This request for proposal solicits offers for an Infrastructure as a Managed Service to replace the Veterans Affairs' existing VistA Imaging architecture. Offerors must propose a solution that consolidates medical imaging files from multiple storage systems onto a single on-premises storage platform with cloud-based disaster recovery capabilities. The contractor will also implement and manage this solution across 156 VA medical facilities. Key details include a February 19, 2021 response deadline, managed service delivery of approximately 14 petabytes of storage growing at 18% annually, implementation of an initial lab system within 45 days of award, and service level agreements for storage performance and outage response times. The VA seeks a prime contractor to coordinate subcontractors and meet small business participation goals.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Request for Proposal 36C10B21R0001 - Infrastructure as a Managed Service (IaaMS) | |||
| Vendor Questions and Answers | |||
| Please be advised that any information contained herein is for informational purposes only, is offered in response to specific questions posed by prospective Offerors, and is subject to change throughout the question and answer process. Accordingly, in the event that there is any discrepancy between the information contained within this document, any subsequent Question and Answer document(s), and/or the Solicitation, Offerors are hereby advised that the terms and conditions contained within the final Solicitation control. | |||
| # | Reference | Question | Answer |
| 1 | Page 1, General | Due to the modified scope and change in acquisition strategy from Small Business set aside to Full and Open, we respectfully request a 3-week extension from the current February 12 submission date. | The RFP has been extended to February 19, 2021 at 2:00PM EST. Government to release RFP amendment next week. |
| 2 | Page 4, Section A.3 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT | Section (2)a Software License of the RFP states: |
“Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software.”
Section (3)e Software Maintenance and Technical Support of the RFP states:
“If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.”
| 1. Please confirm that since the Government will own perpetual software, it will be bound by the specific publishers’ EULAs and their defined reinstatement fees. | Since the IaaMS solution shall be a managed service the Contractor will not be providing software licenses to the Government, therefore, there is no requirement for the licenses to be perpetual and the Government is not bound by any publisher's EULA . RFP Section A.3 has been removed. | ||
| 3 | Page 76, Section 3.0 SCOPE OF WORK | Section 3.0 of the RFP states: |
“The Contractor shall provide all licensing and professional services required to implement a VI cloud disaster recovery repository hosted within the VAEC AWS GovCloud or Azure Government environments. The Contractor shall not be responsible for providing or acquiring cloud-based compute or storage capacity for this contract. VA will furnish VAEC capacity as Government Furnished Equipment (GFE).”
| 1. Please confirm that the Contractor will not be penalized under the Service Level Agreements for any VAEC outage. | The Contractor will not be penalized for outages originating from GFE, including the VA Enterprise Cloud, insofar as they impact relevant operations (e.g. cloud disaster recovery capabilities). | ||
| 4 | Page 86, Section 5.3 IaaMS VI SOLUTION REQUIREMENTS | The RFP states: |
“The current VI application stack is hosted on Hewlett Packard (HP) servers running Windows Server 2012 R2. Those hosts run the Hyper-V virtualization hypervisor with resident Windows-based virtual machine guests that, in turn, run the individual VI applications. An HP 3PAR storage system stores the virtual machine disks and associated VM files, as well as the Tier 1 medical images. The retention time for those images range from 90 calendar days to 5 calendar years depending upon the facility. The VistA Imaging application stack writes image data to Tier 1 via SMB. SMB presentation for Tier 1 is managed by Windows Server 2012 R2 virtual machines.”
1. Is it accurate to state that the application will not run on newer Windows Versions, and has not been validated on a Windows 2016 or newer OS release?
2. Does the current version of VistaA have any kind of API integration?
3. What is client-side minimal / standard ISP bandwidth and QoS?
4. What are the maximum tolerable milliseconds of latency? 1) VA has not tested VistA Imaging on newer versions of Windows Server. However, VA has no reason to believe VistA Imaging would not be functional on newer versions.
2) No.
3) VistA Imaging end users are predominantly located at the same facility as the VistA Imaging application stack they are accessing. As such, "ISP bandwidth and QoS" generally does not apply to traffic between the application stack and the end user.
4) VistA Imaging storage performance is defined in PWS section 5.3.1.5. VA does not specify a traditional storage latency requirement, but rather a composite image recall performance threshold.
5 Page 88, Section 5.3.2 IaaMS VI SOLUTION INITIAL DEPLOYMENT From the RFP, we understand that "Under the IaaMS solution, the Contractor shall replace the VI architecture with approximately 14 PB of on-premises storage and 14 PB of IaaMS VI cloud disaster recovery repository."
1. Please verify that the system can split the targets for storage, i.e., locate tier-1 storage on-prem and tier-2 storage in cloud.
2. What is the predicted ratio of storage content between tier-1, tier-2 and long-term storage?
3. Please provide the development roadmap for this application.
| - | Who is the provider that is controlling versioning for the solution? | |
| - | When is the next version due out? | |
| - | What new functionality will be available in this version? | 1) In the context of VistA Imaging, Tier 1 and Tier 2 storage may not be split between cloud and on-premises. Cloud storage is intended solely as a disaster recovery copy of on-premises data. The primary copy of all tier 1 and tier 2 data shall remain on-premises at all sites. |
2) See response to #1 above.
3) VistA Imaging is in sustainment, meaning no large-scale development efforts are being taken to add new functionality to the application. As such, there is no defined roadmap, no due date for a future version, and no plans exist for the addition of new functionality.
6 Page 89, Section 5.3.2 IaaMS VI SOLUTION INITIAL DEPLOYMENT The RFP states: “The Contractor shall deliver, implement, configure, and test the IaaMS VI solution successfully at the Cleveland, Ohio VA lab site within 45 days of award IAE PWS Section 5.4.”
1. Are existing server and storage workloads hosted on-prem or in a co-location? or both?
- If a co-location, is it within a near-cloud co-location, e.g., an AWS Direct Connect Exchange Point?
2. Do the application workstations run on a cloud VDI solution (e.g., AWS workspaces)? Are there any known issues that would preclude VDI?
3. Does the current solution support multiple DICOM gateways? For example, are multi-part uploads supported?
1) Existing server and storage workloads are hosted on-premises.
2) VistA Imaging is accessed predominantly via CPRS using an executable installed locally on each client workstation. Virtual desktop infrastructure (VDI) is outside of the scope of this contract.
3) A given facility may have multiple DICOM gateways, but multi-part uploads are not supported.
7 Page 96, Section 5.5.2 Shipping The RFP states: “The Contractor shall provide Facility Shipping Documentation to include copy of the purchase order and a bill of material/packing list to logistics staff at each facility prior to shipment and shall send a copy to the VA COR and PM.”
1. How is the required documentation to be provided?
2. Will the contact information be provided for each facility in advance? 1) VA will accept shipping documentation via electronic mail.
2) Yes, contact information will be provided for each facility in advance of shipment.
8 Page 96, Section 5.5.3 INSTALLATION The RFP states: “Contractor shall provide installation services to include: 1. Retrieval of hardware from a designated warehouse at each installation location, which includes both VA and co-location facilities.”
| 1. Is the Contractor required to provide a vehicle to move the equipment? | 1) No. Where necessary, VA will provide a vehicle to move equipment from a discrete warehouse to the installation facility. | ||
| 9 | Page 101-102, Section 5.6.2.4.3 IaaMS SOLUTION UNPLANNED MAJOR OUTAGES | The RFP states: |
6. If the Contractor and/or VA determine an on-site response is required, the Contractor shall coordinate and provide OEM technical subject matter expert to arrive onsite no more than four (4) hours after notification.
7. If the Contractor and/or VA determine parts are required to remedy the outage, parts shall arrive onsite no more than four (4) hours after notification.”
| 1. Are these requirements applicable to all locations? | 1) Yes, these requirements apply to all locations. | ||
| 10 | Page 103, Section 5.6.4 CATASTROPHIC FACILITY RECOVERY | The RFP states: “Following notification of a catastrophic loss by VA, the contractor shall deliver, install and configure a fully functional replacement solution at the facility that experienced the catastrophic loss within 24 hours.” |
| 1. Is this requirement applicable to all locations? | 1) Yes, this requirement applies to all locations. | |||
| 11 | Page 111-116, Section 5.11 OPTIONAL TASK FOUR (4) – HYPERCONVERGED COMPUTE FOUNDATION through 5.14 OPTIONAL TASK SEVEN (7) – CONVERGED COMPUTE NODE EXPANSION | Please provide End of Service Life/End of Life timelines for the current applications stack (hyperconverged and converged). | There is no End of Service Life/End of Life timelines for the current applications stack. Hyperconverged and converged refers to hardware infrastructure, not the application stack. | |
| 12 | Page 111, Section 5.11 OPTIONAL TASK FOUR (4) – HYPERCONVERGED COMPUTE FOUNDATION | Section 5.11.1 (4) BASE COMPUTE REQUIREMENTS of the RFP states: |
“The solution shall include highly available network switches as defined in Attachment B - IaaMS Solution Infrastructure Requirements including all necessary licensing, cabling, modules, adapters as needed to complete a fully formed and usable solution.”
Section 5.13 OPTIONAL TASK SIX (6) – CONVERGED COMPUTE FOUNDATION (2b) states:
“The Converged Compute Foundation shall be an OEM-validated design. In addition to the requirements provided in Attachment B, switches used to facilitate connectivity for any devices provided as part of this option shall meet the following additional requirements:”
These sections clearly call out the requirement for network switches to be provided. However, there is no reference for providing network switches for accomplishing Section 5.3 IaaMS VI SOLUTION REQUIREMENTS, Future State – Initial Deployment:
“IaaMS VI solution that shall consolidate the medical images and associated files from the existing HP 3PAR tier 1 solution and the medical images and associated files from the existing NetApp StorageGRID/E-Series tier 2 solution onto a single replacement IaaMS solution.”
Based on the information provided above:
1. Our understanding is that network switches must be included to meet the pricing requirements of Attachment D - IaaMS Price Evaluation Spreadsheet, Line 5, FFP Base Task - 5.3 - VistA Imaging Capacity (0003, 1003, 2003, 3003, 4003, 5003, 6003) (NTE). Please confirm our understanding.
2. If network switches are not required, will the Government provide connectivity via its existing network stack?
- If so, please provide network rack diagrams for each site so the appropriate solution can be architected. 1) Switches must be included to meet the pricing requirements of Attachment D, Line 5.
2) No the Government will not provide connectivity via its existing network stack since network switches shall be included as part of the IaaMS solution.
13 Page 183, Section E.8 BASIS FOR AWARD The RFP states that the Technical evaluation factor is based on our understanding of the VA’s problems and the feasibility of our approach.
1. For clarification, please verify that Volume I - Technical requires a response only to the following PWS sections: 5.2, 5.3.1, 5.3.2.1, 5.3.3 and 5.6.
2. Please verify that Volume I – Technical does not require a response to sections 5.0, 5.1, 5.4, 5.4.1, 5.5, 5.5.1, 5.5.2, 5.5.4, 5.7, 5.8, 5.9, 5.10, 5.11, 5.12, 5.13, 5.14, 5.15, and 5.16.
| 3. Within Volume I - Technical, does the Government want us to explain our full understanding of the entire PWS starting from section 4.0 to 5.16? | Offerors shall provide a detailed technical approach to the five discriminators detailed in section E.9 (2)(c)(i). While the Offeror is still required to complete all PWS tasks upon award, Offerors are not required to provide a technical approach for any other PWS sections in its proposal. | |||
| 14 | Page 188, Section E.9 RESPONSE INSTRUCTIONS Volume I | Per the instructions, the Volume I - Technical cannot exceed a 30-page limit. For us to fully explain our solution and to explain our knowledge of the Government requirements, we are asking for an increase of the page limit (the number of pages required will depend on the Government’s response to Question 13). | The page limitation for Volume I - Technical shall remain at 30 pages. | |
| 15 | Page 192, Section E.9 (vi) | Is a signature required on the representations at E.2, E.3 E.4 and E.5? | No, the Offeror shall complete all check boxes in E.2 - E.5 and in accordance with section E.9(vi) the Offeror shall sign the 1449. | |
| 16 | Attachment D – IaaMS Price Evaluation Spreadsheet, Est Cloud Resources - Compute tab | Has the Government performed any cloud assessment services (AWS, Azure) on this infrastructure? If so, please share the data for sizing. | Offerors will no longer be required to provide estimated quantities of cloud resources as part of the Price Volume and the Government will no longer be adding the estimated cost of the cloud resources to the Offerors’ total evaluated price. The IaaMS Price Evaluation Spreadsheet (Attachment D) has been updated accordingly. Offerors will now be required to provide its estimated cloud resources required to support its proposed IaaMS disaster recovery solution as an attachment to the Technical Volume submission. RFP Sections E.8 and E.9 have been updated accordingly. | |
| 17 | Page 1, Section SF 1449 Block 10 | The VA decided to release this requirement as "Unrestricted." We believe there were more than three (3) qualified Small Veteran Owned Small Businesses (SDVOSB) responded to the multiple Requests For Information. Under the provisions of FAR 19.202, we request the VA release the justification to change the intended SDVOSB set aside to full and open. | The VA performed market research to determine if there were two or more SDVOSBs capable of performing this requirement. All responses to the multiple requests for information were reviewed and assessed as to each respondent's capabilities. A determination was made that there were not two or more SDVOSBs capable of performing this requirement, therefore, the solicitation was released as Unrestricted. VA is not required under FAR 19.202 to release its justification for posting the solicitation as full and open. | |
| 18 | General | For purposes of proposal, what should Offeror use as the start date? | The period of performance for the Base Period is 12 months from contract award. The Government anticipates contract award in 3rd quarter of this fiscal year. | |
| 19 | Attachment E | Reference: Column E “Total Dollar Amount”, does not take into consideration a small business under multiple socio-economic categories, and will double or triple count the total dollar value. |
Please clarify:
| Would the Government please consider allowing one-line item to address all socio-economic categories by company and dollar amount, or change the formula within column E to assure the dollars allocated are not double and triple counted? | Attachment E, Small Business Subcontracting Plan has been revised to allow Offerors to propose actual percentages for the overall small business participation requirement as well as the socio-economic status goals. | |||
| 20 | Page 4, A.3 Software License, Maintenance and Technical Support | Given that the solution is Infrastructure as a Service whereby the VA is paying for a service and not purchasing hardware and software, this provision should not apply. Request removal or provide clarification as to why it would apply. | RFP Section A.3 has been removed. | |
| 21 | Page 155, C.3 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items | FAR provision 52.222-41 Service Contract Labor Standards was not checked or incorporated into the solicitation, however FAR 52.222-55 and FAR 52.222-62 were checked. |
Please clarify if FAR 52.222-41 applies, if so, please update the solicitation. The Government has determined that 52.222-41 is applicable to this procurement and has been checked off in RFP Section C.3. FAR Clause 52.222-49 is applicable and has been added to Section C. The Service Contract Act Compliance Requirement has been added to the RFP in Section A.
22 Page 155, RFP Section C.3, 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items shows FAR 52.222-55, Minimum Wages Under Executive Order 13658 and FAR 52.222-62, Paid Sick Leave Under Executive Order 13706 as applicable. However, in accordance with FAR 22.1906 and FAR 22.2110, both clauses are applicable in solicitations and contracts that include the clause at FAR 52.222-6, Construction Wage Rate Requirements or FAR 52.222-41, Service Contract Labor Standards. Neither FAR 52.222-6 nor FAR 52.222-41 is marked as applicable to this solicitation. Please confirm the applicability of FAR 52.222-55 and FAR 52.222-62. The Government has determined that 52.222-41 is applicable to this procurement and has been checked off in RFP Section C.3, therefore both FAR 52.222-55 and 52.222-62 are also applicable.
23 Page 17-18, CLIN X0015 “Before any work begins, the Contractor shall produce time estimates of the number of hours that will be needed for the work to be performed and shall obtain VA approval for the expenditure of hours.”
| Please clarify whether VA approval means COR approval or CO approval, and update the CLIN as appropriate | Approval will be provided by the COR. PWS and Price Schedule updated accordingly. | |||
| 24 | Page 14, Section B.2 | There is no Optional Task Two, only One and Three. Please update or confirm this is intentional. | Optional Task Two can be found at CLIN 8001. | |
| 25 | Page 177, Section E-5 52.212-3(j) | Please confirm that “Place of Manufacture” does not apply to this solicitation since it is predominately for services. | Confirmed. 52.212-3(j) does not apply since this solicitation is for a managed service and not predominately for the acquisition of manufactured end products. | |
| 26 | Page 79, RFP Paragraph 5.1.2 Technical Kick-Off Meeting | Reference: states, “The Contractor shall submit the final updated presentation to the CO for review and signature within three (3) calendar days after the meeting. The Contractor shall also work with CS to prepare and distribute the meeting minutes of the kickoff meeting to the CO, COR and all attendees within three (3) calendar days after the meeting.” |
| Since the Contractor is required to submit the meeting minutes to the CO for review within the same period of time that the Contractor is required to distribute the minutes to all attendees, please confirm that the Contractor is to distribute the meeting minutes within three (3) calendar days after the meeting, regardless of whether the minutes have been reviewed and signed by the CO. | Section 5.1.2 has been updated to strike the following language: The Contractor shall submit the final updated presentation to the CO for review and signature within three (3) calendar days after the meeting. | ||
| 27 | Page 157, RFP Section C.5, 52.217-8 Option to Extend Services (NOV 1999) | Reference: states, “The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.” |
Within 30 days of what? RFP section C.5 has been updated as follows:
“The Contracting Officer may exercise the option by written notice to the Contractor within 30 days of expiration of period of performance.”
28 Page 157, RFP Section C.6, 52.217-9 Option to Extend the Term of the Contract (MAR 2000) Reference: states, “The Government may extend the term of this contract by written notice to the Contractor at any time prior to expiration of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend prior to contract expiration.”
| Please include in the clause the number of days prior to extension of the option the preliminary notice will be provided. | Section C.6, FAR 52.217-9 has been updated to include the following language "The Government may extend the term of this contract by written notice to the Contractor at any time prior to expiration of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires." | ||
| 29 | Page 184, RFP Section E.8 Basis for Award, paragraph 2 Price Evaluation Approach | Reference: states the total evaluated price “will equal the sum of the total evaluated FFP, the total evaluated LH Price and the total evaluated estimated Cloud Resource price…” The RFP does not indicate that the Government intends to perform either a price reasonableness analysis or a price realism analysis, but simply states that the Government will “verify the Offeror’s calculation of the total proposed price.” |
a. In order to ensure that proposed prices are reasonable, and that the offeror is expected to be able to perform for the proposed price, does the Government intend to evaluate offers for price reasonableness?
b. In order to determine that the offerors’ proposed fully loaded blended hourly labor rates are realistic for the offeror’s proposed technical solution, and will ensure the offeror’s ability to recruit and retain qualified personnel throughout the period of performance, it is respectfully suggested that the Government evaluate the offerors’ proposed labor rates for realism. Offerors will no longer be required to provide estimated quantities of cloud resources as part of the Price Volume and the Government will no longer be adding the estimated cost of the cloud resources to the Offerors’ total evaluated price. The IaaMS Price Evaluation Spreadsheet (Attachment D) has been updated accordingly. Offerors will now be required to provide its estimated cloud resources required to support its proposed IaaMS disaster recovery solution as an attachment to the Technical Volume submission. RFP Sections E.8 and E.9 have been updated accordingly.
The Government is not performing a price realism analysis but will ensure that the final price is fair and reasonable in accordance with FAR 15.404.
30 Page 186, RFP Section E.8 Basis for Award, paragraph 5a Reference: states, “The proposal will be evaluated to determine whether the Offeror has met the overall Small Business Participation Requirement for this procurement which is 20% of the total proposed contract price, which does not include the cloud resources price calculated for evaluation purposes only.” It is unclear what portion of the work is to be excluded from the amount upon which the Small Business percentages are based. Small Business Participation requirement of 20 percent is based on the total proposed price (The Total proposed price is the sum of the total Firm Fix Price and the total proposed Labor Hour price), NOT the total evaluated price. No portion of the proposed work is to be excluded from the 20 percent calculation. RFP Section E.8(2) has been updated to add definition of Total Proposed Price.
Note: Government will no longer be adding the estimated cost of the cloud resources to the Offerors’ total evaluated price.
| 31 | Page 187, RFP Section E.9 Response Instructions, paragraph 2 Proposal Files | Reference: states, “All files will be submitted as either a Microsoft Word 2019 (.docx) or Microsoft Excel 2019 (.xlsx) file or an Adobe Acrobat (.pdf) file or compatible as indicated in the table.” The referenced table indicates that all proposal files other than Price are to be PDF and the Price submission is to be .xls. Therefore, please explain what is meant by “or compatible as indicated in the table.” | RFP Section E.9(2)(a) has been updated to remove the following language: "or compatible as indicated in the table" and the table has been updated to remove file extensions from the File Name column. |
| 32 | Page 188, RFP Section E.9 Response Instructions, paragraph 2c, Table | Reference: states, the Technical volume is limited to 30 pages. |
| Given the amount of information required to be included in the Technical proposal, we request that the Government increase the page limit to 40 pages. | The page limitation for Volume I - Technical shall remain at 30 pages. | ||
| 33 | Attachment E, IaaMS Small Business Subcontracting Plan | Reference: contains a section entitled “Socio-Economic Status Goals.” This section has blocks for offerors to enter dollars and percentages for SDVOSB, VOSB, SDB, WOSB, HUBZone and Large Business percentages. However, it does not contain a block for offerors to enter the percentage for Small Business. |
a. Should a row be added to this section for offerors to include dollars and percentage for Small Business?
b. In the drop-down list under Small Business Subcontracting Plan Tables, SDVOSB, VOSB, SDB, WOSB, HUBZone and LB are included. Should not Small Business also be included in the drop-down list?
| c. It appears that the drop-down list under Small Business Subcontracting Plan Tables limits the selection to one socioeconomic category per subcontractor. How should offerors show subcontractors that fall under several socioeconomic categories? | Attachment E, Small Business Subcontracting Plan has been revised to allow Offerors to propose actual percentages for the overall small business participation requirement as well as the socio-economic status goals. | ||
| 34 | Page 190, RFP Section E.9 Response Instructions, paragraph 2c(iii) Volume III – Past Performance Factor | Reference: defines relevance as follows: “Areas of relevance include contracts totaling over $5M involving implementation of enterprise server and storage infrastructure at 25 or more facilities as part of a managed service.” |
| For subcontractors Past Performance will the Government consider a broader consideration of areas of relevance to include contracts totaling over $5M involving implementation of enterprise server and storage infrastructure at 5 or more facilities as part of a managed service. This will expand opportunities for Small Business. | RFP Section E.9 Response Instructions , 2, (iii) Volume III, Past Performance Factor has been updated to allow Offerors to submit up to 2 past performance instances for subcontractors performing installation/implementation management services of relevant contracts (up to 2 total, not 2 per subcontractor). The areas of relevancy for such instances remains the same, but the definition of major subcontractor does not apply to the installation/implementation management subs. | ||
| 35 | Page 191, RFP 36C10B21R000, Infrastructure as a Managed Service (IaaMS); (iii) VOLUME III – PAST PERFORMANCE FACTOR | Reference: states, Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number, points of contact (Government Contacting Officer Representative or equivalent), and type of work to be performed by citing the applicable Government PWS paragraph number. |
Will the Government please amend the RFP to remove the above reference from the past performance requirement? Specifically, the requested outline/information: “…an outline of how the effort required by the solicitation will be assigned for performance within the Offeror’s corporate entity and among the proposed subcontractors”; would be better suited for response within the Technical Volume I in response to Question 5 - Management Methodology, which states as follows:
| “The Offeror’s management methodology that shall be used in executing the effort. The Offeror shall provide its staffing approach and details of how the proposed effort will be assigned within the Offeror’s corporate entity and among the proposed subcontractors. The Offeror shall provide a summary of how it and its subcontractors’ corporate expertise will be utilized to meet the requirements of the PWS.” | RFP Section E.9(2)(c)(iii) Volume III Past Performance Factor has been updated to strike the following language "Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Offeror’s corporate entity and among the proposed subcontractors. " | |||
| 36 | Page 84, PWS Para 5.2.2.5 | Reference: This requirement indicates that: “All storage media devices delivered to VA shall be permanently retained by VA.” There is no formal contractual deliverable identified for this requirement, however, associated with any storage media. | Media devices are not a formal deliverable, they are components of the overall IaaMS solution. Upon removal of storage media from use by the Contractor, all storage media shall be retained by the Government for proper destruction. | |
| 37 | Page 8, PWS 5.1 | Reference: CLINs X001AB and X001AC appear to reference the incorrect PWS section 5.1.3, please update to reference PWS 5.1.2. | Applicable CLINs have been updated to reference PWS section 5.1.2. | |
| 38 | The RFP highlights the need for cloud services as part of the “proposed cloud-based backup solution as specified within Attachment D”. However, Attachment D specifies only AWS branded cloud services/offerings. Lines 12 and 14 of the IaaMS Price Evaluation Spreadsheet requires specific AWS compute (12) and storage (14) pricing with no opportunity for VA contractor responses to include similar Microsoft Azure cloud services. By requesting only AWS pricing, it’s our opinion that the VA will not have adequate data to support a sufficient cost or functional evaluation of cloud services. Furthermore, requesting costs for only one of the two approved VA cloud service providers introduces bias by limiting VA contractor responses to include only AWS pricing, excluding Azure. |
Will the VA issue a separate, fair and open, competition for the ECSO/GFE provided cloud services supporting the back-up and recovery requirements outlined in RFP 36C10B21R0001?
Will the VA consider re-issuing/updating RFP 36C10B21R0001, specifically Attachment D, to request VA contractor pricing for equivalent Microsoft Azure services to support the compute and storage requirements? The Government requires a DR solution that operates in BOTH AWS and Azure. The Government will determine which cloud resources to provide as it sees fit.
Offerors will no longer be required to provide estimated quantities of cloud resources as part of the Price Volume and the Government will no longer be adding the estimated cost of the cloud resources to the Offerors’ total evaluated price. The IaaMS Price Evaluation Spreadsheet (Attachment D) has been updated accordingly. Offerors will now be required to provide its estimated cloud resources required to support its proposed IaaMS disaster recovery solution as an attachment to the Technical Volume submission. RFP Sections E.8 and E.9 have been updated accordingly.
A separate competition for cloud services is not required as either Azure OR AWS (to be determined by the Government) will be provided as GFE after award.
39 Page 96, Section 5.5.2.d “Note: A limited number of facilities may not be able to support an additional contractor-supplied server cabinet. At these facilities, VA will provide server cabinet space for the Contractor’s use. This server cabinet space may be non-contiguous, and the Contractor shall provide transceivers, cabling, and other ancillary hardware required to facilitate non-contiguous placement.”
• Will the VA provide the number of sites that cannot support contractor-supplied server cabinets? Without this information it is impossible to determine the amount of additional cabling, transponders, etc. necessary to complete the installation at these sites and the associated cost.
| • In not, will the VA allow for time and material pricing for these situations? | VA cannot provide the number of facilities pre-award as this determination will be made as part of the Site Readiness Activity. VA will not permit Time and Materials pricing for these situations. The Offeror shall account for any hardware required to support its proposed IaaMS solution in its FFP TB/MO unit price. | ||
| 40 | Page 3, Attachment B 3.0 NETWORK CHANNEL RACKS | “1. The Contractor shall provide network channel racks for any facility that cannot provide sufficient space in existing network channel racks to support the Contractor-provided network switches.” |
• Will the VA provide the number of sites that do not have sufficient space in existing network channel racks? Without this information it is impossible to determine the number of additional network channel racks necessary to complete the installation at these sites and the associated cost.
| • If not, will the VA allow for time and material pricing for these situations? | VA cannot provide the number of facilities pre-award as this determination will be made as part of the Site Readiness Activity. VA will not permit Time and Materials pricing for these situations. The Offeror shall account for any hardware required to support its proposed IaaMS solution in its FFP TB/MO unit price. | |
| 41 | Page 5, Attachment B 4.0 | |
| HORIZONTAL DISTRIBUTION AREAS (HDAS) | “1. If existing structured cabling infrastructure is not available for use at the facility, the Contractor shall install a Horizontal Distributor (HD) in each network rack supporting the IaaMS equipment.” |
• Will the VA provide the number of sites that do not have sufficient structured cabling infrastructure and associated details? Without this information it is impossible to determine the number of site and amount of HD that will be required to complete the installation at these sites and the associated cost.
| • If not, will the VA allow for time and material pricing for these situations? | VA cannot provide the number of facilities pre-award as this determination will be made as part of the Site Readiness Activity. VA will not permit Time and Materials pricing for these situations. The Offeror shall account for any hardware required to support its proposed IaaMS solution in its FFP TB/MO unit price. | |
| 42 | Page 5, Attachment B |
5.0 STRUCTURED HORIZONTAL CABLING BETWEEN NETWORK RACKS AND SERVER CABINETS “1. If no existing structured horizontal cabling exists at the site or the cabling is not suitable for connection of the IaaMS equipment, the Contractor shall install structured horizontal cabling supporting the IaaMS equipment.”
• Will the VA provide the number of sites that do not have sufficient horizontal cabling infrastructure and associated details? Without this information it is impossible to determine the number of site and amount of horizontal cabling that will be required to complete the installation at these sites and the associated cost.
| • If not, will the VA allow for time and material pricing for these situations? | VA cannot provide the number of facilities pre-award as this determination will be made as part of the Site Readiness Activity. VA will not permit Time and Materials pricing for these situations. The Offeror shall account for any hardware required to support its proposed IaaMS solution in its FFP TB/MO unit price. | |
| 43 | Page 6, Attachment B |
6.0 STRUCTURED BACKBONE CABLING BETWEEN MDAS AND HDAS “1. If no existing structured backbone cabling exists at the site or the cabling is not suitable for connection of the network switching equipment in the network racks, the Contractor shall install structured backbone cabling supporting the IaaMS equipment.”
• Will the VA provide the number of sites that do not have sufficient structured backbone cabling infrastructure and associated details? Without this information it is impossible to determine the amount of structured backbone cabling that will be required to complete the installation at these sites and the associated cost.
| • If not, will the VA allow for time and material pricing for this situation? | VA cannot provide the number of facilities pre-award as this determination will be made as part of the Site Readiness Activity. VA will not permit Time and Materials pricing for these situations. The Offeror shall account for any hardware required to support its proposed IaaMS solution in its FFP TB/MO unit price. | |
| 44 | Page 6, Attachment B |
7.0 CABLE TRAYS 1. If no existing cable tray exists at the site or the tray is not suitable for the structured cabling elements, the Contractor shall install cable tray and fiber pathway supporting the IaaMS equipment.
• Will the VA provide the number of sites that do not have sufficient cable tray infrastructure and associated details? Without this information it is impossible to determine the amount of cable tray that will be required to complete the installation at these sites and the associated cost.
| • If not, will the VA allow for time and material pricing for this situation? | VA cannot provide the number of facilities pre-award as this determination will be made as part of the Site Readiness Activity. VA will not permit Time and Materials pricing for these situations. The Offeror shall account for any hardware required to support its proposed IaaMS solution in its FFP TB/MO unit price. | |||
| 45 | General | Will the government be receptive to proposals that contain assignment of claims provision? | The Government is not receptive to proposals that contain an assignment of claims. Any assignment of claims is governed by the policies and procedures set forth in FAR Subpart 32.8. The Government’s examination of any proposed assignment is mutually exclusive from the Government’s solicitation and proposal evaluation process, and shall only be conducted post-award, if submitted on behalf of the successful Offeror post-award. The submission of an assignment of claims with a proposal, may be considered a deviation from the Government's material terms and conditions as established by the RFP, which may render the offeror's proposal unacceptable and thus, ineligible for award. | |
| 46 | General | Will the government be willing to accept special financing terms associated with a proposal, such as completing an essential use questionnaire, or agreeing to a non-replacement cooling off period in the event of an early termination or non-option exercise? These terms help industry lower the total cost of the solution for the government by spreading the risk of capital expenditures into future years. | It is the responsibility of the contractor to provide all resources needed for performance of the contract. The government is not willing to accept special financing terms associated with this acquisition. | |
| 47 | General | If any authority imposes upon any transaction around this contract a duty, tax, levy or fee, will the Government agree to provide the OEM exemption documentation? | The contractor will have the relationship with the OEM so the Government is not in the position to provide an OEM exemption. Any such exemption would have to be obtained by the contractor as this is a contract for managed services. | |
| 48 | General | Upon delivery of the Infrastructure to the Government, will the Government provide a property ‘all-risk’ insurance covering damage or loss to the Infrastructure, including damage or loss due to flood and earthquake, with limits at least equal to the replacement cost of the Infrastructure? | The Government will not provide a property "all-risk" insurance covering damage or loss to the infrastructure as the infrastructure is owned by the contractor and the contractor assumes risk of loss. | |
| 49 | Past Performance | It is our opinion that the current IaaMS requirement for 3 past performance references will seriously diminish competition. Similar to the stated hybrid technical solution desired by the VA, we recommend the VA consider a single past performance for a Prime to demonstrate their proven experience with enterprise server, storage and managed services. This could then be assessed with at least one past performance reference from any/all team members contributing at least 10% to highlight the synergies being brought by the team assembled (and managed) by the Prime. |
| Managed Services as envisioned by this program is relatively new in the Federal space and wrought with many challenges that a highly experienced company can help implement successfully in the VA. As written, however, the requirements limit competition to very few companies and unintentionally eliminates solution providers who can assemble a team with proven success with managed service contracts of this magnitude in the VA and throughout the Federal government but which may not have 3 past performances as currently required. | The requirement states "up to 3" relevant contracts for the Prime contractor. Therefore the Government WILL consider a single past performance instance for the Prime. | ||
| 50 | Attachment B_IaaMS Solution Infrastructure Requirements | Requirement: Attachment B_IaaMS Solution Infrastructure Requirements, Section 10.0 Network, 10.1 Solution Switches, 2.b. states; A minimum of 48 non-blocking ports supporting a 1000BASE, 10GBASE, and 25GBASE transmission. All 48 ports shall support 16Gb and 32Gb fibre Channel connectivity. |
| Question: The specification for the network switch platform to support multiple protocols, Ethernet and fibre Channel on all 48-ports is highly restrictive and reduces competition. General availability of products supporting both protocols on the same platform with flexibility to designate any of the 48-ports as either protocol is limited. We have identified a Cisco product which indicates the ability to provision ports as ‘either’ the specified speed 1000Base/10GBase /25GBase Ethernet or 16Gb and 32Gb fibre Channel. However, the number of ports available supporting fibre Channel is limited to 16-ports. Would VA accept a solution which included both an Ethernet network infrastructure and separate fibre Channel SAN fabric environment? If the option for a dual fabric, Ethernet and fibre Channel is not acceptable, will VA consider reducing the number of ports required to supporting the fibre Channel protocol to 16 ports? | Attachment B has been updated to specify "a minimum of 16 ports shall support 16Gb and 32Gb Fibre Channel connectivity." | |||
| 51 | Vendor Q and A from RFI (#42) | Based on the need to prioritize critical infrastructure nearing End of Life (EOL) and the aggressive deployment timeline, will the Government please provide the list of facilities that have reached and/or are nearing EOL? This will allow vendors to efficiently plan a cost effective deployment schedule that will help minimize risk for VA. | All 156 sites included in Attachment A have equipment that has reached end of life. |
VA does not have a pre-existing schedule for prioritizing the 156 facility installations. VA will provide the list of critical sites and provide to the Contractor at the kickoff meeting. The Contractor may schedule all remaining sites at their convenience.
| 52 | Reference: Section B.2, Item F | Where in the RFP is it stated that Veterans Affairs will not be the owner of new hardware introduced to stand up this IaaMS contract? | The RFP Section 3.0 Scope of Work has been updated to state that the Government does not own or receive title to the hardware and software which comprises the IaaMS solution. The Contractor retains ownership to the IaaMS solution. |
| 53 | Reference: Section B.2, Item F | Is it in fact the intention of Veterans Affairs that the successful offeror will be the owner of new hardware introduced to stand up this IaaMS contract? | Yes, this is a managed service and the Contractor will be the owner of any hardware required to provide the IaaMS solution and provide the managed services. |
| 54 | PWS 1.0, 3.0, 5.3, 6.6, Question #135 | PWS states in multiple locations that VAEC is GFE (1.0, 3.0, 6.6), additionally VA requires 2nd, DR, copy to be on VAEC (5.3). Attachment D (tab ‘Est Cloud Resources – Storage) lists 14 different classes of VAEC cloud storage. |
PWS states in multiple locations that VAEC is GFE (1.0, 3.0, 6.6), additionally VA requires 2nd, DR, copy to be on VAEC (5.3). Attachment D (tab ‘Est Cloud Resources – Storage) lists 14 different classes of VAEC cloud storage. Which is the preferred 2nd copy, DR, storage type VA requires? Q&A #135 states ‘no cost to the contractor for the use of VAEC resources’. What is the purpose of the 14 VAEC storage resources?
VA does not have a preferred 2nd copy, DR storage type, as long as the storage method meets the performance requirements specified within the PWS.
Offerors will no longer be required to provide estimated quantities of cloud resources as part of the Price Volume and the Government will no longer be adding the estimated cost of the cloud resources to the Offerors’ total evaluated price. The IaaMS Price Evaluation Spreadsheet (Attachment D) has been updated accordingly. Offerors will now be required to provide its estimated cloud resources required to support its proposed IaaMS disaster recovery solution as an attachment to the Technical Volume submission. RFP Sections E.8 and E.9 have been updated accordingly.
55 PWS 6.6, VAEC OT, cloud management tools PWS 6.6, VAEC OT, cloud management tools. Can you elaborate the tools available and their functions and capabilities? The tools available are a mix of CSP and third party tools.
The VAEC operational tools are part of the overall VAEC architecture, and consist of the following types:
1. Self-Service Cloud Service Catalog
2. Provisioning Orchestration Deployment
3. Access and Security Management
4. Resource and Accounting Management
5. Cloud Access Security Broker (CASB)
6. Application Programming Interface (API) Gateway
| 56 | Question #146, 24 | Question #146 site surveys, prior to RFP response & pricing are not allowed. Question #24 states all items in Attachment B must be included, and priced. Can VA verify that all items in Attachment B must be priced and included in $/TB/mo capacity, for all sites? | |
| Yes, all items in Attachment B shall be included in the cost per terabyte-month for all sites. | |||
| 57 | PWS 5.2.1, SRM | PWS 5.2.1, SRM, states contractor must provide ‘a single interface and covers […] all storage systems provided as part of this contract’. Can VA verify that each of the 5 laptops provided, are GFE and will have remote access to every site? | Access is defined per user, not per device. All Contractor personnel with access to the VA network will be provided remote access to all Contractor-managed equipment regardless of geographic location. |
| 58 | PWS 5.2.1, SRM | SRM, states contractor must provide ‘a single interface and covers … all storage systems provided as part of this contract’. |
| In order to centrally manage the SRM solution can the VA verify that remote access to the offerors on-site solution will be authorized? | Yes. All Contractor personnel with access to the VA network will be provided remote access to all Contractor-managed equipment regardless of geographic location. | |||
| 59 | PWS 5.11 | PWS 5.11 states "The hyperconverged compute foundation shall utilize existing VA vSphere licensing, supporting transparent migration from existing Intel e5 and e7 compute infrastructure.". Does this indicate that the government will only accept VMware ESXi and VMware vSAN-based hyperconverged solutions to satisfy this optional task? | The Government will only accept compute infrastructure capable of supporting the VMware ESXi hypervisor, for which licensing will be provided by the Government. The Offeror may use VMware vSAN but VMware vSAN is not required and the Government will not provide VMware vSAN licensing. | |
| 60 | PWS 5.11 | PWS 5.11 states "The hyperconverged compute foundation shall utilize existing VA vSphere licensing, supporting transparent migration from existing Intel e5 and e7 compute infrastructure.". Does this indicate that the government will provide both VMware ESXi and VMware vSAN licensing for a VMware-based hyperconverged solution to satisfy this optional task? If yes, will these licenses be provided as part of an existing VMware ELA, or will they be existing VMware licenses in use that will be transferred to the successful bidder for use in the hyperconverged solution? | The Government will only accept compute infrastructure capable of supporting the VMware ESXi hypervisor, for which licensing will be provided by the Government. The Offeror may use VMware vSAN but VMware vSAN is not required and the Government will not provide VMware vSAN licensing. The Government will provide VMware ESXi hypervisor licensing for the use of the Contractor. The Government does not intend to transfer licenses to the Contractor. | |
| 61 | Attachment E | The Small Business participation spreadsheet does not accurately account for a company filling multiple designations. That is a SDVOSB is also a VOSB and may also have other small business designations. Will the VA update the spreadsheet? | Attachment E, Small Business Subcontracting Plan has been revised to allow Offerors to propose actual percentages for the overall small business participation requirement as well as the socio-economic status goals. |