3-Attachment 3 Cost Sheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Salt Lake City Request for Proposals SLCI26094 - Tree Pruning and Tree Removal Services
Solicitation number
SLCI26094
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a cost proposal attachment form for Salt Lake City Corporation's Request for Proposals SLCI26094 for comprehensive tree pruning and tree removal services. The solicitation seeks arboricultural services including tree pruning, tree and stump removal, tree planting, emergency tree service, work share arrangements, tree inventory work, and recordkeeping across all areas of Salt Lake City. Services will be provided on an as-needed basis at the direction of the City's Urban Forestry Division manager on both City-owned/managed property and private property. The proposal due date is May 12, 2026, with a posting date of April 14, 2026. The contract will be awarded to qualified offerors and will be performed on an ongoing as-needed basis.

The cost proposal form requires offerors to provide all-inclusive per-unit rates for tree pruning by size class (11" to 20", 21" to 30", 31" to 40", and 41"+) and species type (Modesto Ash, Siberian Elm, and all other species), with rates including labor, equipment, and hauling/disposal costs. Additionally, offerors must submit hourly rates for fully equipped crews (two-person pruning crews, two-person removal crews, two-person stump crews, and variations including climbers), supervisor rates, personnel labor-only rates for work share assignments, and equipment-only hourly rates for various machinery including aerial towers, chippers, stump grinders, and trucks. The form also requires submission of additional costs such as equipment storage, chemical stump treatment, soil for fill, and chip disposal. All pricing must be comprehensive and include materials, supervision, labor, insurance, fuel, and any other surcharges. Early payment discount information is requested at the end of the form.

View the file

Other files

File Type Posted
6-Attachment 4 - Score Sheet.xls XLS spreadsheet
1-Confidential+and+Proprietary+Info+Declaration+Form.pdf PDF
5-RFP Document.pdf PDF
2-Attachement 1 Sample Agreement.pdf PDF
2-Confidential+and+Proprietary+Info+Declaration+Form.pdf PDF
1-SLCI25024.docx DOCX document
4-Attachment 2 Scope of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal

ATTACHMENT 3 - COST PROPOSAL
Tree Pruning and Tree Removal Services

Offeror Name:

1All cells in yellow require an input.
2All costs necessary to perform the services under this contract must be included on this form.
3If zero is entered for any cell or if any cell is left blank, the City will assume that the related services are either provided at no cost or built into another cost item. If a cost category is not applicable, enter N/A.
4Pricing stated below shall include all costs associated with providing the products listed, including materials, supervision, labor, insurance, fuel, and/or any other surcharges, etc.
A. All-inclusive “per unit” rate (rate per tree) which shall include all labor, equipment and hauling/disposal costs for block tree pruning for the following size classes and species.
TREE SIZEUNIT COSTUNIT COSTUNIT COST
(d.b.h.)(Modesto Ash)(Siberian Elm)(all other species)
11” to 20”$___________each$___________each$___________each
21” to 30”$___________each$___________each$___________each
31” to 40”$___________each$___________each$___________each
41” +$___________each$___________each$___________each
B. Hourly rate for fully equipped, operational crews and the hourly rate for the supervisor.
Hourly rate includes all labor for all persons in the crew and equipment.
Total Hourly Rate for a:REGULAROTHER HOURS
HOURS
Two (2) Person Pruning Crew$$
Two (2) Person Pruning Crew & One (1) Climber$$
Two (2) Person Removal Crew$$
Two (2) Person Removal Crew & One (1) Climber$$
Two (2) Person Stump Crew$$
Supervisor$$
C. Hourly rates for the following personnel for “Work Share” Assignments.
(Labor only/no equipment)
PERSONNELREGULAROTHER HOURS
HOURS
Supervisor$$
Climber$$
Grounds-person$$
Stump Grinder Operator$$

D. Hourly rates for equipment only for “Work Share” assignments.

EQUIPMENTHOURY RATES
Pick-up Truck with crew cab$
Pick-up Truck , 1 ton$
Aerial Tower (55’)$
Aerial Tower (120’)$
Brush Chipper$
Stump Grinder$
Loader$
Log Truck$
Chip Box Truck (if separate from aerial tower)$
Trailer$
Backhoe$
Snorkle-lift 120’$
Knuckle-boom log truck$
Walk behind stump grinder$
Additional Available Equipment:$
Additional Available Equipment:$

E. List any additional costs and a description of the cost.

Additional CostsCost (describe)
Equipment Storage/Staging
Chemical Treatment of Stumps

Soil to Fill Stump Holes

Disposal of Pruning/Removal Chips

Disposal of Brush or Logs

Other charges, if any:

F. Early Payment Discount:

File details come from the government source that posted it. Updated .