2021-0709 100 Final CDs WPB Bldg 10 VBA3239_SPECS VOL1.pdf
PDF 3 MB Posted
- Attached to
- Y1AZ--Renovate Building Number 10 Veterans Benefits Administration Office Space, West Palm Beach, FL.
- Solicitation number
- 36C10E21R0006
About this file
This pre-solicitation notice announces a forthcoming solicitation for renovation services. The Veterans Benefits Administration will solicit proposals to renovate approximately 1,900 square feet of office space at its West Palm Beach, Florida medical center to include a waiting area, check-in area, conference room, multiple workstations, a private supervisor office and four counselor offices. The renovation will include demolition and construction of electrical, HVAC, data/voice systems and interior finishes. The solicitation number is 36C10E21R0006 and offers will be due on July 16, 2021. The procurement is set aside for verified service-disabled veteran-owned small businesses and has an estimated value between $5-10 million. The contract type will be firm-fixed-price and the project completion timeline is 90 days from notice to proceed.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Romanyk Consulting Corp. Copyright © 2021
PRIVILEGED AND CONFIDENTIAL PROPRIETARY INFORMATION
Specifications Volume 1 Div 00 – Div 14
A&E DESIGN FOR THE WEST
PALM BEACH FL BLDG 10
VBA WEST PALM BEACH
West Palm Beach, Florida
100% FINAL CONSTRUCTION DOCUMENTS
July 9, 2021
Project Number: VB3239 Contract Number: 36C10E18D0019
Task Order: 36C10E20N0232
07/09/2021 100% Final Construction Documents A&E Design for the West Palm Beach FL Bldg 10 VBA Project Number VB3239
VA 07‐01‐20
00 00 00 ‐ 1
SECTION 00 00 00
SEALS PAGE
ROMANYK CONSULTING
Architecture (Spec Sections 00 – 13)
Mechanical, Plumbing and Fire Protection (Spec Sections 21 – 23)
Electrical Specifications (Spec Sections 26– 28)
07/09/2021 100% Final Construction Documents
00 01 10‐1
DEPARTMENT OF VETERANS AFFAIRS00
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
Volume 1
DIVISION 00 – SPECIAL SECTIONS
00 00 00 Seals Page
00 01 15 List of Drawing Sheets 05‐20
DIVISION 01 ‐ GENERAL REQUIREMENTS
01 00 00 General Requirements 01‐21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03‐20
01 33 23 Shop Drawings, Product Data, and Samples 05‐17
01 35 26 Safety Requirements 07‐20
01 42 19 Reference Standards 11‐20
01 45 00 Quality Control 02‐21
01 57 19 Temporary Environmental Controls 01‐21
01 74 19 Construction Waste Management 01‐21
01 81 13 Sustainable Construction Requirements 10‐17
DIVISION 02 – EXISTING CONDITIONS
02 41 19.33 Selective Demolition
DIVISION 03 – CONCRETE (NOT USED)
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08‐18
00 01 10‐2
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 20 00 Rough Carpentry 10‐17
06 20 00 Finish Carpentry 01‐21
DIVISION 07 ‐ THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01‐21
07 84 00 Firestopping 01‐21
07 92 00 Joint Sealants 10‐17
DIVISION 08 ‐ OPENINGS
08 11 13 Hollow Metal Doors and Frames 08‐16
08 14 00 Interior Wood Doors 02‐16
08 71 00 Door Hardware 04‐20
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01‐21
09 06 00 Schedule for Finishes 07‐15
09 22 16 Non‐Structural Metal Framing 06‐18
09 29 00 Gypsum Board 04‐20
09 51 00 Acoustical Ceilings 12‐18
09 65 13 Resilient Base and Accessories 01‐21
09 65 19 Resilient Tile Flooring 05‐18
09 68 00 Carpeting 10‐15
09 91 00 Painting 01‐21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01‐21
10 26 00 Wall and Door Protection 01‐21
10 44 13 Fire Extinguisher Cabinets 08‐18
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08‐17
12 24 21 Lightproof Shades 01‐21
12 50 00.33 Furniture and Equipment – General Requirements
00 01 10‐3
DIVISION 13 ‐ SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)
Volume 2
DIVISION 21‐ FIRE SUPPRESSION
21 13 13 Wet‐Pipe Sprinkler Systems 06‐15
DIVISION 22 – PLUMBING (NOT USED)
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02‐20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02‐20
23 07 11 HVAC and Boiler Plant Insulation 02‐20
23 09 23 Direct‐Digital Control System for HVAC 09‐11
23 23 00 Refrigerant Piping 02‐20
23 31 00 HVAC Ducts and Casings 02‐20
23 36 00 Air Terminal Units 02‐20
23 37 00 Air Outlets and Inlets 02‐20
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01‐16
26 05 19 Low‐Voltage Electrical Power Conductors and Cables 01‐17
26 05 26 Grounding and Bonding for Electrical Systems 01‐17
26 05 33 Raceway and Boxes for Electrical Systems 01‐18
26 09 23 Lighting Controls 01‐18
26 27 26 Wiring Devices 01‐18
26 51 00 Interior Lighting 01‐18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09‐19
27 05 26 Grounding and Bonding for Communications Systems 06‐15
00 01 10‐4
27 05 33 Raceways and Boxes for Communications Systems 10‐18
27 15 00 Communications Structured Cabling 01‐16
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04‐18
28 05 13 Conductors and Cables for Electronic Safety and Security 10‐18
28 05 26 Grounding and Bonding for Electronic Safety and Security 09‐11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09‐11
28 13 00 Physical Access Control System 10‐11
28 23 00 Video Surveillance 09‐11
28 26 00 Electronic Personal Protection System 09‐11
28 31 00 Fire Detection and Alarm 10‐11
DIVISION 31 – EARTHWORK (NOT USED)
DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – Electrical Power Generation (NOT USED)
‐ END ‐
VA 05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
ARCHITECTURAL
10-GI100 SHEET INDEX & GENERAL INFORMATION
10-GI101 ABBREVIATIONS & SYMBOLS
10-GI102 CODE REVIEW & FIRST FLOOR LIFE SAFETY PLAN
10-AD101 FIRST FLOOR DEMOLITION PLAN
10-AD102 FIRST FLOOR RCP DEMOLITION PLAN
10-AE101 FIRST FLOOR OVERALL FLOOR PLAN
10-AE102 ENLARGED FIRST FLOOR PLAN
10-AE103 FOURTH FLOOR EQUIPMENT AND FURNITURE PLAN
10-AE104 FIRST FLOOR DIMENSION PLAN
10-AE120 FIRST FLOOR REFLECTED CEILING PLAN
10-AE501 FIRST FLOOR MILLWORK PLAN & ELEVATIONS
10-AE702 FIRST FLOOR CEILING DETAILS
10-AE703 METAL STUD DETAILS
10-AE704 CEILING DETAILS SUSPENDED GYPSUM
10-AF101 FIRST FLOOR DOOR SCHEDULE & DETAILS
10-AF102 FIRST FLOOR FINISH PLAN & SCHEDULES
10-AF103 FIRST FLOOR WALL TYPES
10-AW101 INTERIOR WALL SIGNAGE FLOOR PLAN
10-AW102 INTERIOR & WALL SIGNAGE
FIRE PROTECTION
10-FS100 SPRINKLER LEGEND, DETAILS, SCHEDULES AND ABBREVIATIONS
10-FD101 FIRST FLOOR PARTIAL PLAN – SPRINKLER DEMOLITION
10-FS101 FIRST FLOOR PARTIAL PLAN – SPRINKLER
VA 05-01-20
00 01 15 - 2
MECHANICAL
10-M-100 MECHANICAL LEGEND AND ABBREVIATIONS
10-MD101 FIRST FLOOR PARTIAL PLAN – HVAC DEMOLITION
10-MH101 FIRST FLOOR PARTIAL PLAN - HVAC
10-MH300 HVAC DETAILS
10-MH400 HVAC SCHEDULES
ELECTRICAL
10-E-100 ELECTRICAL LEGEND AND ABBREVIATIONS
10-ED101 PARTIAL GROUND FLOOR PLAN – LIGHTING DEMOLITION
10-ED102 PARTIAL GROUND FLOOR PLAN – POWER & SYSTEMS
DEMOLITION
10-EL101 FIRST FLOOR PARTIAL PLAN - LIGHTING
10-EP101 FIRST FLOOR PARTIAL PLAN - POWER
10-EP102 FIRST FLOOR PARTIAL PLAN – MECHANICAL POWER
10-ET101 FIRST FLOOR PARTIAL PLAN - SYSTEMS
10-E-400 ELECTRICAL DETAILS
10-E-500 ELECTRICAL ONE-LINE DIAGRAMS AND SCHEDULES
- - - E N D - -
VA 01‐01‐21
01 00 00 ‐1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Project
Number VB3239 VBA at West Palm Beach VAMC as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center
Engineering Officer.
C. Offices of Romanyk Consulting Corp., as Architect‐Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Throughout the drawings and specifications, references to Contracting Officer shall be represented by the abbreviation “CO”. References to COR, Contracting Officer’s Technical
Representative or Contracting Officer’s Representative shall be represented by the abbreviation
“COR”. Any reference to “Resident Engineer” or “Project Engineer” is synonymous with “COR”.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Contractor to provide all labor, equipment, materials and supervision necessary to complete Project Number VB3239 A&E Design for Bldg
10 ‐ VBA at VAMC in West Palm Beach, Florida in accordance with the attached drawings and specifications. All work to be done in a first‐class manner as approved by the COR.
01 00 00 ‐2
1.4 PERIOD OF PERFORMANCE
A. The period of performance for this project shall be 160 calendar days total for completion of all contractual obligations. The period of performance begins on the date of the Notice To Proceed, and includes but is not limited to submittal review and product procurement, all construction services required, all punch list items reconciled, and ending once close‐out services have been completed, and close‐out documents have been distributed to the owner, including the as‐ builts. The contractor shall provide a project schedule accounting for all material lead times to be approved by the VA.
1.5 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.6 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub‐contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge.
They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the COR. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The General
Contractor may return to the site only with the written approval of the Contracting Officer.
01 00 00 ‐3
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the
Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation . See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law
Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e‐ mail provided all VA encryption procedures are followed.
01 00 00 ‐4
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical
Center Facility Manager.
1.7 OPERATIONS AND STORAGE AREAS (FAR 52.236‐10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadwaysand as authorized by the COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
C. Working space and space available for storing materials shall as determined by the COR .
D. Workers are subject to rules of Medical Center applicable to their conduct.
E. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements as determined by the COR..
01 00 00 ‐5
F. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR . All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
G. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work outlined in the drawings and specifications shall be completed in 1 (one) phase.
2. No phasing is anticipated for this project.
H. Part of Bldg No. 10will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.
I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre‐inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
J. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure
01 00 00 ‐6 uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior written approval of COR .
Electrical work shall be accomplished with all affected circuits or equipment de‐energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center .
Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of
COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source and all penetrations in walls, floors, and or roofs shall be infilled to meet all governing codes and specifications. Those which
01 00 00 ‐7 are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
L. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
M. Coordinate the work for this contract with other construction operations as directed by COR.
This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.8 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of building in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting
Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR , to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in
01 00 00 ‐8 accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236‐2) and
"CHANGES" (FAR 52.243‐4).
C. Re‐Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re‐survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re‐survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.9 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re‐installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center .
01 00 00 ‐9
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with
Contractor's operation.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.
Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.)
disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243‐4) and "DIFFERING SITE CONDITIONS" (FAR 52.236‐2).
1.11 AS‐BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as‐built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
01 00 00 ‐10
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as‐built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as‐built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.12 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National
Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze‐up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
01 00 00 ‐11
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.13 TEMPORARY TOILETS
A. Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to Contractor by Medical Center Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.
1.14 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the
Contractor from existing outlets and supplies, as specified in the contract.
1.15 NEW TELEPHONE EQUIPMENT
A. The contractor shall coordinate with the work of installation of telephone equipment by others.
This work shall be completed before the building is turned over to VA.
1.16 TESTS
A. Testing to include pressure tests on new duct work, all lines prior to connection, and test and balance. No commissioning will be required. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre‐test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre‐tested.
01 00 00 ‐12
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building.
Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.17 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub‐assembly components. Manuals shall include an index covering all component parts clearly cross‐referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control
01 00 00 ‐13 shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished.
Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory‐trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site.
These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter‐related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the
VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.18 GOVERNMENT‐FURNISHED PROPERTY
A. The Government shall deliver to the Contractor, the Government‐furnished property shown on the drawings .
B. Equipment furnished by Government to be installed by Contractor will be furnished to
Contractor at the Medical Center .
C. Contractor will be provided Government Furnished Equipment at such time as needed. No requirement to store.
D. Notify Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the Government for delivery of equipment.
01 00 00 ‐14
1. Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government. At such time the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the
Government representative with a written statement as to its condition or shortages.
2. Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
E. Equipment furnished by the Government will be delivered in a partially assembled (knock down) condition in accordance with existing standard commercial practices, complete with all fittings, fastenings, and appliances necessary for connections to respective services installed under contract. All fittings and appliances (i.e., couplings, ells, tees, nipples, piping, conduits, cables, and the like) necessary to make the connection between the Government furnished equipment item and the utility stub‐up shall be furnished and installed by the contractor at no additional cost to the Government.
F. Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
G. Furnish supervision of installation of equipment at construction site by qualified factory trained technicians regularly employed by the equipment manufacturer.
‐ ‐ ‐ E N D ‐ ‐ ‐
07/09/2021 100% Final Construction Documents
VA 01‐21
01 32 16.15 ‐ 1
SECTION 01 32 16.15
PROJECT SCHEDULES
(SMALL PROJECTS – DESIGN/BID/BUILD)
PART 1‐ GENERAL
1.1 DESCRIPTION:
A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up‐to‐date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications.
1.2 CONTRACTOR'S REPRESENTATIVE:
A. The Contractor shall designate an authorized representative responsible for the Project
Schedule including preparation, review and progress reporting with and to the Contracting
Officer's Representative (COTR).
B. The Contractor's representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section.
C. The Contractor’s representative shall have the option of developing the project schedule within their organization or to engage the services of an outside consultant. If an outside scheduling consultant is utilized, Section 1.3 of this specification will apply.
1.3 CONTRACTOR'S CONSULTANT:
A. The Contractor shall submit a qualification proposal to the COTR, within 10 days of bid acceptance. The qualification proposal shall include:
1. The name and address of the proposed consultant.
2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph.
3. A representative sample of prior construction projects, which the proposed consultant has performed complete project scheduling services. These representative samples shall be of similar size and scope.
07/09/2021 100% Final Construction Documents
01 32 16.15 ‐ 2
B. The Contracting Officer has the right to approve or disapprove the proposed consultant, and will notify the Contractor of the VA decision within seven calendar days from receipt of the qualification proposal. In case of disapproval, the Contractor shall resubmit another consultant within 10 calendar days for renewed consideration. The Contractor shall have their scheduling consultant approved prior to submitting any schedule for approval.
1.4 COMPUTER PRODUCED SCHEDULES
A. The contractor shall provide monthly, to the Department of Veterans Affairs (VA), all computer‐ produced time/cost schedules and reports generated from monthly project updates. This monthly computer service will include: three copies of up to five different reports (inclusive of all pages) available within the user defined reports of the scheduling software approved by the
Contracting Officer; a hard copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data; and the resulting monthly updated schedule in PDM format. These must be submitted with and substantively support the contractor’s monthly payment request and the signed look ahead report. The COTR shall identify the five different report formats that the contractor shall provide.
B. The contractor shall be responsible for the correctness and timeliness of the computer‐ produced reports. The Contractor shall also responsible for the accurate and timely submittal of the updated project schedule and all CPM data necessary to produce the computer reports and payment request that is specified.
C. The VA will report errors in computer‐produced reports to the Contractor’s representative within ten calendar days from receipt of reports. The Contractor shall reprocess the computer‐ produced reports and associated diskette(s), when requested by the Contracting Officer’s representative, to correct errors which affect the payment and schedule for the project.
1.5 THE COMPLETE PROJECT SCHEDULE SUBMITTAL
A. Within 45 calendar days after receipt of Notice to Proceed, the Contractor shall submit for the
Contracting Officer's review; three blue line copies of the interim schedule on sheets of paper
765 x 1070 mm (30 x 42 inches) and an electronic file in the previously approved CPM schedule program. The submittal shall also include three copies of a computer‐produced activity/event ID schedule showing project duration; phase completion dates; and other data, including event cost. Each activity/event on the computer‐produced schedule shall contain as a minimum, but not limited to, activity/event ID, activity/event description, duration, budget amount, early start
07/09/2021 100% Final Construction Documents
01 32 16.15 ‐ 3 date, early finish date, late start date, late finish date and total float. Work activity/event relationships shall be restricted to finish‐to‐start or start‐to‐start without lead or lag constraints.
Activity/event date constraints, not required by the contract, will not be accepted unless submitted to and approved by the Contracting Officer. The contractor shall make a separate written detailed request to the Contracting Officer identifying these date constraints and secure the Contracting Officer’s written approval before incorporating them into the network diagram.
The Contracting Officer’s separate approval of the Project Schedule shall not excuse the contractor of this requirement. Logic events (non‐work) will be permitted where necessary to reflect proper logic among work events, but must have zero duration. The complete working schedule shall reflect the Contractor's approach to scheduling the complete project. The final
Project Schedule in its original form shall contain no contract changes or delays which may have been incurred during the final network diagram development period and shall reflect the entire contract duration as defined in the bid documents. These changes/delays shall be entered at the first update after the final Project Schedule has been approved. The Contractor should provide their requests for time and supporting time extension analysis for contract time as a result of contract changes/delays, after this update, and in accordance with Article, ADJUSTMENT OF CONTRACT COMPLETION.
B. Within 30 calendar days after receipt of the complete project interim Project Schedule and the complete final Project Schedule, the Contracting Officer or his representative, will do one or both of the following:
1. Notify the Contractor concerning his actions, opinions, and objections.
2. A meeting with the Contractor at or near the job site for joint review, correction or adjustment of the proposed plan will be scheduled if required. Within 14 calendar days after the joint review, the Contractor shall revise and shall submit three blue line copies of the revised Project Schedule, three copies of the revised computer‐produced activity/event ID schedule and a revised electronic file as specified by the Contracting Officer. The revised submission will be reviewed by the Contracting Officer and, if found to be as previously agreed upon, will be approved.
C. The approved baseline schedule and the computer‐produced schedule(s) generated there from shall constitute the approved baseline schedule until subsequently revised in accordance with the requirements of this section.
07/09/2021 100% Final Construction Documents
01 32 16.15 ‐ 4
D. The Complete Project Schedule shall contain approximately all required work activities/events.
1.6 WORK ACTIVITY/EVENT COST DATA
A. The Contractor shall cost load all work activities/events except procurement activities. The cumulative amount of all cost loaded work activities/events (including alternates) shall equal the total contract price. Prorate overhead, profit and general conditions on all work activities/events for the entire project length. The contractor shall generate from this information cash flow curves indicating graphically the total percentage of work activity/event dollar value scheduled to be in place on early finish, late finish. These cash flow curves will be used by the Contracting
Officer to assist him in determining approval or disapproval of the cost loading. Negative work activity/event cost data will not be acceptable, except on VA issued contract changes.
B. The Contractor shall cost load work activities/events for guarantee period services, test, balance and adjust various systems in accordance with the provisions in Article, FAR 52.232 – 5
(PAYMENT UNDER FIXED‐PRICE CONSTRUCTION CONTRACTS) and VAAR 852.232 –Article 71
Including NAS‐CPMfor (PAYMENTS UNDER FIXED PRICE CONSTRUCTION).
C. In accordance with FAR 52.236 – 1 (PERFORMANCE OF WORK BY THE CONTRACTOR) and VAAR
852.236 – 72 (PERFORMANCE OF WORK BY THE CONTRACTOR), the Contractor shall submit, simultaneously with the cost per work activity/event of the construction schedule required by this Section, a responsibility code for all activities/events of the project for which the
Contractor's forces will perform the work.
D. The Contractor shall cost load work activities/events for all BID ITEMS including ASBESTOS
ABATEMENT (if required). The sum of each BID ITEM work shall equal the value of the bid item in the Contractors' bid.
1.7 PROJECT SCHEDULE REQUIREMENTS
A. Show on the project schedule the sequence of work activities/events required for complete performance of all items of work. The Contractor Shall:
1. Show activities/events as:
a. Contractor's time required for submittal of shop drawings, templates, fabrication, delivery and similar pre‐construction work.
b. Contracting Officer's and Architect‐Engineer's review and approval of shop drawings, equipment schedules, samples, template, or similar items.
07/09/2021 100% Final Construction Documents
01 32 16.15 ‐ 5
c. Interruption of VA Facilities utilities, delivery of Government furnished equipment, and rough‐in drawings, project phasing and any other specification requirements.
d. Test, balance and adjust various systems and pieces of equipment, maintenance and operation manuals, instructions and preventive maintenance tasks.
e. VA inspection and acceptance activity/event with a minimum duration of five work days at the end of each phase and immediately preceding any VA move activity/event required by the contract phasing for that phase.
2. Show not only the activities/events for actual construction work for each trade category of the project, but also trade relationships to indicate the movement of trades from one area, floor, or building, to another area, floor, or building, for at least five trades who are performing major work under this contract.
3. Break up the work into activities/events of a duration no longer than 20 work days each or one reporting period, except as to non‐construction activities/events (i.e., procurement of materials, delivery of equipment, concrete and asphalt curing) and any other activities/events for which the COTR may approve the showing of a longer duration. The duration for VA approval of any required submittal, shop drawing, or other submittals will not be less than 20 work days.
4. Describe work activities/events clearly, so the work is readily identifiable for assessment of completion. Activities/events labeled "start," "continue," or "completion," are not specific and will not be allowed. Lead and lag time activities will not be acceptable.
5. The schedule shall be generally numbered in such a way to reflect either discipline, phase or location of the work.
B. The Contractor shall submit the following supporting data in addition to the project schedule:
1. The appropriate project calendar including working days and holidays.
2. The planned number of shifts per day.
3. The number of hours per shift.
Failure of the Contractor to include this data shall delay the review of the submittal until the
Contracting Officer is in receipt of the missing data.
C. To the extent that the Project Schedule or any revised Project Schedule shows anything not jointly agreed upon, it shall not be deemed to have been approved by the COTR. Failure to include any element of work required for the performance of this contract shall not excuse the
07/09/2021 100% Final Construction Documents
01 32 16.15 ‐ 6
Contractor…