This document provides details for a federal solicitation seeking construction services for campus demolition and paving projects at the Jefferson Barracks Division Campus of the St. Louis VA Medical Center. The opportunity is set aside for verified Service-Disabled Veteran-Owned Small Businesses. Offerors must be registered as such in the Vendor Information Pages VetBiz database. The estimated construction cost is between $10-20 million and work must be completed within 530 calendar days of receiving notice to proceed. The scope of work includes demolition of two buildings, site work, utilities, fencing, pavements, and landscaping. A pre-proposal conference will be held and proposals are due by May 29, 2020. The contract will be awarded using Best Value Trade-Off procedures. All questions should be directed to the named contracting officer.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of
Veterans Affairs
H ig hw ay
Koch Rd
Koch Rd Sout h E nt ra nc e
Jefferson Dr
E C ir c le
D r
M ill er S t
G ra v e s S t
Dugan St
J B
N a t'l
C e m
J B
N a t' l
C e m
JB
N at 'l
C em
Mississippi River
PROJECT SITE
TRUEPLAN
N o rth
E n tran ce
PLAN TRUE
Drawing Title
Approved: Project Director
Project Title
Revisions
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofNo.
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t
B
A
E th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
5 6 87
F
D
C
94321
5 6 87 94321
B
A
E
F
D
C
JEFFERSON BARRACKS DIVISION
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862-5344
PRINTED ON ORIGINAL SIZE OF SHEET IS 30" X 42"
Department of Veterans Affairs
Date
CERTIFICATE OF
AUTHORITY: 000842
6/25/2020 8:49:08 AM
CAMPUS DEMOLITION & PAVING
(MANHOLE)
29 OCTOBER 2012
657-313H
GI001-M
JLGCMU
COVER SHEET
CAMPUS DEMOLITION & PAVING
(MANHOLE)
VOLUME 6 OF 6
LOCATION MAP
Medical Facility Improvements and NCA Expansion VA Project 657-313H
DRAWING INDEX
COVER SHEET
GI001-M COVER SHEET 1 of 10
GENERAL
GC100 DIAGRAM FOR OVERALL CONSTRUCTION SEQUENCING 2 of 10
GC101 DIAGRAM FOR CONSTRUCTION SEQUENCING - SOUTH CAMPUS
AREA
GC102 OVERALL PROJECT BOUNDARY PLAN 4 of 10
GC103 SAMPLE CPM NETWORK 5 of 10
MECHANICAL
MS100-M MECHANICAL SITE COVER SHEET 6 of 10
MS101-M MECHANICAL SITE PLAN 7 of 10
MS501-M MECHANICAL DETAILS 8 of 10
MS502-M MECHANICAL DETAILS 9 of 10
MS503-M MECHANICAL DETAILS 10 of 10
SOUTH CAMPUS AREA
REFER TO SHEET GC101 FOR
SEQUENCING INFORMATION
WEST CAMPUS AREA
SEQUENCING OF WORK
WITHIN THE PROJECT
BOUNDARY TO BE AS
DETERMINED BY
CONTRACTOR AND APPROVED
BY RESIDENT ENGINEER
PERIMETER FENCE
SEQUENCE OF WORK AROUND
THE CAMPUS SHALL BE AS
DETERMINED BY
CONTRACTOR AND APPROVED
BY RESIDENT ENGINEER
N O
T I C
E
T
O
P
R O
C E
D
N
T P
GENERAL NOTES:
1. SEQUENCING THE PERFORMANCE OF ALL
WORK TO ACHIEVE CONTINUOUS AND
UNINTERRUPTED PROGRESS TO COMPLETE
THE ENTIRE WORK OF THE PROJECT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY. SUCH
SEQUENCING BY THE CONTRACTOR SHALL BE
SUBJECT TO THE APPROVAL OF THE
RESIDENT ENGINEER AND MEDICAL CENTER
DIRECTOR.
2. IT IS THE GOVERNMENT'S INTENT THAT THE
CONTRACTOR TAKE ADVANTAGE OF
REASONABLE OPPORTUNITIES FOR WORK TO
BE PERFORMED WITHIN TWO OR MORE
PROJECT BOUNDARY AREAS CONCURRENTLY.
SUBJECT TO CONSTRAINTS NOTED AND
MAINTAINING MEDICAL CENTER OPERATIONS,
CONCURRENT WORK COULD INCLUDE, BUT
NOT BE LIMITED TO, THE FOLLOWING:
A: PERFORMANCE OF ABATEMENT AND
DEMOLITION OF BUILDINGS 61 AND 63
CONCURRENT WITH PERFORMANCE OF WORK
IN THE SOUTH CAMPUS AREA.
B: PERFORMANCE OF PERIMETER FENCE
WORK IN CAMPUS AREAS NOT AFFECTED BY
THE SOUTH, NORTH OR WEST AREAS OF
WORK COULD OCCUR CONCURRENTLY WITH
WORK IN THE SOUTH, NORTH AND WEST
AREAS OF THE CAMPUS.
C: PERFORMANCE OF WEST CAMPUS
AREA WORK CONCURRENT WITH
PERFORMANCE OF NORTH CAMPUS AREA
WORK.
3. THE PRIMARY CONSTRAINTS FOR THE
START OF WORK WITHIN CERTAIN CAMPUS
AREAS ARE AS FOLLOWS:
A: START OF WORK IN THE NORTH
CAMPUS AREA IS CONTINGENT ON THE
MEDICAL CENTER VACATING BUILDINGS 61
AND 63 TO ALLOW FOR THEIR ABATEMENT
AND DEMOLITION.
B: START OF WORK IN THE WEST
CAMPUS AREA IS CONTINGENT ON
CONTRACTOR'S COMPLETION OF THE SOUTH
CAMPUS AREA WORK TO RESTORE MEDICAL
CENTER PARKING AND NO NEED TO MAINTAIN
THE WEST CAMPUS AREA FOR TEMPORARY
PARKING.
4. THE PERFORMANCE OF WORK IN MORE
THAN ONE CAMPUS AREA IS CONTINGENT ON
MAINTAINING MEDICAL CENTER OPERATIONS
ACROSS THE ENTIRE CAMPUS AND
MAINTAINING ONE ROUTE FOR VEHICULAR
ACCESS TO THE EAST SIDE OF THE CAMPUS
AT ALL TIMES.
5. THE CONTRACTOR'S PLAN FOR
SEQUENCING THE PERFORMANCE OF ALL
WORK IS SUBJECT TO THE APPROVAL OF THE
RESIDENT ENGINEER AND MEDICAL CENTER
DIRECTOR. IN THIS REGARD, THE
CONTRACTOR SHALL SUBMIT A PRELIMINARY
SEQUENCING PLAN AFTER CONTRACT AWARD
AND PRIOR TO NOTICE TO PROCEED.
CONTRACTOR'S FINAL SEQUENCING PLAN
SHALL BE SUBMITTED TO THE RESIDENT
ENGINEER NOT LATER THAN 30 CALENDAR
DAYS FOLLOWING NOTICE TO PROCEED
6. CONTRACTOR'S SEQUENCING PLAN
APPROVED BY THE RESIDENT ENGINEER
SHALL ESTABLISH THE BASIS FOR THE
CONTRACTOR'S CONSTRUCTION SCHEDULE.
THE CONTRACTOR'S SEQUENCING PLAN AND
CONSTRUCTION SCHEDULE SHALL NOT BE
MODIFIED EXCEPT BY RESIDENT ENGINEER
APPROVAL.
NORTH CAMPUS AREA
GENERAL CONSTRAINT:
MAINTAIN VEHICULAR ACCESS
ALONG EXISTING NORTH
ROADWAY DURING
PERFORMANCE OF WORK
SEQUENCE 1 AND 2
SEQUENCE 1
ABATEMENT AND DEMOLITION
OF BUILDING 61 AND 63
NOTE: ABATEMENT AND
DEMOLITION TO OCCUR
CONCURRENTLY WITH SOUTH
CAMPUS AREA WORK
SUBJECT TO BUILDING HAVING
BEEN VACATED BY THE
MEDICAL CENTER
SEQUENCE 2
STORM SEWER
STRUCTURES 1 TO 7 AND 9 TO
EX1
WATER
INSTALL NEW 8" LINE ALONG
RELOCATED GRAVES STREET
FROM B53 LOADING DOCK TO
NORTH END OF B53
CONSTRAINT
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO CONNECTING NEW WATER
LINE TO EXISTING
DEMO EXISTING UTILITIES
SITE GRADING
ELECTRICAL UNDERGROUND
UTILITIES FOR RE TRAILER
SUBGRADE AND BASE,
BIO-RETENTION
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL LIGHTING
FINAL PAVEMENT
LANDSCAPE
SEQUENCE 3
RELOCATE AND REMOVE RE
TRAILERS
REMOVE EXISTING NORTH
ROADWAY AND EXISTING
TRAILER SITE
FINAL GRADING
CONSTRAINT 1:
START OF WORK IS
CONTINGENT ON
CONTRACTOR'S COMPLETION
OF ALL WORK IN SOUTH
CAMPUS AREA AND MEDICAL
CENTRAL NO LONGER
NEEDING WEST CAMPUS AREA
FOR TEMPORARY PARKING
CONSTRAINT 2:
CONTRACTOR SHALL
MAINTAIN ONE LANE OF
JEFFERSON DRIVE OPEN TO
VEHICULAR TRAFFIC DURING
PERFORMANCE OF THE WORK
CONSTRAINT 3:
CONTRACTOR SHALL
MAINTAIN ACCESS TO NORTH
AND SOUTH ENTRANCE
DRIVES DURING
PERFORMANCE OF THE
WORK. IF TEMPORARY
SHUTDOWN OF DRIVES
CANNOT BE AVOIDED, ONLY
ONE DRIVE SHALL BE SHUT
DOWN AT ANY GIVEN TIME
MANDATORY CONTRACT
REQUIREMENT:
AS INDICATED ON SHEET
GC102, CONTRACTOR SHALL
SEQUENCE THE WORK TO
COMPLETE THE FENCE ALONG
THE NORTH AND EAST SIDES
OF THE CAMPUS AS PART OF
THE NORTH CAMPUS WORK
CONSTRAINT 1:
FOR GATE INSTALLATIONS AT
THE NORTH AND SOUTH
CAMPUS ENTRANCES,
CONTRACTOR SHALL
MAINTAIN CAMPUS ACCESS
THROUGH ONE ENTRANCE AT
ALL TIMES.
CONSTRAINT 2:
INSTALLATION OF THE NORTH
AND SOUTH CAMPUS
ENTRANCE GATES IS
CONTINGENT ON JEFFERSON
DRIVE BEING OPEN FOR
TWO-WAY TRAFFIC FLOW
7. PLAN WORK TO MAINTAIN EMERGENCY
EGRESS FROM ALL EXISTING BUILDINGS AT
ALL TIMES. COORDINATE EXIT LOCATIONS FOR
EACH BUILDING WITH RESIDENT ENGINEER
AND MEDICAL CENTER.
8. MAINTAIN AT LEAST ONE MEANS OF
PEDESTRIAN AND VEHICULAR ACCESS TO
EACH BUILDING AT ALL TIMES FOR MEDICAL
CENTER OPERATIONS AND EMERGENCY
VEHICLES.
9. PROVIDE TEMPORARY CONCRETE
WALKWAYS WHERE REQUIRED WHEN
EXISTING WALKWAYS AND BUILDING
ENTRANCES OR EXITS ARE IMPACTED BY
CONSTRUCTION. REMOVE TEMPORARY
WALKWAYS WHEN EXISTING WALKWAYS ARE
RESTORED FOR USE OR NEW WALKWAYS ARE
CONSTRUCTED AND AVAILABLE FOR USE.
10. PROVIDE AND MAINTAIN TEMPORARY
SIGNAGE, BARRICADES, TRENCH COVERS,
ETC. TO RE-DIRECT TRAFFIC FLOW, PARKING,
ETC. INCLUDING PEDESTRIAN TRAFFIC.
11. WORK THAT CANNOT BE PERFORMED SO
AS TO MAINTAIN MEDICAL CENTER
OPERATIONS, EMERGENCY VEHICLE ACCESS,
ETC. SHALL BE SCHEDULED WITH THE
RESIDENT ENGINEER AND MEDICAL CENTER
AS APPROVED SHUT DOWNS OR PERFORMED
DURING OTHER THAN NORMAL WORK HOURS
TO MAINTAIN NORMAL MEDICAL CENTER
WORK HOUR OPERATIONS.
12. PORTIONS OF EXISTING STORM AND
SANITARY SEWERS THAT NEED TO REMAIN IN
PLACE AND ACTIVE, PRIOR TO THE
COMPLETION OF RE-ROUTING THE ENTIRE
UTILITY SERVICE, SHALL BE TEMPORARILY
CONNECTED TO THEIR NEW CONSTRUCTION
OR BY-PASS PUMP TO THEIR NEW
CONSTRUCTION FOR THE DURATION THE
EXISTING PORTIONS HAVE TO REMAIN IN
PLACE AND ACTIVE.
13. ALL MAJOR UTILITY SHUTDOWNS
REQUIRED TO CONNECT NEW UTILITY
SERVICES SHALL BE COORDINATED WITH THE
RESIDENT ENGINEER NOT LESS THAN FIFTEEN
(15) CALENDAR DAYS PRIOR TO THE
SHUTDOWN OCCURRING. CONTRACTOR
SHALL COORDINATE ALL REQUIRED UTILITY
SHUTDOWNS WITH THE RESIDENT ENGINEER
TO ESTABLISH THOSE WHICH REQUIRE 15
CALENDAR DAYS NOTICE PRIOR TO WORK
BEING PERFORMED.
14. CONTRACTOR TO MAINTAIN TRAFFIC FLOW
TO AND AROUND ALL EXISTING BUILDINGS
AND PARKING AT ALL TIMES FOR THE
DURATION OF THE PROJECT. TEMPORARY
DISRUPTIONS SHALL BE APPROVED BY THE
RESIDENT ENGINEER AND MEDICAL CENTER
PRIOR TO WORK BEING PERFORMED IN THE
VICINITY OF THESE BUILDINGS.
CONSTRUCTION DURATION
(530 CALENDAR DAYS)
NOTE: THIS DIAGRAM IS INTENDED TO SET FORTH THE GENERAL
SEQUENCING OF ALL WORK OF THE PROJECT. IT IS NOT INTENDED TO
DICTATE CONTRACTOR MEANS AND METHODS, BUT THE GENERAL
NOTES ARE INTENDED TO CONVEY THE ABILITY FOR THE CONTRACTOR
TO PERFORM WORK CONCURRENTLY AS APPROVED BY THE RESIDENT
ENGINEER.
Acoustical Ceiling Submittals
REFER TO GENERAL NOTE 2B
THIS SHEET
STEAM MANHOLE REPAIRS
REFER TO SHEET GC101 FOR
ADDITIONAL INFORMATION
DIAGRAM FOR OVERALL
CONSTRUCTION SEQUENCING
GC100
CMU/SBCMU
2 57 No. Date Revisions
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: CAMPUS DEMOLITION &
PAVING
657-313H Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL (S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 2011014429
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL
CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
ofDwg.
29 OCTOBER 2012
SEQUENCE 1B
REMOVE SITE LIGHTING
DEMO EXISTING PAVING
SEQUENCE 1C
STORM SEWER
MH-1 TO MH-4
MH-2 TO INLET 9, MH-11
MH-4 TO INLET 12
DEMO EXISTING UTILITIES
SEQUENCE 1E
ELECTRICAL AND
TECHNOLOGY UNDERGROUND
SERVICES
RETAINING WALL
SITE GRADING
SUBGRADE AND BASE
SEQUENCE 1F
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL PAVING
ENERGENCY CALL STATIONS
AND ACCESS CONTROL GATES
LANDSCAPING AND
BIO-RETENTION
SEQUENCE 1G
FINAL INSPECTION AND
ACCEPTANCE
SEQUENCE 3A
REMOVE SITE LIGHTING AT
B-25 AND REPLACE WITH NEW
N O
T I C
E
T
O
P
R O
C E
D
N
T P
CONSTRAINT
TURN OVER SEQUENCE 1 TO
MEDICAL CENTER PRIOR TO
STARTING SEQUENCE 2
CONSTRAINT
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO CONNECTING NEW WATER
LINES TO EXISTING AND B2
SEQUENCE 2E
SITE GRADING
ELECTRICAL AND
TECHNOLOGY UNDERGROUND
SERVICES
SUBGRADE AND BASE
SEQUENCE 2F
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL PAVING
EMERGENCY CALL STATIONS
LANDSCAPING AND
BIO-RETENTION
SEQUENCE 2G
FINAL INSPECTION AND
ACCEPTANCE
CONSTRAINT
TURN OVER SEQUENCE 2 TO
MEDICAL CENTER PRIOR TO
STARTING SEQUENCE 3
SEQUENCE 3B
REMOVE EXISTING SITE
LIGHTING
DEMO EXISTING PAVING AND
ELECTRICAL
ELECTRICAL UNDERGROUND
SERVICE
SUBGRADE AND BASE
CURB/GUTTER, SIDEWALKS,
SITE LIGHTING
FINAL PAVING
LANDSCAPING
CONSTRAINT
RE-ROUTE TRAFFIC FLOW TO
MAINTAIN ACCESS FROM
JEFFERSON DRIVE TO GRAVES
STREET
COORDINATE RE-ROUTING OF
ACCESS TO B-1 WITH
RESIDENT ENGINEER AND
MEDICAL CENTER. ESTABLISH
A TEMPORARY
DROP-OFF/PICK UP LOCATION
FOR PATIENTS
SEQUENCE 3C
FINAL INSPECTION AND
ACCEPTANCE
GENERAL NOTES - STEAM MANHOLE REPAIRS:
1. REFER TO THE CAMPUS STEAM SYSTEM
MANHOLE REPAIR DRAWINGS FOR
ADDITIONAL INFORMATION.
2. STEAM SYSTEM INTERRUPTIONS AND
MANHOLE ACCESS FOR PERFORMANCE
OF THE MANHOLE REPAIR WORK IS
SEASON AND TEMPERATURE DEPENDENT
AND SUBJECT TO THE APPROVAL OF THE
RESIDENT ENGINEER AND MEDICAL
CENTER AT ALL TIMES. THE MEDICAL
CENTER'S OPERATIONS AND NEED FOR
THE STEAM SYSTEM TO BE OPERATIONAL
SHALL TAKE PRECEDENCE AND DICTATE
WHEN THE STEAM SYSTEM CAN BE SHUT
DOWN FOR THE MANHOLE REPAIR WORK
TO BE PERFORMED. ALL STEAM SYSTEM
SHUTDOWNS SHALL BE SCHEDULED WITH
THE RESIDENT ENGINEER AND MEDICAL
CENTER NOT LATER THAN TEN (10) WORK
DAYS PRIOR TO WHEN THE CONTRACTOR
NEEDS THE STEAM SYSTEM SHUT DOWN.
FAILURE OF THE CONTRACTOR TO
SCHEDULE SHUTDOWNS IN ADVANCE
SHALL NOT ENTITLE THE CONTRACTOR TO
ADDITIONAL COMPENSATION OR AN
EXTENSION OF CONTRACT TIME.
3. THE CONTRACTOR SHALL COMMENCE
PERFORMANCE OF THE STEAM MANHOLE
REPAIR WORK UPON NOTICE TO PROCEED
AND SHALL COMPLETE AS MANY REPAIRS
AS CAN BE ACCOMPLISHED BY OCTOBER
15, 2020 AFTER WHICH THE GOVERNMENT
ANTICIPATES THAT STEAM SYSTEM
OPERATION CANNOT BE INTERRUPTED
DUE TO NEED FOR HEATING CAMPUS
FACILITIES. THOSE MANHOLE REPAIRS
NOT COMPLETED PRIOR TO THIS DATE
SHALL BE COMPLETED AT THE EARLIEST
OPPORTUNITY AFFORDED BY MEDICAL
CENTER OPERATIONS AND DAILY
TEMPERATURES FORECASTED TO REMAIN
ABOVE 55 DEGREES FAHRENHEIT
THROUGHOUT ANY REQUIRED STEAM
OUTAGES NECESSARY TO FACILITATE
WORK. CONTRACTOR SHALL ANTICIPATE
THAT COMPLETION OF ALL MANHOLE
REPAIRS MAY BE INTERRUPTED AND HAVE
TO BE POSTPONED DUE TO SEASONAL
AND TEMPERATURE DEMAND FOR THE
STEAM SYSTEM TO BE OPERATIONAL FOR
MEDICAL CENTER OPERATIONS.
4. AFTER CONTRACT AWARD AND NOT
LATER THAN FIVE (5) WORK DAYS AFTER
NOTICE TO PROCEED, CONTRACTOR
SHALL SUBMIT, FOR REVIEW AND
APPROVAL BY THE RESIDENT ENGINEER
AND MEDICAL CENTER, A SEQUENCING
AND SCHEDULING PLAN FOR
PERFORMANCE OF THE MANHOLE REPAIR
WORK. SUCH PLAN SHALL INCLUDE, BUT
NOT BE LIMITED TO, ESTABLISHING THE
FIRST MANHOLE TO BE REPAIRED AND
PROGRESSION OF THE REPAIR WORK BY
MANHOLE AROUND THE CAMPUS; DATES
WHEN STEAM SYSTEM SHUTDOWNS NEED
TO OCCUR FOR EACH MANHOLE TO BE
REPAIRED; MANHOLE SHUTDOWNS
REQUIRED TO ISOLATE A SPECIFIC
MANHOLE FOR PERFORMANCE OF THE
REPAIR WORK; DURATION FOR
PERFORMANCE OF THE REPAIR WORK IN
EACH MANHOLE; DATES OR PERIOD OF
TIME WHEN THE STEAM SYSTEM CAN BE
RE-ENERGIZED FOR OPERATION; AND ANY
OTHER DEFINITIVE AND SPECIFIC
INFORMATION REQUIRED BY THE
RESIDENT ENGINEER OR MEDICAL
CENTER FOR SEQUENCING AND
SCHEDULING THE PERFORMANCE OF ALL
MANHOLE REPAIR WORK. CONTRACTOR'S
SEQUENCING AND SCHEDULING PLAN
SHALL ACCOUNT FOR A REASONABLE
AMOUNT OF FLOAT TIME IN ANTICIPATION
OF UNEXPECTED DELAYS DUE TO
INCLEMENT WEATHER OR OTHER CAUSE
FOR DELAY THAT CAN BE ANTICIPATED BY
THE CONTRACTOR TO OCCUR, INCLUDING
POSTPONEMENT OF WORK DUE TO
SEASONAL DEMAND FOR THE STEAM
SYSTEM TO BE OPERATIONAL.
CONTRACTOR SHALL NOT BE ENTITLED
TO ADDITIONAL COMPENSATION OR AN
EXTENSION OF CONTRACT TIME IF
REASONABLE FLOAT TIME IS NOT
INCLUDED IN THE CONTRACTOR'S
SEQUENCING AND SCHEDULING PLAN.
CONTRACTOR'S SEQUENCING AND
SCHEDULING PLAN SHALL BE
PERIODICALLY UPDATED BY THE
CONTRACTOR AS REQUIRED BY THE
RESIDENT ENGINEER.
5. UPON COMPLETION OF REPAIRS IN EACH
MANHOLE AND UPON COMPLETION OF
REPAIRS IN ALL MANHOLES, CONTRACTOR
SHALL REQUEST OF THE RESIDENT
ENGINEER AND MEDICAL CENTER THAT
THE STEAM SYSTEM BE RE-ENERGIZED TO
TEST THE REPAIRS MADE. SUCH TESTING
SHALL BE WITNESSED BY THE RESIDENT
ENGINEER, MEDICAL CENTER AND
CONTRACTOR AND DEFICIENCIES
OBSERVED SHALL BE NOTED TO BE
REPAIRED BY THE CONTRACTOR AND AT
THE CONTRACTOR'S EXPENSE PRIOR TO
ACCEPTANCE OF ALL MANHOLE REPAIRS
BY THE GOVERNMENT. CONTRACTOR
SHALL WARRANTY THE MANHOLE REPAIR
WORK FOR A PERIOD OF TIME THAT
COVERS FULL OPERATION OF THE STEAM
SYSTEM OVER TWO (2) HEATING SEASON
PERIODS AFTER ACCEPTANCE OF ALL
MANHOLE REPAIR WORK BY THE
GOVERNMENT.
SEQUENCE 1A
INSTALL NEW 8" WATER LINE
BEHIND B2 AND B18 AND
RESTORE EXISTING
CONDITIONS
CONSTRAINT
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO CONNECTING NEW LINE TO
EXISTING LINES AND B2 AND
B18
SEQUENCE 1D
CONSTRUCT MH-S19 AND
INSTALL HPS PIPING SOUTH
TO JUST OUTSIDE B18
INSTALL HPS PIPING FROM
MH-S19 TO JUST OUTSIDE B3
EXTEND HPS PIPING NORTH
FROM MH-S19 AND CAP FOR
EXTENDING IN SEQUENCE 2
CONSTRAINT
NEW HPS CONNECTIONS TO
B3 AND B18 CANNOT OCCUR
UNTIL HPS PIPING IS
COMPLETE IN MH-S6 DURING
SEQUENCE 2
SEQUENCE 2B
EXTEND HPS PIPING FROM
MH-S19 TO MH-S6
MAKE HPS CONNECTIONS IN
MH-S6, MH-S19, AT B3 AND B18
CONSTRAINT
ALL HPS CONNECTIONS HAVE
TO OCCUR CONCURRENTLY
ALL HPS CONNECTIONS TO BE
PERFORMED DURING WARM
WEATHER CONDITIONS AS
DETERMINED BY RESIDENT
ENGINEER
SCHEDULE SHUTDOWN WITH
RESIDENT ENGINEER PRIOR
TO MAKING CONNECTIONS.
SEQUENCE 2C
CONSTRUCT MH-S20 AND
INSTALL HPS PIPING FROM
MH-S6 TO JUST OUTSIDE B1
AND B24
MAKE CONNECTION IN MH-S6,
AT B1 AND AT B24
CONSTRAINT
ALL HPS CONNECTIONS HAVE
TO OCCUR CONCURRENTLY
ALL HPS CONNECTIONS TO BE
PERFORMED DURING WARM
WEATHER CONDITIONS AS
DETERMINED BY RESIDENT
ENGINEER
SCHEDULE SHUTDOWNS WITH
RESIDENT ENGINEER PRIOR
TO MAKING HPS
CONNECTIONS.
SEQUENCE 2A
REMOVE SITE LIGHTING
DEMO EXISTING PAVING
SEQUENCE 2D
STORM SEWER
MH-4 TO MH-5
MH-5 TO INLET 6, INLET 7
MH-5 TO INLET 10
INLET 8 TO INLET EX-1
WATER
INSTALL NEW 8" LINE EAST TO
WEST INCLUDING NEW FIRE
HYDRANTS AND CONNECTION
TO B2
INSTALL NEW 8" LINE ON EAST
SIDE WEST OF FISCHER
HOUSE
STEAM MANHOLE REPAIRS
REFER TO CAMPUS STEAM
SYSTEM MANHOLE REPAIR
DRAWINGS FOR ADDITIONAL
INFORMATION
REFER TO GENERAL NOTES
THIS SHEET
DIAGRAM FOR CONSTRUCTION
SEQUENCING - SOUTH CAMPUS AREA
GC101
CMU/SBCMU
2 57 No. Date Revisions
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: CAMPUS DEMOLITION &
PAVING
657-313H Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL (S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 2011014429
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL
CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
ofDwg.
29 OCTOBER 2012
CONSTRUCTION
ENTRANCE
WEST CAMPUS
PROJECT
BOUNDARY
CURRENT
CONSTRUCTION
UNDER SEPARATE
CONTRACT
NORTH CAMPUS
PROJECT BOUNDARY
PORTION OF PERIMETER FENCE TO
BE COMPLETED WITH NORTH
CAMPUS (REFER TO CIVIL DRAWINGS
FOR REMAINDER OF FENCE WORK)
CONTRACTOR'S
STAGING AREA
(TO BE RESTORED BY
CONTRACTOR UPON
COMPLETION OF ALL
WORK)
CURRENT
CONSTRUCTION UNDER
SEPARATE CONTRACT
SEQUENCE 3
SEQUENCE 2
SEQUENCE 1
SOUTH CAMPUS
PROJECT
BOUNDARY
SEQUENCE 3
SEQUENCE 2
SEQUENCE 1
CEMETERY PROPERTY
(CONSTRUCTION UNDER
SEPARATE CONTRACT)
PORTION OF
PERIMETER FENCE
TO BE COMPLETED
WITH NORTH
CAMPUS (REFER TO
CIVIL DRAWINGS
FOR REMAINDER OF
FENCE WORK)
REFER TO CIVIL DRAWINGS
FOR ROUTING OF NEW
PERIMETER FENCE
START
FENCE
WORK
LEGEND
EXISTING BUILDING
PROPERTY LINE
BUILDING NUMBER
PROJECT BOUNDARY
PLAN TRUE
No. Date Revisions
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: CAMPUS DEMOLITION & PAVING 657-313H Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL (S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2019 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 2011014429
MECHANICAL/ELECTRICAL/PLUMBING/
TECHNOLOGY:
IMEG CORPORATION
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL
CONSULTING, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
OVERALL PROJECT BOUNDARY PLAN
GC102
CMU/SBCMU29 OCTOBER 2012
AutoCAD SHX Text
AutoCAD SHX Text
NORTH GATE ENTRANCE DRIVE
AutoCAD SHX Text
KOCH ROAD
AutoCAD SHX Text
SOUTH GATE ENTRANCE DRIVE
AutoCAD SHX Text
JEFFERSON DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 53T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1CC
AutoCAD SHX Text
1CC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 51T
AutoCAD SHX Text 60T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 90T
AutoCAD SHX Text
EXISTING TRAILER
AutoCAD SHX Text 101T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3T
AutoCAD SHX Text 8.45'
AutoCAD SHX Text
BUS STOP
AutoCAD SHX Text
SHELTER
AutoCAD SHX Text 12.2'
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
CONC. CURB
AutoCAD SHX Text
RIP-RAP
AutoCAD SHX Text
WV
AutoCAD SHX Text
| Sheets |
| GI001-M - COVER SHEET |