1-B1 - 2026 ADA Project Bid tab.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Traffic Signal Upgrade Equipment and Related Materials Procurement B820-26-05
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a bid tab spreadsheet for the City of Lancaster, Pennsylvania's 2026 ADA Curb Ramps Project, detailing unit pricing for mobilization, traffic control, general conditions, and standard construction items across ten project locations (Parts A through K) spanning various streets including Plum Street, Chestnut Street, James Street, Euclid Avenue, Ross Street, High Street, Shippen Street, Laurel Street, Christian Street, and Queen Street. The project involves the replacement of existing curbs, sidewalks, and construction of ADA-compliant curb ramps. Bids are due online through PennBid by April 22, 2026, at 11:00 AM, with a non-mandatory pre-bid conference scheduled for April 8, 2026, at 11:00 AM via Microsoft Teams. The work includes curb construction (438 linear feet), pavement restoration (975 square feet), concrete ramp and driveway replacements (1,318 and 525 square feet respectively), sidewalk and ramp transitions (1,827 square feet), and truncated domes (44 units), along with contingency items for potential utility adjustments, tree removal, drainage work, and specialty repairs.

The bid tab contains line items across three parts with quantities and unit price columns currently showing zero values, indicating this is a template for bidders to complete. Part 1 includes a project schedule submittal and ten location-specific lump sum line items; Part 2 provides estimated quantities for standard unit pricing items subject to increase or decrease based on program participation; and Part 3 lists 21 contingency items for unforeseen conditions such as inlet installations, utility grade adjustments, tree removal, and specialized repairs. The project is partially funded through a Community Development Block Grant (CDBG) from the U.S. Department of Housing and Urban Development (HUD) and is subject to prevailing wage requirements, Steel Products Procurement Act compliance, and nondiscrimination provisions. The City will select the lowest responsible bidder based not solely on price but also on quality of services, responsiveness, past performance, and ability to handle the proposed work volume.

View the file

Other files

File Type Posted
2-Exhibit A - PennDOT Grant.pdf PDF
1-C1 - Technical Specifications.pdf PDF
3-B820-26-05 FINAL GLG Materials.docx DOCX document
7-B886-26-01 FINAL 2026 ROW Tree Planting Project.docx DOCX document
3-C5 - PA PrevailingWages Tree ROW Planting Project 2026.pdf PDF
1-Exhibit A - Appendix II to Part 200 Title 2.pdf PDF
5-C4 - 2026 Locations and Tree Species List.pdf.xlsx XLSX spreadsheet
6-C1 - Standard General Conditions of the Contract - 79 pages.pdf PDF
2-C3 - 2026 Urban Tree Planting Specifications.pdf PDF
4-C6 - Davis Bacon ROW Tree Planting 2026.pdf PDF
1-B562-26-08 FINAL 2026 Concrete Repair Contract.docx DOCX document
6-C12 - PA Prevailing Wages.pdf PDF
3-C09 - NO PARKING, Informational Sign, FINAL FOR USE 11.11.2021.xls XLS spreadsheet
10-C06 - Streets and Sidewalks Ord April 2017.pdf PDF
7-C10 - Traffic Control Application rev 04.2023.pdf PDF
2-B1 - 2026 Excel Bid Tab.xlsx XLSX spreadsheet
12-C01 - Standard General Conditions of the Contract - 79 pages.pdf PDF
4-C07 - No Parking Sign Request Process.pdf PDF
11-C08 - No Parking Signage Guidelines 11.11.2021.pdf PDF
9-C05 - Street Details 2026.pdf PDF
5-C11 - 2026 Curb Stop Locations.xlsx XLSX spreadsheet
13-C04 - Curb and Sidewalk Details 2026.pdf PDF
8-C03 - Curb and Sidewalk Specs 2026.pdf PDF
2-EXHIBIT A - Grant Agreement.BRC-TAG-31-108.pdf PDF
1-B820-26-02 FINAL- Reservoir Park Master Plan RFP nm.docx DOCX document
3-C5 - City of Lancaster 3683415 A-8 WQM Permit.pdf PDF
8-C3 - Specifications.pdf PDF
7-EXHIBIT A.pdf PDF
6-C1 - Standard General Conditions of the Contract - 79 pages.pdf PDF
1-2025-19 FINAL DRAFT South Train Screenings Improvements Project.docx DOCX document
2-C7 - PA Prevailing Wage Rate Determination 032426.pdf PDF
5-C2 - Supplemental Conditions.pdf PDF
9-C4 - Plans.pdf PDF
4-C8 - Davis Bacon Wage Determination South Screen 2026.pdf PDF
13-C10 - 2026 ADA Ramp Location Map.pdf PDF
7-C08 Streets and Sidewalks Ord April 2017 - 34 pages.pdf PDF
9-EXHIBIT A.pdf PDF
11-C13 - LI Wage Rates - 6 pages.pdf PDF
10-C03 - 2026 ADA Technical Specifications - 93 pages.pdf PDF
5-C14 - DB Wage Rates 3.3.26 - 12 pages.pdf PDF
3-C01 - Standard General Conditions of the Contract - 79 pages.pdf PDF
12-C06 - Curb and Sidewalk Details 2026 - 3 pages.pdf PDF
2-C09 - Interested Subcontractors PennBid instructions - 2 pages.pdf PDF
4-C04 - Curb and Sidewalk Specs 2026 - 26 pages.pdf PDF
14-B820-26-03 2027 DRAFT ADA Curb Ramps Project.docx DOCX document
8-C07 - Street Details 2026 - 2 pages.pdf PDF
6-C05 - 2026 Summary of CS Specification, CS and Street Detail Revisions.pdf PDF
15-C11 - James Cherry Crossing Concept Alt2.pdf PDF
2-C6 - PA Prevailing Wage Determination Central Market 03172026.pdf PDF
3-C3 - Ceiling Diagram.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Tab

PART 1 CURB AND SIDEWALK NOTICE WORK
PART 1 MOBILIZATION, TRAFFIC CONTROL AND GENERAL CONDITIONS
Reference ItemDescriptionUOMQuantityUnit PriceTotal
1-1SCH-1 Project schedule (includes: initial project schedule by project number, with monthly updates detailing progression by block at a minimum)LS1$ - 0
1-2PART A- N-S Plum StLS1$ - 0
1-3PART B - E. Chestnut St.LS1$ - 0
1-4PART C - W James StLS1$ - 0
1-5PART D - Euclid Ave.LS1$ - 0
1-6PART E - E. James St & Cherry St.LS1$ - 0
1-7PART F - E. Ross St. & Alley 103NELS1$ - 0
1-8PART G - High St. & Alley 170SWLS1$ - 0
1-9PART H - N. Shippen St. & Alley 49NELS1$ - 0
1-10PART I - Laurel St. & High St.LS1$ - 0
1-11PART J - S. Christian St. & Dauphin St.LS1$ - 0
1-12PART K - N. Queen St. & W. Walnut St.LS1$ - 0
$ - 0PART 1 TOTAL
PART 2 STANDARD UNIT PRICING (Projects A-K) These quantities are estimates and are subject to increase or decrease depending on program participation.
Reference NumberDescriptionUOMQuantityUnit PriceTotal
2-1Curb construction - Including all necessary demolition, excavation, stone, backfill, and lawn/planting restorations.LF438$ - 0
2-2Pavement restoration - Including all necessary demolition, excavation, stone, 5" base course and 1.5" wearing course (SF)SF975$ - 0
2-36" Concrete Ramp/Driveway replacement - Including all necessary demolition, excavation, stone, backfill, and lawn/planting restorations.SF1318$ - 0
2-44" Sidewalk or ramp transition construction - Including all necessary demolition, excavation, stone, backfill, and lawn/planting restorations.SF1827$ - 0
2-58" concrete driveway apron - Including all necessary reinforcement, demolition, excavation, stone, backfill, and lawn/planting restorations.SF525$ - 0
2-6Truncated Domes, furnish and installEA44$ - 0
$ - 0PART 2 TOTAL
$ - 0PART 1 & 2 TOTAL
PART 3 Contingency Items
Reference NumberDescriptionUOMQuantityUnit PriceTotal
3-1Inlet Type M Top, furnish and install (includes any excavation and restoration needed)EA1$ - 0
3-2Inlet Type C Top, furnish and install (includes any excavation and restoration needed)EA1$ - 0
3-3Standard Inlet Box, furnish and install(includes any excavation and restoration needed)EA1$ - 0
3-48" to 12" SDR-35 stormwater piping, including fittings and connections to structures (includes any excavation and restoration needed)LF10$ - 0
3-5PVC Sign Post Sleeves, 4" diameterEA10$ - 0
3-6Tree Removal as directed, including stump grinding (up to 18" diameter)EA1$ - 0
3-7Tree Removal as directed, including stump grinding (greater than 18" diameter)EA2$ - 0
3-8Misc. Rock RemovalCY5$ - 0
3-9Utility Grade Adjustment (this item to be used for grade adjustments require materials provided by contractor, all other adjustments are incidental to sidewalk items)EA15$ - 0
3-10Monument Adjustment by a Professional Licensed SurveyorEA5$ - 0
3-11Sewer Lateral Repair by a Licensed PlumberEA1$ - 0
3-12Cheek Wall or Retention Wall, less than 12" height, for minor ADA grade changes onlyLF70$ - 0
3-13Inlet Snout / Debris SeparatorEA1$ - 0
3-14Inlet trap, 90-degree SDR/PVC elbowEA1$ - 0
3-15Residential stair conflict, tread adjustment or replacement to meet IBCLF15$ - 0
3-16Manual excavation, as directed. (Item to be used for work near trees or other conflicts where non-mechanical excavation is required)CY5$ - 0
3-17Trench Drain (ADA Compliant)LF10$ - 0
3-18PVC Downspout Leader (under sidewalk/through curb) 6" diameter and belowLF10$ - 0
3-19Reset Brick Sidewalk (includes setting bed, replacement brick necessary, etc)SF80$ - 0
3-20Detectable Warning Surface Brick (furnish & install)SF30$ - 0
3-21Radial Detectable Warning Surface Tiles (furnish & install)SF23$ - 0
$ - 0PART 3 TOTAL
$ - 0PARTS 1-3 TOTAL

Locations

PartStreetLimit of WorkADA Ramp Locations - Notes
(cr - corner)Total SinglesTotal DoublesTotal Driveway ApronsExtra Qty
(Refer to Contingency Items)Curb constructionPavement repair (Base/Wearing)6" Concrete Ramp/Driveway4" Sidewalk or ramp transition construction8" Concrete driveway apronTruncated Domes, furnish and install
Qty (LF)Qty (SF)Qty (SF)Qty (SF)Qty (SF)Qty (EA)
AN-S Plum StJohn to E. Fulton1 double @ Fulton, SW cr01040608515002
BE. Chestnut St.N. Queen St. to Eastern City LimitRepair @ SE Queen (raise Chestnut Crossing)

Repair @ SW Duke Double @ SW Shippen Repair @ NE Plum Cut in singles @ SW/NW Ann DWS Repair @ NW/SW Marshall DWS Repair @ SE Franklin DWS Repair @ SE Franklin Repairs @ NW/NE Broad 2 1 0 80 sf Brick Reset 30 sf DWS Brick (Replacement)

1 Monument box replacement NW6599350176015
CW James StN Mary St to College Ave4 doubles @ Pine

1 double @ Nevin, SE cr

1 single @ Nevin, NE cr05125lf Cheekwall22540042582516012
DEuclid Ave.Alley 190 SW
Alley 191 SW1 Driveway @ Alley 190SW
Driveway repair @ Alley 191SW00264641654
EE James StN Cherry StRefer to concept drawing

1 single, north side 1 blended transition, SE corner

Pavement regrading thru crosswalk11023SF radial tile DWS3018613413101
FE Ross StAlley 103NE1 driveway apron @ Alley 103NE00121110175802
GHigh StAlley 170SW2 Singles @ Alley 170SW200406010015002
HN. Shippen St.Alley 49NE1 Driveway apron0011760601202
ILaurel St.High St.NW cr, repairs due to settlement802
JS. Christian St.Dauphin St.NE cr, repairs due to settlement40961
KN. Queen St.W. Walnut St.NW cr, Ramp Repair DWS replacement401
Totals5854389751318182752544