This is a Pennsylvania Prevailing Wage Rate Determination document issued by the Commonwealth of Pennsylvania Department of Labor & Industry for the City of Lancaster's Advanced Wastewater Treatment Plant (AWWTP) South Train Screenings Improvements Project. The project involves the replacement of bar screens and conveyors at the wastewater treatment plant located in Lancaster Township, Lancaster County. The work consists of furnishing all labor, materials, equipment, and incidentals for installation of two bar screens, screenings washer compactors, slide gates, and concrete channel work within the existing screen house at the South Train. The project is divided into two prime contracts: General Construction and Electrical. Bids were due April 29, 2026, at 11:00 AM through PennBid's electronic platform, with a contract award date of May 30, 2026. A non-mandatory pre-bid conference was held on April 9, 2026, at 1:00 PM at the AWWTP Control Building with a site tour following. The prevailing wage determination was effective March 24, 2026.

The document establishes mandatory prevailing wage rates for both Building and Heavy/Highway project classifications, with rates varying by trade and effective date. Wage rates range from $18.69 to $66.54 per hour for base wages, with fringe benefits ranging from $0.00 to $45.47 per hour, resulting in total hourly rates from $32.52 to $108.28. Rates cover numerous trades including carpenters, electricians, laborers (classified by skill level), equipment operators (in multiple classes), plumbers, pipefitters, and various specialized trades. Multiple wage schedules are provided with effective dates spanning from 2016 through 2027, accommodating the extended project timeline. The project is funded in whole or in part with federal monies from the U.S. Environmental Protection Agency through PENNVEST's Drinking Water State Revolving Loan Fund (CFDA number 66.468). All contractors and subcontractors must comply with Pennsylvania prevailing wage requirements, the Steel Products Procurement Act, and applicable federal and state labor laws, with compliance monitored by the Harrisburg Field Office of the Bureau of Labor Law Compliance.

View the file

Other files

File Type Posted
2-Exhibit A - PennDOT Grant.pdf PDF
1-C1 - Technical Specifications.pdf PDF
3-B820-26-05 FINAL GLG Materials.docx DOCX document
7-B886-26-01 FINAL 2026 ROW Tree Planting Project.docx DOCX document
3-C5 - PA PrevailingWages Tree ROW Planting Project 2026.pdf PDF
1-Exhibit A - Appendix II to Part 200 Title 2.pdf PDF
5-C4 - 2026 Locations and Tree Species List.pdf.xlsx XLSX spreadsheet
6-C1 - Standard General Conditions of the Contract - 79 pages.pdf PDF
2-C3 - 2026 Urban Tree Planting Specifications.pdf PDF
4-C6 - Davis Bacon ROW Tree Planting 2026.pdf PDF
1-B562-26-08 FINAL 2026 Concrete Repair Contract.docx DOCX document
6-C12 - PA Prevailing Wages.pdf PDF
3-C09 - NO PARKING, Informational Sign, FINAL FOR USE 11.11.2021.xls XLS spreadsheet
10-C06 - Streets and Sidewalks Ord April 2017.pdf PDF
7-C10 - Traffic Control Application rev 04.2023.pdf PDF
2-B1 - 2026 Excel Bid Tab.xlsx XLSX spreadsheet
12-C01 - Standard General Conditions of the Contract - 79 pages.pdf PDF
4-C07 - No Parking Sign Request Process.pdf PDF
11-C08 - No Parking Signage Guidelines 11.11.2021.pdf PDF
9-C05 - Street Details 2026.pdf PDF
5-C11 - 2026 Curb Stop Locations.xlsx XLSX spreadsheet
13-C04 - Curb and Sidewalk Details 2026.pdf PDF
8-C03 - Curb and Sidewalk Specs 2026.pdf PDF
2-EXHIBIT A - Grant Agreement.BRC-TAG-31-108.pdf PDF
1-B820-26-02 FINAL- Reservoir Park Master Plan RFP nm.docx DOCX document
3-C5 - City of Lancaster 3683415 A-8 WQM Permit.pdf PDF
8-C3 - Specifications.pdf PDF
7-EXHIBIT A.pdf PDF
6-C1 - Standard General Conditions of the Contract - 79 pages.pdf PDF
1-2025-19 FINAL DRAFT South Train Screenings Improvements Project.docx DOCX document
5-C2 - Supplemental Conditions.pdf PDF
9-C4 - Plans.pdf PDF
4-C8 - Davis Bacon Wage Determination South Screen 2026.pdf PDF
13-C10 - 2026 ADA Ramp Location Map.pdf PDF
7-C08 Streets and Sidewalks Ord April 2017 - 34 pages.pdf PDF
9-EXHIBIT A.pdf PDF
11-C13 - LI Wage Rates - 6 pages.pdf PDF
1-B1 - 2026 ADA Project Bid tab.xlsx XLSX spreadsheet
10-C03 - 2026 ADA Technical Specifications - 93 pages.pdf PDF
5-C14 - DB Wage Rates 3.3.26 - 12 pages.pdf PDF
3-C01 - Standard General Conditions of the Contract - 79 pages.pdf PDF
12-C06 - Curb and Sidewalk Details 2026 - 3 pages.pdf PDF
2-C09 - Interested Subcontractors PennBid instructions - 2 pages.pdf PDF
4-C04 - Curb and Sidewalk Specs 2026 - 26 pages.pdf PDF
14-B820-26-03 2027 DRAFT ADA Curb Ramps Project.docx DOCX document
8-C07 - Street Details 2026 - 2 pages.pdf PDF
6-C05 - 2026 Summary of CS Specification, CS and Street Detail Revisions.pdf PDF
15-C11 - James Cherry Crossing Concept Alt2.pdf PDF
2-C6 - PA Prevailing Wage Determination Central Market 03172026.pdf PDF
3-C3 - Ceiling Diagram.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: City of Lancaster AWWTP South Train Screenings Improvements

General Description: Replacement of bar screens and conveyors at Wastewater Treatment Plant

Project Locality Lancaster Township

Awarding Agency: City of Lancaster

Contract Award Date: 5/30/2026

Serial Number: 26-02881

Project Classification: Building

Determination Date: 3/24/2026

Assigned Field Office: Harrisburg

Field Office Phone Number: (717)787-4763

Toll Free Phone Number: (800)932-0665

Project County: Lancaster County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 3/24/2026 Page 1 of 7

Project: 26-02881 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 7/1/2024 $40.00 $29.86 $69.86

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $40.47 $19.68 $60.15

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $42.32 $19.68 $62.00

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2025 $36.84 $20.44 $57.28

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $36.84 $22.69 $59.53

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $36.84 $24.94 $61.78

Cement Finishers & Plasterers 5/4/2025 $32.23 $22.27 $54.50

Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50

Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50

Cement Masons 5/1/2024 $35.00 $21.30 $56.30

Cement Masons 5/1/2025 $36.00 $21.30 $57.30

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2024 $30.33 $22.79 $53.12

Drywall Finisher 5/1/2025 $31.83 $23.26 $55.09

Electricians 9/2/2024 $44.52 $26.83 $71.35

Electricians 9/1/2025 $46.02 $28.39 $74.41

Elevator Constructor 1/1/2025 $63.40 $40.03 $103.43

Elevator Constructor 1/1/2026 $61.26 $45.78 $107.04

Floor Coverer 5/1/2025 $37.78 $19.80 $57.58

Floor Coverer 5/1/2026 $38.59 $20.61 $59.20

Glazier 5/1/2024 $32.46 $20.93 $53.39

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Laborers (Class 01 - See notes) 5/1/2023 $23.26 $18.03 $41.29

Laborers (Class 02 - See notes) 5/1/2023 $25.26 $18.03 $43.29

Laborers (Class 03 - See notes) 4/30/2023 $26.47 $18.22 $44.69

Laborers (Class 04 - See notes) 4/30/2023 $27.97 $18.22 $46.19

Laborers (Class 05 - See notes) 4/30/2023 $28.47 $18.22 $46.69

Laborers (Class 06 - See notes) 5/1/2023 $25.26 $18.03 $43.29

Marble Mason 5/1/2025 $37.20 $19.24 $56.44

Marble Mason 5/1/2026 $39.15 $19.24 $58.39

Millwright 6/1/2025 $43.00 $22.95 $65.95

Millwright 6/1/2026 $44.97 $22.95 $67.92

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/24/2026 Page 2 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2024 $27.59 $18.08 $45.67

Painters Class 1 (see notes) 5/1/2025 $28.42 $18.36 $46.78

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2020 $27.43 $15.99 $43.42

Painters Class 3 (see notes) 5/1/2020 $33.18 $15.99 $49.17

Piledrivers 5/1/2021 $43.73 $37.99 $81.72

Plasterers 5/1/2024 $32.93 $21.08 $54.01

Plasterers 5/1/2025 $34.68 $21.23 $55.91

Plumber/Pipefitter 5/1/2023 $41.36 $29.72 $71.08

Plumber/Pipefitter 5/1/2025 $45.30 $29.91 $75.21

Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 6/1/2024 $43.09 $43.14 $86.23

Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Terrazzo Finisher 5/1/2024 $35.66 $20.76 $56.42

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Grinder 5/1/2024 $36.42 $20.76 $57.18

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/24/2026 Page 3 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Mechanics 5/1/2024 $36.44 $22.51 $58.95

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Setter 5/1/2019 $31.81 $19.67 $51.48

Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30

Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25

Tile Setter 5/1/2025 $37.20 $19.24 $56.44

Tile Setter 5/1/2026 $39.15 $19.24 $58.39

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/24/2026 Page 4 of 7

Project: 26-02881 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter - Chief of Party (Surveying & Layout) 5/1/2021 $41.42 $15.49 $56.91

Carpenter - Instrument Person (Surveying & Layout) 5/1/2021 $36.02 $15.49 $51.51

Carpenter - Rodman I (Survey & Layout) 5/1/2021 $28.82 $12.39 $41.21

Carpenter - Rodman II (Survey & Layout) 5/1/2016 $18.69 $13.83 $32.52

Carpenter 5/1/2025 $36.87 $20.49 $57.36

Carpenter 5/1/2026 $37.63 $21.18 $58.81

Carpenter Welder 5/1/2025 $37.62 $20.49 $58.11

Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56

Carpenters - Piledriver/Welder 1/1/2025 $37.62 $20.49 $58.11

Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56

Cement Finishers 1/1/2017 $27.70 $22.20 $49.90

Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2025 $60.31 $44.97 $105.28

Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $52.80 $30.61 $83.41

Electric Lineman 6/2/2025 $55.42 $31.04 $86.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Millwright 6/1/2025 $45.46 $23.33 $68.79

Millwright 6/1/2026 $47.52 $23.33 $70.85

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/24/2026 Page 5 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters Class 1 (see notes) 5/1/2018 $23.92 $14.37 $38.29

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $30.55 $18.36 $48.91

Painters Class 3 (see notes) 5/1/2024 $35.47 $18.08 $53.55

Painters Class 3 (see notes) 5/1/2025 $36.30 $18.36 $54.66

Piledrivers 5/1/2025 $36.87 $20.49 $57.36

Piledrivers 5/1/2026 $37.63 $21.18 $58.81

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/24/2026 Page 6 of 7

Expiration Date

Hourly Rate Fringe Benefits

Total

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 3/24/2026 Page 7 of 7