3-Attachment 3 Cost Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- SLCI26094
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a cost proposal attachment form for Salt Lake City Corporation's Request for Proposals SLCI26094 for comprehensive tree pruning and tree removal services. The solicitation seeks arboricultural services including tree pruning, tree and stump removal, tree planting, emergency tree service, work share arrangements, tree inventory work, and recordkeeping across all areas of Salt Lake City. Services will be provided on an as-needed basis at the direction of the City's Urban Forestry Division manager on both City-owned/managed property and private property. The proposal due date is May 12, 2026, with a posting date of April 14, 2026. The contract will be awarded to qualified offerors and will be performed on an ongoing as-needed basis.
The cost proposal form requires offerors to provide all-inclusive per-unit rates for tree pruning by size class (11" to 20", 21" to 30", 31" to 40", and 41"+) and species type (Modesto Ash, Siberian Elm, and all other species), with rates including labor, equipment, and hauling/disposal costs. Additionally, offerors must submit hourly rates for fully equipped crews (two-person pruning crews, two-person removal crews, two-person stump crews, and variations including climbers), supervisor rates, personnel labor-only rates for work share assignments, and equipment-only hourly rates for various machinery including aerial towers, chippers, stump grinders, and trucks. The form also requires submission of additional costs such as equipment storage, chemical stump treatment, soil for fill, and chip disposal. All pricing must be comprehensive and include materials, supervision, labor, insurance, fuel, and any other surcharges. Early payment discount information is requested at the end of the form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-Attachment 4 - Score Sheet.xls | XLS spreadsheet | |
| 1-Confidential+and+Proprietary+Info+Declaration+Form.pdf | ||
| 5-RFP Document.pdf | ||
| 2-Attachement 1 Sample Agreement.pdf | ||
| 2-Confidential+and+Proprietary+Info+Declaration+Form.pdf | ||
| 1-SLCI25024.docx | DOCX document | |
| 4-Attachment 2 Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal
| ATTACHMENT 3 - COST PROPOSAL | |
| Tree Pruning and Tree Removal Services |
Offeror Name:
| 1 | All cells in yellow require an input. |
| 2 | All costs necessary to perform the services under this contract must be included on this form. |
| 3 | If zero is entered for any cell or if any cell is left blank, the City will assume that the related services are either provided at no cost or built into another cost item. If a cost category is not applicable, enter N/A. |
| 4 | Pricing stated below shall include all costs associated with providing the products listed, including materials, supervision, labor, insurance, fuel, and/or any other surcharges, etc. |
| A. All-inclusive “per unit” rate (rate per tree) which shall include all labor, equipment and hauling/disposal costs for block tree pruning for the following size classes and species. |
| TREE SIZE | UNIT COST | UNIT COST | UNIT COST |
| (d.b.h.) | (Modesto Ash) | (Siberian Elm) | (all other species) |
| 11” to 20” | $___________each | $___________each | $___________each |
| 21” to 30” | $___________each | $___________each | $___________each |
| 31” to 40” | $___________each | $___________each | $___________each |
| 41” + | $___________each | $___________each | $___________each |
| B. Hourly rate for fully equipped, operational crews and the hourly rate for the supervisor. |
| Hourly rate includes all labor for all persons in the crew and equipment. |
| Total Hourly Rate for a: | REGULAR | OTHER HOURS |
| HOURS | ||
| Two (2) Person Pruning Crew | $ | $ |
| Two (2) Person Pruning Crew & One (1) Climber | $ | $ |
| Two (2) Person Removal Crew | $ | $ |
| Two (2) Person Removal Crew & One (1) Climber | $ | $ |
| Two (2) Person Stump Crew | $ | $ |
| Supervisor | $ | $ |
| C. Hourly rates for the following personnel for “Work Share” Assignments. |
| (Labor only/no equipment) |
| PERSONNEL | REGULAR | OTHER HOURS |
| HOURS | ||
| Supervisor | $ | $ |
| Climber | $ | $ |
| Grounds-person | $ | $ |
| Stump Grinder Operator | $ | $ |
D. Hourly rates for equipment only for “Work Share” assignments.
| EQUIPMENT | HOURY RATES |
| Pick-up Truck with crew cab | $ |
| Pick-up Truck , 1 ton | $ |
| Aerial Tower (55’) | $ |
| Aerial Tower (120’) | $ |
| Brush Chipper | $ |
| Stump Grinder | $ |
| Loader | $ |
| Log Truck | $ |
| Chip Box Truck (if separate from aerial tower) | $ |
| Trailer | $ |
| Backhoe | $ |
| Snorkle-lift 120’ | $ |
| Knuckle-boom log truck | $ |
| Walk behind stump grinder | $ |
| Additional Available Equipment: | $ |
| Additional Available Equipment: | $ |
E. List any additional costs and a description of the cost.
| Additional Costs | Cost (describe) |
| Equipment Storage/Staging | |
| Chemical Treatment of Stumps |
Soil to Fill Stump Holes
Disposal of Pruning/Removal Chips
Disposal of Brush or Logs
Other charges, if any:
F. Early Payment Discount:
File details come from the government source that posted it. Updated .