3-SLCI26119 Attachment 3 - Cost Proposal Form.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
SLCI26119 Historic Exhibit Advisory, Design, Production, Fabrication and Installation Services
Solicitation number
SLCI26119
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a Cost Proposal Form for Solicitation #SLCI26119 issued by the City of Salt Lake City, Utah, for Historic Exhibit Advisory, Design, Production, Fabrication and Installation Services. The project involves creating a museum-quality historic exhibit on the third floor of the historic Salt Lake City & County Building that presents an inclusive narrative of Salt Lake City and the building's history, with equitable representation of the City's diverse residents and their experiences. The cost proposal form requires offerors to provide pricing for four distinct tasks, with columns for anticipated hours and cost per task, culminating in a total project cost calculation.

The cost proposal form permits offeror input only in yellow-highlighted cells and evaluates proposals based on the lowest Total Proposed Costs listed in cell D24. Offerors must enter pricing for all applicable cost categories; zero entries or blank cells will be interpreted by the City as services provided at no cost or incorporated into another line item, while N/A should be used for non-applicable categories. Any costs not included in the cost schedule will not be allowed into the resulting contract. Offerors may add additional line items for other costs or separate modules as needed. Strict adherence to the provided format is required, as deviations may result in proposal disqualification. Any cost categories that cannot be properly captured in the provided schedule should be submitted as suggestions to the solicitation's Q&A board.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Form

Attachment 3: Cost Proposal Form
Historic Exhibit Advisory, Desing, Production, Fabrication and Installation Services
Solicitation # SLCI26119

Offeror Name:

Costing Considerations & Instructions
1. All cells in a yellow highlight allow for a Offeror input.
2. Cost will be evaluated based on the lowest Total Proposed Costs (cell D24 Highlighted in blue).
4. If zero is entered for any cell or if any cell is left blank, the City will assume that the related services are either provided at no cost or built into another cost item. If a cost category is not applicable, enter N/A.
5. Where Offeror's proposed solution incorporates pricing or licenses for different modules, the pricing for the separate modules shall be listed on separate lines below. As needed, Offeror may add additional "Other Costs" lines.
6. Any cost not provided on this Cost Schedule, will not be allowed into the resulting contract. If you identify a cost that cannot be properly captured in this Cost Schedule, then provide suggestions for modifying this Cost Schedule to the Q&A board for this solicitation.
7. Any deviation from this format may result in disqualification of Offeror's proposal.
Total Project Cost
TasksAnticipated HoursCost per Task
Task 1
Task 2
Task 3
Task 4
Total Project Cost$ - 0

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

File details come from the government source that posted it. Updated .