1680001 Maintenance Shop Bid Sch.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
333302-24RF-0010029 Construction of a Maintenance Shop, Gamboa, Republic of Panama
Solicitation number
333302-24RF-0010029
Issued by

About this file

This document is a Base Bid Pricing Sheet for the Construction of a Maintenance Shop at the Gamboa facility in the Republic of Panama, which is a federal contract opportunity issued by the Smithsonian Institution.

The Smithsonian is seeking proposals for the construction of a Maintenance Shop located at Gamboa, Republic of Panama, with a construction budget estimated up to $1.2M. The applicable NAICS code is 236220 Commercial and Institutional Building Construction. The solicitation is open to all businesses regardless of size, and the selected contractor must have a Unique Entity ID number and be actively registered and current in the SAM System. The company must be legally registered and licensed to operate as a Construction Company in the Republic of Panama for at least 5 years and have performed at least three construction projects with a minimum value of $1M during the past three years.

The Base Bid Pricing Sheet provides a detailed breakdown of the anticipated costs for the project, including materials, labor, and equipment for various construction divisions. The total Base Bid amount is to be submitted, which includes overhead, profit, and performance bond. Proposals are due on July 12, 2024, at 3:00 PM EST.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid

Title :Maintenance ShopPrepared by :
Facility :Gamboa Building No. 78Date :
Project Number :1680001Company:
Base Bid
BASE BID: All work associated with the Maintenance Shop, construction of the infrastructure, civil works, steel structures, MEP & life safety systems, and finishes as described in the specifications and Drawings dated January 29, 2024.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0$ - 0
Div. 2 Existing Conditions$ - 0$ - 0$ - 0$ - 0
HAZMAT$ - 0$ - 0$ - 0$ - 0
Div. 3 Concrete$ - 0$ - 0$ - 0$ - 0
Div. 4 Masonry$ - 0$ - 0$ - 0$ - 0
Div. 5 Metals$ - 0$ - 0$ - 0$ - 0
Div. 6 Wood, Plastics and Composites$ - 0$ - 0$ - 0$ - 0
Div. 7 Thermal and Moisture Prot.$ - 0$ - 0$ - 0$ - 0
Div. 8 Openings$ - 0$ - 0$ - 0$ - 0
Div. 9 Finishes$ - 0$ - 0$ - 0$ - 0
Div. 10 Specialties$ - 0$ - 0$ - 0$ - 0
Div. 11. Equipment$ - 0$ - 0$ - 0$ - 0
Div. 12 Furnishings$ - 0$ - 0$ - 0$ - 0
Div. 13 Special Construction$ - 0$ - 0$ - 0$ - 0
Div. 14 Conveying Systems$ - 0$ - 0$ - 0$ - 0
Div. 21 Fire Suppression$ - 0$ - 0$ - 0$ - 0
Div. 22 Plumbing$ - 0$ - 0$ - 0$ - 0
Div. 23 Heating, Ventilation and Air Conditioning$ - 0$ - 0$ - 0$ - 0
Div. 26 Electrical$ - 0$ - 0$ - 0$ - 0
Div. 27 Communications$ - 0$ - 0$ - 0$ - 0
Div. 28 Electronic Safety & Security$ - 0$ - 0$ - 0$ - 0
Div. 31. Earthwork$ - 0$ - 0$ - 0$ - 0
Div. 32 Exterior Improvements$ - 0$ - 0$ - 0$ - 0
Div. 33 Utilities$ - 0$ - 0$ - 0$ - 0
$ - 0
BASE BID SUBTOTAL$ - 0
$ - 0
Overhead and Profit$ - 0
Performance Bond$ - 0

Total $ - 0

BASE BIDTotal$ - 0
DISCLAIMERS:
SI does not guarantee the integrity of files, formulas, or graphics. Spreadsheet user is responsible for the accuracy of all calculations.

B-&P

File details come from the government source that posted it. Updated .