About this file
This is a technical specifications document for aggregates used in earthwork, prepared by Herbert, Rowland & Grubic, Inc. for the Weaverland Valley Authority's North Earl Street Low Pressure Sanitary Sewer Extension Project (Project No. 011361.0461) in Lancaster County, Pennsylvania. The specification details requirements for coarse aggregate materials including PennDOT 2A, AASHTO No. 57, AASHTO No. 8, AASHTO No. 3, and Select Granular Material (2RC), as well as fine aggregate materials such as Bituminous Concrete Sand Type B, Mortar Sand, Filler Type C, and other sieve-graded materials conforming to PennDOT standards. All aggregate materials must originate from a single source approved by PennDOT and must meet specifications outlined in PennDOT Publication 408. Stockpiling requirements mandate that materials be stored on-site in sufficient quantities to meet project schedules, with different aggregate types separated by dividers or stockpiled individually to prevent mixing, and surface water directed away from stockpile sites to prevent erosion or deterioration.
The specification establishes quality assurance requirements referencing PennDOT Publication 408 and various AASHTO and ASTM standards for testing and classification, including sieve analysis, compaction characteristics, and soil classification methods. Contractors must submit 10-pound samples of each fill material type in air-tight containers to the testing laboratory when required by the engineer, provide names of imported material suppliers, and furnish manufacturer's certificates certifying that products meet or exceed specified requirements. Upon project completion, all stockpiles must be removed and the site left in clean and neat condition with surface grading to prevent standing water. The document references related sections including Section 31 23 16.13 for trenching and Section 01 33 00 for submittal procedures, establishing this as part of a comprehensive construction specification framework for the sanitary sewer extension project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 05 16 - AGGREGATES FOR EARTHWORK
Herbert, Rowland & Grubic, Inc. 31 05 16 - 1 011361.0461
SECTION 31 05 16 - AGGREGATES FOR EARTHWORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Coarse aggregate materials.
2. Fine aggregate materials.
B. Related Sections:
1. Section 31 23 16.13 - Trenching.
1.2 REFERENCES
A. Pennsylvania Department of Transportation (PennDOT):
1. American Association Publication 19 – Field and Laboratory Test Methods, latest edition.
2. Publication 408 - Specifications, latest edition, as amended.
B. American Association of State Highway and Transportation Officials:
1. AASHTO M147 - Standard Specification for Materials for Aggregate and Soil-
Aggregate Subbase, Base and Surface Courses.
2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils
Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
C. ASTM International:
1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse
Aggregates.
2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of
Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).
3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).
4. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified
Soil Classification System).
5. ASTM D4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity
Index of Soils.
1.3 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. Samples: Submit, in air-tight containers, 10 lb sample of each type of fill to testing laboratory, when required by the Engineer.
C. Materials Source: Submit name of imported materials suppliers.
D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
Herbert, Rowland & Grubic, Inc. 31 05 16 - 2 011361.0461
1.4 QUALITY ASSURANCE
A. Furnish each aggregate material from single source throughout the Work.
B. All aggregate must originate from a source approved by PennDOT meeting according to PennDOT standards.
PART 2 - PRODUCTS
2.1 COARSE AGGREGATE MATERIALS
A. PennDOT 2A: consisting of naturally or artificially graded mixture of natural or crushed gravel, crushed stone, or crushed slag meeting the requirements of PennDOT Publication 408, Section 703.2 for No. 2A, type C.
B. AASHTO No. 57: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 57.
C. AASHTO No. 8: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 8.
D. AASHTO No. 3: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 3.
E. Select Granular Material: Select Granular Material conforming to PennDOT Publication 408 Section 703.3 for 2RC.
2.2 FINE AGGREGATE MATERIALS
A. Fine Aggregates: Conforming to PennDOT’s standards as follows:
Bituminous Concrete Sand Type B
Mortar Sand
Sieve Size #1 #3 Filler Type C
3/8 inch 100 100 -- --
No. 4 95-100 80-100 -- 100
No. 8 70-100 65-100 -- 95-100
No. 16 40-80 40-80 -- --
No. 30 20-65 20-65 100 --
No. 50 7-40 7-40 95-100 --
No. 100 2-20 2-20 90-100 0-25
No. 200 0-10 0-10 70-100 0-10
PART 3 - EXECUTION
3.1 STOCKPILING
A. Stockpile materials on site at locations.
Herbert, Rowland & Grubic, Inc. 31 05 16 - 3 011361.0461
B. Stockpile in sufficient quantities to meet Project schedule and requirements.
C. Separate different aggregate materials with dividers or stockpile individually to prevent mixing.
D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.
3.2 STOCKPILE CLEANUP
A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
END OF SECTION