2E1 RLP 36C10F25R0036 Appendix A41 OIT Data Cter Design Narrative Baltimore MD OPC 6 6 2025.pdf

PDF 8 MB Posted

Attached to
X1DB--Baltimore, MD. Outpatient Clinic 135, 148 ANSI/BOMA
Solicitation number
36C10F25R0036
Issued by

About this file

This appears to be an Adobe PDF portfolio opening screen that recommends using Acrobat X or Adobe Reader X for optimal viewing. The screen displays the Adobe PDF logo and includes a button to download Adobe Reader. No specific contract details are visible in this image.

View the file

Other files

File Type Posted
Attachment 4 - GSA Form 3517B General Clauses_Baltimore - 6.1.26.pdf PDF
Attachment 5 - 1 RLP 36C10F25R0036 Lease Baltimore MD OPC 12.2.2025 - Amendment 3 - 6.1.26.pdf PDF
Attachment 2 - Baltimore LDN revised - 6.1.26.pdf PDF
Attachment 3 - Baltimore OPC OpEx cost details - 6.1.2026.xlsx XLSX spreadsheet
Attachment 1 - Baltimore LDN revised - tracked changes - 6.1.26.docx DOCX document
S02-Baltimore OPC - RLP Amendment 3 - 6.3.2026.pdf PDF
36C10F25R0036 Baltimore MD OPC RLP Amendment 2 .pdf PDF
4 RLP 36C10F25R0036 Appendix B Lease Service Narrative Baltimore MD OPC .pdf PDF
36C10F25R0036 0002.docx DOCX document
36C10F25R0036 Baltimore MD OPC RLP Amendment 1 Pre bid Presentation.pdf PDF
19 RLP 36C10F25R0036 DOL Wage Determination Baltimore City Baltimore MD OPC 7 9 2025.pdf PDF
36C10F25R0036 Baltimore MD OPC RLP Amendment 1 VA Q and A Matrix.xlsx XLSX spreadsheet
36C10F25R0036 Baltimore MD OPC RLP Amendment 1.pdf PDF
36C10F25R0036 0001.docx DOCX document
19 RLP 36C10F25R0036 DOL County Wage Determination Baltimore County Baltimore MD OPC 7 9 2025.pdf PDF
2C RLP 36C10F25R0036 Appendix A2 Lease Design Narrative LDN Baltimore MD OPC 7 9 2025.pdf PDF
18 RLP 36C10F25R0036 Certification of Building Energy Performance Baltimore MD OPC 6 6 2025.pdf PDF
12 RLP 36C10F25R0036 SF 330 Architect Engineer Qualifications Baltimore MD OPC 6 6 2025.pdf PDF
10 RLP 36C10F25R0036 10091 VA Vendor File Request Form Baltimore MD OPC 6 6 2025.pdf PDF
5 RLP 36C10F25R0036 Offering Entity Acknowledgement Form Baltimore MD OPC 6 6 2025.pdf PDF
2D RLP 36C10F25R0036 Appendix A3 Room Data Matrix RDM Baltimore MD OPC 6 6 2025.pdf PDF
2C RLP 36C10F25R0036 Appendix A2 Lease Design Narrative LDN Baltimore MD OPC 6 6 2025.pdf PDF
19 RLP 36C10F25R0036 DOL County Wage Determination Baltimore County Baltimore MD OPC 6 6 2025.pdf PDF
16 RLP 36C10F25R0036 3517B General Clauses Baltimore MD OPC 6 6 2025.pdf PDF
8 RLP 36C10F25R0036 Attachment No 1 to GSA Form 1364 Baltimore MD OPC 6 6 2025.xlsx XLSX spreadsheet
6 RLP 36C10F25R0036 Offeror Proposal Compliance Matrix Baltimore MD OPC 6 6 2025.pdf PDF
4 RLP 36C10F25R0036 Appendix B Lease Service Narrative Baltimore MD OPC 6 6 2025.pdf PDF
3 RLP 36C10F25R0036 Appendix A6 Conceptual Floor Plan Baltimore MD OPC 6 6 2025.pdf PDF
2E RLP 36C10F25R0036 Appendix A4 VA CBOC Info Transp Sys Specs Baltimore MD OPC 6 6 2025.pdf PDF
15 RLP 36C10F25R0036 3516 Solicitation Provisions Baltimore MD OPC 6 6 2025.pdf PDF
14 RLP 36C10F25R0036 VA Handbook 6500 6 Baltimore MD OPC 6 6 2025.pdf PDF
11 RLP 36C10F25R0036 Past Performance Questionnaire Form for VA Baltimore MD OPC 6 6 2025.pdf PDF
7 RLP 36C10F25R0036 Proposal to Lease Space GSA Form 1364 Baltimore MD OPC 6 6 2025.pdf PDF
2B RLP 36C10F25R0036 Appendix A1 Project Room Contents List PRC Baltimore MD OPC 6 6 2025.xlsx XLSX spreadsheet
1 RLP 36C10F25R0036 Lease Baltimore MD OPC 6 6 2025.pdf PDF
36C10F25R0036.docx DOCX document
21 RLP 36C10F25R0036 PreBid Registration Form Baltimore MD OPC 6 6 2025.pdf PDF
20 RLP 36C10F25R0036 FAR 52 204 24 Representation Regarding Certain Telecom Baltimore MD OPC 6 6 2025.pdf PDF
17 RLP 36C10F25R0036 Prelease FPLS Evaluation Form 12000 Part A and Part B Baltimore MD OPC 6 6 2025.pdf PDF
13 RLP 36C10F25R0036 GSA Form 527 Contractors Quals and Financial Info Baltimore MD OPC 6 6 2025.pdf PDF
9 RLP 36C10F25R0036 GSA Form 1217 Lessors Annual Cost Statement Baltimore MD OPC 6 6 2025.pdf PDF
2F RLP 36C10F25R0036 Appendix A5 Facility Security Level II FSL Baltimore MD OPC 6 6 2025.pdf PDF
2A RLP 36C10F25R0036 Appendix A Program for Design PFD Baltimore MD OPC 6 6 2025.pdf PDF
2 RLP 36C10F25R0036 Cover Page for Agency Specific Requirements ASRs Baltimore MD OPC 6 6 2025.pdf PDF
0 RLP 36C10F25R0036 RLP Baltimore MD OPC 6 6 2025.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Computational Fluid Dynamics (CFD) Simulation - Extra Small Computer Room - Rectangle Version

This report contains the results and images from a CFD simulation. It shows the performance of the current cooling system in this representation of a generic extra small computer room for use within VA.

Data Center & Infrastructure Engineering Solution Delivery, DevSecOps, OIT

Geometry and Objects

Data Center Dimensions

Item Value

Floor Length 20.0 ft

Floor Width 39.5 ft

Tile Size 24.0 inch

UF Plenum Height 0.0 inch

Real Ceiling Height 12.0 ft

Object Count

Downflow CRACs 2

Server Racks 10

Hot Boxes 2

Vertical Partitions 6

Horizontal Partitions 1

Downflow CRACs by Style

Downflow CRAC Style Total Units Failed Units Total Airflow (CFM) Nominal Cooling (Ton) Nominal Cooling (kW)

Liebert DS053AS/AD/DS/DD 2 1 8,000 15.1 53.2

Racks by Style

Rack Style Total Racks Turned Off Total Heat Load (kW) Total Airflow (CFM)

CPI TeraFrame 60 cm x 110 cm x 45 U (Ducted) 6 0 30.0 4,731

CPI TeraFrame NF8N with Chimney 4 0 11.2 1,766

Heat Load/Cooling Airflow

Total Heat Load and Airflow

Net Floor Area 742 sq ft

Heat Load Density 61.2 W/sq ft

Total Heat Load 45.5 kW

Total Airflow Demand 7,497 CFM

Total Airflow Supplied 8,000 CFM

Cooling Airflow Supplied

Source Value

Downflow CRACs 8,000 CFM

Special CRACs 0.0 CFM

Upflow CRACs 0.0 CFM

In-Row Coolers 0.0 CFM

Overhead Coolers 0.0 CFM

Spot Coolers 0.0 CFM

UF Vents (Net) 0.0 CFM

AF Inlet Vents 0.0 CFM

Summary of AF Results

Total Heat Load and Cooling

Total Airflow Demand

7,497 CFM

Total Airflow Supply

8,000 CFM

Total Heat Load

45.5 kW

Cooling by Cooling Units

Heat Loads and Cooling Achieved

Item kW Ton

Server Rack Heat Load 41.2 11.7

Hot Box Heat Load 4.26 1.21

Cooling by Downflow CRACs 45.5 12.9

Cooling by Upflow CRACs 0.0 0.0

Cooling by RDHx 0.0 0.0

Cooling by In-Row Coolers 0.0 0.0

Cooling by Overhead Coolers 0.0 0.0

Cooling by Spot Coolers 0.0 0.0

Cooling by Inlet Vents 0.0 0.0

Rack Temperature Results

Rack Statistics

Range of Max Inlet Temp Number of Racks

Above 80 F 1

Between 75 F and 80 F 0

Between 70 F and 75 F 2

Below 70 F 9

Hot Boxes are included

Rack Temperatures in Detail

No. Rack or HotBox Name Xref Yref Heat Load Nominal Airflow Actual Airflow TinMax ToutMax Tbot_F Tmid_F Ttop_F

1 Row 2 - HDA A_1 7.0 6.1 2.80 442 824 67.8 78.5 67.2 67.6 67.7

2 Row 2 - HDA A 10.4 6.1 2.80 442 782 68.6 79.9 67.4 67.7 67.8

3 Row 2 - Rack 8 SD 13.8 6.0 5.00 789 896 69.2 86.8 67.5 68.0 68.7

4 Row 2 - Rack 9 SD 15.8 6.0 5.00 789 854 69.0 87.5 67.8 67.9 68.5

5 Row 2 - Rack 10 SD 17.8 6.0 5.00 789 818 68.7 88.0 67.9 67.7 68.2

6 Row 2 - Rack 3 SD 19.8 6.0 5.00 789 791 68.2 88.1 67.9 67.7 67.9

7 Row 2 - Rack 1 SD 21.8 6.0 5.00 789 770 68.0 88.5 67.9 67.7 67.7

8 Row 2 - Rack 2 SD 23.8 6.0 5.00 789 750 68.0 89.1 68.0 67.8 67.7

9 Row 2 - HDA B_1 25.8 6.1 2.80 442 452 69.8 89.4 68.1 67.9 67.8

10 Row 2 - HDA B 29.1 6.1 2.80 442 446 71.4 91.2 68.8 68.1 67.9

11 Hot Box 1 25.3 16.4 2.13 500 500 88.6 90.9

12 Hot Box 1_1 7.3 16.4 2.13 500 500 70.5 83.1

Xref and Yref in ft; Heat Load in kW; Airflow in CFM; Temperatures in F.

Results for Cooling Units

Downflow CRACs: Cooling & Temperatures

Name Xref Yref Airflow T_Return T_Supply Cooling (Ton) Cooling (kW)

CRAC 1 3.0 2.8 8,000 85.4 66.3 12.9 45.5

CRAC 1_1 36.5 11.0 turned off ----- ----- ----- -----

Xref and Yref in ft; Airflow in CFM; Temperatures in F; Cooling Produced in Ton and kW.

Four Feet Above Floor

Temperature Fog

X Axis View

One CRAC Failed

Y Axis View

One CRAC Failed

10.5 Feet Above the Floor

Computational Fluid Dynamics (CFD) Simulation - Extra Small Computer Room - Square Version

This report contains the results and images from a CFD simulation. It shows the performance of the current cooling system in this extra small computer room for use within VA.

Data Center and Infrastructure Engineering Solution Delivery, DevSecOps, OIT

Geometry and Objects

Data Center Dimensions

Floor Length 24.0 ft

Floor Width 32.5 ft

Tile Size 24.0 inch

UF Plenum Height 0.0 inch

Real Ceiling Height 12.0 ft

Downflow CRACs 2

Server Racks 10

Hot Boxes 2

Vertical Partitions 6

Horizontal Partitions 2

Downflow CRACs by Style

Downflow CRAC Style Total Units Failed Units Total Airflow (CFM) Nominal Cooling (Ton) Nominal Cooling (kW)

Liebert DS053AS/AD/DS/DD 2 1 8,000 15.1 53.2

Racks by Style

Rack Style Total Racks Turned Off Total Heat Load (kW) Total Airflow (CFM)

CPI TeraFrame 60 cm x 110 cm x 45 U (Ducted) 6 0 30.0 4,731

CPI TeraFrame NF8N with Chimney 4 0 11.2 1,766

Heat Load/Cooling Airflow

Total Heat Load and Airflow

Net Floor Area 732 sq ft

Heat Load Density 62.1 W/sq ft

Total Heat Load 45.5 kW

Total Airflow Demand 7,497 CFM

Total Airflow Supplied 8,000 CFM

Cooling Airflow Supplied

Source Value

Downflow CRACs 8,000 CFM

Special CRACs 0.0 CFM

Upflow CRACs 0.0 CFM

In-Row Coolers 0.0 CFM

Overhead Coolers 0.0 CFM

Spot Coolers 0.0 CFM

UF Vents (Net) 0.0 CFM

AF Inlet Vents 0.0 CFM

Summary of AF Results

Total Heat Load and Cooling

Total Airflow Demand

7,497 CFM

Total Airflow Supply

8,000 CFM

Total Heat Load

Cooling by Cooling Units

Heat Loads and Cooling Achieved

Item kW Ton

Server Rack Heat Load 41.2 11.7

Hot Box Heat Load 4.26 1.21

Cooling by Downflow CRACs 45.5 12.9

Cooling by Upflow CRACs 0.0 0.0

Cooling by RDHx 0.0 0.0

Cooling by In-Row Coolers 0.0 0.0

Cooling by Overhead Coolers 0.0 0.0

Cooling by Spot Coolers 0.0 0.0

Cooling by Inlet Vents 0.0 0.0

Rack Temperature Results

Rack Statistics

Range of Max Inlet Temp Number of Racks

Above 80 F 0

Between 75 F and 80 F 0

Between 70 F and 75 F 0

Below 70 F 12

Hot Boxes are included

Rack Temperatures in Detail

No. Rack or HotBox Name Xref Yref Heat Load Nominal Airflow Actual Airflow TinMax ToutMax Tbot_F Tmid_F Ttop_F

1 Row 2 - HDA B 10.7 17.7 2.80 442 657 68.0 81.5 67.9 68.0 68.0

2 Row 2 - HDA B_1 14.0 17.7 2.80 442 619 67.9 82.2 67.9 67.9 67.9

3 Row 2 - Rack 2 SD 16.0 18.0 5.00 789 841 68.2 86.9 68.1 68.0 67.9

4 Row 2 - Rack 1 SD 18.0 18.0 5.00 789 831 68.3 87.3 68.3 68.1 67.9

5 Row 2 - Rack 3 SD 20.0 18.0 5.00 789 820 68.4 87.6 68.4 68.3 68.0

6 Row 2 - Rack 10 SD 13.0 6.1 5.00 789 866 68.2 86.4 68.2 67.8 67.2

7 Row 2 - Rack 8 SD 15.0 6.0 5.00 789 845 68.3 87.0 68.3 68.0 67.4

8 Row 2 - Rack 9 SD 17.0 6.0 5.00 789 825 68.3 87.4 68.3 68.2 67.6

9 Row 2 - HDA A_1 19.0 6.4 2.80 442 568 68.1 83.7 68.1 67.9 67.6

10 Row 2 - HDA A 22.4 6.4 2.80 442 558 68.1 83.9 68.0 67.9 67.8

11 Hot Box 1 7.2 6.4 2.13 500 500 67.4 80.6

12 Hot Box 1_1 25.8 17.7 2.13 500 500 68.2 81.6

Xref and Yref in ft; Heat Load in kW; Airflow in CFM; Temperatures in F.

Results for Cooling Units

Downflow CRACs: Cooling & Temperatures

Name Xref Yref Airflow T_Return T_Supply Cooling (Ton) Cooling (kW)

CRAC 1 3.0 8.0 8,000 85.3 66.4 12.9 45.5

CRAC 1_1 29.5 16.2 turned off ----- ----- ----- -----

Xref and Yref in ft; Airflow in CFM; Temperatures in F; Cooling Produced in Ton and kW.

Temperature Fog

Four Feet Above Floor

X Axis

Y Axis

10.5 Feet Above Floor

Generic Extra-Small CSC Design Narrative.pdf

Table of Contents

1 Background

2 Campus Support Center (CSC) Overview

2.1 Main Computer Rooms (MCRs)

2.2 Other Campus Support Centers (CSCs)

3 Design Description

3.1 Architectural

3.2 Electrical

3.3 Mechanical

3.4 Telecommunications

3.4.1 IT Equipment Enclosures

3.4.2 Cable Tray

3.4.3 Structured Cabling

3.4.4 Fiber Backbone

4 Other Telecommunications Infrastructure

4.1 Entrance Rooms

4.2 Telecommunications Rooms

4.3 Fiber Backbone

5 Contact Information

Generic Extra Small Data Center Design Package 1

CFD Extra Small Computer Room - Rectangle Version

Report Summary

Computational Fluid Dynamics (CFD) Simulation - Extra Small Computer Room - Rectangle Version

General Info

Geometry and Objects

Heat Load/Cooling Airflow

Above Floor

Summary of AF Results

Rack Temperature Results

Results for Cooling Units

Four Feet Above Floor

Temperature Fog

X Axis View

Y Axis View

10.5 Feet Above the Floor

CFD Extra Small Computer Room - Square Version

Report Summary

Computational Fluid Dynamics (CFD) Simulation - Extra Small Computer Room - Square Version

General Info

Geometry and Objects

Heat Load/Cooling Airflow

Above Floor

Summary of AF Results

Rack Temperature Results

Results for Cooling Units

Temperature Fog

Four Feet Above Floor

X Axis

Y Axis

10.5 Feet Above Floor

OFFICE OF

INFORMATION

AND TECHNOLOGY

Design Narrative Generic Extra-Small Data Center for Main Computer Rooms (MCRs) and other Campus Support Centers (CSCs)

14 May 2021 Data Center & Infrastructure Engineering Solution Delivery

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 1

Table of Contents Table of Contents 1 ................................................................................................................................... Background 2 ......................................................................................... Campus Support Center (CSC) Overview

2.1 Main Computer Rooms (MCRs)

2.2 Other Campus Support Centers (CSCs)

3 ......................................................................................................................... Design Description

3.1 Architectural

3.2 Electrical

3.3 Mechanical

3.4 Telecommunications

IT Equipment Enclosures Cable Tray Structured Cabling Fiber Backbone

4 ...................................................................................... Other Telecommunications Infrastructure

4.1 Entrance Rooms

4.2 Telecommunications Rooms

4.3 Fiber Backbone

5 ...................................................................................................................... Contact Information

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 2

1 Background There is a recognized need to provide a generic Campus Support Center (CSC) data center design that can be applied without significant modifications to future construction projects.

The existence of a standardized, standards-based design will prevent non-compliant, incorrectly sized, unbalanced, and unsustainable data center designs from being produced by VA mission partners, reducing design project timelines and costs, and preventing unnecessary rework and change orders.

The Office of Information Technology (OIT) Solution Delivery (SD) Data Center & Infrastructure Engineering team has developed the accompanying design package (Generic Extra-Small Data Center Design Package for Main Computer Rooms (MCRs) and Other Campus Support Centers (CSCs)) for Architect/Engineer (A/E) partners to use in their design drawing development for new construction projects across VA.

This design narrative describes the generic CSC design utilizing a standardized TIA-942-B Telecommunications-Electrical-Architectural-Mechanical (TEAM) approach that will allow A/E designs to separate requirements by discipline. Disciplines not directly related to the telecommunications infrastructure (e.g. structural, plumbing, fire protection) are not addressed.

2 Campus Support Center (CSC) Overview CSCs provide geographically specific, operational IT services in support of campus services to Veterans and VA employees that cannot be effectively consolidated or provided over cloud architectures to the campus. Information Technology (IT) services at CSCs support multiple organizations, including Clinical Engineering (CE, a.k.a. biomed), Facility Management Services (FMS), VA police, Research & Development (R&D), Veterans Benefits Administration (VBA) Regional Offices, Office of Information Field Offices (OIFOs), and others.

Design models for CSCs are intended to provide for collocation of IT equipment and systems from all provider organizations into the minimum number of operational spaces on a campus;

that is, consolidated data centers providing environmental and area network support appropriate to all IT equipment needed by tenant organizations on a particular campus to perform their missions. There should only be a single data center on a campus that hosts all of the locally necessary IT hardware to operate the site; similarly, all IT hardware necessary to operate the site should be physically located in the single data center described.

2.1 Main Computer Rooms (MCRs)

The most common type of CSC in the VA inventory is the Main Computer Room (MCR) that provides IT services to a VAMC campus.

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 3

Legacy MCRs in in-patient VA Medical Centers typically support between 25kW and 75kW of critical load, with significant additional loads anticipated as VA modernizes electronic health record systems and deploys additional medical systems increasingly dependent upon IT systems.

Analysis of projected IT trends and needs has led VA to standardize on a single CSC design for major VA outpatient clinical facilities (known variously as super-CBOCs (Community Based Outpatient Clinics, ACCs (Ambulatory Care Centers), and HCCs (Health Care Centers)) with a footprint larger than 50,000 square feet (and with 48 or fewer Telecommunications Rooms (TRs), which will satisfy anticipated telecommunications support needs for a twenty (20) year data center life cycle (coinciding with the expected typical lease length for many of these facilities)

Utilize this ‘extra-small’ design when indicated by OIT Data Center & Infrastructure Engineering.

2.2 Other Campus Support Centers (CSCs)

Consult OIT Data Center & Infrastructure Engineering for the appropriate size and design of CSCs during project scoping for other facility classifications.

3 Design Description This design narrative describes a generic, standardized CSC suitable for insertion into new construction at selected VA outpatient clinical facilities with a footprint larger than 50,000 square feet with fewer support requirements to provide all necessary IT services for all tenants.

The standards-based design will result in a TIA-942 Rating 3 CSC that complies with the requirements of the VA’s Infrastructure Standard for Telecommunications Spaces.

The ultimate design load for this facility is 41.2kW, which is sufficient to support all existing loads, anticipated equipment consolidations, deployment of Cerner EHRM equipment, and provides for reasonable amounts of growth over the planned 20-year lifecycle of the CSC.

Physical space, electrical capacity and distribution, heat rejection, and telecommunications elements have been holistically designed and balanced in this design.

Include all described elements (except for active server/storage/switch equipment and patch cords) in the scope of the construction project.

3.1 Architectural

Any modifications to the generic design will require the design team to conduct additional Computational Fluid Dynamics (CFD) analysis to show that the new design functions as intended at all design loading and contingency conditions. Contact the Data Center & Infrastructure Engineering team for additional information as required.

https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdsTelecommSpaces.pdf

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 4

For maximum flexibility, there are two (2) basic designs for the generic extra-small CSC. The ‘square’ extra-small design requires a 24’x34’-4-1/2” (775 square foot) footprint without column interruptions. The ‘rectangle’ extra-small design requires a 20’x39’-2-3/4” (785 square foot) footprint without column interruptions. Insertion of columns will require an increase in the allocated square footage, and is not recommended. This space is sufficient to house both the IT equipment and the endpoint electrical and mechanical support equipment necessary to support the critical load. The minimum height of the space is twelve (12) feet, and sixteen (16) feet are suggested. Provide a minimum 6’ width 8’ height double door to the MCR either without a mullion or with a removable one.

Future CSCs will be slab-floor facilities, so raised access floor systems are not required. There shall not be a suspended ceiling in future CSCs. In this design the CSC will have contained return air ducting providing airflow separation.

Depending on the generic design selected, the generic extra-small CSC supports either a single row or split, two-row system of server and networking equipment, a 2N UPS system, and an N+1 heat rejection system sized to support the ultimate design load for the CSC. Dimensions and layout for the generic extra-small CSC are shown on sheets 4 and 9 of the Generic Extra- Small Data Center Design Package.

There is insufficient physical space in the generic extra-small design for other telecommunications functions (e.g. carrier circuit demarc/Entrance Room functions) to be collocated in the data center.

3.2 Electrical

The ultimate design for the critical load in the generic extra-small CSC is 41.2kW, which provides for six (6) IT equipment server cabinet positions at Standard Density. UPS systems sized to support this ultimate design load are necessary. 2N UPS redundancy in the CSC is a requirement for this classification of facility.

Provide power to the CSC 2N Uninterruptible Power Supply (UPS) systems from separate distribution panels both on the generator-backed facility electrical bus.

In order to provide the 2N redundancy necessary for critical electrical distribution for the mission critical CSC, Data Center & Infrastructure Engineering specifies installation of a matched pair of modular UPS systems suitable for all capacity levels up to the ultimate design. Adoption of the modular technology will decrease initial capital costs to procure these systems, as well as provide higher operating efficiencies for the UPS systems over their lifecycle. As the critical load in the MCR increases with additional IT workload over time, the systems can be gradually built up (using operations, not capital funds) to support the new critical loads.

Individual facilities will have varying levels of critical load at the time of CSC commissioning.

Procure the UPS systems to have sufficient modular UPS and battery elements to support the load at the time of commissioning with N+1 internal elements in each UPS. (Example: The

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 5 modular UPS system has 10kW UPS modules. At the time of commissioning, the critical load is 16kW. The smallest number of UPS modules that can support this load is 2 (20kW capacity).

Provide three (3) 10kW modules in each UPS to provide internal N+1 capability.)

In order to achieve the 41.2kW ultimate load, Data Center & Infrastructure Engineering recommends specification of a modular UPS system similar to the Eaton 93PM (93PM-L for 208V applications), expandable in 10kW increments with 120/208V output, initially built out to support the planned critical load at commissioning. At fully-built out condition, the battery cabinet is estimated to be able to provide around 15 minutes of runtime, which exceeds the 10-minute requirement of the VA Infrastructure Standard for Telecommunications Spaces.

Procure sufficient batteries in these battery cabinets to provide at least 10 minutes of runtime at initial critical load. This will result in a UPS unit that is approximately 83-85” wide, depending on the specific configuration. The total physical space required for each UPS system to support the recommended ultimate design load is estimated to be equivalent to less than four (4) IT equipment cabinets, with 36” front and 0” rear clearance. (Other makes and manufactures of UPS may have rear clearance requirements and not be compatible with all extra-small designs.)

The generic extra-small CSC uses busbar electrical distribution to support the critical load to minimize lifecycle expansion and operation cost and complexity. Power distribution from the UPS systems to the IT equipment rows is via overhead 120/208V busbars as shown in sheets 24 and 25 of the Generic Extra-Small Data Center Design Package. In the ‘square’ layout, each busbar requires the ability to power 20.6kW of critical load on either busbar, per equipment row. In the ‘rectangle’ layout, each busbar requires the ability to power 41.2kW of critical load on either busbar. (A-side and B-side busbars in the ‘square’ layout may be combined depending upon busbar manufacturer offerings, which changes the supported load requirement to 41.2kW.) Assume a 30% phase load imbalance when conducting amperage calculations for busbar sizing.

Distribute 120/208V output from the A/B UPS units to circuit breakers in the UPS distribution cabinets to support each A/B busbar.

Determine an identifying color scheme for the “A” and “B” side distribution elements. Label each circuit, busbar, and busbar tap (receptacle element) in accordance with the requirements of the Infrastructure Standard for Telecommunications Spaces.

There are ten (10) total IT equipment enclosures in the generic extra-small CSC layout. In the busbar distribution model each individual Standard Density enclosure receives a single 3-phase 20A busbar tap outfitted with a single L21-20R receptacle from each A/B redundant bus as shown in the diagram below. This will provide power to the entire MCR (ultimate design) in the standard configuration defined in the Infrastructure Standard for Telecommunications Spaces.

(There are no High Density enclosures specified in the generic extra-small CSC design.)

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 6

Provide and install twenty (20) standardized 3-phase Rack PDUs per sheet 26 of the Generic Extra-Small Data Center Design Package. Each Standard Density IT equipment enclosure receives a mirrored set of two (2) Rack PDUs. Additional detail on these pieces of equipment is shown in the diagram below.

Provide and install A/B color-coded IEC-320 power cords for installed IT equipment to connect to the standard 3-phase Rack PDUs. The use of IEC-320 C13/14 and C19/20 power cords allows auto-ranging PSUs to automatically pull 208V power, which can decrease the power consumption of the equipment in the range of 2-3%. The A side power cords shall be black and the B side a distinctly different color.

A complete grounding system is required for the generic extra-small CSC. Ensure that Main Distribution Area (MDA) & Horizontal Distribution Area (HDA) network racks in the CSC each receive a Rack Bonding Busbar (RBB) to be mounted in the top rear 1RU. Typical bonding connections that comply with TIA-607-C are shown on sheet 27 of the Generic Extra-Small Data Center Design Package.

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 7

3.3 Mechanical

Any modifications to the generic design will require the design team to conduct additional Computational Fluid Dynamics (CFD) analysis to show that the new design functions as intended at all design loading and contingency conditions. Contact the Data Center & Infrastructure Engineering team for additional information as required.

Heat loads for IT equipment enclosures vary by the function and planned density of the intended equipment. There are six (6) Standard Density (5kW) server cabinets in the generic extra-small CSC design as shown on sheets 4 and 9 of the Generic Extra-Small Data Center Design Package. Each of two (2) HDA network cabinets generates 2.8kW of heat load. Each of the two (2) MDA network cabinets each generate 2.8kW of heat load. The total critical load heat generation at ultimate design load is 41.2kW.

The estimated total heat generation of the generic extra-small CSC at ultimate design is 45.5kW. The installed heat rejection system shall be sized to support 50kW of heat load. N+1 heat rejection system redundancy in the CSC is a requirement for this classification of facility.

Provide and install two (2) matched downflow Computer Room Air Conditioner (CRAC) units set on 12” floor stands as shown on sheets 4 and 9 of the Generic Extra-Small Data Center Design Package. The placement of these units will require the A/E to select units that have maintenance access requirements that can be met in the available space. Selection of units with front-only access, for example, may be necessary.

Team the units to minimize energy consumption during regular operation, which means operating both units at the minimum fan speeds necessary to supply the required airflow for the critical load except in contingency conditions.

The generic extra-small CSC is designed to operate providing cooling supply air to the room at 72°F from the CRAC units, with a 20°F ΔT. This provides a near-optimal environmental condition (77°F) for the UPS batteries to maximize their life.

Approximately 160CFM per critical load kW is necessary at this ΔT level; therefore, at the ultimate operating load (41.2kW) the system should be set to provide 7,500CFM (3,750CFM per unit in regular conditions and 7,500CFM in N+1 contingency contions). Maintaining a CRAC Supply Air Temperature (SAT) of 72°F allows the CRAC units to supply cooling air to the IT equipment inlets between 72°F and 79°F, which meets the requirements of the Infrastructure Standards for Telecommunications Spaces.

The airflow requirement for the CRAC units, based on the ultimate operating heat load to be rejected, is 8,00CFM. Units modeled in the Generic extra-small CSC CFD Report accompanying the design package are 53.2kW Liebert DS053 units meeting the requirements listed above.

Ensure that controls for the system can specify Supply Air Temperature (SAT) setpoints and fan speed/CFM percentage. Typical systems are based solely on Return Air Temperature (RAT) setpoints, which are not appropriate for this design.

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 8

At ultimate design loading, the facility can be operated with both CRACs operating at 50% fan speed (72°F setpoints), or one unit operating at 100% (75°F setpoint). Due to the fan affinity law, in normal operating conditions at commissioning, it will be more efficient to operate both units together at a lower fan speed each than to operate one unit at higher fan speeds to supply the necessary amount of cooling air. Example: If the critical load at commissioning is 20kW, ~4,150CFM will be required. Operate both units at 2,160CFM each (27%) to minimize operational energy consumption.

Power supplied to the new CRAC units may be either 208V or 480V, at the discretion of the facility based on the availability of generator-backed distribution. Input voltage of 480V is typically preferred for motor efficiency. Ideally, select units with redundant compressors that can be powered from redundant sources, and ideally have each unit powered from multiple generator-backed sources that do not share a common upstream single point of failure (e.g., from different distribution panels).

Server and network cabinets are provided with Vertical Exhaust Ducts (VEDs) elements allowing IT equipment exhaust air to be directly vented to a common overhead return air ducting system.

Install a return air ducting system as shown on sheets 19, 20, and 22 of the Generic Extra-Small Data Center Design Package. The Computational Fluid Dynamics (CFD) model used to analyze this design indicates that the minimum duct size necessary to evacuate the heat in contingency conditions at ultimate design load is 36” width x 30” height, with common return ducts over the CRAC units 100” or 97” (depending upon design selected) width x 30” height. Mount the return air ducting system as high as feasible in the space, but at a minimum height of 9’-0” to provide adequate clearance for electrical and telecommunications infrastructure equipment.

Provide and install blanking panels in every open RU of each IT equipment enclosure (server cabinets, HDA racks, and MDA racks) that does not have other equipment. This will dramatically reduce bypass and recirculation airflow issues in the MCR. An estimated 400RU of blanking panels will be necessary initially.

3.4 Telecommunications

IT Equipment Enclosures Provide six (6) server cabinets and four (4) network cabinets with Vertical Exhaust Ducts (VEDs) meeting the requirements of sheets 28 and 29 of the Generic Extra-Small Data Center Design Package.

Outfit each server cabinet, HDA network rack, and MDA network rack as shown on sheets 16 and 17 of the Generic Extra-Small Data Center Design Package. MDA and HDA network racks will require side panel cutouts and grommets to allow for horizontal distribution between the cabinets. This is not a standard feature and will need to be explicitly called out.

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 9

Cable Tray

Install a ceiling-mounted cable tray system as detailed in sheets 5, 10, and 15 of the Generic Extra-Small Data Center Design Package to allow bidirectional (diverse path) distribution to each equipment cabinet. The minimum size of the main tray is 4”x12” to hold the 144 Cat 6A UTP cables necessary for structured cabling distribution (this size of tray can hold up to 199 standard Cat 6A cables at 50% fill). Telecommunications cable trays will extend to the walls in two places to allow for diverse backbone routing from the MDAs to campus TRs.

Structured Cabling

Install a structured cabling system within the MCR. Utilize OM4 in a mesh between MDAs and the HDAs, Cat 6A copper unshielded twisted pair (UTP) from MDAs to their respective HDAs, and a combination of OM4 fiber and Cat 6A copper UTP from the HDAs to each IT equipment enclosure location. All distribution components, such as the media and the media interfaces, must be component compliant to the same performance specifications (Cat 6A or OM4). Utilize only pre-terminated connections on installed structured cabling elements as shown in the graphic below.

Determine the total cable lengths for fiber and copper connections between the MDAs and respective HDAs (backbone), and between the HDAs and respective terminations in the server cabinet Equipment Distributors (EDs) (horizontal), accounting for both horizontal and vertical distances. Procure and install both the backbone and horizontal structured cabling elements.

Specifications for each element shall be:

• Backbone fiber – MPO-MPO (Type A) 12-fiber OM4 fiber backbone between the fiber cassettes in MDA A and HDA B, and between the fiber cassettes in MDA B and HDA A.

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 10

(A total of four (4) 12-strand cables for a total of 24 duplex LC connections are required on each path.)

• Horizontal fiber – MPO-MPO (Type A) 12-fiber OM4 fiber backbone between the fiber cassettes in each redundant A/B HDA to the corresponding A/B fiber cassettes in each server cabinet. (A total of four (4) are required in each Standard Density server cabinet.)

• Horizontal copper – See media recommendations on sheet 18, plate 3 of the Generic Extra-Small Data Center Design Package.

In IT equipment server cabinets, reserve the top rear 5RU of space for structured cabling landing (the Equipment Distributor, or ED). See sheet 16, plate 2 of the Generic Extra-Small Data Center Design Package. Reserve the top rear 1RU in each network rack for the Rack Bonding Busbar (RBB).

Provide fiber and copper UTP patch equipment as specified above and in the accompanying design package. Necessary equipment will include fiber breakout boxes to land new campus fiber backbone bulk cable, fiber cassettes (MPO rear to LC-LC front), angled Cat 6A UTP patch panels, and horizontal and vertical cable management devices.

See the Generic Extra-Small Data Center Design Package for details and to develop a bill of materials (BOM) for these patch equipment elements.

All installed cabling and equipment will require labeling compliant with the current version of the Infrastructure Standard for Telecommunications Spaces.

Fiber Backbone All campus backbone fiber must be re-run to the CSC location as part of the CSC construction project. The fiber backbone refresh work must be planned and accomplished to be complete and ready to transition to during the commissioning of the CSC.

Field-terminate the new backbone fiber in the CSC in the redundant A/B MDAs and in the supported TRs.

4 Other Telecommunications Infrastructure This design narrative specifically addresses the requirements for the CSC. Other telecommunications infrastructure elements are necessary to support the facility, and are generically described in this section.

4.1 Entrance Rooms

Carrier circuits shall be terminated in Entrance Rooms (ERs) located in the same building as the CSC. Relocate circuits as necessary depending on the situation. Provide two (2) ERs for the building containing the CSC, with one carrier circuit entering each from different pathways. The

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 11

ERs shall be located within 50 feet of the exterior of the building and separated by not less than 20 meters (66 feet).

See sheet 4 of the OIT Design Guide Templates (Appendix B of the Infrastructure Standard for Telecommunications Spaces), for construction and outfitting guidance for these redundant ERs.

Follow guidance for the Network Support Center (NSC) telecommunications space classification in the Infrastructure Standard for Telecommunications Spaces for electrical distribution and environmental control requirements for these spaces.

A grounding system compliant with the requirements of TIA-607-C is required for each ER.

Connect the ERs to the CSC with redundant, diverse path fiber optic cabling (24-strand OM4 multimode and 12-strand OS1 single-mode per path). Provide rack-mounted fiber breakout boxes on each end and field terminate the bulk cable installed.

4.2 Telecommunications Rooms

Fiber backbone from the CSC terminates in Telecommunications Rooms (TRs) distributed around the buildings on campus, which provide horizontal network distribution to end-user Work Area Outlets (WAOs). All campus backbone fiber must be re-run to the CSC location as part of the CSC construction project.

TR construction and outfitting requirements are detailed in sheet 5 of the OIT Design Guide Templates (Appendix B of the Infrastructure Standard for Telecommunications Spaces). Follow guidance for the Network Support Center (NSC) telecommunications space classification in the Infrastructure Standard for Telecommunications Spaces for electrical distribution and environmental control requirements for these spaces.

A grounding system compliant with the requirements of TIA-607-C is required for each TR.

Connect the TRs to the CSC with redundant, diverse path fiber optic cabling.

• From the CSC to each TR in the same building, install an “A” path and a “B” path each consisting of 24 strands of OM4 multimode fiber and 12 strands of OS1 single-mode fiber. For campus building TRs following protected interior pathways at a total distance of less than 400m, follow the same guidance.

• For TRs in unconnected campus buildings, provide an “A” path and a “B” path each consisting of 24 strands of OS2 single-mode fiber.

Provide rack-mounted fiber breakout boxes on each end and field terminate the bulk cable installed.

4.3 Fiber Backbone

All campus backbone fiber must be re-run to the CSC location as part of the CSC construction project. The fiber backbone refresh work must be planned and accomplished to be complete and ready to transition to during the commissioning of the CSC.

https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdsTelecommSpaces.pdf

Greenfield Design Narrative – Extra-Small Data Center for MCRs and other CSCs | 12

Develop a backbone distribution plan (logical and physical) to provide diverse pathways for the backbone between the CSC and all campus TRs. Provide updated logical and physical maps of the campus, documenting backbone pathways.

All installed cabling and equipment will require labeling compliant with the current version of the Infrastructure Standard for Telecommunications Spaces.

5 Contact Information OIT Solution Delivery (SD) Data Center & Infrastructure Engineering VAITESEDatacenterEngineering2@va.gov

---Nothing Follows---mailto:VAITESEDatacenterEngineering2@va.gov

Table of Contents

1 Background

2 Campus Support Center (CSC) Overview

2.1 Main Computer Rooms (MCRs)

2.2 Other Campus Support Centers (CSCs)

3 Design Description

3.1 Architectural

3.2 Electrical

3.3 Mechanical

3.4 Telecommunications

3.4.1 IT Equipment Enclosures

3.4.2 Cable Tray

3.4.3 Structured Cabling

3.4.4 Fiber Backbone

4 Other Telecommunications Infrastructure

4.1 Entrance Rooms

4.2 Telecommunications Rooms

4.3 Fiber Backbone

5 Contact Information

PROJECT:

DRAWING No:

Department of Veterans Affairs

IT Operations and Services

DATE

ISSUE:

DESCRIPTIONMARK

FILE: Generic Extra Small Data Center Design Package 1.vsd

DESIGNED BY: KEVIN GRZELKA, CTDC

CHECKED BY:

DOC VERSION No:

SHEET TITLE

PRINT DATE: Sep 21, 2021

ISSUE DATE: Jun 25, 2021

SHEET: 1 OF 32

1.0

GENERIC EXTRA SMALL DATA

CENTER DESIGN PACKAGE

FOR MCRS AND

OTHER CSCS

A

B

C

D

2 3 4

1 2 3 4

TITLE

MICHAEL JULIAN, RCDD

KELLY BATES, DCIE

ENTERPRISE DATA CENTER AND

INFRASTRUCTURE ENGINEERING

GENERIC EXTRA SMALL (~780FT2) DATA CENTER DESIGN PACKAGE

FOR MAIN COMPUTER ROOMS (MCRS)

AND OTHER

CAMPUS SUPPORT CENTERS (CSCS)

DESIGN PACKAGE DEVELOPED BY:

DATA CENTER AND INFRASTRUCTURE ENGINEERING

SHEET: 2 OF 32

LEGEND

LEGEND

ELECTRICAL

NOTES

TYP

DETAIL NUMBER

TYPICAL THROUGHOUT THIS

SHEET

ELECTRICAL

BONDING BUSBAR

ARCHITECTURAL

TELECOMMUNICATIONS TELECOMMUNICATIONS

ARCHITECTURAL

DETAIL NUMBER#

TYPICAL THROUGHOUT THIS SHEET

40" TELECOMMUNICATIONS CABINET WITH HORIZONTAL CABLE

CUTOUTS AND APPROPRIATE CABLE MANAGEMENT

ACCESSORIES, SUPPORTING 5KW REDUNDANT

DEMO WALL

NEW WALL

MECHANICAL MECHANICAL

CHANGES TO DESIGN WILL REQUIRE A NEW COMPUTATIONAL FLUID

DYNAMICS (CFD) ANALYSIS TO BE PERFORMED

FLOORPLANS ARE NOT TO SCALE

DOCUMENTS ARE NOT TO BE USED FOR CONSTRUCTION

COLD AISLE CONTAINMENT (PVC CURTAIN)

1 SERVICE PROVIDER ENTRANCE POINT

SERVICE BACKBONE (ENTRANCE ROOM-MAIN COMPUTER

ROOM)

MAIN CROSS CONNECT (CAMPUS/BUILDING DISTRIBUTOR) –

BACKBONE CABLING (MCR-TELECOMMUNCIATIONS ROOMS)

ENTRANCE ROOM (TR) INTERCONNECT

HORIZONTAL DISTRIBUTION TO WORK AREA OUTLETS (WAO)

ADDITIONAL CABINETS OR TELECOMMUNICATIONS RACKS TO

MEET REQUIREMENTS.

7 HORIZONTAL DISTRIBUTION AREA – SIDE A

8 HORIZONTAL DISTRIBUTION AREA – SIDE B

9 MAIN DISTRIBUTION AREA – SIDE A

10 MAIN DISTRIBUTION AREA – SIDE B

STANDARD DENSITY CABINET SUPPORTING 5KW

REDUNDANT

12 HIGH DENSITY CABINET SUPPORTING 10KW REDUNDANT

WIRE MESH CABLE TRAY MINIMUM OF 6"X 12" WITH SECOND LEVEL

OF FIBER CHANNEL PATHWAY (4" X 4")

15 BLUE CABLE TRAY PATH FOR CABLES TO THE A-SIDE MDA/HDA

YELLOW CABLE TRAY PATH FOR CABLES TO THE B-SIDE MDA/

HDA

17 TELECOMMUNICATIONS CHANNEL RACK

SECONDARY BONDING BUSBAR PLACEMENT DETERMINED BY

OTHERS

PRIMARY BONDING BUSBAR PLACEMENT DETERMINED BY

OTHERS

MINIMUM TWO 110V 20A CONVENIENCE BUILDING POWER

OUTLETS PER WALL; PLACEMENT DETERMINED BY OTHERS.

30 AMP 208 VOLT THREE-PHASE TWIST LOCK RECEPTACLE (L21-

30R);8.5 FT AFF {WYE (5-WIRE)} COORDINATE INSTALLATION

LOCATION WITH TELECOMMUNICATIONS CONTRACTOR

20 AMP 208 VOLT THREE-PHASE TWIST LOCK RECEPTACLE (L21-

20R);8.5 FT AFF {WYE (5-WIRE)} COORDINATE INSTALLATION

LOCATION WITH TELECOMMUNICATIONS CONTRACTOR

SERVICE PANEL FOR RACK POWER. IT LOAD ONLY. SHALL BE

EQUIPPED WITH POWER METER; MONITORED SOLUTION

PREFERRED. PLACEMENT PER OTHERS

SERVICE PANEL FOR DEDICATED ROOM AIR CONDITIONING. NON-IT

LOAD ONLY. SHALL BE EQUIPPED WITH POWER METER;

MONITORED SOLUTION PREFERRED. PLACEMENT PER OTHERS

1. LED LIGHTING PLACED IN AISLES DIRECTLY IN FRONT OF

AND BEHIND CABINET ROWS

2. LIGHTING OPERATED BY MOTION SENSOR PER CABINET

ROW OR SECTION

3. 500 LUX IN THE HORIZONTAL PLANE AND 200 LUX IN THE

VERTICAL PLANE REQUIRED MEASURED AT 3 FT AFF IN

FRONT OF AND BEHIND EQUIPMENT CABINETS

POWER BUS BAR (VOLTAGE AND AMPERAGE SUFFICIENT TO

SUPPORT TEN [10] SINGLE BREAKER 208V, 20 AMP, L21-20R

BUSWAY TAPS) FED FROM A SIDE SOURCE

SUPPORT TEN [10] SINGLE BREAKER 208V, 20 AMP, L21-20R

BUSWAY TAPS) FED FROM B SIDE SOURCE

WIRE MESH CABLE TRAY SIZE COMMENSURATE

WITH REQUIREMENTS

SLEEVE WITH BUSHING FIRESTOP AND INNERDUCT FOR

FIBER

CONDUIT WITH BUSHING FIRESTOP AND INNERDUCT FOR

FIBER

SLEEVE OR CONDUIT WITH BUSHING FIRESTOP AND

INNERDUCT FOR FIBER

TELECOMMUNICATIONS CHANNEL RACK, 19" RAILS, #12-24

TAPPED EIA HOLE PATTERN, 30" DEEP CHANNEL MINIMUM, 7'

HIGH, 45RU, WHITE

VERTICAL CABLE MANAGER WITH DOOR, 6" WIDE MINIMUM

SERVER CABINET, 45U, 24"X48" (NOMINAL), SQUARE

PUNCHED RAIL, SINGLE PERFORATED FRONT DOOR, SOLID

REAR DOOR (VERTICAL EXHAUST DUCT IMPLEMENTATION),

DOUBLE PERFORATED REAR DOOR (NO VED), TWO-POINT

KEYED LOCKS, WHITE,SOLID SIDE PANELS

OR

TELECOMMUNICATIONS CABINET, 7' HIGH, 45U, 40"X48"

(NOMINAL), SQUARE PUNCHED RAIL, SINGLE

PERFORATED FRONT DOOR, SOLID REAR DOOR

(VERTICAL EXHAUST DUCT IMPLEMENTATION), TWO-

POINT KEYED LOCKS, WHITE,SOLID SIDE PANELS

OR WIRE MESH CABLE TRAY SIZE COMMENSURATE WITH

REQUIREMENTS

SUPPORT FIVE [5] SINGLE BREAKER 208V, 20 AMP, L21-20R

BUSWAY TAPS) FED FROM A SIDE SOURCE

SUPPORT FIVE [5] 208V, 20 AMP, L21-20R BUSWAY TAPS) FED

FROM B SIDE SOURCE

BLUE CABLE PATH FOR A-SIDE UPS12

YELLOW CABLE PATH FOR B-SIDE UPS13

LIGHTING:

RETURN AIR DUCT

COMPUTER ROOM AIR CONDITIONER (SEE COMPUTATIONAL

FLUID DYNAMICS REPORT FOR SIZING)

REQUIRED CLEARANCE AROUND CRACS

ELECTRICAL SERVICE PANEL

OVERHEAD POWER DROP CORD WITH L21-20 RECEPTACLE

POWER BUSWAY TAP WITH SINGLE BREAKER 3' DROP

CORD WITH L21-20R FOR STANDARD-DENSITY CABINETS

POWER BUSWAY TAP WITH DUAL BREAKER AND TWO 3'

DROP CORDS WITH L21-20R FOR HIGH DENSITY CABINETS

TYPICAL UNSWITCHED 110 VOLT, 20 AMP DUPLEX

CONVENIENCE OUTLET

AC

SPLIT PACKAGE AIR CONDITIONER OR EQUIVALENT 24/7

SUPPLY AIR TO REJECT 5KW (17,000 BTU PER

TELECOMMUNICATIONS RACK)

AC

ADDITIONAL SPLIT PACKAGE AIR CONDITIONER OR LARGER

UNIT TO REJECT HEAT FROM ADDITIONAL RACKS (17,000

BTU PER TELECOMMUNICATIONS RACK)

4'X 8' AC GRADE ¾” TRADE SIZE PLYWOOD BACKBOARD

PAINTED HIGH-GLOSS WHITE WITH TWO COATS OF FIRE

RESISTANT PAINT FOR SERVICE PROVIDER / SECURITY /

VIDEO / ET CETERA

3 FT WIDE, 8 FT HIGH DOOR, FIRE RESISTANT TO ¾ HOUR OR

MORE PER AHJ

6 FT WIDE, 8 FT HIGH DOOR, NO CENTER MULLION, FIRE

RESISTANT TO ¾ HOUR OR MORE PER AHJ

STANDARD 25% OPEN PERFORATED FLOOR TILE

R

MODULAR UPS CABINET (POWER MODULES, BATTERIES,

POWER PANELS)

LED LIGHTING

POWER BUSWAY WITH METERED HEADEND FOR B SIDE

POWER DISTRIBUTION

POWER BUSWAY WITH METERED HEADEND FOR A SIDE

POWER DISTRIBUTION

C FIXED CAMERA, PAN/TILT/ZOOM, PASSIVE INFRARED

CAMERA - DUAL TECHNOLOGY”

PIV ENABLED TWO-FACTOR AUTHENTICATION KEYPAD

M

CEILING MOUNTED MOTION SENSOR (LOCATIONS AS

REQUIRED FOR FULL ROOM COVERAGE)

MOTION SENSOR LIGHT SWITCH

J

OVERHEAD POWER DROP CORD WITH L21-30 RECEPTACLE

POWER JUNCTION BOX FOR 60A CONNECTION

SHEET: 3 OF 32

SPECIFICATIONS

GENERIC TELECOMMUNICATIONS MEDIA AND INTERFACE SPECIFICATIONS FOR TELECOMMUNICATION SPACES

SPECIFICATIONPRIMARY ATTRIBUTEID SECONDARY ATTRIBUTE

1 COPPER PATCH PANELS

PERFORMANCE CATEGORY CATEGORY 6A (10 GBE)

POSITION COUNT 48

FORM FACTOR ANGLED

SIZE ONE RACK UNIT

JACK COLOR CODING A-SIDE BLUE / B-SIDE YELLOW

CASSETTE CAPACITY 12 CASSETTES OR 6 DOUBLE CASSETTES

CASSETTE USER INTERFACES LC DUPLEX CONNECTORS

FIBER DISTRIBUTION PANELS CASSETTE BACKBONE INTERFACES MPO-12

PERFORMANCE CHARACTERISTICS OM4 LASER ENHANCED 40 GBE 50/125 MULTIMODE / OS1 9/125 SINGLE MODE

FORM FACTOR ONE (1) RU

3 UTP (HORIZONTAL AND FIRST LEVEL BACKBONE)

PERFORMANCE CATEGORY CATEGORY 6A (10 GBE)

PERFORMANCE SPECIFICATIONS MEETS OR EXCEEDS TIA-EIA-568-C.2-10, TSB-155.

JACKET COLOR BLUE (HORIZONTAL), WHITE (1ST LEVEL BACKBONE)

PERFORMANCE CATEGORY OM4 LASER ENHANCED TO 40 GIGABIT ETHERNET (GBE) / OS1 / OS2

PERFORMANCE SPECIFICATIONS

LASER OPTIMIZED 50/125 MM FIBERS WITH AT LEAST 4,700 MHZ·KM AT 850 NM /

OS1 9/125 SM FIBERS (INTRA-BUILDING) / OS2 9/125 SM (INTER-BUILDING)

FIBER (HORIZONTAL AND FIRST LEVEL BACKBONE)

MODE MULTIMODE/SINGLE MODE (DISTRIBUTION TO TRS ONLY)

JACKET COLOR AQUA (OM4) / YELLOW (OS1/2)

MEDIA CONNECTOR PRE-TERMINATED WITH MPO, TYPE A

STRAND COUNT 12 OR 24

BUNDLING LOOSE TUBE

5 UTP PATCH CORDS

PERFORMANCE CATEGORY CATEGORY 6A, 26-GAUGE, STRANDED

PERFORMANCE SPECIFICATIONS CENTER TUNED TO HORIZONTAL MEDIA

JACKET COLOR BLUE

6 FIBER PATCH CORDS MODE MULTIMODE/SINGLE MODE (PATCH CORD TO TRS ONLY)

MEDIA CONNECTOR PRE-TERMINATED WITH DUPLEX LC

JACKET COLOR AQUA (OM4) / YELLOW (OS1/2)

PERFORMANCE SPECIFICATIONS LASER OPTIMIZED 50/125 ΜM FIBERS WITH AT LEAST 4,700 MHZ·KM AT 850 NM /

OS1 9/125 SM FIBERS (INTRA-BUILDING) / OS2 9/125 SM (INTER-BUILDING)

PERFORMANCE CATEGORY OM4 / OS1 / OS2

TERMINATION METHOD FACTORY PRE-TERMINATED

SHEET: 4 OF 32

EXTRA SMALL DATA CENTER -

SQUARE

P O

W E

U

LE

Y

S

T

IN

IS

GENERIC FLOOR PLAN FOR EXTRA SMALL DATA CENTERS – SQUARE VERSION

UPS A

UPS B

HDA A

'-0

32'-4 1/2"

4'-0"

MDA A

MDA B HDA B

~775 FT2

SHEET: 5 OF 32

DATA CABLE TRAY LAYOUT -

DATA CABLE TRAY LAYOUT – SQUARE VERSION1

SHEET: 6 OF 32

CABINETS TO HDA CABLE

ROUTING - SQUARE

HDA B

HDA A

DIVERSE ROUTING FOR CABLES FROM CABINETS TO HORIZONTAL DISTRIBUTION AREAS – SQUARE VERSION1

SHEET: 7 OF 32

HDA/MDA CABLE ROUTING -

DIVERSE ROUTING FOR CABLES FROM HORIZONTAL DISTRIBUTION AREAS TO MAIN DISTRIBUTION AREAS – SQUARE VERSION1

NOTE: A FULL MESH CONNECTION IS REQUIRED

FROM THE HDA TO BOTH THE MDAs. THESE

MUST BE ROUTED DIVERSELY.

HDA A MDA A

MDA B HDA B

SHEET: 8 OF 32

MDA TO TR CABLE ROUTING -

DIVERSE ROUTING FOR CABLES FROM MAIN DISTRIBUTION AREAS TO TELECOMMUNICATIONS ROOMS – SQUARE VERSION1

MDA A

MDA B

SHEET: 9 OF 32

EXTRA SMALL DATA CENTER -

RECTANGLE

TR

N

L

GENERIC FLOOR PLAN FOR EXTRA SMALL DATA CENTERS – RECTANGLE VERSION

~785 FT2

UPS A UPS B

HDA A MDA A MDA B HDA B

39'-2 3/4"

SHEET: 10 OF 32

DATA CABLE TRAY LAYOUT -

DATA CABLE TRAY LAYOUT – RECTANGLE VERSION1

2 3

SHEET: 11 OF 32

CABINETS TO HDA CABLE

ROUTING - RECTANGLE

DIVERSE ROUTING FOR CABLES FROM CABINETS TO HORIZONTAL DISTRIBUTION AREAS – RECTANGLE VERSION1

SHEET: 12 OF 32

HDA/MDA CABLE ROUTING -

DIVERSE ROUTING FOR CABLES FROM HORIZONTAL DISTRIBUTION AREAS TO MAIN DISTRIBUTION AREAS – RECTANGLE VERSION1

NOTE: CONNECTIONS TO SAME SIDE MDA FROM

HDA WILL PATCH DIRECTLY IN THE

COLOCATED HDA/MDA.

CROSS-CONNECT TO OPPOSITE MDA WILL

USE STRUCTURED CABLING

SHEET: 13 OF 32

MDA TO TR CABLE ROUTING -

DIVERSE ROUTING FOR CABLES FROM MAIN DISTRIBUTION AREAS TO TELECOMMUNICATIONS ROOMS – RECTANGLE VERSION1

SHEET: 14 OF 32

COMPUTER ROOM DIVERSE

ROUTING

ED ED ED

ED ED ED

MDA

1 STRUCTURED CABLING DIVERSE ROUTING – SQUARE VERSION2

24 DUPLEX LC OM4 – A-SIDE

24 DUPLEX LC OM4 – B-SIDE

12 DUPLEX LC OM4/24 CAT 6A – A-SIDE

12 DUPLEX LC OM4/24 CAT 6A – B-SIDE

HORIZONTAL DISTRIBUTION – EQUIPMENT DISTRIBUTOR/

HORIZONTAL DISTRIBUTION AREA

BACKBONE DISTRIBUTION – MAIN DISTRIBUTION AREA TO MAIN

DISTRIBUTION AREA

STRUCTURED CABLING DIVERSE ROUTING – RECTANGLE VERSION

ED ED ED ED ED EDHDA

24 DUPLEX LC OM4 – A-SIDE

24 DUPLEX LC OM4 – B-SIDE

12 DUPLEX LC OM4/24 CAT 6A – A-SIDE

12 DUPLEX LC OM4/24 CAT 6A – B-SIDE

HORIZONTAL DISTRIBUTION – EQUIPMENT DISTRIBUTOR/HORIZONTAL DISTRIBUTION AREA

BACKBONE DISTRIBUTION – MAIN DISTRIBUTION AREA TO MAIN DISTRIBUTION AREA

SHEET: 15 OF 32

PATHWAY DETAILS

PROPOSED CABLE TRAY:

CABLOFIL CF105/300

4" DEEP X 12" WIDE MINIMUM (2"X18" OR 6"X8" ACCEPTABLE)

WHITE POWERCOAT

TRAY INSERT

MAX. CAPACITY (40% FILL):

199 CATEGORY 6A UTP (0.35 OD)

271 CATEGORY 6A UTP (0.30 OD)

MAXIMUM PLANNED UTP CABLE FILL:

144 CABLES AT .35 OD CMP

MAXIMUM LOAD:

11.15 LBS PER FOOT

MAXIMUM ANTICIPATED LOAD:

~6.48 LBS PER FOOT

LOAD CAPACITY IN LBS/FT PER SPAN:

5: 142 6: 126.8* 7: 93.1 8: 89.2

* RECOMMENDED MAX UNSUPPORTED SPAN

CABLE TRAY CAPACITY PLANNING

1PROPOSED FIBER PATHWAY AND DETAILS

FIBER PATHWAY MOUNTING BRACKET (PANDUIT FR6TRBE/FR6TRBN OR EQUIVALENT):

BRACKET TO MOUNT TO EXISTING THREADED ROD OR

BRACKET TO MOUNT TO NEW THREADED ROD

FIBER PATHWAY CHANNEL AND COVERS (PANDUIT FR4X4/FRHC4/FRSHC4 OR EQUIVALENT):

4X4" CHANNEL RUNNER

SOLID COVER

SPLIT HINGED COVER

FIBER PATHWAY CHANNEL CORNERS (PANDUIT FR4X4/FRHC4/FRSHC4 OR EQUIVALENT):

RIGHT ANGLE CORNER

TEE CONER

FOUR WAY CROSSING

SPLIT OR SOLID COVERS

FIBER PATHWAY BEND RADIUS SPILLWAYS (PANDUIT FRVT4X4/FRTR4X4 OR EQUIVALENT):

VERTICAL TEE

TRUMPET SPILLWAY

BEND RADIUS SPILLWAYS REQUIRED AT EVERY RACK LOCATION

SHEET: 16 OF 32

EQUIPMENT AND HORIZONTAL

DISTRIBUTORS

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

STANDARD DENSITY EQUIPMENT DISTRIBUTOR ELEVATION FOR CABINETS 2

RU44

RU43

RU42

RU41

48-PORT 1RU ANGLED PATCH PANEL

FOR 10 GbE (24 PORTS TO “A” SIDE

AND 24 PORTS TO “B” SIDE HDAs)

FIBER DISTRIBUTION FOR 10 – 40 GbE

ANGLED BLANKING PANEL

TYPICAL END OF ROW HORIZONTAL DISTRIBUTION AREA1

“A” SIDE

12 DUPEX LC (TWO 12-

STRAND MPO CABLES)

“B” SIDE

12 DUPEX LC (TWO 12-

STRAND MPO CABLES)

RU45

HORIZONTAL FIBER DISTRIBUTION FROM THE

ED IN EACH CABINET IN THE ROW

HORIZONTAL UTP DISTRIBUTION FROM THE

ED IN EACH CABINET IN THE ROW

33 RU FOR LAN ELEMENTS

AND LEAF OR ACCESS LAYER

SWITCHES

1st LEVEL BACKBONE

24 DUPLEX LC FIBER CONNECTIONS

TO OPPOSITE SIDE ONLY

B SIDEA SIDE

LEVITON

SHEET: 17 OF 32

MAIN DISTRIBUTION AREA

MAIN DISTRIBUTION AREA (A & B SIDES)

RESERVED

FOR CORE,

SECURITY

AND WAN

ELEMENTS

AND A-SIDE

DISTRIBUTION

TO TR’S

A-SIDE

“A” SIDE FO

BACKBONE

“B” SIDE FO

BACKBONE

B-SIDE

RESERVED

FOR CORE,

SECURITY

AND WAN

ELEMENTS

AND B-SIDE

DISTRIBUTION

TO TR’S

SHEET: 18 OF 32

MEDIA DETAIL

RECOMMENDED UTP MEDIA: ATLAS-X1 COPPER TRUNKS

CAT 6A UTP CMP CABLE ASSEMBLY

BUNDLE OF 6 BLUE CABLES

BERK-TEK - LANMARK-10G2 (UTP) BRANDED CABLE

TIA/EIA WIRING T568B

TESTED TO TIA 568-C.2

TERMINATION: ATLAS-X1 E2XHD CONNECTION

RECOMMENDED CASSETTE: LEVITON HDX ENTERPRISE MTP

FIBER TYPE: OM4/OS1

FIBER COUNT: 12-FIBER

CONNECTOR (FRONT): LC

CONNECTOR (REAR): MPO

POLARITY: TYPE A

RECOMMENDED FIBER DISTRIBUTION CABINET:

LEVITON ANGLED OPT-X UHDX

144 FIBER

ONE (1) RACK UNIT

RECOMMENDED UTP PATCH PANEL:

LEVITON e2XHD-BLK HIGH-DENSITY ANGLED

48 POSITION

ONE (1) RACK UNIT PER PANEL

RECOMMENDED A SIDE JACK COLOR: BLUE RECOMMENDED B SIDE JACK COLOR: YELLOW

FIBER DISTRIBUTION CABINET

FIBER CASSETTE43 UTP MEDIA

2 UTP PATCH PANEL

SHEET: 19 OF 32

TYPICAL ELEVATION

SIDE ELEVATION ENCLOSURE1

NTS

FLOOR TO ENCLOSURE TOP

7.

0f t.

FLOOR TO BOTTOM OF CABLE TRAY

FLOOR TO BOTTOM OF BUSWAY

ENCLOSURE

8.

3f

REAR ELEVATION ENCLOSURES2

NOTE: HEIGHTS ANNOTATED ARE NOTIONAL. ACTUAL

ELEVATIONS TO BE DETERMINED BY OTHERS

9.

0f

VERTICAL EXHAUST DUCT

UTP CABLE TRAY WITH DROP OUT KIT

.0 ft

.5 ft

AMPS VOLTS

L1

L2

L3

N KW

7.

5f

BLK

G ND

GN D

RETURN AIR DUCT TO CRACS SIZED TO SUPPORT HEAT REJECTION IN

ACCORDANCE WITH COMPUTATIONAL FLUID DYNAMICS (CFD)

ANALYSIS…