3 - ESNWR. SOW. Edits 12-08-20.pdf

PDF 229 KB Posted

Attached to
Ellicott Slough NWR Lead/Asbestos Abate and Demo
Solicitation number
140F0321Q0007
Issued by

About this file

This statement of work describes asbestos abatement, lead remediation, and structure demolition services required at the Ellicott Slough National Wildlife Refuge in Watsonville, California. The U.S. Fish and Wildlife Service requires planning, design, remediation, construction, demolition, and disposal services to remove hazardous materials and demolish multiple structures across two sites. Services include surveying each structure, developing abatement and demolition plans, obtaining necessary permits, removing asbestos and lead materials, disconnecting utilities, and fully demolishing and removing all structures. The performance period is approximately 10 months from notice to proceed. This is a 100% small business set-aside solicitation conducted under FAR Parts 12 and 13, with award based on price, technical capability, experience, approach, and past performance.

View the file

Other files

File Type Posted
Sol_140F0321Q0007_Amd_0001.pdf PDF
Site Photos_0001.pdf PDF
1 - ESNWR. Revised Pricing Schedule. Edits 01-12_0001.xlsx XLSX spreadsheet
Site Visit Minutes. ESNWR. 12-29-20_0001.docx DOCX document
Drawing showing Potential Perimeter Line_0001.pdf PDF
Questions and Responses. 01-12_0001.xlsx XLSX spreadsheet
5 - ESNWR. Revised DIV 01_General Requirements. Edits 01-12_0001.docx DOCX document
3 - ESNWR. Revised SOW. Edits 01-12_0001.docx DOCX document
9 - Site Visit Sign-in Sheet_0001.doc DOC document
4 - ESNWR. Revised Requirements Document. Edits 01-12_0001.doc DOC document
10 - CAD Design Checklist.pdf PDF
3.a. - Lead and Asbestos Survey Report. Harkin's Slough. 10.2.2020.pdf PDF
10 - ESNWR. Beta.SAM Website Instructions to Contractors. 12-09-20.pdf PDF
9 - CAD Standards Manual.pdf PDF
1 - ESNWR. Pricing Schedule. 12-8-20.xlsx XLSX spreadsheet
4 - ESNWR. Requirements Document. Edits 12-08-20.pdf PDF
1 - ESNWR. Pricing Schedule. 12-8-20.pdf PDF
2 - ESNWR. Subcontract List. 12-09-20.pdf PDF
5 - ESNWR. DIV 01_General Requirements. Edits 12-08-20.pdf PDF
8.- Past Performance Questionnaires.pdf PDF
11 - Pre-Work Safety Checklist.pdf PDF
Sol_140F0321Q0007.pdf PDF
6 - Technical Requirements. Edits 12-09-20.pdf PDF
7 - Pre-Quote Site Visit. 12-20.pdf PDF
12- DOL Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Planning, Design Services, Remediation Services, Temporary Construction, Selective

Demolition, and Demolition Services for:

Asbestos Abatement, Containment, Removal, and Disposal, Lead Containing Paint and Lead Containing Material Abatement, Containment, Removal, and Disposal, And Structure Demolition, Removal, and Disposal for Multiple On-Site Structures

U.S. Fish and Wildlife Service

Ellicott Slough National Wildlife Refuge (NWR) – Watsonville, California

December 8, 2020

C:\Users\zspruell\Desktop\Nick's Edits\3 - ESNWR. SOW. Edits 12-08-20.docx

1.0. GENERAL INFORMATION.

1.1 Contractor shall provide Planning, Design Services, Remediation Services, Temporary

Construction, Selective Demolition, and Demolition Services for the Abatement, Containment, Removal, and Disposal of Asbestos Containing Construction Materials (ACCM), Asbestos Containing Materials (ACM), Lead Containing Paint (LCP), and Lead Containing Material (LCM) and All Associated Hazardous Materials and Substances.

In addition to the Abatement, Containment, Removal and Disposal of Hazardous Materials and Substances, the Contractor shall provide Services for Multiple Structure Demolition, Removal, and Disposal.

The Project / Contract is located at the Harkin’s Slough Unit of the Ellicott Slough NWR in Watsonville, California. No Design Documents (Drawings and Technical Specifications) for Abatement and Demolition have been prepared in advance for this Project / Contract. The Contractor shall be responsible for Developing, Preparing, and Submitting Design Drawings and Technical Specifications for the Abatement, Containment, Demolition, Removal, and Disposal of Multiple Structures. The Design Drawings and Specifications shall be prepared at the 100% Draft and 100% Final Draft Milestones.

A Previous Limited Lead and Asbestos Building Survey was performed and follow-up Analysis and Testing of select specimen materials was conducted.

However, the Contractor shall be required to perform an additional Field Survey, Analysis, and Testing of Materials, which may have not been previously Analyzed and Tested for Verification and Validation Purposes and to ensure All Hazardous Materials are Abated, Contained, Removed, and Disposed of at a Hazardous Materials Disposal Facility(ies). The Standard Protocol if certain Materials are not able to be Analyzed and Tested due to Site Conditions / Site Constraints shall be to assume the Un- Tested Material is Asbestos and Lead Positive and the Un-Tested Materials shall be

Disposed of at a State Licensed and Permitted Hazardous Waste Disposal Facility / Hazardous Waste Landfill.

1.2 Contractor’s Certifications: All Abatement, Containment, Removal, and Disposal Work Tasks of this Request for Proposal (RFP) shall be performed by a licensed Prime Contractor (“Prime Contractor” hereinafter referred to as “Contractor”). The Contractor shall be licensed with the California State Licensing Board (CSLB) and shall be a Cal/OSHA Asbestos Registered Contractor. The Contractor shall hold All Required Active Asbestos Certifications and Lead Certifications required to successfully perform the Project / Contract Work Tasks.

Contractor’s Qualifications: Contractors shall be experienced and have demonstrated positive past performance with the Abatement, Containment, Removal, and Disposal of Asbestos Containing Construction Material (ACCM), Asbestos Containing Material (ACM), Lead Containing Paint (LCP), and Lead Containing Materials (LCM).

Contractors shall demonstrate extensive knowledge, ability, and skill in the Design, Abatement, and Demolition of Structures typical of the area.

Contractors shall demonstrate knowledge of All Relevant Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions for Anticipated Work Activities and Work Tasks under this Statement of Work.

Furthermore, Contractors shall demonstrate extensive experience applying this knowledge in Design, Abatement, Demolition, Removal, and Disposal Work Tasks.

For those certifications and qualifications not shown above, but required for successful project delivery, the Contractor shall obtain those certifications or qualifications as necessary and required to result in successful project completion.

1.3 Regulatory Requirements: It is the Contractor’s responsibility to construct the Project in compliance with applicable requirements of federal and state laws, codes, rules, regulations, ordinances, and standards, including, but not limited to, those outlined below. Contractor shall have copies available of applicable codes and regulations for ready reference. These shall include, but are not limited to:

- State and Local Regulatory Requirements

- Federal Regulatory Requirements

- FWS Policies

- Codes

- NFPA 101 Fire and Life Safety Code, latest edition

- International Building Code as adopted by the Local Authority Having Jurisdiction.

- International Plumbing Code

- International Mechanical Code

- National Electrical Code

- Architectural Barriers Act (ABA)

In the event of a conflict, the most stringent laws, codes, regulations, standards, and provisions shall apply.

2.0. WORK LOCATION AND PERIOD OF PERFORMANCE.

2.1 Work Location: Harkin’s Slough Unit of the Ellicott Slough National Wildlife Refuge

(ESNWR), 1487 Ranport Road, Watsonville, California 95076.

Site 1 Coordinates: Latitude 36.921902, Longitude -121.805054

Site 2 Coordinates: Latitude 36.916809, Longitude -121.806297

2.2 Period of Performance:

Start Date: February 1, 2021 – Estimated (Depends on NTP Date).

End Date: November 30, 2021 – Estimated (Depends on NTP Date).

In the event of damage to government property resulting from demolition, the contractor shall return the damaged area to its original condition. The contractor will also be instructed where to access the Construction / Demolition Site to minimize potential damage to the existing resources.

The Period of Performance for this Contract is 10-Months from the actual date of Notice to Proceed (NTP) Letter. Anticipated Delivery Date for NTP Letter is 30 Days Following Initial Contract Award Date. Above dates shown are tentative and subject to change.

Contractor shall coordinate with the Refuge Manager and/or Project Leader for a Proposed Construction Work Window. The Final Accepted Construction Work Window will be mutually agreed to between the Contractor and USFWS Ellicott Slough NWR prior to Abatement, Demolition, and De-Construction.

Contract Work Window: Nesting Birds (e.g. Owls and Swallows), maybe using the Structures during the Breeding / Nesting Season. Breeding / Nesting Season is from March 1 on or about through mid-August. Abatement and Demolition Work Activities and Work Tasks shall be scheduled outside of the Breeding / Nesting Season of Nesting Birds. For example, Abatement and Demolition Work Activities and Work Tasks could be performed before March 1 or after mid-August of each year.

2.3 Normal Business Hours for the Refuge, Monday thru Friday 7:00 a.m. - 5:00 p.m. Work Activities shall be performed during Normal Business Hours. Limited accommodation to an alternate schedule maybe possible with coordination with on-site FWS staff. In the event of emergencies, Contractor shall provide contact information.

2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

3.0. DEFINITIONS.

Not Used.

4.0. BACKGROUND.

The Ellicott Slough National Wildlife Refuge (ESNWR) is operated by the U.S. Fish and Wildlife Service (USFWS). It is located approximately 6.0 miles northwest of Watsonville, California and approximately 15.1 miles southeast of Santa Cruz, California. The nearest major city / town is Watsonville, California.

The Future Awarded Contract is to result in the Planning, Design Services, Temporary Construction, Selective Demolition, and Demolition Services required for Abatement, Containment, Removal, and Disposal of Multiple On-site Structures. The Structures are located on the Harkin’s Slough Unit of the Ellicott Slough NWR at two (2) separate Sites Designated as Site 1 and Site 2.

Site 1 is located closest to the Refuge Gate into the Unit.

Site 2 is located approximately 0.40 miles distance away from Site 1.

Below is an Itemized List of Structures located on Site 1 and Site 2 respectively.

Site 1:

Residence 1 (Main Residence) – Estimated at 3,170 SF.

Garage – Estimated at 1,480 SF.

Metal Building – Estimated at 2,232 SF.

Shed Associated with Metal Building – Approximately 900 SF.

Site 2:

Residence 1 – Estimated at 1,190 SF.

Residence 2 – Estimated at 1,010 SF.

Barn – Estimated at 1,775 SF.

(Qty. 4) Sheds – Estimated at 50 – 100 SF Each.

Purpose.

5.0. SCOPE OF WORK.

Pre-Abatement and Pre-Demolition Permitting. Contractor shall be in charge of Development, Preparation, and Submittal of Permit Applications and Supporting Documents to the Permit Agencies / Permit Authorities for Review and Approval / Disapproval prior to Abatement and Demolition Work Activities and Work Tasks. Contractor shall be responsible for Identification of Permits through a Permit Registry. After identifying permits, the Contractor shall apply for, Pay, and Secure Permits to result in successful project delivery.

The Scope of Work for this contract shall include the Following Project Design Elements:

Abatement, Containment, Demolition, Removal, and Disposal of Multiple Structures located on Site 1 and Site 2 of the Harkin’s Slough Unit.

The Contractor shall accomplish the following Tasks if awarded this contract:

5.1 BASE TASK 1. Follow-up Field Verification Site Visit and SITE SURVEY.

The Contractor and Contractor’s Certified Professionals and Professional Engineers shall perform a Follow-up Field Verification Site Visit to Review Existing Structures and Site Conditions at Site 1 and Site 2 of the Harkin’s Slough Unit of the Ellicott Slough NWR.

The Contractor is advised a Comprehensive Personal Protective Equipment (PPE) worn by each Employee is required prior to entering the dilapidated buildings. The Asbestos and Lead Paint in the interiors of the buildings has pulverized into dust and is disturbed by movement.

The Follow-up Site Visit shall include a Follow-up Asbestos and Lead Survey to confirm previous locations of Hazardous Materials and identify any new locations of Hazardous Materials present.

After performing the Follow-up Site Visit and Asbestos and Lead Survey, the Contractor and Contractor’s Certified Professionals and Professional Engineers shall develop, prepare, and submit the Follow-up Asbestos and Lead Survey to USFWS for Review.

After receiving the USFWS Review Notes, the Contractor shall develop, prepare, and submit the Final Signed Version of the Follow-up Asbestos and Lead Survey.

Deliverables:

(1) Electronic Copy of Contractor’s and Contractor’s Certified Professionals’ and Professional Engineer’s Follow-up Asbestos and Lead Survey.

(1) Electronic Copy of Contractor’s and Contractor’s Certified Professionals’ and Professional Engineer’s Final Signed Version of the Follow-up Asbestos and Lead Survey.

5.2 BASE TASK 2. 100 PERCENT DRAFT DESIGN DOCUMENTS.

The 100% Draft Design Documents (Consisting of Drawings, Narrative Descriptions, and Technical Specifications) shall fully define and describe All Base and Option Tasks / Elements selected for Contract Award and required for Abatement, Containment, Demolition, Removal, and Disposal Work Activities and Work Tasks required for this Project / Contract. The Level of Detail for the Design and Engineering Sections of Work shall be as follows:

The 100% Submittal Documents shall describe All of the Site Specific Health and Safety and Engineering Design Elements to be included in the 100% Final Draft Document Package, including, but not limited to the following:

Existing Conditions Plans, Site Specific Safety Plans, Health and Safety Plans, Job Hazards Analyses, Abatement Plans, Containment Plans, Isolation Plans, De-Contamination Plans, Demolition Plans, Site Plans, Background Maps, Testing and Analysis Procedures, Waste Stream Separation/Segregation and Characterization, Material Sorting, Material Collection, Material Hauling Processes and Procedures, and Plans for the Delivery / Unloading of Waste Material at the Licensed and State Permitted Disposal Facilities.

In addition, the 100% Draft Design Documents shall identify and describe the Design Criteria, Design Parameters, Design Calculations, Code Analyses, Project Controls, Environmental Controls, Project Constraints, Environmental Constraints, Engineering Design Schedules, Abatement Schedules, Demolition, Removal, and Disposal Schedules, and Technical Specifications to be implemented.

The 100% Technical Specifications shall be Developed, Prepared, and Submitted in PDF and DOCX File Extensions. The 100% DRAFT Technical Specifications shall be incorporated into the 100% FINAL DRAFT Technical Specifications.

The Contractor shall incorporate the findings of any Cultural Resource Evaluations

(provided by the USFWS Project Leader and/or Refuge Manager) to determine necessary Cultural Coordination, Report / Application Preparation (including supporting documents), or documents for processing through the State / County Regulatory Entity.

(For example, National Historic Preservation Office (NHPO) and State Historic Preservation Office (SHPO) Requirements if it applies to this Project / Contract).

The Drawings shall identify and describe Work, which has Added any Scope (beyond the

Scope of the Contract) using Revision Clouds and Annotations. A separate Accounting by the Contractor shall be provided in XLSX File Extension for Changes to Scope (considered beyond the Scope of the Contract) Any Changes to Scope beyond the Scope of the Contract shall be Approved by the Government (USFWS) prior to the Contractor continuing with the next Phase. The 100% Submittal shall also identify “Work by Others” required for the Project to be successfully Constructed / Installed as Designed.

The Contractor’s Certified Professionals and Professional Engineers shall conduct a Safety Analysis, Perform Code Reviews, and Ensure the Design and Construction of the Abatement, Containment, Removal, and Disposal Temporary Structures complies with (but is not limited to) the USFWS Manuals and Current Edition of the Federal and State OSHA Safety Requirements.

The Contractor shall be required to Apply For, Pay, and Secure Permit Applications, Inspections, and Develop, Prepare, and Submit Supporting Documents (to include but not be limited to: Quality Assurance and Quality Control Analysis and Testing, Environmental Clearance, Cultural Resource Clearance, Utility Company, Local Building Department, and Local Department of Transportation Permits and Inspections).

Unless explicitly agreed to otherwise by the USFWS, Identify, Annotate, Develop, Prepare and Submit Permit Applications for USFWS Signature with Supporting

Documents (To Include But Not be Limited To: Permit Drawings, Narratives, Assessments, and Similar).

In summary, this 100% Draft Submittal shall include All of the Above Items to result in

100% Detail Drawings and/or Narrative Descriptions, 100% Technical Specifications, and a 100% Design, Abatement, and Demolition (De-Construction), Removal, and Disposal Schedule.

(1) Electronic Copy of the 100% DRAFT Drawings and/or Narrative Descriptions and Specifications (plans, elevations, sections, and demolition (de-construction) details).

(1) 100% DRAFT Design Summary / Project Narrative for Asbestos and Lead Abatement, Containment, Removal, and Disposal and Structure Demolition, Removal, and Disposal.

(1) 100% DRAFT Design, Abatement, Demolition (De-Construction), Removal, and Disposal Project Schedule.

(1) Completed USFWS Safety Checklist.

(1) Copy of All Processed and Approved Permit Applications and Supporting Documents.

(1) Electronic Copy of the 100% DRAFT Permit and Submittal Registry

Electronic Drawing Deliverables shall be submitted in DWG and PDF File Extensions and include the Color Table (CTB) File Extension for accurate plotting of the line weights in CAD. Deliverables other than Drawing Deliverables shall be submitted in PDF File Extensions and DOCX File Extensions when available.

5.3 BASE TASK 3. 100 PERCENT FINAL DRAFT DESIGN DOCUMENTS.

After Responding to 100% Draft USFWS Review Notes, the Contractor, the Contractor’s Architect-Engineer Company, and the Contractor’s Certified Professionals shall develop, prepare, and submit 100% FINAL DRAFT Design Documents consisting of drawings, narrative descriptions, technical specifications, and the Contractor’s Opinion of Probable Design, Abatement, Demolition, and De-Construction Schedule. The Contractor shall provide Review Copies of the 100% FINAL Design Documents to the USFWS within 45 Calendar Days after Receipt of Review Notes concerning the 100% Draft Design Document Submittal.

(1) Electronic Copy of the 100% FINAL DRAFT Drawings and/or Narrative Descriptions and Specifications (to include plans, elevations, sections, and demolition (de-construction) details).

(1) Electronic Copy of the 100% FINAL DRAFT Design Summary / Project Narrative for Asbestos and Lead Abatement, Containment, Removal, and Disposal and Structure Demolition, Removal, and Disposal.

(1) Electronic Copy of the Contractor’s Opinion of Probable Design, Abatement, Demolition, De-Construction, Removal, and Disposal Schedule.

(1) Electronic Copy of the 100% FINAL DRAFT Permit and Submittal Registry.

Electronic Drawing Deliverables shall be submitted in DWG and PDF File Extensions and include the Color Table (CTB) File Extension for accurate plotting of the line weights in CAD. Deliverables other than Drawing Deliverables shall be submitted in PDF File Extensions and DOCX File Extensions when available. Registries (Registers) for Permits and Submittals shall be submitted in XLSX File Extensions.

5.4 BASE TASK 4. Mobilization and De-Mobilization from Project Site.

Mobilize All Labor, Materials, Equipment, Personal Protective Equipment (PPE), Tools, and Resources onto the Project Site. De-Mobilize All Labor, Materials, Equipment, PPE, Tools, and Resources from the Project Site.

SITE 1 – RESIDENCE 1 (MAIN RESIDENCE).

5.5 BASE TASK 5. Asbestos Abatement, Containment, Removal, and Disposal.

Location: Site 1 – Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.6 BASE TASK 6. Lead Abatement, Containment, Removal, and Disposal.

Location: Site 1 – Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.7 BASE TASK 7. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 1 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

[Electricity, Water, and Septic Disconnects.]

5.8 BASE TASK 8. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 1 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.9 OPTION TASK 9. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Below Grade Substructure ONLY.] Location: Site 1 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 1 – METAL BUILDING.

5.A OPTION TASK A. Asbestos Abatement, Containment, Removal, and Disposal.

Location: Site 1 - Metal Building.

To include but not be limited to:

Incidentals.

5.B. OPTION TASK B. Lead Abatement, Containment, Removal, and Disposal.

Location: Site 1 - Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.C. OPTION TASK C. Follow-up TTLC, TCLP and/or STLC Analysis and Testing for Lead Containing Materials and Lead Containing Paints. Required Waste Characterization for Sorting and Disposal to Required Facilities.

Location: Site 1 - Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.D. OPTION TASK D. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 1 - Metal Building.

To include but not be limited to:

Incidentals.

5.E. OPTION TASK E. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 1 - Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.F. OPTION TASK F. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Below Grade Substructure ONLY.] Location: Site 1 - Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 1 – GARAGE.

5.G. OPTION TASK G. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 1 - Garage.

To include but not be limited to:

Incidentals.

5.H. OPTION TASK H. Demolition, Removal, and Disposal of NON-Hazardous

[Above Grade Superstructure ONLY.] Location: Site 1 - Garage.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.I. OPTION TASK I. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Below Grade Substructure ONLY.] Location: Site 1 - Garage.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 1 – SHED AT METAL BUILDING.

5.J. OPTION TASK J. Lead Abatement, Containment, Removal, and Disposal.

Location: Site 1 - Shed at Metal Building.

To include but not be limited to:

5.K. OPTION TASK K. Follow-up TTLC, TCLP, and/or STLC Analysis and Testing for Lead Containing Materials and Lead Containing Paints. Required Waste Characterization for Sorting and Disposal to Required Facilities.

Location: Site 1 - Shed at Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.L. OPTION TASK L. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 1 - Shed at Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

[Electricity, Water, and Septic Disconnects.]

5.M. OPTION TASK M. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 1 - Shed at Metal Building.

To include but not be limited to:

5.N. OPTION TASK N. Demolition, Removal, and Disposal of NON-Hazardous

[Below Grade Substructure ONLY.] Location: Site 1 - Shed at Metal Building.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 2 – RESIDENCE 1.

5.O. OPTION TASK O. Asbestos Abatement, Containment, Removal, and Disposal.

Location: Site 2 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.P. OPTION TASK P. Lead Abatement, Containment, Removal, and Disposal.

Location: Site 2 - Residence 1.

To include but not be limited to:

5.Q. OPTION TASK Q. Follow-up TTLC, TCLP, and/or STLC Analysis and Testing for for Sorting and Disposal to Required Facilities.

Location: Site 2 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.R. OPTION TASK R. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 2 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

[Electricity, Water, and Septic Disconnects.]

5.S. OPTION TASK S. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 2 - Residence 1.

To include but not be limited to:

5.T. OPTION TASK T. Demolition, Removal, and Disposal of NON-Hazardous

[Below Grade Substructure ONLY.] Location: Site 2 - Residence 1.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 2 – RESIDENCE 2.

5.U. OPTION TASK U. Asbestos Abatement, Containment, Removal, and Disposal.

Location: Site 2 - Residence 2.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.V. OPTION TASK V. Lead Abatement, Containment, Removal, and Disposal.

Location: Site 2 - Residence 2.

To include but not be limited to:

5.W. OPTION TASK W. Follow-up TTLC, TCLP, and/or STLC Analysis and Testing for Lead Containing Materials and Lead Containing Paints. Required Waste Characterization for Sorting and Disposal to Required Facilities.

Location: Site 2 - Residence 2.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

5.X. OPTION TASK X. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 2 - Residence 2.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

[Electricity, Water, and Septic Disconnects.]

5.Y. OPTION TASK Y. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 2 - Residence 2.

To include but not be limited to:

5.Z. OPTION TASK Z. Demolition, Removal, and Disposal of NON-Hazardous

[Below Grade Substructure ONLY.] Location: Site 2 - Residence 2.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 2 – BARN.

5.AA. Option Task AA. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 2 - Barn.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

[Electricity, Water, and Septic Disconnects.]

5.BB. Option Task BB. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 2 - Barn.

To include but not be limited to:

5.CC. OPTION TASK CC. Demolition, Removal, and Disposal of NON-Hazardous

[Below Grade Substructure ONLY.] Location: Site 2 - Barn.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

SITE 2 – (QUANTITY 4) SHEDS.

5.DD. OPTION TASK DD. Shutdown, Disconnect, and Cap off Utilities in accordance with Federal, State, County, and Local Laws, Codes, Regulations, Standards, and Provisions.

Location: Site 2 - (Qty. 4) Sheds.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

[Electricity, Water, and Septic Disconnects.]

5.EE. OPTION TASK EE. Demolition, Removal, and Disposal of NON-Hazardous Materials Separated and Segregated from Hazardous Materials.

[Above Grade Superstructure ONLY.] Location: Site 2 - (Qty. 4) Sheds.

To include but not be limited to:

5.FF. OPTION TASK FF. Demolition, Removal, and Disposal of NON-Hazardous

[Below Grade Substructure ONLY.] Location: Site 2 - (Qty. 4) Sheds.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

UNIT PRICING.

Option Unit Price 1. Asbestos Abatement, Containment, Removal, and Disposal.

Location: All Locations.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

Option Unit Price 2. Lead Abatement, Containment, Removal, and Disposal.

Location: All Locations.

To include but not be limited to:

Option Unit Price 3. Follow-up TTLC, TCLP, and/or STLC Analysis and Testing for for Sorting and Disposal to Required Facilities.

Location: All Locations.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

Option Unit Price 4. Removal and Disposal of Hazardous Waste Contaminated Soils.

Location: All Locations.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

For All TASKs, the Contractor shall develop, prepare, and submit the following Pre-Design, Design, Pre-Abatement, Abatement, Pre-Demolition, Pre-Deconstruction, Analysis, Testing, Demolition, De-Construction, Hauling, and Disposal Submittals to include but not be limited to the following:

Prepare and Submit a Schedule of Values. Refer to General Specification Section 01 20

00 – Payment Procedures.

Prepare and Submit a Master Submittal List. Refer to General Specification Section 01 33 00 Submittal Procedures for Master Submittal List Requirements.

Prepare and Submit Subcontractor List and Key Personnel Names. Refer to General Specification Section 01 34 00 – Baseline Submittal List.

Prepare and Submit Site Specific Safety Plan, Job Hazards Analysis (JHA), and Health and Safety Plan (HSP). Provide Detailed Project Data in the Site Specific Safety Plan, Job Hazards Analysis (JHA), and Health and Safety Plan (HSP). Refer to General Specification Section 01 34 00 – Baseline Submittal List.

Prepare and Submit Testing Agency Qualifications, Permits, Licenses, and Certificates.

Refer to General Specification Section 01 34 00 – Baseline Submittal List.

Prepare and Submit Contractor’s Abatement, Demolition, De-Construction, Removal, and Disposal Plan describing All Processes and Procedures to be implemented for Abatement, Containment, Isolation, Sorting, and Collection of Materials into separate piles for Delivery and Disposal to Hazardous Waste Disposal Facilities and Non-Hazardous Waste Disposal Facilities.

Prepare and Submit Contractor’s Demolition and De-Construction Schedule, Demolition/De-Construction Schedule Updating Reports, Daily Abatement, Demolition, and De-Construction Reports, Site Condition Reports, and Qualification Data.

Prepare and Submit Quality Control Plan (QCP). Provide delineation of Laboratory, Ex- Situ (Offsite), and In-Situ (Onsite) Tests and Inspections to be performed by the Contractor’s Independent Testing Agency In-House or under Subcontract. Scope and Quantity of Tests and Inspections required for the Project / Contract to be determined by the Contractor.

Prepare and Submit Site Utilization Plan and Project Identification and Temporary Signs. Refer to General Specification Section 01 51 00 – Temporary Facilities.

Prepare and Submit Product Substitution Requests (if applicable). Refer to General Specification Section 01 63 00 – Product Substitution Procedures.

Prepare and Submit Certificates, Landfill Receipts, Certified Surveys, and Final Property Survey (where required).

Prepare and Submit Proposed Protection Measures and Schedule of Selective Demolition Activities.

Prepare and Submit Demolition, Recycling, and Disposal Plan, Recycling and Processing Facility Records, Landfill and Incinerator Disposal Records. Refer to General Specification Section 01 74 00 – Cleaning and related Specification Sections.

Prepare, Submit, and Maintain an On-site Asbestos Abatement and Containment Plan, Lead Abatement and Containment Plan, and a Spill Prevention, Containment, and Response Plan.

Prepare, Submit, and Maintain a Toxic and Hazardous Materials Storage, Application, and Disposal Procedures.

Prepare and Submit a Demolition and De-Construction Plan. The Plan shall describe how the Contractor plans to perform the Work of the Contract.

Prepare and submit Product Literature, Product Data, Material Safety Data Sheets (MSDS), and Product / Material Certifications for proposed materials and products to be provided and installed.

Prepare and Submit Contractor’s List of Incomplete Items, Certified List of Incomplete Items, Certificates of Release, Certificate of Insurance for continuing coverage, and Schedule of Maintenance Material Items.

Prepare and Submit Initial and Final Submittal Record Drawings, Record Specifications, Record Product Data. Refer to General Specification 01 78 00 – Closeout Submittals.

Submittals – ALL TASKs Number of Copies and Format

Schedule of Values Master Submittal List (Submittal Registry) Subcontractor List and Key Personnel

Names Site Specific Safety Plan Job Hazard Analysis (JHA) Health and Safety Plan (HSP) Qualification Data Testing Agency Qualifications Permits Licenses Certificates Contractor’s Abatement, Demolition, and

De-Construction Schedule Abatement, Demolition / De-Construction

Schedule Updating Reports Daily Abatement Reports Daily Demolition / De-Construction

Reports Site Condition Reports Quality Assurance and Quality Control

Plan (QA-QCP) Site Utilization Plan Project Identification and Temporary

Signs Temporary Structures Product Substitution Requests (if applicable) Certificates Landfill Receipts / Disposal Receipts

Multiple Electronic Copies (.pdf file extensions)

Certified Surveys (where required) Final Property Survey (where required) Proposed Protection Measures Schedule of Selective Demolition

Activities Demolition, De-Construction, Recycling, and Disposal Plan Recycling and Processing Facility Records Landfill and Incinerator Disposal Records Hazardous Materials Disposal Records.

Written Spill Prevention, Containment, and Response Procedure Written Toxic and Hazardous Materials

Storage, Application, and Disposal Procedures

Demolition / De-Construction Plan Product Literature Product Data Material Safety Data Sheets (MSDS) Product and Material Certifications Contractor’s List of Incomplete Items Certified List of Incomplete Items Certificates of Release Certificate of Insurance for continuing coverage Initial and Final Submittal Record

Drawings Record Specifications Record Product Data

6.0. GENERAL REQUIREMENTS.

Contractor shall provide supervision, labor, materials, equipment, tools, construction equipment, machinery, inspection, testing, start-up, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.

6.1 Quality Assurance:

a. Contractor shall implement a Quality Assurance/Quality Control (QA/QC) Plan to verify products and services are free of errors or omissions. Use of Contractor’s internal QA/QC plan and procedures is OK; however, they shall be adapted to the specifics of this contract.

6.2 Submittal Reviews:

a. Contractor shall provide electronic submittals indicating Certified Professional and/or

Professional Engineer of Record and Contractor Approval. Distribute the response via email to the USFWS CO and COR.

6.3 Communications:

a. Contractor shall direct contracting related inquiries in writing or electronically to the CO during the pre-solicitation, solicitation, and contract period of performance. Contractor shall direct technical-related inquiries in writing or electronically to the COR.

6.4 Initial Field Visit:

a. After issuance of Contract Award, the USFWS shall arrange for an Initial Conference Call

Project Kick-Off Meeting.

Topics to be covered during the Initial Conference Call Project Kick-Off Meeting:

- Contracting Requirements

- Scope and Objectives

- Ambiguities and Discrepancies

- Existing Facility Drawings

- Construction Work Window

6.5 Subcontractors:

a. Contractor shall utilize general contractors and specialty subcontractors who are duly-licensed and well-qualified to perform the work, consistent with the contract documents.

Contracting officer may remove from the work any employee they deem incompetent, careless or otherwise objectionable. Refer to FAR Clause 52.236-5 for additional information.

b. Within fourteen (14) days after award of the contract, Contractor shall submit to the CO completed Standard Form (SF) 1413s for each subcontractor.

6.6 Progress Schedules:

a. Prior to the pre-abatement and pre-demolition meeting, Contractor shall submit to the Refuge and COR for review and approval, a preliminary project schedule, in .pdf format. At a minimum, schedule shall consider the periods of performance of each task stated within the bid schedule.

b. Contractor shall update the schedule every two weeks. Progress schedules shall be submitted to the Refuge, CO, and COR. If at any time the contractor’s schedule shows any slippage in critical tasks or completion past the completion date, contractor shall narrate the reasoning for slippage and/or late completion.

6.7 Pre-Abatement and Pre-Demolition Meeting:

a. After Contract Award and prior to Start of Work, the Refuge and COR will arrange for a Pre-

Abatement and Pre-Demolition Meeting. Contractor, along with their major subcontractors, shall attend the meeting. Due to COVID-19 Travel Restrictions, this Meeting is to be a Virtual Meeting. Meeting is expected to occur within fourteen (14) days after issuance of the Contract Award and to be approximately two (2) hours in duration.

c. Meeting will address the contract requirements and identify and resolve any ambiguities or discrepancies. In accordance with FAR 36.212 and FAR Clause 52.236-26, the Meeting shall discuss statutory matters such as labor standards (refer to FAR Subpart 22.10). Other topics include matters of significant interest, including who has authority to decide matters.

For example, contractual, administrative (e.g. security, safety, and fire, and environmental protection) and construction responsibilities.

6.8 Temporary Facilities and Utilities:

a. Contractor shall furnish all temporary utilities needed, except as noted otherwise. Facilities and utilities include but are not limited to: Heating, lighting, non-potable water, telephone, material handling equipment, temporary construction aids and storage enclosures. Refer to FAR Clause 52.236-10 for additional information.

b. No electrical power is available to the Contractor.

6.9 Diligence: Contractor shall perform all construction activities efficiently and with the requisite expertise, skill and competence to satisfy the requirements of the contract documents. Contractor shall at all times exercise complete and exclusive control over the means, methods, sequences and techniques of construction. [KND1]

6.10 Supervision: Contractor shall provide a Project Manager or Project Superintendent on-site at all times while work is underway. Manager or Superintendent shall have a good working knowledge of the project work. Refer to FAR Clause 52.236-6 for additional information.

6.11 USFWS Operations: USFWS operations have precedence over construction activities.

Contractor shall schedule and coordinate all construction and demolition activities so as not to unduly impact ongoing facility operations. Refer to FAR Clause 52.236-8 for additional

6.12 Security: Contractor shall effectively secure the worksite, staging areas and materials storage areas. The Government shall be held harmless from any liability resulting from the contractor’s negligence to provide effective security.

6.13 Construction Safety:

a. Contractor shall be ultimately responsible for health and safety on the worksite at all times.

Refer to FAR Clause 52.236-13 for additional information.

b. Contractor shall ensure that all onsite activities, equipment and facilities constructed by the contractor, subcontractor or supplier conform fully to the safety standards in Section 8.2 of the SOW.

c. Contractor shall provide barricades and warning devices as necessary to safeguard the public, workers and Government personnel. Where project work affects public roads, Contractor shall provide signage in accordance with the current edition of the Manual on Uniform Traffic Control Devices (MUTCD), as published by the U.S. Department of Transportation (USDOT) Federal Highway Administration (FHWA).

d. Contractor shall initiate and maintain, throughout the performance of this contract, an effective health and safety program that provides adequate policies, procedures, and practices to protect workers from (and allow them to recognize) job-related health and safety hazards.

e. The program shall include provisions for the identification, evaluation, prevention and control of general work site hazards, specific job hazards, and potential hazards that may arise from foreseeable construction methods and conditions, as well as providing a competent person to conduct frequent and regular inspections.

f. Each employee (Contractor or subcontractor) must be instructed in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment.

g. The contractor shall adopt the USACE Safety and Occupational Health (SOH) Program as a starting point for Safety Program requirements. In the event a more stringent Safety Program exists, the more stringent Safety Program shall be applied to the Contract / Project by the Contractor.

6.14 Site Cleanup: Contractor shall remove construction debris from the worksite daily, including debris within temporary facilities and storage areas. Before completing the work, Contractor shall remove from the worksite any rubbish, tools, scaffolding, equipment and materials that are not the property of the Government. Upon completion of work, Contractor shall leave the work area in a clean, neat and orderly condition. Refer to FAR Clause 52.236-12 for additional information.

6.15 Material, Equipment, Transportation, Handling and Storage:

a. Government-owned equipment will not be made available to the Contractor for use within this contract. Government buildings and other facilities are not available for storage of the Contractor’s materials, equipment and tools.

b. Contractor shall have a representative onsite to receive material deliveries. Contractor shall be responsible for all material deliveries, whether or not their representative is on-site at the time of delivery or not.

c. Contractor shall transport, handle and store materials and equipment in a secure manner and in accordance with the manufacturer’s written instructions.

d. Contractor shall promptly remove from the worksite any material(s) and equipment which are damaged or are otherwise unsuitable.

6.16 Demolition Waste:

a. Minimize creation of construction, deconstruction, and demolition waste.

b. Minimize factors that contribute to waste such as over-packaging, improper storage, ordering error, poor planning, breakage, mishandling, and contamination.

c. Develop a Waste Management Plan to ensure any existing or new materials/equipment/substances are properly characterized, reused, salvaged, recycled, and/or disposed of properly.

d. Any regulated quantities of hazardous materials shall be disposed of at disposal facilities specifically licensed to accept hazardous waste.

e. Dispose of any materials (not salvaged, reused, or recycled) in a legal manner off-site, in licensed disposal facilities.

f. Contractor shall actively protect the natural environment and human health by using environmentally preferable products in their activities.

g. The Contractor wherever possible shall divert solid waste from disposal in landfills through recycling and reuse of materials to lower greenhouse gas emissions.

7.0. GOVERNMENT FURNISHED ITEMS.

No Government Furnished Material or Government Furnished Equipment will be provided.

7.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract.

7.2. Materials: The Contractor shall furnish all materials, supplies, and equipment necessary to meet the requirements of this contract.

7.3. Equipment: The Contractor shall furnish all required equipment to meet the requirements to perform work under this contract.

Government Furnished Information:

7.4 Design Drawings NOT provided as part of this solicitation.

7.5 Division 01 General Specifications provided as part of the Solicitation to be used in close coordination with Design Drawings and Technical Specifications prepared by the Contractor.

7.6 Access to Facilities to be based on Pre-Determined Schedule.

7.7 USFWS Facility Managers and / or Maintenance, as required and as by Pre-Arrangement.

7.8 Obtain Pre-Approval from USFWS for Selected Staging Areas to conduct Project Work and

Temporary Storage of Materials.

7.9 There is no public internet and no wireless access at Ellicott Slough NWR sites. Cell phone service may be limited.

7.10 Certain roads within Site are High Clearance Dirt Roads.

7.11 Contractors will be instructed by the government on entry points to the Work Site and

Equipment Staging Areas.

8.0. CODES AND STANDARDS.

8.1 Technical Standards: All work shall be done in accordance with all applicable International

Code Council (ICC) Codes (e.g. International Building Code (IBC), International Plumbing Code (IPC)), NFPA 70 (National Electrical Code®) and NFPA 101 (Life Safety Code®), as well as other applicable State or local regulations. In the event of a conflict, the most stringent laws, codes, and regulations shall apply.

8.2 Safety Standards: Contractor shall adhere to Occupational Safety and Health Administration

(OSHA) 29 CFR 1910 and 1926, as well as other applicable DOI, USFWS, State, AND local regulations. In the event of a conflict, the most stringent laws, codes, regulations, standards, and provisions shall apply. Refer to FAR Clause 52.236-13 for additional

9.0. INSPECTION AND ACCEPTANCE.

9.1 Inspection and acceptance will be determined by the USFWS. Refer to FAR Clause 52.246-

13 for additional information.

9.2 The Work is subject to observation and inspection by the USFWS and other authorities with jurisdiction.

9.3 Acceptance of the work is contingent on compliance with the requirements set forth in the specifications, drawings, and other documents awarded with (or referenced by) the contract for this project.

10.0. FINAL WALK THROUGH.

10.1 Submit a preliminary list of unfinished work and notify the USFWS at least ten (10) calendar days prior to the anticipated date of completion of unfinished work.

10.2 The USFWS will perform the final walk through as promptly as practicable.

10.3 The time required for such walk through and for making any corrections as a result thereof shall be included in the contract performance time.

10.4 The Contractor’s representative responsible for the work shall be present at the final walk through.

11.0 CLOSEOUT DOCUMENTS.

11.1 Submit any requested regulatory-agency clearance documents indicating the work complies with their requirements such as finalized plumbing/gas/electrical inspections.

11.2 After completion of the work and prior to final payment, submit a Release of Claims (Form

DI-137 provided by the Contracting Officer), properly executed by the Contractor, releasing claims against the United States arising out of this contract, other than claims specifically excepted from the operation of the release.

12.0. INVOICE AND PAYMENT.

12.1 General: Contractor shall not invoice between September 20th and October 20th, due to the seasonal financial system closure.

12.2 Payments: Invoices shall be submitted at the time of Government acceptance of specific tasks under this contract. Prior to submitting invoices, they shall be sent to the COR for review and approval / disapproval. See FAR 52.212-4(i).

12.3 Final Payment: Final payment shall be invoiced and submitted in accordance with Clause

52.212-4 and the IPP clause contained in this contract. Prior to submitting the final invoice, Contractor shall have submitted all closeout submittals. In addition, Contractor shall have been provided an approval by the USFWS stating all deficiencies have been corrected.

13.0. GOVERNMENT AVAILABILITY.

13.1 Government is available Monday thru Friday from 7:00 AM to 5:00 PM (Pacific Daylight

Time), excluding Federal Holidays. Availability outside those dates / hours shall be coordinated with the Refuge at least two business days in advance.

13.2 Work shall be performed during work hours agreed to by the Refuge and Contractor.

14.0. WORK HOURS.

14.1 Work shall be performed between Monday thru Friday, 7:00 AM to 5:00 PM (Pacific

Time), excluding Federal Holidays. Work outside those dates / hours shall be coordinated with the Refuge Manager at least two business days in advance.

14.2 Weekend work shall be coordinated and either approved / disapproved by the Refuge

Manager.

14.3 USFWS escort required unless previously arranged with the Service.

Diane Kodama, Refuge Manager (510) 377-5695, Diane_Kodama@fws,gov Chris Caris, Wildlife Biologist, (831) 999-0766, Christopher_Caris@fws.gov