided by the Contractor and approved by the Resident Engineer and shall be removed by the
Contractor prior to acceptance of the project by the Government.
I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction boundary areas indicated on the contract drawings and as otherwise directed by Resident Engineer for construction operations. Provide gates as required for access with necessary hardware, including hasps and padlocks and keep gates locked during times when construction operations are not being performed. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches).
Bottom of fences shall extend to 25mm (one inch) above grade. Contractor shall maintain fence throughout the duration of the project to ensure its serviceability to achieve its intended purpose for providing safety and security within and around the project boundary limits. Remove the fence, relocate or leave in place as directed by Resident Engineer.
1. Subject to the approval of the Resident Engineer, Contractor will be allowed to use movable fencing when required to facilitate relocation during performance of the work to accommodate Medical Center operations.
J. Utilities Services: Maintain uninterrupted existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing utilities including, but not limited to, water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services, fire protection systems, or communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Resident Engineer. All such actions shall be coordinated with the Resident Engineer, Utility Company involved and
Medical Center for approval prior to performance of the work. When required, utility services interruptions shall be performed during other than Contractor’s normal working hours to facilitate maintaining Medical
Center operations.
01 00 00-16
1. No utility service including, but not limited to, water, gas, steam, sewers, electricity, fire protection or communications systems may be…