3-C5 - City of Lancaster 3683415 A-8 WQM Permit.pdf

PDF 137 KB Posted

Attached to
Traffic Signal Upgrade Equipment and Related Materials Procurement B820-26-05
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a Water Quality Management Permit Amendment issued by the Commonwealth of Pennsylvania Department of Environmental Protection Bureau of Clean Water to the City of Lancaster for modifications to the Lancaster City Advanced Wastewater Treatment Plant (AWWTP). The permit (No. 3683415, Amendment No. A-8) authorizes the removal of existing manually raked bar screens, mechanical screens, and screenings handling equipment, and the installation of two multi-rake catenary type bar screens with 3/8" openings, each designed to handle a peak flow of 32.1 MGD, along with two screenings washer/compactors with a peak capacity of 70 cubic feet per hour. Additional work includes modification of the channel in the screen house to improve grit settlement through a curved bulge in the upstream portion and reduction of channel width by 3 inches on each side. The permit was issued on September 25, 2025, by Maria D. Bebenek, P.E., Clean Water Program Manager, based on the Water Quality Management Permit Amendment application dated May 6, 2025. Construction must be supervised by a Pennsylvania licensed Professional Engineer in accordance with approved plans and specifications, with a requirement for Post Construction Certification using Form 3800-PM-WSFR0179a to be submitted before the facility is placed in operation, including as-built drawings and photographs within 30 days of certification.

The permit is subject to comprehensive conditions relating to sewerage including the requirement that all construction, operations, and procedures comply with the approved application and supporting documentation. The permittee must obtain all necessary permits under 25 Pa. Code Chapters 102, 105, and 106 prior to construction, and an operator certified in accordance with the Water and Wastewater Systems Operator Certification Act must operate the treatment plant. The approval is contingent upon acquiring necessary property rights by easement or otherwise, and the authority granted shall be null and void five years from the issuance date unless construction or modification has commenced by the fifth anniversary of the permit date. Collected screenings, sludge, and other solids must be handled and disposed of in compliance with Title 25 Pa. Code Chapters 271, 273, 275, 283, and 285 and federal regulations. The permit does not relieve the permittee of obligations to comply with all federal, interstate, state, or local laws, ordinances, and regulations applicable to the sewerage facilities, and no discharge is authorized unless approved by an NPDES Permit.

View the file

Other files

File Type Posted
2-Exhibit A - PennDOT Grant.pdf PDF
1-C1 - Technical Specifications.pdf PDF
3-B820-26-05 FINAL GLG Materials.docx DOCX document
7-B886-26-01 FINAL 2026 ROW Tree Planting Project.docx DOCX document
3-C5 - PA PrevailingWages Tree ROW Planting Project 2026.pdf PDF
1-Exhibit A - Appendix II to Part 200 Title 2.pdf PDF
5-C4 - 2026 Locations and Tree Species List.pdf.xlsx XLSX spreadsheet
6-C1 - Standard General Conditions of the Contract - 79 pages.pdf PDF
2-C3 - 2026 Urban Tree Planting Specifications.pdf PDF
4-C6 - Davis Bacon ROW Tree Planting 2026.pdf PDF
1-B562-26-08 FINAL 2026 Concrete Repair Contract.docx DOCX document
6-C12 - PA Prevailing Wages.pdf PDF
3-C09 - NO PARKING, Informational Sign, FINAL FOR USE 11.11.2021.xls XLS spreadsheet
10-C06 - Streets and Sidewalks Ord April 2017.pdf PDF
7-C10 - Traffic Control Application rev 04.2023.pdf PDF
2-B1 - 2026 Excel Bid Tab.xlsx XLSX spreadsheet
12-C01 - Standard General Conditions of the Contract - 79 pages.pdf PDF
4-C07 - No Parking Sign Request Process.pdf PDF
11-C08 - No Parking Signage Guidelines 11.11.2021.pdf PDF
9-C05 - Street Details 2026.pdf PDF
5-C11 - 2026 Curb Stop Locations.xlsx XLSX spreadsheet
13-C04 - Curb and Sidewalk Details 2026.pdf PDF
8-C03 - Curb and Sidewalk Specs 2026.pdf PDF
2-EXHIBIT A - Grant Agreement.BRC-TAG-31-108.pdf PDF
1-B820-26-02 FINAL- Reservoir Park Master Plan RFP nm.docx DOCX document
8-C3 - Specifications.pdf PDF
7-EXHIBIT A.pdf PDF
6-C1 - Standard General Conditions of the Contract - 79 pages.pdf PDF
1-2025-19 FINAL DRAFT South Train Screenings Improvements Project.docx DOCX document
2-C7 - PA Prevailing Wage Rate Determination 032426.pdf PDF
5-C2 - Supplemental Conditions.pdf PDF
9-C4 - Plans.pdf PDF
4-C8 - Davis Bacon Wage Determination South Screen 2026.pdf PDF
13-C10 - 2026 ADA Ramp Location Map.pdf PDF
7-C08 Streets and Sidewalks Ord April 2017 - 34 pages.pdf PDF
9-EXHIBIT A.pdf PDF
11-C13 - LI Wage Rates - 6 pages.pdf PDF
1-B1 - 2026 ADA Project Bid tab.xlsx XLSX spreadsheet
10-C03 - 2026 ADA Technical Specifications - 93 pages.pdf PDF
5-C14 - DB Wage Rates 3.3.26 - 12 pages.pdf PDF
3-C01 - Standard General Conditions of the Contract - 79 pages.pdf PDF
12-C06 - Curb and Sidewalk Details 2026 - 3 pages.pdf PDF
2-C09 - Interested Subcontractors PennBid instructions - 2 pages.pdf PDF
4-C04 - Curb and Sidewalk Specs 2026 - 26 pages.pdf PDF
14-B820-26-03 2027 DRAFT ADA Curb Ramps Project.docx DOCX document
8-C07 - Street Details 2026 - 2 pages.pdf PDF
6-C05 - 2026 Summary of CS Specification, CS and Street Detail Revisions.pdf PDF
15-C11 - James Cherry Crossing Concept Alt2.pdf PDF
2-C6 - PA Prevailing Wage Determination Central Market 03172026.pdf PDF
3-C3 - Ceiling Diagram.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3850-PM-BCW0015d 3/2016 Permit

COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

WATER QUALITY MANAGEMENT

PERMIT

PERMIT NO. 3683415

AMENDMENT NO. A-8

APS ID. 321149

AUTH. ID. 1528470

A. PERMITTEE (Name and Address): CLIENT ID#: 117554

Lancaster City

120 N Duke Street, PO Box 1599

Lancaster, PA 17608-1599

B. PROJECT/FACILITY (Name):

Lancaster City AWWTP

C. LOCATION (Municipality, County):

Lancaster City, Lancaster County

SITE ID#: 453237

D. This permit approves the modification of sewage facilities consisting of:

- Removal of existing manually raked bar screen, mechanical screen, and screenings handling equipment

- Installation of two (2) multi-rake catenary type bar screens with 3/8” openings, with each screen designed to handle a peak flow of 32.1 MGD

- Installation of two (2) screenings washer/compactors with a peak capacity of 70 cu. ft./hr

- Modification of channel in the screen house to improve grit settlement, including a curved bulge in the upstream portion, as well as the reduction of the channel width by 3” on each side

Pump Stations: Manure Storage: Sewage Treatment Facility:

Design Capacity: GPM Volume: MG Annual Average Flow: MGD

Freeboard: inches Design Hydraulic Capacity: MGD

Design Organic Capacity: lb/day

E. APPROVAL GRANTED BY THIS PERMIT IS SUBJECT TO THE FOLLOWING:

1. Amendments: All construction, operations and procedures shall be in accordance with the Water Quality Management Permit Amendment application dated May 6, 2025 and its supporting documentation and addendums dated May 6, 2025, which are hereby made a part of this amendment.

Except for any herein approved modifications, all terms, conditions, supporting documentation and addendums approved under Water Quality Management Permit No. 3683415, Water Quality Management Permit Amendment No. 3683415 A-1, Water Quality Management Permit Amendment No. 3683415 A-2 dated May 3, 1983, Water Quality Management Permit Amendment No. 3683415 A-3 dated June 19, 2000, Water Quality Management Permit Amendment No. 3683415 A-4 dated February 2, 2006, Water Quality Management Permit Amendment No. 3683415 A-5 dated June 14, 2010, Water Quality Management Permit Amendment No. 3683415 A-6 dated July 26, 2016, and Water Quality Management Permit Amendment No. 3683415 A-7 dated February 20, 2024 shall remain in effect.

2. Permit Conditions Relating to Sewerage are attached and made part of this permit.

F. THE AUTHORITY GRANTED BY THIS PERMIT IS SUBJECT TO THE FOLLOWING FURTHER QUALIFICATIONS:

1. If there is a conflict between the application or its supporting documents and amendments and the attached conditions, the attached conditions shall apply.

2. Failure to comply with the rules and regulations of DEP or with the terms or conditions of this permit shall void the authority given to the permittee by the issuance of this permit.

3. This permit is issued pursuant to the Clean Streams Law Act of June 22, 1937, P.L. 1987, as amended 35 P.S. §691.1 et seq. Issuance of this permit shall not relieve the permittee of any responsibility under any other law.

PERMIT ISSUED: BY:

Maria D. Bebenek, P.E.

September 25, 2025 TITLE: Clean Water Program Manager

Southcentral Regional Office

Maria D. Bebenek

3850-PM-BCW0015a Rev. 12/2019 Permit No. 3683415 A-8 Conditions Sewerage

- 1 -

COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT

PERMIT CONDITIONS RELATING TO SEWERAGE

For use in Water Quality Management Permits

(Check boxes that apply)

General

1. The Department of Environmental Protection (DEP) considers the licensed Professional Engineer whose seal is affixed to the design documents to be fully responsible for the adequacy of all aspects of the facility design.

2. The permittee shall adopt and enforce an ordinance requiring the abandonment of privies, cesspools or similar receptacles for human waste and onlot sewage disposal systems on the premises of occupied structures accessible to public sewers. All such structures must be connected to the public sewers.

3. The outfall sewer or drain shall be extended to the low water mark of the receiving body of water. Where necessary to ensure proper mixing and waste assimilation, an outfall sewer or drain may be extended with appurtenances below the low water mark and into the bed of a navigable stream provided that the permittee has secured an easement, right-of-way, license or lease from DEP in accordance with Section 15 of the Dam Safety and Encroachments Act, the Act of November 26, 1978, P.L. 1375, as amended.

4. The approval is specifically made contingent on the permittee acquiring all necessary property rights, by easement or otherwise, providing for the satisfactory construction, operation, maintenance and replacement of all sewers or sewerage structures in, along or across private property with full rights of ingress, egress and regress.

5. When construction of the approved sewerage facilities is completed and before they are placed in operation, the permittee shall notify DEP in writing so that a DEP representative may inspect the facilities.

6. The approval of the plans, and the authority granted in this permit, if not specifically extended, shall cease and be null and void 5 years from the issuance date of this permit unless construction or modification of the facilities covered by this permit has begun on or before the fifth anniversary of the permit date.

7. If, at any time, the sewerage facilities covered by this permit create a public nuisance, including but not limited to, causing malodors or causing environmental harm to waters of the Commonwealth, DEP may require the permittee to adopt appropriate remedial measures to abate the nuisance or harm.

8. If, after the issuance of this permit, DEP approves a municipal sewage facilities official plan or an amendment to an official plan under Act 537 (Pennsylvania Sewage Facilities Act, the Act of January 24, 1966, P.L. 1535 as amended) in which sewage from the herein approved facilities will be treated and disposed of at other planned facilities, the permittee shall, upon notification from the municipality or DEP, provide for the conveyance of its sewage to the planned facilities, abandon use and decommission the herein approved facilities including the proper disposal of solids, and notify DEP accordingly. The permittee shall adhere to schedules in the approved official plan, amendments to the plan, or other agreements between the permittee and municipality. This permit shall then, upon notice from DEP, terminate and become null and void and shall be relinquished to DEP.

9. This permit does not relieve the permittee of its obligations to comply with all federal, interstate, state or local laws, ordinances and regulations applicable to the sewerage facilities.

10. This permit does not give any real or personal property rights or grant any exclusive privileges, nor shall it be construed to grant or confirm any right, easement or interest in, on, to or over any lands which belong to the Commonwealth.

11. The authority granted by this permit is subject to all effluent requirements, monitoring requirements and other conditions as set forth in the NPDES Permit and all subsequent amendments and renewals. No discharge is authorized from these facilities unless approved by an NPDES Permit.

Construction

12. This permit is issued under the authorization of The Clean Streams Law and 25 Pa. Code Chapter 91. The permittee shall obtain all necessary permits, approvals and/or registrations under 25 Pa. Code Chapters 102, 105 and 106 prior to commencing construction of the facilities authorized by this permit, as applicable. The permittee should contact the DEP office that issued this permit if there are any questions concerning the applicability of additional permits.

3800-PM-BPNPSM0015a Rev. 12/2019 Permit No. 3683415 A-8 Conditions Sewerage

- 2 -

13. The facilities shall be constructed under the supervision of a Pennsylvania licensed Professional Engineer in accordance with the approved reports, plans and specifications.

14. A Pennsylvania licensed Professional Engineer shall certify that construction of the permitted facilities was completed in accordance with the application and design plans submitted to DEP, using the "Post Construction Certification" form (3800-PM-WSFR0179a). It is the permittee's responsibility to ensure that a Professional Engineer is on-site to provide the necessary oversight and/or inspections to certify the facilities. The certification must be submitted to DEP before the facility is placed in operation. As-built drawings, photographs (if available) and a description of all deviations from the application and design plans must be submitted to DEP within 30 days of certification.

15. Manhole inverts shall be formed to facilitate the flow of the sewage and to prevent the stranding of sewage solids. The manhole structure shall be built to prevent undue infiltration, entrance of street wash or grit and provide safe access to facilitate manhole maintenance activities.

16. The local Waterways Conservation Officer of the Pennsylvania Fish and Boat Commission (PFBC) shall be notified when the construction of any stream crossing and/or outfall is started and completed. A written permit must be secured from the PFBC if the use of explosives in any waterways is required and the permittee shall notify the local Waterways Conservation Officer when explosives are to be used.

Operation and Maintenance

17. The permittee shall maintain records of "as-built" plans showing all the treatment facilities as actually constructed together with facility operation and maintenance (O&M) manuals and any other relevant information that may be required. Upon request, the "as-built" plans and O&M manuals shall be filed with

DEP.

18. The sewers shall have adequate foundation support as soil conditions require. Trenches shall be back-filled to ensure that sewers will have proper structural stability, with minimum settling and adequate protection against breakage. Concrete used in connection with these sewers shall be protected from damage by water, freezing, drying or other harmful conditions until cured.

19. Stormwater from roofs, foundation drains, basement drains or other sources shall not be admitted directly to the sanitary sewers.

20. The approved sewers shall be maintained in good condition, kept free of deposits by flushing or other cleaning methods and repaired when necessary.

21. The sewerage facilities shall be properly operated and maintained to perform as designed.

22. The attention of the permittee is called to the highly explosive nature of certain gases generated by the digestion of sewage solids when these gases are mixed in proper proportions with air and to the highly toxic character of certain gases arising from such digestion or from sewage in poorly ventilated compartments or sewers. Therefore, at all places throughout the sewerage facilities where hazard of fire, explosion or danger from toxic gases may occur, the permittee shall post conspicuous permanent and legible warnings. The permittee shall instruct all employees concerning the aforesaid hazards, first aid and emergency methods of meeting such hazards and shall make all necessary equipment and material accessible.

23. An operator certified in accordance with the Water and Wastewater Systems Operator Certification Act of February 21, 2002, 63 P.S. §§1001, et seq. shall operate the sewage treatment plant.

24. The permittee shall properly control any industrial waste discharged into its sewerage system by regulating the rate and quality of such discharge, requiring necessary pretreatment and excluding industrial waste, if necessary, to protect the integrity or operation of the permittee's sewerage system.

25. There shall be no physical connection between a public water supply system and a sewer or appurtenance to it which would permit the passage of any sewage or polluted water into the potable water supply. No water pipe shall pass through or come in contact with any part of a sewer manhole.

26. All connections to the approved sanitary sewers must be in accordance with the official Act 537 Plan and, if applicable, a corrective action plan as contained in the approved Title 25 Pa. Code Chapter 94 Municipal Wasteload Management Annual Report.

27. Collected screenings, slurries, sludge and other solids shall be handled and disposed of in compliance with Title 25 Pa. Code Chapters 271, 273, 275, 283 and 285 (related to permits and requirements for land filling, land application, incineration and storage of sewage sludge), Federal Regulations 40 CFR 257 and the Federal Clean Water Act and its amendments.

Engineer' s

Seal

3800-PM-WSFR0179a 9/2005 Post Construction Certification

COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

WATER QUALITY MANAGEMENT

POST CONSTRUCTION CERTIFICATION

PERMITTEE IDENTIFIER

Permittee Lancaster City

Municipality Lancaster City

County Lancaster

WQM Permit No. 3683415 A-8

Facility Type Sewage

All of the above information should be taken directly from the Water Quality Management Permit.

CERTIFICATION

This certification must be completed and returned to the permits section of the DEP’s regional office issuing the WQM permit within 30 days of completion of the project and received by DEP prior to operation, and if requested, as-built drawings, photographs (if available) and a discussion of any DEP-approved deviations from the design plans during construction.

I, being a Registered Professional Engineer in Pennsylvania, do hereby certify to the best of my knowledge and belief, based upon personal observation and interviews, that the above facility approved under the Water Quality Management Permit has been constructed in accordance with the plans, specifications and modifications approved by DEP.

Construction Completion Date (MM/DD/YYYY):

Professional Engineer

Name (Please Print or Type)

Signature

Date

License Expiration Date

Firm or Agency

Telephone

Permittee or Authorized Representative

Name

(Please Print or Type)

Signature

Title

Telephone