10 - CAD Design Checklist.pdf
PDF 262 KB Posted
- Attached to
- Ellicott Slough NWR Lead/Asbestos Abate and Demo
- Solicitation number
- 140F0321Q0007
About this file
This document package includes a checklist for CAD design of a federal construction project and details of a related federal contract opportunity. The checklist outlines design requirements for site plans, surveys, demolition plans, utility plans, road plans, erosion control plans, sections and details to support construction of a new culvert. Key details include specifications for title sheets, notes, line types and callouts. The related solicitation is for asbestos and lead abatement, containment and removal services, as well as structure demolition for multiple on-site structures. The total small business set-aside contract will be awarded on a firm-fixed price basis considering price, technical capability, past experience, technical approach and past performance. Site visits are encouraged prior to submitting quotes in response to the solicitation by the specified due date. The federal agency is the U.S. Fish and Wildlife Service located in Portland, Oregon.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e | 1
CAD DESIGN CHECKLIST
GEOMORPHIC ANALOG METHOD
JANUARY 24, 2020
P a g e | 2
LIST OF POTENTIAL SHEETS:
• TITLE SHEET
• QUANTITIES & GENERAL NOTES
• SURVEY
• DEMOLITION PLAN
• PHASING PLAN
• SITE PLAN
• SITE ACCESS & STAGING PLAN
• UTILITY PLAN
• ROAD PLAN & PROFILE
• CULVERT PLAN & PROFILE
• DETOUR & DIVERSION PLAN
• EROSION & SEDIMENT CONTROL PLAN
• SUBSTRATE PLAN
• CULVERT & ROAD SECTIONS
• SILT FENCE DETAILS
• STRAW WATTLE DETAILS
• REVEGETATION PLAN
• REVEGETATION DETAILS
• CHANNEL RESTORATION SECTIONS & DETAILS
• CHANNEL STRUCTURE SECTIONS & DETAILS
• BANK BIOENGINEERING SECTIONS & DETAILS
• ROAD CUT & FILL TABLES
• CHANNEL CUT & FILL TABLES
• THAW PIPE DETAILS
P a g e | 3
TITLE SHEET
� HEAD OF PROJECT TOP LEFT: U.S. FISH & WILDLIFE SERVICE
� MAP OF ALASKA
o SITE LOCATION (STAR)
� AERIAL IMAGE OF SITE
o NORTH ARROW o SCALE BAR o PROJECT LOCATION LABEL
� FWS LOGO TOP RIGHT(PARTNER LOGO WHEN APPLICABLE)
� PROJECT TITLE WITH LOCATION (UNDERNEATH FWS LOGO)
o PROJECT #
� DRAWING INDEX TABLE
o SHEET N0., TITLE
QUANTITIES AND GENERAL NOTES
� ITEM INVENTORY TABLE
o ITEM N0., DESCRIPTION, UNIT, QUANTITY
� ABBREVIATIONS TABLE
� NOTES
o GENERAL NOTES: *example
1. SURVEY INFORMATION WAS PROVIDED BY ________. THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL SITE FEATURES. IF
CONDITIONS OTHER THAN THOSE SHOWN ON THE PLANS ARE ENCOUNTERED, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER.
2. PLANS MAY NOT SHOW ALL EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR
LOCATING ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION
3. EXERCISE EXTREME CAUTION AND OBSERVE ALL APPLICABLE OSHA REQUIREMENTS FOR
WORKING IN CONFINED AREAS AND OPEN EXCAVATIONS.
4. EXCAVATION AND BACKFILL: REMOVE ALL ORGANIC OR OVER SATURATED SOFT
MATERIAL WHICH CANNOT BE COMPACTED. BACKFILL SHALL BE PLACED AND
COMPACTED WITH CARE AND BROUGHT UP EVENLY AND SIMULTANEOUSLY ON BOTH
SIDE OF THE CULVERTS. COMPACT TO 95% MAXIMUM DENSITY.
5. VERIFY INVERTS OF EXISTING CHANNEL AND ALL PROPOSED STRUCTURES PRIOR TO
CONSTRUCTION. REPORT ANY DISCREPANCIES FROM PLANS IMMEDIATELY TO OWNER'S
REPRESENTATIVE.
6. CULVERT INSTALLATION: CULVERT INFILL MATERIAL SHALL BE INSTALLED IN PIPE
ACCORDING TO PLANS. MANUAL INSTALLATION IS REQUIRED.
7. ALL VEGETATION IN AREAS NOT AFFECTED BY WORK SHALL BE PRESERVED AND
PROTECTED BY THE CONTRACTOR. RESEED ALL DISTURBED AREAS IN CONFORMANCE
WITH REVEGETATION PLAN ON SHEET ???
8. ESTIMATE OF QUANTITIES ARE IN PLACE AND DO NOT ACCOUNT FOR SWELL PRIOR TO
COMPACTION OR WASTE.
P a g e | 4
SURVEY
� TOPO PLAN VIEW (ENTIRE WORK SITE)
o NORTH ARROW o SCALE BAR o CONTROL POINTS (BENCHMARKS) o EDGES OF ROAD o ORDINARY HIGH WATER LINES o EXISTING CULVERT o UTILITY LINES o CONTROL POINT TABLE (BENCHMARKS)
POINT #, NORTHING, EASTING, ELEVATION
o NOTES:
1. NORTHINGS, EASTINGS AND ELEVATIONS BASED ON ???? (PER SURVEYOR OR
LOCAL DATUM).
� IMAGES
o EXISTING ROAD o EXISTING CULVERT INLET o EXISTING CULVERT OUTLET
P a g e | 5
DEMOLITION PLAN
o NORTH ARROW o SCALE BAR o EXISTING ROAD
NAME LABEL
ARROW TO ACCESS
o ORIDNARY HIGH WATER LINES o THALWEG
FLOW DIRECTION ARROW
o LIMITS OF DISTURBANCE OUTLINED AND HATCHED
LEGEND CONTAINS AREA IN ACRES OF LOD.
LOD’S ARE BASED ON THE FOOTPRINT OF THE CULVERT EXCAVATION, THE
DIVERSION CHANNEL, DETOUR ROAD AND THE TOE OF THE NEW ROAD.
� NOTES:*example
1. LIMITS OF DISTURBANCE SHOWN ARE APPROXIMATE BASED ON FIELD OBSERVATIONS.
ACTUAL LIMITS SHALL BE DELINEATED BY THE CONTRACTOR AND APPROVED BY THE
ENGINEER PRIOR TO CLEARING AND GRUBBING.
2. THE STREAM CHANNEL AND VEGETATION IN AREAS NOT EFFECTED BY WORK SHALL BE
PROTECTED AND PRESERVED BY THE CONTRACTOR. RESEED ALL DISTURBED AREAS IN
CONFORMANCE WITH THE REVEGETATION PLAN ON SHEET ???.
SITE PLAN (ROAD PLAN & PROFILE)
� TOPO PLAN VIEW (ENTIRE WORK SITE)
o NORTH ARROW o SCALE BAR o NEW ROAD
STATION ALONG CL
NAME LABEL
ARROW TO ACCESS
HORIZONTAL ALIGNMENT AND LABELS
VERTICAL CURVES
TIE IN POINTS
o RIP RAP o RECONSTRUCTED BANKS o LEGEND FOR HATCH TYPES o TEXT LABELS:
NEW CONTOURS
EXISTING CONTOURS
CONTOUR ELEVATIONS
NEW THALWEG
EXISTING THALWEG
ORDINARY HIGH WATER
P a g e | 6
NEW CULVERT
• SPECS
UTILITY LINES
POINT TABLE (POINT #, NORTHING, EASTING, ELEVATION
• ROAD TIE INS
� HYDROLOGIC AND HYDRAULIC SUMMARY
o DRAINAGE AREA
SQUARE MILES
o EXCEEDANCE PROBABILITY o RETURN PERIOD
50 YEAR & 100 YEAR
o DESIGN DISCHARGE
C.F.S o DESIGN HIGH WATER ELEVATION
FT.
o HEADWATER/ DEPTH RATIO o TEXT LABELS:
ANTICIPATED ADDITIONAL BLACKWATER AT Q100 = 0.0 FEET
ELEVATIONS ARE BASED ON A LOCAL PROJECT DATUM
� ROAD PROFILE ALONG CENTERLINE
o PUT ON SAME SHEET AS SITE PLAN IF POSSIBLE AND ALIGN WITH ROAD PLAN VIEW o NEW CULVERT o NEW ROAD
SLOPE VALUES
VERTICAL CURVES
o EXISTING ROAD o TIE IN POINTS
STATION, ELEVATION
P a g e | 7
CULVERT PLAN AND PROFILE
� TOPO PLAN VIEW (ZOOMED TO CULVERT)
o NORTH ARROW o SCALE BAR o INVERT ELEVATIONS o CROSS SECTION CALL OUTS FOR COLLAR ARMOR o THALWEG HORIZONTAL ALIGNMENT & STATIONING o RIP RAP COLLAR ARMOR
HATCH
DIMENSION LABELS
EXTEND 2xD100 PAST THE END OF CULVERT o RECONSTRUCTED BANKS
HATCH
DIMENSION LABELS
o LEGEND FOR HATCHES
DETAILED DESCRIPTIONS
� STREAM PROFILE ALONG THALWEG
o ALIGN WITH PLAN VIEW o HORIZONTAL SCALE TO MATCH PLAN VIEW, VERTICAL SCALE EXAGGERATED o PROFILE VIEW o EXISTING GROUND o NEW GROUND
MINIMUM COVERAGE OVER NEW CULVERT
o NEW CULVERT
STATIONING AT INLET & OUTLET
INVERT ELEVATIONS
SLOPE
CALL OUT SIZE AND LENGTH
o BANKFULL LINE
DIMENSION TO THALWEG
o THALWEG TIE IN POINTS & STATIONING o HATCH CULVERT SUBSTRATE MATERIAL o HATCH NEW CHANNEL MATERIAL o HATCH MATERIAL TO BE REMOVED
P a g e | 8
DETOUR AND DIVERSION PLAN
o NORTH ARROW o SCALE BAR o CROSS SECTION CALL OUT FOR DIVERSION CHANNEL o DETOUR ROAD
TIE IN POINTS
L&C TABLE (OPTIONAL – ONLY IF DETOUR ROAD NEEDS TO BE EXACTLY AS
DRAWN. OTHERWISE, LEAVE IT UP TO THE CONTRACTOR).
o EXISTING ROAD o EXISTING CULVERTS o EXISTING TOPO LINES o HORIZONTAL ALIGNMENT CENTERLINE (ROAD) o CULVERT EXCAVATION AREA o DEWATERING PUMP & DISCHARGE LOCATION o DIVERSION CHANNEL
MAX SLOPE
DIVERSION PIPE/CULVERT
THALWEG
• FLOW DIRECTION ARROW
� CALL BEFORE YOU DIG LABEL
o CALL BEFORE YOU DIG
CONTRACTOR SHALL CONTACT
UTILITY COMPANIES TWO WEEKS
PRIOR TO EXCAVATION.
ALASKA DIG LINE: 1-800-478-3121
WWW.AKONECALL.COM
� NOTES:*example
1. THIS WORK WILL REQUIRE A DETOUR ROAD AND DIVERSION OF THE STREAM. STREAM
FLOWS MAY NOT BE PUMPED DURING CONSTRUCTION.
2. DETOUR ROAD, DIVERSION AND DEWATERING IS THE CONTRACTOR'S RESPONSIBILITY;
DETAILS ON THIS SHEET ARE PROVIDED FOR INFORMATION ONLY. THE CONTRACTOR
SHALL PROVIDE A DETAILED DIVERSION AND DEWATERING PLAN TO THE ENGINEER FOR
REVIEW PRIOR TO STARTING CONSTRUCTION. TEMPORARY DIKES OR BERMS MAY BE
CREATED TO ISOLATE THE WORK FROM WATER OF SURROUNDING AREA.
3. STREAM BASE FLOWS WILL BE BYPASSED DURING CONSTRUCTION. LARGER FLOWS
DURING PROLONGED PRECIPITATION OR SNOW MELT EVENTS WILL OVER TOP THE ROAD
OR CAUSE EXTENSIVE FLOODING OF THE SURROUNDING AREA AND CONSTRUCTION
MUST BE TIMED TO ACCOUNT FOR THESE EVENTS.
4. ROAD MAY NOT BE CLOSED TO THRU TRAFFIC DURING CONSTRUCTION. DO NOT BLOCK
ACCESS TO EXISTING RESIDENCES.
P a g e | 9
5. THE TEMPORARY DIVERSION CHANNEL SHOWN HAS BEEN DESIGNED FOR FLOWS UP TO
89 CFS (APPROXIMATELY EQUIVALENT TO THE 2 YEAR FLOOD EVENT). CONTRACTOR
SHALL PLAN FOR CONSTRUCTION TO OCCUR DURING THE DRY SEASON AFTER BREAKUP.
6. USE 10 MIL REINFORCED VISQUEEN LINER ALONG THE ENTIRE LENGTH AND WIDTH OF
TEMPORARY DIVERSION CHANNEL. DO NOT CONSTRUCT WITH LONGITUDINAL JOINTS.
BURY UPSTREAM EDGE OF LINER A MINIMUM OF 12" DEEP AND SECURE WITH RIPRAP OR
SAND BAGS.
7. CONSTRUCT TEMPORARY DIVERSION CHANNEL PRIOR TO CONSTRUCTION OF
ALUMINUM BOX CULVERT.
8. BOX CULVERT SHALL BE CONSTRUCTED IN THE DRY. PROVIDE COFFERDAM AND PUMP
HOSE AS REQUIRED TO DEWATER CONSTRUCTION AREA. ALL DISCHARGE POINTS
REQUIRE PERMANENT OR TEMPORARY VELOCITY CONTROLS. PROVIDE FOR SEDIMENT
REMOVAL FOR ALL DEWATERING ACTIVITY PRIOR TO DISCHARGE FROM THE PROJECT
INTO ANY WATER OF THE UNITED STATES.
9. PUMPS SHALL BE SIZED TO CARRY HIGHEST FLOW REASONABLY EXPECTED TO OCCUR
DURING CONSTRUCTION INCLUDING SURFACE AND SUBSURFACE FLOWS.
10.ENERGY DISSIPATOR WILL BE NECESSARY AT THE DEWATERING DISCHARGE LOCATION.
DEWATERING DISCHARGE POINT MUST BE LOCATED AT LEAST 100 FEET FROM STREAM
TO ALLOW FOR SEDIMENT REMOVAL THROUGH THE RIPARIAN VEGETATION BUFFER.
11.REMOVE DIVERSION CHANNEL AFTER STREAM FLOW HAS BEEN RE-DIVERTED TO THE
ALUMINUM BOX CULVERT. SEED ALL DISTURBED AREAS.
� DIVERSION CHANNEL CROSS SECTION
o DIMENSIONS
DEPTH
WIDTH
GRADE
o TEXT LABELS:
TYPE OF LINING
ROCK INFORMATION
� SUPERSACK DETAILS
� NOTES: *example o DIVERSION CULVERT AND COFFERDAM NOTES:
1.DIVERSION CULVERTS ARE TEMPORARY AND SHALL BE REMOVED AT THE END OF THE
PROJECT.
2.SUPERSACK COFFERDAM SHALL BE CONSTRUCTED OF MULTIPLE UNITS OF SUPERSACKS
FILLED WITH CLEAN GRAVEL OR COBBLE, AND ABUTTED SIDE BY SIDE TO CREATE A WATER
TIGHT BARRIER THAT SEPARATES THE CONSTRUCTION SITE FROM THE STREAM.
3.IF WATER DEPTH EXCEEDS 85% OF THE SUPER SACK HEIGHT, AN ADDITIONAL TOP ROW
OF BAGS SHALL BE INSTALLED AND SUPPORTED BY TWO BOTTOM ROWS OF SUPERSACK
BAGS.
P a g e | 10
4.THE COFFERDAM SHALL BE SEALED BY COVERING IT WITH REINFORCED PLASTIC
SHEETING THAT IS HELD IN PLACE BY ROWS OF SANDBAGS OR ROCK. INTERMITTENT
PLACEMENT OF SANDBAGS OR ROCKS WILL BE EFFECTIVE. THE SANDBAGS MUST BE
PLACED ON THE TOP OF THE SACKS AS WELL AS ALONG THE TOE OF THE COFFERDAM TO
HOLD IT IN PLACE. THE PORTION OF THE SHEETING DRAPED ONTO THE WATER SIDE OF
THE COFFERDAM SHALL BE WEIGHTED TO THE BOTTOM WITH A MINIMUM OF TWO
ROWS OF SANDBAGS.
5.THE ENDS OF THE COFFERDAM SHALL BE EXTENDED ONTO DRY LAND AND THE ENDS OF
THE POLY SHEETING SHALL BE SECURED ABOVE THE WATERLINE WITH MULTIPLE LAYERS
OF SANDBAGS. IF THE ENDS MUST BE TERMINATED AT A WET LOCATION THE COFFERDAM
SHALL BE TIGHTLY SEALED TO THE GROUND WITH MULTIPLE LAYERS OF SHEETING AND
SANDBAGS.
6.THE SUPERSACKS SHALL BE WATERPROOF, CUBE SHAPED, POLYPROPYLENE WOVEN
FABRIC WITH A FLAT BOTTOM, FOUR LIFTING LOOPS, RATED FOR A MINIMUM OF 2.5
TONS WORKING LOAD WITH A 5:1 SAFETY FACTOR.
7.THE POLY SHEETING SHALL BE A MINIMUM OF 6 MIL THICKNESS. THE ROLL SHALL BE A
MINIMUM OF 12 FEET WIDE AND LONG ENOUGH TO SPAN THE LENGTH OF THE
COFFERDAM WITHOUT A SEAM.
8. THE CONTRACTOR SHALL PROVIDE DEWATERING, AS NEEDED, ON THE BACK SIDE OF
THE COFFERDAM IN THE WORK AREA. DEWATERING OPERATIONS SHALL CONSIST OF A
PRIMARY PUMP AND BACKUP PUMP BOTH LARGE ENOUGH TO MAINTAIN THE WATER
LEVEL SO THE EXCAVATION AND BACKFILL OPERATIONS CAN BE COMPLETED.
DEWATERING OPERATIONS SHALL BE MONITORED 24 HOURS A DAY UNTIL THE PUMPS
CAN BE SAFELY SHUT DOWN WITHOUT THE RISK OF DAMAGE TO THE WORK.
9.WHEN THE WORK IS COMPLETED ALL SUPERSACKS, SANDBAGS, POLY SHEETING AND
ALL DEBRIS SHALL BE CLEANED UP AND LEGALLY DISPOSED OF OFFSITE.
P a g e | 11
STREAM SUBSTRATE PLAN
� ISOLATE SUBSTRATE VIEW (ENTIRE LENGTH OF NEW STREAM)
o NORTH ARROW o SCALE BAR o ORINARY HIGH WATER/BANKFULL o LOW FLOW CHANNEL o THALWEG HORIZONTAL ALIGNMENT & STATIONING
TIE IN POINTS
o POINT TABLE (POINT #, NORTHING, EASTING, ELEVATION)
THALWEG TIE IN POINTS
CULVERT INVERT CENTERLINE POINTS
o CULVERT SUBSTRATE
HATCH
DIMENSION LABELS
o STREAM SUBSTRATE
HATCH
DIMENSION LABELS
o LEGEND FOR HATCHES o CROSS SECTION CALL OUT FOR CULVERT
� STREAM SUBSTRATE AND CULVERT SUBSTRATE AGGREGATE GRADATIONS SHOWN IN TABLE FORM
� FINE AND COARSE AGGREGATE PROPORTIONS SHOWN.
NOTES:*example
1.CULVERT SUBSTRATE MATERIAL SHALL CONSIST OF 2 PARTS COARSE MATERIAL TO 1
PART FINE MATERIAL MEETING THE GRADATION IN TABLE 1 AND 2 THIS SHEET. CULVERT
STREAMBED MATERIALS SHALL BE MIXED ON SITE BEFORE PLACEMENT. ADD FINES (NO
10 AND SMALLER) IF NEEDED TO SEAL THE BED.
2.STREAM SUBSTRATE MATERIAL SHALL FOLLOW THE GRADATION NOTED IN TABLE 3 ON
THIS SHEET. CONTRACTOR MAY USE SALVAGED STREAMBED MATERIAL THAT MEET THE
GRADATION WITH THE ENGINEER'S APPROVAL. ADD FINES (NO 10 AND SMALLER) IF
NEEDED TO SEAL THE BED.
3.CONSTRUCT CHANNEL LEAVING A NON-UNIFORM, ROUGH SURFACE. CONTRACTOR
SHALL WASH FINE MATERIALS INTO COARSE MATERIALS UNTIL BED IS SEALED AND
WATER POOLS ON SURFACE. ADDITIONAL FINES MAY BE REQUIRED DURING THIS
PROCESS.
4.STREAM SHALL NOT BE RE-DIVERTED INTO CULVERT UNTIL ENGINEER HAS APPROVED
BED MATERIALS ARE SUFFICIENTLY SEALED.
P a g e | 12
EROSION AND SEDIMENT CONTROL PLAN
o NORTH ARROW o SCALE BAR o EXISTING CULVERT o DETOUR ROAD
TIE IN POINTS
L&C TABLE
o EXISTING ROAD o DIVERSION CHANNEL
DIVERSION PIPE/CULVERT
THALWEG
• FLOW DIRECTION ARROW
ORDINARY HIGH WATER
o DEWATERING PUMP & DISCHARGE LOCATION
DIMENSION MINIMUM 100’ FROM CHANNEL
o DIVERSION CHANNEL o EXCAVATION AREA FOR NEW CULVERT o PERIMETER EROSION CONROL
LEGEND FOR LINE TYPES
� NOTES:*example
1.USE SUPER SACKS TO CONTAIN SEDIMENT DURING STREAM DIVERSION. ADJUST
PERIMETER CONTROL AS NECESSARY TO MATCH TEMPORARY FILL EXTENT OF DIVERSION
CHANNEL.
2. EROSION AND SEDIMENT CONTROL PLAN SHEETS GIVE GENERAL INFORMATION FOR
USE IN MINIMIZING EROSION AND OFFSET TRANSPORT OF SEDIMENT. THE CONTRACTOR
IS EXPECTED TO PROVIDE SITE SPECIFIC DETAILS AND BMP'S BASED ON THE
CONTRACTOR'S ACTURAL SCHEDULE AND CONSTRUCTION METHODS.
3. CONTRACTOR SHALL MINIMIZE THE AMOUNT OF DISTURBED AREA OPEN TO EROSION
AT ANY ONE TIME.
4. PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO EARTH DISTURBING ACTIVITIES.
UTILIZE VEGETATED BUFFERS, STRAW WATTLES, AND/OR SILT FENCE. APPROXIMATE
LOCATIONS AS SHOWN ON THE PLAN SHEETS DEPENDS ON THE METHOD OF WORK
5. “FINISH AS YOU GO” STABILIZATION SHALL OCCUR AS EACH EARTH DISTURBING
ACTIVITY IS COMPLETED IN ANY AREA. TEMPORARY STABILIZATION SHALL BE INSTALLED
UNTIL PERMANENT STABILIZATION IS ACHIEVED.
6. PROVIDE STABILIZED CONSTRUCTION EXIT FOR VEHICLE LEAVING THE WORK AREA AND
ADD AREAS WHICH MAY BE UTILIZED BY THE TRAVELING PUBLIC.
7. PROVIDE TEMPORARY EROSION CONTROL BMP'S FOR EXPOSED SOILS DURING
CONSTRUCTION (E.G. HYDRO MULCH, EROSION CONTROL BLANKETS, AND/OR WATTLES).
PROVIDE VELOCITY DISSIPATORS AT ALL DEWATERING DISCHARGE POINTS.
P a g e | 13
8. EROSION AND SEDIMENT CONTROL DEVICES MAY HAVE TO BE REMOVED AND
REINSTALLED DAILY TO ALLOW CONSTRUCTION TO PROCEED. MAINTAIN ALL DEVICES ON
A DAILY BASIS INCLUDING BUT NOT LIMITED TO REMOVAL AND DISPOSAL OF
ACCUMULATED SEDIMENT CLEANING DEVICES AND REPLACEMENT OF DAMAGED
DEVICES WITH NEW.
9. INSTALL PERMANENT EROSION CONTROL MEASURES SUCH AS RIPRAP APRONS AND
EMBANKMENT STABILIZATION AS SOON AS PRACTICABLE.
10.ALL DISTURBED GROUND CAPABLE OF SUPPORTING VEGETATION SHALL BE
REVEGETATED FOR FINAL STABILIZATION. FINAL STABILIZATION AREAS NOT REVEGETATED
SHALL BE 100% COVERED BY ROCK OR OTHER PERMANENT NON-ERODIBLE MATERIAL.
ATTAINMENT OF FINAL STABILIZATION SHALL BE AS APPROVED IN THE FIELD BY THE
ENGINEER.
11.SLOPE PROTECTION BMP'S SHALL INCLUDE SLOPE ROUGHENING, MULCH, TACKIFYING,
EROSION CONTROL BLANKETS, SEEDING, ROCK LINING, OR OTHER METHODS APPROVED
BY THE ENGINEER.
12.STOCKPILE AND STAGING LOCATION SHALL BE RECLAIMED TO THEIR ORIGINAL
CONDITION. NO STOCKPILES OR STAGING AREAS ARE ALLOWED IN WETLANDS.
13.ALL STOCKPILES OR ERODIBLE MATERIAL SHALL HAVE PERIMETER CONTROLS IN PLACE.
14.THE WORK AREA SHALL BE ISOLATED FROM THE FLOWING WATER. VEHICLES OR
EQUIPMENT OPERATION SHALL BE MINIMIZED IN FLOWING WATER.
P a g e | 14
SECTIONS AND DETAILS
� SECTION A: ROAD DETAIL (NTS)
o ROAD CROSS SECTION VIEW o DIMENSION LABELS
ROAD WIDTH
LANE WIDTH
o LANE SLOPES o TEXT LABELS:
ROAD FILL MATERIAL THICKNESS & TYPE
SEEDING START
EXISTING ROAD
� SECTION B: CULVERT COLLAR DETAIL (NTS)
o RIP RAP COLLAR CROSS SECTION VIEW
NEW CULVERT
EDGE OF GRAVEL
DIMENSIONS
• SUBSTRATE MATERIAL
• SPLASH GUARD (TYP 20’)
• GRADE OF SUBSTRATE & COLLAR RIP RAP
TEXT LABELS
• CULVERT INVERT
• SUBSTRATE MATERIAL
• SLOPE EXPLAINATION
� SECTION C: CULVERT DETAIL (NTS)
o CULVERT CROSS SECTION VIEW o NEW CULVERT
RISE DIMENSION
SPAN DIMENSION
THAW PIPES: LABELED
MIN COVER DIMENSION
o CULVERT SUBSTRATE
SUBSTRATE MATERIAL: HATCHED AND LABELED
DRAW ROUGH AND REALISTIC
LOW FLOW CHANNEL
• DIMENSIONS (WIDTHS, DEPTHS)
• SLOPE LABELS FOR BANKS
o EXCAVATION PAY GRADE LIMIT @ 1:1 SLOPE o NEW ROAD
FILL MATERIAL: HATCHED AND LABELED
o EXISTING ROAD o TEXT LABELS:
MATERIALS OF ALL FILL/SUBSTRATE
NEW CULVERT SPECS
P a g e | 15
SILT FENCE DETAILS
� USE STANDARD DETAILS FROM AUTOCAD FILES
STRAW WATTLE DETAILS
THAW PIPE DETAILS
P a g e | 16
REVEGETATION PLAN
o NORTH ARROW o SCALE BAR o CROSS SECTION CALL OUT FOR CHANNEL RECONSTRUCTION o THALWEG
FLOW DIRECTION ARROW
o NEW CULVERT o RIP RAP COLLARS
HATCH
TOPSOIL AND SEED
o RECONSTRUCTED BANKS WITH VEG MAT
HATCH
o DISTURBED AREA
HATCH
INCLUDE NEW ROAD EMBANKMENT & AREA DISTURBED BY EXCAVATION,
DIVERSION CHANNEL & DETOUR ROAD
TOPSOIL AND SEED
o LEGEND FOR HATCH TYPES
DETAILED DESCRIPTIONS
� TABLE 1: SEED AND MULCH APPLICATION RATES
o COMPONENT, INGREDIENTS, APPLICATION RATES o DO NOT FERTILIZE WILLOWS OR VEGMAT
� NOTES:
o SITE PREPARATION AND REVEGETATION DESCRIPTION:
MINIMIZE IMPACT TO EXISTING VEGETATION WHERE POSSIBLE. VEGETATED AREAS THAT
ARE LIGHTLY IMPACTED SHALL BE RE-ESTABLISHED BY WATERING AND ALLOWING
EXISTING VEGETATION TO GROW. ANY AREAS THAT CAN NOT BE REESTABLISHED
THROUGH THIS METHOD SHALL BE TREATED AS NOTED BELOW.
P a g e | 17
REVEGETATION DETAILS
� SECTION A: STREAM CHANNEL
o STREAM CROSS SECTION VIEW
LOW FLOW CHANNEL
• DIMENSIONS
BANKFULL ELEVATION
• DIMENSIONS
THALWEG ELEVATION
OHW
SUBSTRATE
• DIMENSIONS
• MIN DEPTH
• CALL OUT MATERIAL SIZE (REFER TO TABLES)
VEG MAT
• DIMENSIONS
• SLOPE
EXISTING GROUND
RECONSTRUCTED TOEWOOD BANK
� TOEWOOD BANK RECONSTRUCTION
o STEP 1 AND STEP 2