This document package includes a checklist for CAD design of a federal construction project and details of a related federal contract opportunity. The checklist outlines design requirements for site plans, surveys, demolition plans, utility plans, road plans, erosion control plans, sections and details to support construction of a new culvert. Key details include specifications for title sheets, notes, line types and callouts. The related solicitation is for asbestos and lead abatement, containment and removal services, as well as structure demolition for multiple on-site structures. The total small business set-aside contract will be awarded on a firm-fixed price basis considering price, technical capability, past experience, technical approach and past performance. Site visits are encouraged prior to submitting quotes in response to the solicitation by the specified due date. The federal agency is the U.S. Fish and Wildlife Service located in Portland, Oregon.

View the file

Other files

File Type Posted
Sol_140F0321Q0007_Amd_0001.pdf PDF
Site Photos_0001.pdf PDF
1 - ESNWR. Revised Pricing Schedule. Edits 01-12_0001.xlsx XLSX spreadsheet
Site Visit Minutes. ESNWR. 12-29-20_0001.docx DOCX document
Drawing showing Potential Perimeter Line_0001.pdf PDF
Questions and Responses. 01-12_0001.xlsx XLSX spreadsheet
5 - ESNWR. Revised DIV 01_General Requirements. Edits 01-12_0001.docx DOCX document
3 - ESNWR. Revised SOW. Edits 01-12_0001.docx DOCX document
9 - Site Visit Sign-in Sheet_0001.doc DOC document
4 - ESNWR. Revised Requirements Document. Edits 01-12_0001.doc DOC document
3.a. - Lead and Asbestos Survey Report. Harkin's Slough. 10.2.2020.pdf PDF
3 - ESNWR. SOW. Edits 12-08-20.pdf PDF
10 - ESNWR. Beta.SAM Website Instructions to Contractors. 12-09-20.pdf PDF
9 - CAD Standards Manual.pdf PDF
1 - ESNWR. Pricing Schedule. 12-8-20.xlsx XLSX spreadsheet
4 - ESNWR. Requirements Document. Edits 12-08-20.pdf PDF
1 - ESNWR. Pricing Schedule. 12-8-20.pdf PDF
2 - ESNWR. Subcontract List. 12-09-20.pdf PDF
5 - ESNWR. DIV 01_General Requirements. Edits 12-08-20.pdf PDF
8.- Past Performance Questionnaires.pdf PDF
11 - Pre-Work Safety Checklist.pdf PDF
Sol_140F0321Q0007.pdf PDF
6 - Technical Requirements. Edits 12-09-20.pdf PDF
7 - Pre-Quote Site Visit. 12-20.pdf PDF
12- DOL Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e | 1

CAD DESIGN CHECKLIST

GEOMORPHIC ANALOG METHOD

JANUARY 24, 2020

P a g e | 2

LIST OF POTENTIAL SHEETS:

• TITLE SHEET

• QUANTITIES & GENERAL NOTES

• SURVEY

• DEMOLITION PLAN

• PHASING PLAN

• SITE PLAN

• SITE ACCESS & STAGING PLAN

• UTILITY PLAN

• ROAD PLAN & PROFILE

• CULVERT PLAN & PROFILE

• DETOUR & DIVERSION PLAN

• EROSION & SEDIMENT CONTROL PLAN

• SUBSTRATE PLAN

• CULVERT & ROAD SECTIONS

• SILT FENCE DETAILS

• STRAW WATTLE DETAILS

• REVEGETATION PLAN

• REVEGETATION DETAILS

• CHANNEL RESTORATION SECTIONS & DETAILS

• CHANNEL STRUCTURE SECTIONS & DETAILS

• BANK BIOENGINEERING SECTIONS & DETAILS

• ROAD CUT & FILL TABLES

• CHANNEL CUT & FILL TABLES

• THAW PIPE DETAILS

P a g e | 3

TITLE SHEET

� HEAD OF PROJECT TOP LEFT: U.S. FISH & WILDLIFE SERVICE

� MAP OF ALASKA

o SITE LOCATION (STAR)

� AERIAL IMAGE OF SITE

o NORTH ARROW o SCALE BAR o PROJECT LOCATION LABEL

� FWS LOGO TOP RIGHT(PARTNER LOGO WHEN APPLICABLE)

� PROJECT TITLE WITH LOCATION (UNDERNEATH FWS LOGO)

o PROJECT #

� DRAWING INDEX TABLE

o SHEET N0., TITLE

QUANTITIES AND GENERAL NOTES

� ITEM INVENTORY TABLE

o ITEM N0., DESCRIPTION, UNIT, QUANTITY

� ABBREVIATIONS TABLE

� NOTES

o GENERAL NOTES: *example

1. SURVEY INFORMATION WAS PROVIDED BY ________. THE CONTRACTOR IS

RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL SITE FEATURES. IF

CONDITIONS OTHER THAN THOSE SHOWN ON THE PLANS ARE ENCOUNTERED, THE

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER.

2. PLANS MAY NOT SHOW ALL EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR

LOCATING ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION

3. EXERCISE EXTREME CAUTION AND OBSERVE ALL APPLICABLE OSHA REQUIREMENTS FOR

WORKING IN CONFINED AREAS AND OPEN EXCAVATIONS.

4. EXCAVATION AND BACKFILL: REMOVE ALL ORGANIC OR OVER SATURATED SOFT

MATERIAL WHICH CANNOT BE COMPACTED. BACKFILL SHALL BE PLACED AND

COMPACTED WITH CARE AND BROUGHT UP EVENLY AND SIMULTANEOUSLY ON BOTH

SIDE OF THE CULVERTS. COMPACT TO 95% MAXIMUM DENSITY.

5. VERIFY INVERTS OF EXISTING CHANNEL AND ALL PROPOSED STRUCTURES PRIOR TO

CONSTRUCTION. REPORT ANY DISCREPANCIES FROM PLANS IMMEDIATELY TO OWNER'S

REPRESENTATIVE.

6. CULVERT INSTALLATION: CULVERT INFILL MATERIAL SHALL BE INSTALLED IN PIPE

ACCORDING TO PLANS. MANUAL INSTALLATION IS REQUIRED.

7. ALL VEGETATION IN AREAS NOT AFFECTED BY WORK SHALL BE PRESERVED AND

PROTECTED BY THE CONTRACTOR. RESEED ALL DISTURBED AREAS IN CONFORMANCE

WITH REVEGETATION PLAN ON SHEET ???

8. ESTIMATE OF QUANTITIES ARE IN PLACE AND DO NOT ACCOUNT FOR SWELL PRIOR TO

COMPACTION OR WASTE.

P a g e | 4

SURVEY

� TOPO PLAN VIEW (ENTIRE WORK SITE)

o NORTH ARROW o SCALE BAR o CONTROL POINTS (BENCHMARKS) o EDGES OF ROAD o ORDINARY HIGH WATER LINES o EXISTING CULVERT o UTILITY LINES o CONTROL POINT TABLE (BENCHMARKS)

POINT #, NORTHING, EASTING, ELEVATION

o NOTES:

1. NORTHINGS, EASTINGS AND ELEVATIONS BASED ON ???? (PER SURVEYOR OR

LOCAL DATUM).

� IMAGES

o EXISTING ROAD o EXISTING CULVERT INLET o EXISTING CULVERT OUTLET

P a g e | 5

DEMOLITION PLAN

o NORTH ARROW o SCALE BAR o EXISTING ROAD

NAME LABEL

ARROW TO ACCESS

o ORIDNARY HIGH WATER LINES o THALWEG

FLOW DIRECTION ARROW

o LIMITS OF DISTURBANCE OUTLINED AND HATCHED

LEGEND CONTAINS AREA IN ACRES OF LOD.

LOD’S ARE BASED ON THE FOOTPRINT OF THE CULVERT EXCAVATION, THE

DIVERSION CHANNEL, DETOUR ROAD AND THE TOE OF THE NEW ROAD.

� NOTES:*example

1. LIMITS OF DISTURBANCE SHOWN ARE APPROXIMATE BASED ON FIELD OBSERVATIONS.

ACTUAL LIMITS SHALL BE DELINEATED BY THE CONTRACTOR AND APPROVED BY THE

ENGINEER PRIOR TO CLEARING AND GRUBBING.

2. THE STREAM CHANNEL AND VEGETATION IN AREAS NOT EFFECTED BY WORK SHALL BE

PROTECTED AND PRESERVED BY THE CONTRACTOR. RESEED ALL DISTURBED AREAS IN

CONFORMANCE WITH THE REVEGETATION PLAN ON SHEET ???.

SITE PLAN (ROAD PLAN & PROFILE)

� TOPO PLAN VIEW (ENTIRE WORK SITE)

o NORTH ARROW o SCALE BAR o NEW ROAD

STATION ALONG CL

NAME LABEL

ARROW TO ACCESS

HORIZONTAL ALIGNMENT AND LABELS

VERTICAL CURVES

TIE IN POINTS

o RIP RAP o RECONSTRUCTED BANKS o LEGEND FOR HATCH TYPES o TEXT LABELS:

NEW CONTOURS

EXISTING CONTOURS

CONTOUR ELEVATIONS

NEW THALWEG

EXISTING THALWEG

ORDINARY HIGH WATER

P a g e | 6

NEW CULVERT

• SPECS

UTILITY LINES

POINT TABLE (POINT #, NORTHING, EASTING, ELEVATION

• ROAD TIE INS

� HYDROLOGIC AND HYDRAULIC SUMMARY

o DRAINAGE AREA

SQUARE MILES

o EXCEEDANCE PROBABILITY o RETURN PERIOD

50 YEAR & 100 YEAR

o DESIGN DISCHARGE

C.F.S o DESIGN HIGH WATER ELEVATION

FT.

o HEADWATER/ DEPTH RATIO o TEXT LABELS:

ANTICIPATED ADDITIONAL BLACKWATER AT Q100 = 0.0 FEET

ELEVATIONS ARE BASED ON A LOCAL PROJECT DATUM

� ROAD PROFILE ALONG CENTERLINE

o PUT ON SAME SHEET AS SITE PLAN IF POSSIBLE AND ALIGN WITH ROAD PLAN VIEW o NEW CULVERT o NEW ROAD

SLOPE VALUES

VERTICAL CURVES

o EXISTING ROAD o TIE IN POINTS

STATION, ELEVATION

P a g e | 7

CULVERT PLAN AND PROFILE

� TOPO PLAN VIEW (ZOOMED TO CULVERT)

o NORTH ARROW o SCALE BAR o INVERT ELEVATIONS o CROSS SECTION CALL OUTS FOR COLLAR ARMOR o THALWEG HORIZONTAL ALIGNMENT & STATIONING o RIP RAP COLLAR ARMOR

HATCH

DIMENSION LABELS

EXTEND 2xD100 PAST THE END OF CULVERT o RECONSTRUCTED BANKS

HATCH

DIMENSION LABELS

o LEGEND FOR HATCHES

DETAILED DESCRIPTIONS

� STREAM PROFILE ALONG THALWEG

o ALIGN WITH PLAN VIEW o HORIZONTAL SCALE TO MATCH PLAN VIEW, VERTICAL SCALE EXAGGERATED o PROFILE VIEW o EXISTING GROUND o NEW GROUND

MINIMUM COVERAGE OVER NEW CULVERT

o NEW CULVERT

STATIONING AT INLET & OUTLET

INVERT ELEVATIONS

SLOPE

CALL OUT SIZE AND LENGTH

o BANKFULL LINE

DIMENSION TO THALWEG

o THALWEG TIE IN POINTS & STATIONING o HATCH CULVERT SUBSTRATE MATERIAL o HATCH NEW CHANNEL MATERIAL o HATCH MATERIAL TO BE REMOVED

P a g e | 8

DETOUR AND DIVERSION PLAN

o NORTH ARROW o SCALE BAR o CROSS SECTION CALL OUT FOR DIVERSION CHANNEL o DETOUR ROAD

TIE IN POINTS

L&C TABLE (OPTIONAL – ONLY IF DETOUR ROAD NEEDS TO BE EXACTLY AS

DRAWN. OTHERWISE, LEAVE IT UP TO THE CONTRACTOR).

o EXISTING ROAD o EXISTING CULVERTS o EXISTING TOPO LINES o HORIZONTAL ALIGNMENT CENTERLINE (ROAD) o CULVERT EXCAVATION AREA o DEWATERING PUMP & DISCHARGE LOCATION o DIVERSION CHANNEL

MAX SLOPE

DIVERSION PIPE/CULVERT

THALWEG

• FLOW DIRECTION ARROW

� CALL BEFORE YOU DIG LABEL

o CALL BEFORE YOU DIG

CONTRACTOR SHALL CONTACT

UTILITY COMPANIES TWO WEEKS

PRIOR TO EXCAVATION.

ALASKA DIG LINE: 1-800-478-3121

WWW.AKONECALL.COM

� NOTES:*example

1. THIS WORK WILL REQUIRE A DETOUR ROAD AND DIVERSION OF THE STREAM. STREAM

FLOWS MAY NOT BE PUMPED DURING CONSTRUCTION.

2. DETOUR ROAD, DIVERSION AND DEWATERING IS THE CONTRACTOR'S RESPONSIBILITY;

DETAILS ON THIS SHEET ARE PROVIDED FOR INFORMATION ONLY. THE CONTRACTOR

SHALL PROVIDE A DETAILED DIVERSION AND DEWATERING PLAN TO THE ENGINEER FOR

REVIEW PRIOR TO STARTING CONSTRUCTION. TEMPORARY DIKES OR BERMS MAY BE

CREATED TO ISOLATE THE WORK FROM WATER OF SURROUNDING AREA.

3. STREAM BASE FLOWS WILL BE BYPASSED DURING CONSTRUCTION. LARGER FLOWS

DURING PROLONGED PRECIPITATION OR SNOW MELT EVENTS WILL OVER TOP THE ROAD

OR CAUSE EXTENSIVE FLOODING OF THE SURROUNDING AREA AND CONSTRUCTION

MUST BE TIMED TO ACCOUNT FOR THESE EVENTS.

4. ROAD MAY NOT BE CLOSED TO THRU TRAFFIC DURING CONSTRUCTION. DO NOT BLOCK

ACCESS TO EXISTING RESIDENCES.

P a g e | 9

5. THE TEMPORARY DIVERSION CHANNEL SHOWN HAS BEEN DESIGNED FOR FLOWS UP TO

89 CFS (APPROXIMATELY EQUIVALENT TO THE 2 YEAR FLOOD EVENT). CONTRACTOR

SHALL PLAN FOR CONSTRUCTION TO OCCUR DURING THE DRY SEASON AFTER BREAKUP.

6. USE 10 MIL REINFORCED VISQUEEN LINER ALONG THE ENTIRE LENGTH AND WIDTH OF

TEMPORARY DIVERSION CHANNEL. DO NOT CONSTRUCT WITH LONGITUDINAL JOINTS.

BURY UPSTREAM EDGE OF LINER A MINIMUM OF 12" DEEP AND SECURE WITH RIPRAP OR

SAND BAGS.

7. CONSTRUCT TEMPORARY DIVERSION CHANNEL PRIOR TO CONSTRUCTION OF

ALUMINUM BOX CULVERT.

8. BOX CULVERT SHALL BE CONSTRUCTED IN THE DRY. PROVIDE COFFERDAM AND PUMP

HOSE AS REQUIRED TO DEWATER CONSTRUCTION AREA. ALL DISCHARGE POINTS

REQUIRE PERMANENT OR TEMPORARY VELOCITY CONTROLS. PROVIDE FOR SEDIMENT

REMOVAL FOR ALL DEWATERING ACTIVITY PRIOR TO DISCHARGE FROM THE PROJECT

INTO ANY WATER OF THE UNITED STATES.

9. PUMPS SHALL BE SIZED TO CARRY HIGHEST FLOW REASONABLY EXPECTED TO OCCUR

DURING CONSTRUCTION INCLUDING SURFACE AND SUBSURFACE FLOWS.

10.ENERGY DISSIPATOR WILL BE NECESSARY AT THE DEWATERING DISCHARGE LOCATION.

DEWATERING DISCHARGE POINT MUST BE LOCATED AT LEAST 100 FEET FROM STREAM

TO ALLOW FOR SEDIMENT REMOVAL THROUGH THE RIPARIAN VEGETATION BUFFER.

11.REMOVE DIVERSION CHANNEL AFTER STREAM FLOW HAS BEEN RE-DIVERTED TO THE

ALUMINUM BOX CULVERT. SEED ALL DISTURBED AREAS.

� DIVERSION CHANNEL CROSS SECTION

o DIMENSIONS

DEPTH

WIDTH

GRADE

o TEXT LABELS:

TYPE OF LINING

ROCK INFORMATION

� SUPERSACK DETAILS

� NOTES: *example o DIVERSION CULVERT AND COFFERDAM NOTES:

1.DIVERSION CULVERTS ARE TEMPORARY AND SHALL BE REMOVED AT THE END OF THE

PROJECT.

2.SUPERSACK COFFERDAM SHALL BE CONSTRUCTED OF MULTIPLE UNITS OF SUPERSACKS

FILLED WITH CLEAN GRAVEL OR COBBLE, AND ABUTTED SIDE BY SIDE TO CREATE A WATER

TIGHT BARRIER THAT SEPARATES THE CONSTRUCTION SITE FROM THE STREAM.

3.IF WATER DEPTH EXCEEDS 85% OF THE SUPER SACK HEIGHT, AN ADDITIONAL TOP ROW

OF BAGS SHALL BE INSTALLED AND SUPPORTED BY TWO BOTTOM ROWS OF SUPERSACK

BAGS.

P a g e | 10

4.THE COFFERDAM SHALL BE SEALED BY COVERING IT WITH REINFORCED PLASTIC

SHEETING THAT IS HELD IN PLACE BY ROWS OF SANDBAGS OR ROCK. INTERMITTENT

PLACEMENT OF SANDBAGS OR ROCKS WILL BE EFFECTIVE. THE SANDBAGS MUST BE

PLACED ON THE TOP OF THE SACKS AS WELL AS ALONG THE TOE OF THE COFFERDAM TO

HOLD IT IN PLACE. THE PORTION OF THE SHEETING DRAPED ONTO THE WATER SIDE OF

THE COFFERDAM SHALL BE WEIGHTED TO THE BOTTOM WITH A MINIMUM OF TWO

ROWS OF SANDBAGS.

5.THE ENDS OF THE COFFERDAM SHALL BE EXTENDED ONTO DRY LAND AND THE ENDS OF

THE POLY SHEETING SHALL BE SECURED ABOVE THE WATERLINE WITH MULTIPLE LAYERS

OF SANDBAGS. IF THE ENDS MUST BE TERMINATED AT A WET LOCATION THE COFFERDAM

SHALL BE TIGHTLY SEALED TO THE GROUND WITH MULTIPLE LAYERS OF SHEETING AND

SANDBAGS.

6.THE SUPERSACKS SHALL BE WATERPROOF, CUBE SHAPED, POLYPROPYLENE WOVEN

FABRIC WITH A FLAT BOTTOM, FOUR LIFTING LOOPS, RATED FOR A MINIMUM OF 2.5

TONS WORKING LOAD WITH A 5:1 SAFETY FACTOR.

7.THE POLY SHEETING SHALL BE A MINIMUM OF 6 MIL THICKNESS. THE ROLL SHALL BE A

MINIMUM OF 12 FEET WIDE AND LONG ENOUGH TO SPAN THE LENGTH OF THE

COFFERDAM WITHOUT A SEAM.

8. THE CONTRACTOR SHALL PROVIDE DEWATERING, AS NEEDED, ON THE BACK SIDE OF

THE COFFERDAM IN THE WORK AREA. DEWATERING OPERATIONS SHALL CONSIST OF A

PRIMARY PUMP AND BACKUP PUMP BOTH LARGE ENOUGH TO MAINTAIN THE WATER

LEVEL SO THE EXCAVATION AND BACKFILL OPERATIONS CAN BE COMPLETED.

DEWATERING OPERATIONS SHALL BE MONITORED 24 HOURS A DAY UNTIL THE PUMPS

CAN BE SAFELY SHUT DOWN WITHOUT THE RISK OF DAMAGE TO THE WORK.

9.WHEN THE WORK IS COMPLETED ALL SUPERSACKS, SANDBAGS, POLY SHEETING AND

ALL DEBRIS SHALL BE CLEANED UP AND LEGALLY DISPOSED OF OFFSITE.

P a g e | 11

STREAM SUBSTRATE PLAN

� ISOLATE SUBSTRATE VIEW (ENTIRE LENGTH OF NEW STREAM)

o NORTH ARROW o SCALE BAR o ORINARY HIGH WATER/BANKFULL o LOW FLOW CHANNEL o THALWEG HORIZONTAL ALIGNMENT & STATIONING

TIE IN POINTS

o POINT TABLE (POINT #, NORTHING, EASTING, ELEVATION)

THALWEG TIE IN POINTS

CULVERT INVERT CENTERLINE POINTS

o CULVERT SUBSTRATE

HATCH

DIMENSION LABELS

o STREAM SUBSTRATE

HATCH

DIMENSION LABELS

o LEGEND FOR HATCHES o CROSS SECTION CALL OUT FOR CULVERT

� STREAM SUBSTRATE AND CULVERT SUBSTRATE AGGREGATE GRADATIONS SHOWN IN TABLE FORM

� FINE AND COARSE AGGREGATE PROPORTIONS SHOWN.

NOTES:*example

1.CULVERT SUBSTRATE MATERIAL SHALL CONSIST OF 2 PARTS COARSE MATERIAL TO 1

PART FINE MATERIAL MEETING THE GRADATION IN TABLE 1 AND 2 THIS SHEET. CULVERT

STREAMBED MATERIALS SHALL BE MIXED ON SITE BEFORE PLACEMENT. ADD FINES (NO

10 AND SMALLER) IF NEEDED TO SEAL THE BED.

2.STREAM SUBSTRATE MATERIAL SHALL FOLLOW THE GRADATION NOTED IN TABLE 3 ON

THIS SHEET. CONTRACTOR MAY USE SALVAGED STREAMBED MATERIAL THAT MEET THE

GRADATION WITH THE ENGINEER'S APPROVAL. ADD FINES (NO 10 AND SMALLER) IF

NEEDED TO SEAL THE BED.

3.CONSTRUCT CHANNEL LEAVING A NON-UNIFORM, ROUGH SURFACE. CONTRACTOR

SHALL WASH FINE MATERIALS INTO COARSE MATERIALS UNTIL BED IS SEALED AND

WATER POOLS ON SURFACE. ADDITIONAL FINES MAY BE REQUIRED DURING THIS

PROCESS.

4.STREAM SHALL NOT BE RE-DIVERTED INTO CULVERT UNTIL ENGINEER HAS APPROVED

BED MATERIALS ARE SUFFICIENTLY SEALED.

P a g e | 12

EROSION AND SEDIMENT CONTROL PLAN

o NORTH ARROW o SCALE BAR o EXISTING CULVERT o DETOUR ROAD

TIE IN POINTS

L&C TABLE

o EXISTING ROAD o DIVERSION CHANNEL

DIVERSION PIPE/CULVERT

THALWEG

• FLOW DIRECTION ARROW

ORDINARY HIGH WATER

o DEWATERING PUMP & DISCHARGE LOCATION

DIMENSION MINIMUM 100’ FROM CHANNEL

o DIVERSION CHANNEL o EXCAVATION AREA FOR NEW CULVERT o PERIMETER EROSION CONROL

LEGEND FOR LINE TYPES

� NOTES:*example

1.USE SUPER SACKS TO CONTAIN SEDIMENT DURING STREAM DIVERSION. ADJUST

PERIMETER CONTROL AS NECESSARY TO MATCH TEMPORARY FILL EXTENT OF DIVERSION

CHANNEL.

2. EROSION AND SEDIMENT CONTROL PLAN SHEETS GIVE GENERAL INFORMATION FOR

USE IN MINIMIZING EROSION AND OFFSET TRANSPORT OF SEDIMENT. THE CONTRACTOR

IS EXPECTED TO PROVIDE SITE SPECIFIC DETAILS AND BMP'S BASED ON THE

CONTRACTOR'S ACTURAL SCHEDULE AND CONSTRUCTION METHODS.

3. CONTRACTOR SHALL MINIMIZE THE AMOUNT OF DISTURBED AREA OPEN TO EROSION

AT ANY ONE TIME.

4. PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO EARTH DISTURBING ACTIVITIES.

UTILIZE VEGETATED BUFFERS, STRAW WATTLES, AND/OR SILT FENCE. APPROXIMATE

LOCATIONS AS SHOWN ON THE PLAN SHEETS DEPENDS ON THE METHOD OF WORK

5. “FINISH AS YOU GO” STABILIZATION SHALL OCCUR AS EACH EARTH DISTURBING

ACTIVITY IS COMPLETED IN ANY AREA. TEMPORARY STABILIZATION SHALL BE INSTALLED

UNTIL PERMANENT STABILIZATION IS ACHIEVED.

6. PROVIDE STABILIZED CONSTRUCTION EXIT FOR VEHICLE LEAVING THE WORK AREA AND

ADD AREAS WHICH MAY BE UTILIZED BY THE TRAVELING PUBLIC.

7. PROVIDE TEMPORARY EROSION CONTROL BMP'S FOR EXPOSED SOILS DURING

CONSTRUCTION (E.G. HYDRO MULCH, EROSION CONTROL BLANKETS, AND/OR WATTLES).

PROVIDE VELOCITY DISSIPATORS AT ALL DEWATERING DISCHARGE POINTS.

P a g e | 13

8. EROSION AND SEDIMENT CONTROL DEVICES MAY HAVE TO BE REMOVED AND

REINSTALLED DAILY TO ALLOW CONSTRUCTION TO PROCEED. MAINTAIN ALL DEVICES ON

A DAILY BASIS INCLUDING BUT NOT LIMITED TO REMOVAL AND DISPOSAL OF

ACCUMULATED SEDIMENT CLEANING DEVICES AND REPLACEMENT OF DAMAGED

DEVICES WITH NEW.

9. INSTALL PERMANENT EROSION CONTROL MEASURES SUCH AS RIPRAP APRONS AND

EMBANKMENT STABILIZATION AS SOON AS PRACTICABLE.

10.ALL DISTURBED GROUND CAPABLE OF SUPPORTING VEGETATION SHALL BE

REVEGETATED FOR FINAL STABILIZATION. FINAL STABILIZATION AREAS NOT REVEGETATED

SHALL BE 100% COVERED BY ROCK OR OTHER PERMANENT NON-ERODIBLE MATERIAL.

ATTAINMENT OF FINAL STABILIZATION SHALL BE AS APPROVED IN THE FIELD BY THE

ENGINEER.

11.SLOPE PROTECTION BMP'S SHALL INCLUDE SLOPE ROUGHENING, MULCH, TACKIFYING,

EROSION CONTROL BLANKETS, SEEDING, ROCK LINING, OR OTHER METHODS APPROVED

BY THE ENGINEER.

12.STOCKPILE AND STAGING LOCATION SHALL BE RECLAIMED TO THEIR ORIGINAL

CONDITION. NO STOCKPILES OR STAGING AREAS ARE ALLOWED IN WETLANDS.

13.ALL STOCKPILES OR ERODIBLE MATERIAL SHALL HAVE PERIMETER CONTROLS IN PLACE.

14.THE WORK AREA SHALL BE ISOLATED FROM THE FLOWING WATER. VEHICLES OR

EQUIPMENT OPERATION SHALL BE MINIMIZED IN FLOWING WATER.

P a g e | 14

SECTIONS AND DETAILS

� SECTION A: ROAD DETAIL (NTS)

o ROAD CROSS SECTION VIEW o DIMENSION LABELS

ROAD WIDTH

LANE WIDTH

o LANE SLOPES o TEXT LABELS:

ROAD FILL MATERIAL THICKNESS & TYPE

SEEDING START

EXISTING ROAD

� SECTION B: CULVERT COLLAR DETAIL (NTS)

o RIP RAP COLLAR CROSS SECTION VIEW

NEW CULVERT

EDGE OF GRAVEL

DIMENSIONS

• SUBSTRATE MATERIAL

• SPLASH GUARD (TYP 20’)

• GRADE OF SUBSTRATE & COLLAR RIP RAP

TEXT LABELS

• CULVERT INVERT

• SUBSTRATE MATERIAL

• SLOPE EXPLAINATION

� SECTION C: CULVERT DETAIL (NTS)

o CULVERT CROSS SECTION VIEW o NEW CULVERT

RISE DIMENSION

SPAN DIMENSION

THAW PIPES: LABELED

MIN COVER DIMENSION

o CULVERT SUBSTRATE

SUBSTRATE MATERIAL: HATCHED AND LABELED

DRAW ROUGH AND REALISTIC

LOW FLOW CHANNEL

• DIMENSIONS (WIDTHS, DEPTHS)

• SLOPE LABELS FOR BANKS

o EXCAVATION PAY GRADE LIMIT @ 1:1 SLOPE o NEW ROAD

FILL MATERIAL: HATCHED AND LABELED

o EXISTING ROAD o TEXT LABELS:

MATERIALS OF ALL FILL/SUBSTRATE

NEW CULVERT SPECS

P a g e | 15

SILT FENCE DETAILS

� USE STANDARD DETAILS FROM AUTOCAD FILES

STRAW WATTLE DETAILS

THAW PIPE DETAILS

P a g e | 16

REVEGETATION PLAN

o NORTH ARROW o SCALE BAR o CROSS SECTION CALL OUT FOR CHANNEL RECONSTRUCTION o THALWEG

FLOW DIRECTION ARROW

o NEW CULVERT o RIP RAP COLLARS

HATCH

TOPSOIL AND SEED

o RECONSTRUCTED BANKS WITH VEG MAT

HATCH

o DISTURBED AREA

HATCH

INCLUDE NEW ROAD EMBANKMENT & AREA DISTURBED BY EXCAVATION,

DIVERSION CHANNEL & DETOUR ROAD

TOPSOIL AND SEED

o LEGEND FOR HATCH TYPES

DETAILED DESCRIPTIONS

� TABLE 1: SEED AND MULCH APPLICATION RATES

o COMPONENT, INGREDIENTS, APPLICATION RATES o DO NOT FERTILIZE WILLOWS OR VEGMAT

� NOTES:

o SITE PREPARATION AND REVEGETATION DESCRIPTION:

MINIMIZE IMPACT TO EXISTING VEGETATION WHERE POSSIBLE. VEGETATED AREAS THAT

ARE LIGHTLY IMPACTED SHALL BE RE-ESTABLISHED BY WATERING AND ALLOWING

EXISTING VEGETATION TO GROW. ANY AREAS THAT CAN NOT BE REESTABLISHED

THROUGH THIS METHOD SHALL BE TREATED AS NOTED BELOW.

P a g e | 17

REVEGETATION DETAILS

� SECTION A: STREAM CHANNEL

o STREAM CROSS SECTION VIEW

LOW FLOW CHANNEL

• DIMENSIONS

BANKFULL ELEVATION

• DIMENSIONS

THALWEG ELEVATION

OHW

SUBSTRATE

• DIMENSIONS

• MIN DEPTH

• CALL OUT MATERIAL SIZE (REFER TO TABLES)

VEG MAT

• DIMENSIONS

• SLOPE

EXISTING GROUND

RECONSTRUCTED TOEWOOD BANK

� TOEWOOD BANK RECONSTRUCTION

o STEP 1 AND STEP 2