This is a technical specification document for sanitary pressure sewer piping prepared by Herbert, Rowland & Grubic, Inc. for the North Earl Street Low Pressure Sanitary Sewer Extension Project (Project No. 011361.0461) being procured by the Weaverland Valley Authority in Pennsylvania. The specification outlines requirements for furnishing and installing approximately 270 linear feet of 2-inch low-pressure sanitary sewer main via directional drilling, approximately 100 linear feet of 1.5-inch lateral piping, one 5-foot diameter cleanout manhole, epoxy lining of two existing sanitary sewer manholes, and associated appurtenances. The document details materials and installation standards for polyethylene piping, polyvinyl chloride piping, stainless steel/HDPE transition fittings, curb stop valves, PVC ball valves, valve boxes, bedding and cover materials, and air release valves. Installation must comply with referenced ASTM International and AASHTO standards including ASTM D3035 for polyethylene pipe installation, ASTM D1785 for PVC pipe, and ASTM D2321 for underground thermoplastic pipe installation. The specification requires pressure testing per Section 33 05 05.31 (Hydrostatic Testing), inspection prior to and immediately after bedding placement, and field quality control testing. Bedding material must be AASHTO No. 8 aggregate with a minimum 12-inch compacted thickness over pipe, and backfilling must proceed according to trenching specifications outlined in Section 31 23 16.13.
The specification establishes technical requirements for pipe materials including PE 4710 polyethylene pipe with 200 psig pressure rating complying with ASTM D3035 DR-11, Schedule 80 PVC pipe complying with ASTM D1785, and various fittings meeting AWWA C901 and ASTM standards. Bidders must submit manufacturer product data, certificates of compliance, installation instructions, and field quality control test results. All materials must be delivered in original manufacturer packaging, inspected for damage, and stored in clean, dry locations according to manufacturer instructions without stacking higher than recommended limits. The contractor is responsible for all construction work including excavation, bedding placement, pipe installation, valve installation, valve box installation, backfilling, compaction, pressure testing, and protection of materials from damage or displacement. No pricing terms, set-asides, incumbent contractors, or specific funding amounts are addressed in this technical specification document, which serves as the detailed construction requirements section of the broader project bidding documents available through PennBid.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
33 31 26 - SANITARY PRESSURE SEWER PIPING
Herbert, Rowland & Grubic, Inc. 33 31 26 - 1 011361.0461
SECTION 33 31 26 - SANITARY PRESSURE SEWER PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Sanitary sewer low-pressure pipelines.
2. Service connections.
3. Air release valves.
4. Valves.
5. Bedding and cover materials.
B. Related Requirements:
1. Section 31 05 16 - Aggregates for Earthwork: Aggregate for basin backfill.
2. Section 31 23 16.13 - Trenching: Excavation, backfilling, compacting, and fill.
3. Section 33 05 05.31 - Hydrostatic Testing: Pressure testing of completed pressure sewer piping.
1.2 REFERENCE STANDARDS
A. American Association of State Highway and Transportation Officials:
1. AASHTO T 180 - Standard Method of Test for Moisture-Density Relations of Soils
Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
B. ASTM International:
1. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).
2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).
3. ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.
4. ASTM D2241 - Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-
Rated Pipe (SDR Series).
5. ASTM D2321 - Standard Practice for Underground Installation of Thermoplastic
Pipe for Sewers and Other Gravity-Flow Applications.
6. ASTM D2466 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe
Fittings, Schedule 40.
7. ASTM D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride)
(PVC) Plastic Piping Systems.
8. ASTM D3139 - Standard Specification for Joints for Plastic Pressure Pipes Using
Flexible Elastomeric Seals.
9. ASTM D6938 - Standard Test Method for In-Place Density and Water Content of
Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth).
10. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining
Plastic Pipe.
Herbert, Rowland & Grubic, Inc. 33 31 26 - 2 011361.0461
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer information indicating pipe material used, pipe accessories, valves, fittings, and air release valves.
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
D. Manufacturer Instructions: Submit special procedures required to install specified products.
E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
1.4 CLOSEOUT SUBMITTALS
A. Section 01 77 00 - Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record invert elevations and actual locations of pipe runs, connections, and valves.
C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Storage:
1. Store materials according to manufacturer instructions.
2. Do not store materials on private property without written permission of property owner.
3. Do not stack pipe higher than recommended by pipe manufacturer.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
1.6 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
2. Indicate field measurements on Shop Drawings.
Herbert, Rowland & Grubic, Inc. 33 31 26 - 3 011361.0461
PART 2 - PRODUCTS
2.1 LOW-PRESSURE SEWER PIPING
A. Polyethylene (PE) Piping:
1. Pipe:
a. Pipe Size 3-Inch Nominal Size and Smaller: Comply with ASTM D3035, DR- 11, IPS, for 200 psig pressure rating.
2. Materials:
a. Comply with ASTM D3350.
b. Minimum Cell Classification: 445574C.
c. Designation: PE 4710.
3. Fittings:
a. Comply with AWWA C901.
b. Style: Molded or fabricated.
4. Joints:
a. Fusion: Butt, Socket, and Electrofusion.
b. Threaded: NPT.
B. Stainless Steel/HDPE Transition Fitting:
1. Materials:
a. 304 Stainless Steel.
b. HPDE – Meet piping requirements.
2. Joints:
a. Stainless Steel: Threaded NPT.
b. HDPE: Fusion.
3. Pressure Rating: 200 psig.
4. Fitting shall be manufactured to transition between pipe materials and match size of pipe.
C. Polyvinyl Chloride (PVC) Piping:
1. Pipe:
a. Pipe Size 3-Inch Nominal Size and Smaller: Comply with ASTM D1785 for
SCH. 80 PVC.
2. Materials:
a. Comply with ASTM D1784 and ASTM D1785.
b. Minimum Cell Classification: 12454.
c. Designation: Type I, Grade I Polyvinyl Chloride Compound.
3. Fittings:
a. Comply with ASTM D1784 ASTM D2467.
4. Joints:
a. Solvent Weld.
b. Threaded: NPT.
2.2 VALVES
A. Curb Stop:
1. Description: Injection Molded Plastic Compression Curb Stop Valve.
Herbert, Rowland & Grubic, Inc. 33 31 26 - 4 011361.0461
2. Material: Polypropylene, NSF 61, UV Stabilized.
3. Size: 1.5-inch.
4. Pressure Rating: 200 psig.
5. Connections: Mechanical Compression.
6. Curb Stop Valve operator: Service Key.
7. Meets Requirements of ASTM-F714, ASTM-D3035, and D-1599-99.
8. Manufacturers: Lateral Connection Corp., or equal.
B. PVC Ball Valves:
1. Full port design.
2. SCH. 80 PVC.
3. Pressure rating: 235psig.
4. Quarter Turn Operation with Handle.
5. Connections: True Union.
6. Meets requirements of ASTM F 1970, ASTM D 1974 Cell Classification 12454.
2.3 MATERIALS
A. Bedding and cover.
1. Bedding and cover: AASHTO No. 8 as specified in Section 31 05 16 - Aggregates for Earthwork.
2. Soil Backfill from above Pipe to Finish Grade: See Detail on Drawings.
3. Subsoil: No rocks more than 6 inches in diameter, frozen earth, or foreign matter.
2.4 ACCESSORIES
A. Valve Boxes:
1. Manufacturers:
a. Tyler Union, Bingham & Taylor, or equal.
2. Valves 12 Inches and Smaller:
a. Type: Two-piece screw.
b. Material: Domestic cast iron.
3. Valves Larger Than 12 Inches:
a. Type: Three-piece screw.
b. Material: Domestic cast iron.
c. Base: Round.
4. Lid: Cast iron, inscribed with “SEWER.”
B. Adjustable Valve Boxes:
1. Manufacturers:
a. Tyler Union, Bingham & Taylor, or equal.
2. Material: Cast Iron.
3. Bottom: Belled.
4. Configuration: Bell arched and flanged.
5. Adjustment: Screw.
6. Top Collar and Lid: Cast iron.
7. Inscription:
a. Cast with lid.
Herbert, Rowland & Grubic, Inc. 33 31 26 - 5 011361.0461
b. "SEWER."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.
B. Verify that trench cut is ready to receive Work.
C. Verify that excavations, dimensions, and elevations are as indicated on Drawings.
3.2 PREPARATION
A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.
B. Correct over-excavation with coarse aggregate.
C. Remove large stones or other hard matter that could damage pipe or impede consistent backfilling or compaction.
D. Protect pipe and aggregate cover from damage or displacement until backfilling operation is in progress.
3.3 INSTALLATION
A. Bedding:
1. Excavate pipe trench as specified in Section 31 23 16.13 - Trenching.
2. Place bedding material at trench bottom.
3. Level materials in continuous layer not exceeding 8 inches.
4. Maintain optimum moisture content of bedding material to attain required compaction density.
B. Piping:
1. Install pipe, fittings, and accessories according to ASTM D3035, and seal joints watertight.
2. Lay pipe to slope gradients as indicated on Drawings.
3. Install bedding at sides and over top of pipe to minimum compacted thickness of
12 inches.
4. Backfilling and Compacting:
a. As specified in Section 31 23 16.13 - Trenching.
b. Do not displace or damage pipe while compacting.
C. Air Release Valves and Valves: Install at locations as indicated on Drawings and according to manufacturer instructions.
D. Valves: Install at locations as indicated on Drawings and according to manufacturer instructions.
Herbert, Rowland & Grubic, Inc. 33 31 26 - 6 011361.0461
E. Valve Boxes: Install at locations as indicated on Drawings and according to manufacturer instructions.
3.4 FIELD QUALITY CONTROL
A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection: Request inspection prior to and immediately after placement of bedding.
C. Pressure Testing: As specified in Section 33 05 05.31 - Hydrostatic Testing.
3.5 PROTECTION
A. Section 01 73 00 - Execution Requirements: Requirements for protecting finished Work.
B. Protect pipe and aggregate cover from damage or displacement until backfilling operation is in progress.
END OF SECTION