This document is a set of construction specifications and requirements for a federal contract opportunity related to the construction of a maintenance shop facility for the Smithsonian Tropical Research Institute in Gamboa, Republic of Panama.
The key details include: the solicitation number is 333302-24RF-0010029; the applicable NAICS code is 236220 Commercial and Institutional Building Construction; the construction budget is estimated up to $1.2M; the contractor must be legally registered and licensed to operate as a construction company in Panama for at least 5 years; the contractor must have performed at least 3 construction projects valued at $1M or more in the past 3 years. The document outlines specific requirements for welding, material types, anchoring, and surface preparation. It also notes that all welder certifications must be verified and that special arrangements are required for site access. Proposals are due by July 12, 2024 at 3:00 PM EST and must be submitted via DropBox.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Smithsonian Project
Page 1 de 2
Code: CO - AGA - 01
• As per information sent via drawings approved for the Smithsonian project:
1. The welding symbol for the fillet welds is presented incorrectly drawn, must comply with AWS A 2.4 standards.
2. All fillet welds as drawn in the submitted prints must be carried out as final connections so as to case erection procedure to avoid out of squareness, out of plomb and misalignments, especially those fillets with 1 /2" and 3/8" effective throats. During our field inspection visit to the contractor shops located in calzada larga on June 21 of 2022 we noticed serious inconsistencies, lack of experience in assembling techniques for structural steel components, lack of rigs and special benches, most works were put together using the floor as a mold visible out of squareness, distortion due to poor welding techniques and in some cases poor and limited craftmanship.
3. As per the drawing it seems very difficult to provide an effective throat of 3/8” size on the border of the joint.
4. Filler metal should be E – 7018 H4R to assure structural quality as per AWS D1.1 –
2020 / steel. In order to obtain an 3/8” throat, several oases with 1/8” diameter electrode is recommended, heat input is a major consideration.
5. The welding connections between the 8” beam and the 12” beam are to be welded in the 3F position, vertical up progression.
6. The 4" X 4"X 3/16” square tube must be welded in the 3 F – vertical up progression, in the 4 F – out of position welding or overhead and in the 2F position – horizontal.
7. The 4 anchors bolts B7 implies the welding of the column plates with a combined plug weld and a final fillet weld, this procedure must be submitted for revision and final approval on behalf of the owner or its technical representative. It’s anticipated the usage of shims to attain levelness. special grouting would be required.
8. A special anchoring technique is recommended so as to control speed in drilling and the avoidance of fracture.
9. Before the connection between the 10” beam and the 12” beam through the stiffener plate verification is required to make sure that the 5mm´s fillet welds are feasible and that all drainage designated locations are made so as to avoid corrosion and trapper’s water.
Smithsonian Project
Page 2 de 2
Code: CO - AGA - 01
10. Verification of all welder’s certification is required for the job. They will be welding grooves and fillets joint in the:
1 G 1F flat
2 G 2F horizontal
3 G 3F vertical
4 G 4F overhead
11. Surface preparation and painting is expected, except where a final connection by welding is to be done.
12. All welds between galvanized iron C – channels in the roof section must be done free of holes, burns or excessive heat, E-6011 – 3/32” diameter of F3 Group is recommended with low amperage thus controlling heat input. All weldments must be cleaned and paint protected as soon as the heat in the heat affected zone allows. It is best to paint protect the same day the welding was done.
• As per the ultrasound evaluations:
1. According to the report sent by Ademinsa signed by their representative the UT equipment used to preform the test has a valid calibration certification for one year from February 2022 thru February 2023.
2. According to the TECMEC S.A. UT report all tests and evaluations were accepted except one where a lack of fusion between passes was located, it was marked and identified. Was repaired and UT re-inspected and accepted.