3-SLCI26027 Attachment No. 3 Cost Sheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Salt Lake City Request for Proposals SLCI26027 - Pest and Rodent Control Services for the Salt Lake City Department of Airports
Solicitation number
SLCI26027
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a cost sheet attachment for a Request for Proposals issued by Salt Lake City Corporation's Department of Airports for pest and rodent control services at multiple facilities throughout Salt Lake City International Airport and regional airports. The solicitation covers comprehensive pest management services across 68 locations, including the main terminal complex, concourses, cargo buildings, maintenance facilities, pump stations, parking structures, and ancillary airport buildings, as well as satellite facilities at South Valley Regional Airport and Tooele Valley Airport. The services encompass routine pest control treatments, termite elimination, mosquito control, wildlife management, and bed bug inspections and treatments. A mandatory site visit is required on Wednesday, February 11, 2026, at 8:00 a.m., with attendees meeting at the information desk on level 2 of the Airport Terminal located at 3920 W. Terminal Dr., Salt Lake City, Utah 84122.

The cost sheet requires offerors to provide monthly costs for all base services organized by facility and square footage, with separate line items for supplemental services including hourly treatment costs, termite elimination fees, mosquito treatment pricing, wildlife management rates, and bed bug inspection and treatment costs. All cells highlighted in yellow require cost input reflecting actual charges that would be billed to the City. Offerors must adhere strictly to the provided formulas and format, with any deviation resulting in proposal disqualification. The total monthly cost calculated on this sheet serves as the basis for scoring cost points in the evaluation process. Services are subject to potential modification during the contract term, and offerors are directed to submit any questions or concerns regarding the cost sheet during the designated Q&A period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Sheet

SLCI26027 Attachment 3 - Cost Sheet
Pest and Rodent Control Services
Offeror's Name:
Cost Sheet Instructions:
1. All cells in a yellow highlight throughout this spreadsheet require an input and should include all costs associated with performing the task.
2. The cost proposed below must be the actual costs that would be charged to the City.
3. The services described below are subject to change during the term of the agreement.
4. Any deviation from the formulas below, or this form in general, will result in your proposal being disqualified from consideration. If you have questions or concerns about this form please submit them during the Q&A period.
Salt Lake City International AirportSquare FootageCost Per MonthSupplemental Services "(Not Scored)"
1ARFFFire Station #1228,021Termite EliminationHourly Cost
2CB-02Airfield Operations Base (AOB)14,184Treatment Spray (External Treatment)
3CB-03Sky Chef Building12,600Interior Foaming
4CB-07Joint Cargo Building #137,610Interior Drilling
5CB-08Joint Cargo Building #211,993Bait Stations (each)
6CB-10Airport Operations Center (AOC)66,474Mosquito
7CB-11South Electrical Vault12,387Hourly Treatment Cost
8CR-06Parking Administration Building (PAB)9,870Monthly Treatment Per Sq Ft
9CUPCentral Utility Plant (TSB)38,632WildlifeHourly Cost
10GA-02Technical Systems Building (TSB)6,561Bird Deterrent (Interior)
11GA-03National Weather Service13,338Bird Deterrent (Exterior)
12GA-12Fire Station #1119,077Bed Bug Inspections and TreatmentHourly Cost
13GA-13Ball Park Restrooms527Inspections
14GA-50Airport Training & Activities Center (ATAC)49,824Chemical Treatments
15IC-01International Office (450 Wright Brothers Drive)2,587Apprehend Biopesticides Treatments
16IC-02International Warehouse96,555
17IC-03Radix Plaza (4855 Wiley Post Way)59,138
18NS-01Airfield Mainteance Building41,370
19NS-04Vehicle Maintenance / Warehouse70,803
20NS-07Airfield Paint Shop5,402
21NS-12Radio Repeater Building2,126
22NS-13North Electical Vault11,493
23NS-14Greenhouse4,590
24NS-15Facilities Maintenance Building #230,250
25NS-16Cold Storage11,828
26NS-17Glycol EQ Influent Facility4,158
27NS-18Police Training Facility Shooting Range1,014
28NS-19Police Training Facility Kennels, K-94,365
29NS-21Snow Removal Equipment Storage Building45,819
30NS-26Snow Chemical Storage Building15,824
31NS-33Wildlife Building13,340
32PS-01West Pump Station #1138
33PS-02Pump Station #865
34PS-05Midfield Pump Station #5844
35PS-06East Pump Station #6139
36SS-09Pump Station #9863
37SS-10RW 34L Deicing Support Facility12,224
38SS-11TW L Deicing Support Facility12,224
39SS-15Wildlife5,006
40GTGround Transportation Building9,211
New SLC - Phase ISquare FootageCost Per Month
41ARP Parking Stucture, Ground Level-Circulation Areas4,801
42ARP Parking structure, 2nd Level - Circulation Areas38,927
43ARP Parking Stucture, 3rd Level19,514
44ARP Parking Structure, 4th Level19,354
45ARP Parking Structure, 5th Level19,354
46ARP Utility Tunnel46,314
47ARP Concourse A West - Ground Level201,984
48ARP Concourse A West - 2nd Level204,920
49ARP Concourse A West - 3rd Level36,477
50ARP Terminal - Ground Level317,057
51ARP Terminal - 2nd Level363,201
52ARP Terminal - 3rd Level243,979
New SLC - Phase IISquare FootageCost Per Month
53ARP Concourse B West - Ground Level169,005
54ARP Concourse B West - 2nd Level169,533
55ARP Concourse B West - 3rd Level49,500
56ARP Mid Concourse Tunnel51,654
New SLC - Phase IIISquare FootageCost Per Month
57ARP Concourse A East - Ground Level183,472
58ARP Concourse A East - 2nd Level183,760
59ARP Concourse A East - 3rd Level24,085
60ARP Concourse B East - Ground Level101,241
61ARP Concourse B East - 2nd Level102,417
62ARP Concourse B East - 3rd Level39,435
63ARP Main Tunnel118,656
64Fifteen (15) TSA Trailers - about 10,630 sq. ft. each10,630
65NS-34 Snow Removal Storage101,987
Square FootageCost Per Month
66Eight (8) Guard Shacks - 80 sq. ft. each80
Other LocationsSquare FootageCost Per Month
67SVRASouth Valley Regional Airport74,225
68TVATooele Valley Airport3,517
"Total Monthly Cost (Cost Points Determined by this Amount)"$0.00

File details come from the government source that posted it. Updated .