33330222RF0010009 Amendment 0003.pdf
PDF 300 KB Posted
- Attached to
- SOLICITATION SMITHSONIAN INSTALL SMA ACTIVE POWER SYSTEM (FLYWHEEL) Federal contract opportunity
- Solicitation number
- 33330222RF0010009
- Issued by
- Smithsonian Institution
About this file
This amendment modifies a solicitation for the installation of an Active Power System flywheel at the Submillimeter Array base facility in Hawaii. The Smithsonian Institution seeks offers for the construction work including erecting a mezzanine, installing the flywheel system and associated electrical infrastructure. The period of performance is 180 calendar days with a project estimate between $1-2 million. The amendment extends the bid due date to March 8th, 2022 and provides responses to contractor questions on project details like accommodation availability, equipment access, and adjusting concrete specifications for the long travel time given the nearest plant.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 33330222RF0010009 Amendment 0005.pdf | ||
| 33330222RF0010009 Amendment 0004.pdf | ||
| 33330222RF0010009 Amendment 0002.pdf | ||
| 33330222RF0010009 Amendment 0001.pdf | ||
| 1683701 SAO SMA Active Power Bid Sch 2021 0122.xls | XLS spreadsheet | |
| Payment Bonds.pdf | ||
| Final RFP SAO HI Install SMA Active Power System.pdf | ||
| 1683701_SAO SMA APS Install_Final.pdf | ||
| 1683701_SAO_APS Install_Specifications Final.pdf | ||
| Davis Bacon.pdf | ||
| Contractor_COVID-19_Safety Protocols_10.19.21.pdf | ||
| Performance bonds.pdf | ||
| Release of Claim.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 5
P.O. BOX 37012
MRC 1200
Washington DC 20013-7012
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (x)
9A. AMENDMENT OF SOLICITATION NO.
33330222RF0010009
x 9B. DATED (SEE ITEM 11)
02/23/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 02/23/2022 1683701
6. ISSUED BY CODE OCON 7. ADMINISTERED BY (If other than Item 6) CODE
SMITHSONIAN INSTITUTION
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The Solicitation Number cited above, for the SAO-HI: Install SMA Active Power System
(Flywheel) is hereby amended as follows:
A.2. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.
B. Attached is the Sign-In sheet from the Preproposal Meeting #2.
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Willard B. Powell
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243 x x
A.1. Attached hereto and made part of this Amendment Three are the SI Responses to RFI's for Questions Number 9-11.
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
33330222RF0010009/0003
PAGE OF
2 5
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C) (D
UNIT
UNIT PRICE
(E)
AMOUNT
(F)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
C. THE BID DUE DATE IS EXTENDED TO TUESDAY,
MARCH 8, 2022, AT 5:00PM EST.
Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.
END OF AMENDMENT THREE
Smithsonian Institution Office of Planning Design & Construction
PROJECT: SAO-HI: Install SMA Active Power System (Flywheel)
LAST UPDATED: 02/23/2022
Request for Information SI Response
Experience on Similar Projects – Please confirm whether or not it is acceptable to utilize key subcontractor experience to meet the similar project experience requirement.
It is acceptable to utilize key subcontractor experience to meet the similar project experience requirement.
Will the workers quarters at the visitor's center, Hale Pohaku, be available for the contractor's crew and subcontractors during the duration of the project, for the purpose of overnight sleeping?
Yes, the dormitories at Halepohaku (HP) are available for contractor personnel. The dormitories are operated by the
University of Hawaii Maunakea Shared Services (UH MKSS).
The nightly cost is $ 196.57 per person, including meals (no tax). Contractors would make payment arrangements with
MKSS. HP is a UH facility subject to State of Hawaii requirements for Covid-19 vaccination or testing. To confirm details, please contact Stewart Hunter, MKSS manager
[shunter@ifa.hawaii.edu].
3 Does the Smithsonian observatory on the summit have overnight sleeping quarters? No, there are no sleeping quarters at the SMA on Maunakea.
Can you inform us of the days that the access road is graded? For the purpose of delivery trucks such as concrete, steel, UPS, our suppliers are inquiring when, what days, the unpaved road will be the flattest and safest to drive on?
MKSS grades the Maunakea access road twice a week, either
Monday and Thursday or Tuesday and Friday. MKSS is willing to coordinate the grading schedule when large deliveries are anticipated.
Will the small skytrac / lift which is located in the observatory, be accessible to use for the contractor, by licensed operators?
The SMA forklift may be used by qualified contractor staff under SMA supervision. Contractor must carry insurance coverage.
6 Will the crane attached to the structure be accessible to use for the contractor?
The SMA gantry crane may be used by qualified contractor staff under SMA supervision. Contractor must carry insurance coverage.
7 Is there 220 power available in the observatory?
At the SMA, electrical power is available as: 120 VAC single phase, 208 VAC three phase, or 480 VAC three phase. Circuit capacity (amperage) must be verified.
8 Can we do a 2nd walk through to the summit for the benefit of two of our subcontractors.
A Final Site Visit is scheduled for Friday, February 18, 2022 at
12 PM HST at Maunakea Visitor Station. Subcontractors are encouraged to visit.
Bidders must confirm their participation in the site visit with
COTR Simon Radford, (808) 333-4871, simon.radford@cfa.harvard.edu.
The RFP requires the contractor to submit the pricing per the bid schedule included with the solicitation documents. This breaks down the bid into the CSI Divisions. The form includes a requirement for quantity and unit of measure. My questions is, if the requirement is to provide a breakdown for each of the divisions. As an example, Division 26 Electrical, are quantities and unit cost required for conduit, cable, equipment etc. or can all items be included as one unit of cost?
Provide Lump Sums for each CSI line item. Do not provide
"quantity and unit of measure".
Per Specifications 260519 Pat 3.02.G "VFC Output Circuits: Type XHHW-2 in metal conduit with braided shield." Please provide specs on this cable and where cables are required or if this cable is not applicable to this project.
The referenced cable is not applicable to the project.
10 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to
ASTM C 94, and ASTM C 1116 and furnish batch ticket information. Batch ticket information shall include design mix reference, water that can be added at the jobsite, and admixtures. For transit mixing, complete not less than 70 revolutions of the drum at the manufacturer’s rated mixing speed. Discharge concrete into its final position within 90 minutes after introduction of batch water to the cement. If a retarder admixture is used, the discharge time limit of 90 minutes may be increased by the time specified for retardation by the admixture manufacturer or the concrete supplier.
Mix concrete a minimum of one minute at mixing speed immediately prior to discharge.
The Concrete Mixing requirement can be adjusted if required.
All reasonable approaches to address the long travel time will be considered during the submittal process.
We would not meet the specification-requiring placement of concrete 90 minutes from the time of introduction of water. Do to the Nearest Ready-Mix Plant is About a
2 hour travel time to the project. Hence, we propose the use of Delvo Stabilizer that stops cement hydration by forming a protective barrier around cementitious particles for the period of time it takes to travel to the site. Technical information will be provided upon request. One way to describe the process is as if the cement did not come in contact with water until reaching the job site. With the correct dose, the
Delvo Stabilizer would have worn off upon arrival at the job site and the concrete would proceed to hydrate normally as if the concrete were just batched on site.
| 133330222RF0010009 Amendment 0003.docx.pdf |
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| 233330222RF0010009 Amendment 0003.docx.pdf |
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| 1RFI Spreadsheet Amendment 0003.xlsx.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .