2C RLP 36C10F25R0036 Appendix A2 Lease Design Narrative LDN Baltimore MD OPC 6 6 2025.pdf

PDF 514 KB Posted

Attached to
X1DB--Baltimore, MD. Outpatient Clinic 135, 148 ANSI/BOMA
Solicitation number
36C10F25R0036
Issued by

About this file

This document is a VA Leased Community Based Outpatient Clinic (CBOC) Design Narrative dated June 9, 2024, providing comprehensive technical specifications for designing a VA medical facility. The narrative covers detailed requirements across multiple technical domains including site/civil design, architecture, interior design, mechanical systems, plumbing, electrical, telecommunications, and hardware specifications. Key technical requirements include specific guidelines for facility layout, room configurations, systems infrastructure, accessibility standards, specialized medical spaces like surgical and endovascular services, and technical performance standards for building components and specialized medical environments. The document establishes performance-based standards for a leased VA outpatient clinic, emphasizing patient-centered design principles, compliance with VA and industry standards, and specialized technical considerations for healthcare facility construction.

View the file

Other files

File Type Posted
Attachment 4 - GSA Form 3517B General Clauses_Baltimore - 6.1.26.pdf PDF
Attachment 2 - Baltimore LDN revised - 6.1.26.pdf PDF
Attachment 3 - Baltimore OPC OpEx cost details - 6.1.2026.xlsx XLSX spreadsheet
Attachment 1 - Baltimore LDN revised - tracked changes - 6.1.26.docx DOCX document
Attachment 5 - 1 RLP 36C10F25R0036 Lease Baltimore MD OPC 12.2.2025 - Amendment 3 - 6.1.26.pdf PDF
S02-Baltimore OPC - RLP Amendment 3 - 6.3.2026.pdf PDF
36C10F25R0036 0002.docx DOCX document
4 RLP 36C10F25R0036 Appendix B Lease Service Narrative Baltimore MD OPC .pdf PDF
36C10F25R0036 Baltimore MD OPC RLP Amendment 2 .pdf PDF
36C10F25R0036 0001.docx DOCX document
36C10F25R0036 Baltimore MD OPC RLP Amendment 1 VA Q and A Matrix.xlsx XLSX spreadsheet
19 RLP 36C10F25R0036 DOL Wage Determination Baltimore City Baltimore MD OPC 7 9 2025.pdf PDF
2C RLP 36C10F25R0036 Appendix A2 Lease Design Narrative LDN Baltimore MD OPC 7 9 2025.pdf PDF
36C10F25R0036 Baltimore MD OPC RLP Amendment 1 Pre bid Presentation.pdf PDF
19 RLP 36C10F25R0036 DOL County Wage Determination Baltimore County Baltimore MD OPC 7 9 2025.pdf PDF
36C10F25R0036 Baltimore MD OPC RLP Amendment 1.pdf PDF
18 RLP 36C10F25R0036 Certification of Building Energy Performance Baltimore MD OPC 6 6 2025.pdf PDF
12 RLP 36C10F25R0036 SF 330 Architect Engineer Qualifications Baltimore MD OPC 6 6 2025.pdf PDF
3 RLP 36C10F25R0036 Appendix A6 Conceptual Floor Plan Baltimore MD OPC 6 6 2025.pdf PDF
19 RLP 36C10F25R0036 DOL County Wage Determination Baltimore County Baltimore MD OPC 6 6 2025.pdf PDF
2F RLP 36C10F25R0036 Appendix A5 Facility Security Level II FSL Baltimore MD OPC 6 6 2025.pdf PDF
13 RLP 36C10F25R0036 GSA Form 527 Contractors Quals and Financial Info Baltimore MD OPC 6 6 2025.pdf PDF
2E RLP 36C10F25R0036 Appendix A4 VA CBOC Info Transp Sys Specs Baltimore MD OPC 6 6 2025.pdf PDF
16 RLP 36C10F25R0036 3517B General Clauses Baltimore MD OPC 6 6 2025.pdf PDF
4 RLP 36C10F25R0036 Appendix B Lease Service Narrative Baltimore MD OPC 6 6 2025.pdf PDF
14 RLP 36C10F25R0036 VA Handbook 6500 6 Baltimore MD OPC 6 6 2025.pdf PDF
2B RLP 36C10F25R0036 Appendix A1 Project Room Contents List PRC Baltimore MD OPC 6 6 2025.xlsx XLSX spreadsheet
9 RLP 36C10F25R0036 GSA Form 1217 Lessors Annual Cost Statement Baltimore MD OPC 6 6 2025.pdf PDF
2A RLP 36C10F25R0036 Appendix A Program for Design PFD Baltimore MD OPC 6 6 2025.pdf PDF
0 RLP 36C10F25R0036 RLP Baltimore MD OPC 6 6 2025.pdf PDF
17 RLP 36C10F25R0036 Prelease FPLS Evaluation Form 12000 Part A and Part B Baltimore MD OPC 6 6 2025.pdf PDF
11 RLP 36C10F25R0036 Past Performance Questionnaire Form for VA Baltimore MD OPC 6 6 2025.pdf PDF
6 RLP 36C10F25R0036 Offeror Proposal Compliance Matrix Baltimore MD OPC 6 6 2025.pdf PDF
1 RLP 36C10F25R0036 Lease Baltimore MD OPC 6 6 2025.pdf PDF
7 RLP 36C10F25R0036 Proposal to Lease Space GSA Form 1364 Baltimore MD OPC 6 6 2025.pdf PDF
36C10F25R0036.docx DOCX document
8 RLP 36C10F25R0036 Attachment No 1 to GSA Form 1364 Baltimore MD OPC 6 6 2025.xlsx XLSX spreadsheet
15 RLP 36C10F25R0036 3516 Solicitation Provisions Baltimore MD OPC 6 6 2025.pdf PDF
2E1 RLP 36C10F25R0036 Appendix A41 OIT Data Cter Design Narrative Baltimore MD OPC 6 6 2025.pdf PDF
2 RLP 36C10F25R0036 Cover Page for Agency Specific Requirements ASRs Baltimore MD OPC 6 6 2025.pdf PDF
20 RLP 36C10F25R0036 FAR 52 204 24 Representation Regarding Certain Telecom Baltimore MD OPC 6 6 2025.pdf PDF
21 RLP 36C10F25R0036 PreBid Registration Form Baltimore MD OPC 6 6 2025.pdf PDF
5 RLP 36C10F25R0036 Offering Entity Acknowledgement Form Baltimore MD OPC 6 6 2025.pdf PDF
10 RLP 36C10F25R0036 10091 VA Vendor File Request Form Baltimore MD OPC 6 6 2025.pdf PDF
2D RLP 36C10F25R0036 Appendix A3 Room Data Matrix RDM Baltimore MD OPC 6 6 2025.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 9, 2024

VA Leased CBOC Design Narrative

SECTION 1

INTRODUCTION

June 9, 2024 Section 1 - Page 1

1. INTRODUCTION

2. GENERAL REQUIREMENTS

2.1 General

2.2 Codes

2.3 Standards

2.4 References

2.5 Pricing Standards

3. PLANNING AND DESIGN CRITERIA

3.1 Background

3.2 PACT Guiding Principles

3.3 Community Based Outpatient Clinics (CBOC) Planning Approach

3.4 Room Data Matrix

3.5 Surgical Design Criteria

4. TECHNICAL NARRATIVE

4.1 Site/Civil

4.1.1 Pedestrian, Vehicle Access & Circulation

4.1.2 Parking

4.1.3 Site Grading

4.2 Architecture

4.2.1 General Criteria

4.2.2 Accommodations for Care of Patients of Size

4.2.3 Acoustics

4.2.4 Equipment/Accessories/Furnishings

4.2.5 Signage and Wayfinding

4.2.6 Critical Dimensions

4.2.7 Entry Canopies

4.2.8 Elevators

4.2.9 Slab Depressions and Thickened Slabs

4.2.10 Millwork

4.2.11 Joint Sealant Systems

4.2.12 Doors and Frames

4.2.13 Hardware

4.2.14 Pharmacy Dispensing Windows

4.2.15 Radiation Shielding

4.2.16 Radio Frequency Shielding and Magnetic Shielding

4.3 Interior Design

4.3.1 General Criteria

4.3.2 Acoustic Ceiling Tile

4.3.3 Concrete Floor Treatment

4.3.4 Fiberglass-Reinforced Panels

4.3.5 Painting

4.3.6 Wall Protection

4.3.7 Window Shades

4.3.8 Privacy Curtains / Screens

4.3.9 Flooring, Carpet

June 9, 2024 Section 1 - Page 2

4.3.10 Special Architectural Conditions for Surgical and Endovascular Services

4.4 Mechanical

4.4.1 References

4.4.2 HVAC Design Basis

4.4.3 Air Handling Units (AHUs)

4.4.4 Exhaust Systems

4.4.5 Cooling System

4.4.6 Humidification System

4.4.7 HVAC Piping Systems

4.4.8 Air Distribution and Duct Systems

4.4.9 HVAC Insulation Systems

4.4.10 Testing, Adjusting and Balancing

4.4.11 Automatic Temperature Control Systems

4.4.12 Temperature, Humidity and Pressure Monitoring

4.4.13 Special Conditions

4.5 Plumbing

4.5.1 References

4.5.2 Plumbing Design Basis

4.5.3 Medical Gases

4.5.4 Special Conditions

4.6 Electrical

4.6.1 Standby Generator

4.6.2 Special Conditions

4.7 Lighting

4.7.1 General

4.7.2 Indoor Lighting Specifics

4.7.3 Lighting Controls

4.7.4 LED Drivers

4.7.5 Special Conditions

4.8 Telecommunications

4.8.1 Scope of Work

4.8.2 Pathways

4.8.3 Spaces

4.8.4 Telecommunications Bonding and Grounding

4.8.5 Equipment Racks and Equipment Cabinets

4.8.6 Power Distribution Units and Uninterruptable Power Supplies

4.8.7 Telecommunications Infrastructure Plant

4.8.8 Special Systems

5. Hardware Groups and Modifiers

June 9, 2024 Section 1 - Page 3

SECTION 1 - INTRODUCTION

1.1 The purpose of this Leased CBOC Design Narrative is to consolidate the governing codes, standards, references, and guidelines in a document that provides performance-based standards for a VA leased CBOC.

1.2 The governing codes, standards, and references are based on a VA affiliated outpatient clinic.

1.3 The design of the VA leased CBOC shall be based on the Prototype for Standardized Design and Construction of Community Based Outpatient Clinics which is described in Part 3 Planning and Design Criteria.

1.4 This document, and the associated Room Data Matrix (RDM), provides performance-based standards for rooms/functions that are a part of the project’s Program for Design. If there are standards covered by this document, or room types in the RDM, that are not a part of a specific project’s Program for Design, those standards are considered not applicable to that specific project. However, standards added to the grey “additional requirements” boxes in this document are project specific and are applicable.

1.5 Commonly Used Acronyms and Definitions:

PCMH Patient Centered Medical Home

A team based, comprehensive, coordinated patient care model (refer to PACT) PACT Patient Aligned Care Team

Provides service to veterans that is patient-centered with the right care at the right time by the right person. A typical “teamlet” serving a veteran consists of four caregivers: A Primary Care Provider – physician (MD), physician assistant (PA) or nurse practitioner (NP); a Registered Nurse (RN); a clinical staff assistant (LPN or Medical Assistant) and an administrative staff member (Clerk).

CBOC Community Based Outpatient Clinic Is VA-operated, VA-funded, or VA-reimbursed site of care which is located separate from a VA Medical Facility. A CBOC can provide primary, specialty, subspeciality, mental health, or any combination of healthcare delivery services that can be appropriately provided in an outpatient setting.

PFD Program for Design Net square feet (NSF) listing of all spaces and rooms that are to be included in a construction project.

VA Veterans Affairs VHA Veterans Health Administration VISN Veterans Integrated Services Network RDM Room Data Matrix

SECTION 2

GENERAL REQUIREMENTS

June 9, 2024 Section 2 - Page 1

SECTION 2 – GENERAL REQUIREMENTS

2.1 General

2.1.1 The codes and standards listed below indicate minimum performance requirements.

Minimum requirements or standards may be exceeded by site specific project design.

2.1.2 Compliance is required with applicable codes and standards throughout the process of design, construction, acceptance, and on-going maintenance of the facility.

2.1.3 Design and construction of the CBOC shall be in compliance with the requirements of the GSA Form L100 Global Lease as well as the codes and standards listed below.

This Leased CBOC Design Narrative covers construction materials and standards not fully addressed by the codes, standards, and references below.

2.1.4 Use the most current edition at the date and time of bid submission.

2.2 Codes

2.2.1 All VA leased CBOC facilities are to conform to the most recent applicable codes, which include but is not limited to following:

2.2.1.1 State and local codes as required by the local Authority Having Jurisdiction

(AHJ).

2.2.1.2 National Fire Protection Association (NFPA), NFPA 101 Life Safety Code and those codes and standards referenced by NFPA 101. (NFPA 99 Health Care Facilities Code, etc.)

2.2.1.3 NFPA 70B Standard for Electrical Equipment Maintenance, NFPA 70E Workplace Electrical Safety, NFPA 75 Standard for the Fire Protection of Information Technology.

2.2.1.4 Architectural Barriers Act Accessibility Standards (ABAAS), current edition.

2.2.1.5 International Building Code (IBC): The latest edition shall be used for structural, wind load and seismic design.

Additional Code information:

Lessor shall work with AHJ to properly determine occupancy type, with the following considerations:

• For the Lessor to properly determine occupancy type, VA intends to simultaneously treat 0 patients at any given time who are incapable of self-preservation.

• NFPA Risk Category for most of this facil ity is Category 3. Departments that vary from this r isk category include Pharmacy, Imaging, Rehab R&D Service and Multi Use Gym (Category 2), Administrative Areas (Category 4).

2.3 Standards

2.3.1 All leased CBOC facilities are to conform to the following standards:

2.3.1.1 FGI Guidelines for the Design and Construction of Outpatient Facilities, current edition (referred to as FGI Guidelines herein).

June 9, 2024 Section 2 - Page 2

2.3.1.2 The Joint Commission (TJC) accreditation standards apply to the facility under the affiliated VA medical center license. Building construction and on-going maintenance procedures shall meet TJC standards. Lessor shall provide and submit all documentation that is required for TJC requirements.

2.3.1.3 Facility Security Level (FSL) shall be as outlined in GSA Form L100 Global Lease.

2.3.1.4 Sustainability standards shall be as outlined in GSA Form L100 Global Lease.

2.3.1.5 American Society of Heating, Refrigerating and Air-Conditioning Engineers

(ASHRAE) Standard 170, Ventilation of Health Care Facilities, current edition (referred to as ASHRAE 170 herein)

2.3.1.6 ASHRAE Standard 12, Minimizing the Risk of Legionellosis Associated with Building Water Systems, current edition.

2.3.1.7 ASHRAE Standard 188, Legionellosis: Risk Management for Building Water Systems, current edition.

2.3.1.8 ASHRAE Standard 62.1, Ventilation for Acceptable Indoor Air Quality, current edition (referred to as ASHRAE 62.1 herein)

2.3.1.9 ANSI/ASHRAE/IES Standard 90.1-2019 -- Energy Standard for Buildings Except Low-Rise Residential Buildings

2.3.1.10 Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Standard, HVAC Duct Construction Standards - Metal and Flexible.

2.3.1.11 USP General Chapter 795 Pharmaceutical Compounding – Nonsterile Preparations

2.3.1.12 USP General Chapter 797 Pharmaceutical Compounding – Sterile Preparations

2.3.1.13 USP General Chapter 800 Hazardous Drugs - Handling in Healthcare Settings

2.3.1.14 Association for the Advancement of Medical Instruments (AAMI) standards as applicable to SPS and RME storage

2.3.1.15 Illuminating Engineering Society North America (IESNA) Handbook - latest edition

2.3.1.16 VA Signage Design Manual PG 18-12

2.3.1.17 H 18-8 Seismic Design Handbook is required when the clinic includes

Ambulatory Surgery

2.3.1.18 VA HVAC Design Manual (Specifically regarding the AHU design requirements for Pharmacy Compounding Suite, Sterile Processing Service (SPS), and Surgical Suite)

2.4 References

2.4.1 The following guides, manuals, and other references developed by VA are for reference only:

2.4.1.1 VA Enterprise Facility IT Support Infrastructure Standard, most current.

2.4.1.2 Prototype for Standardized Design and Construction of Community Based

Outpatient Clinicshttps://www.cfm.va.gov/til/prototypes.asp#CBOC

2.4.1.3 PACT Space Module Design Guide

https://www.cfm.va.gov/til/dGuide/dgPACT.pdf

2.4.1.4 Room Templates, Leased Community Based Outpatient Clinics https://www.cfm.va.gov/til/rTemplate/LeasingCBOCw.asp

2.4.1.5 VA Design Guides (PG18-12)

https://www.cfm.va.gov/til/prototypes.asp#CBOC https://www.cfm.va.gov/til/dGuide/dgPACT.pdf https://www.cfm.va.gov/til/rTemplate/LeasingCBOCw.asp

June 9, 2024 Section 2 - Page 3

2.5 Pricing Standards

2.5.1 Building Shell Definition

2.5.1.1 Building shell is the complete enveloping structure, the base building systems, the complete HVAC system, and the finished common areas (building common and floor common) of a building that adjoin the occupant areas.

2.5.1.2 Any demolition cost necessary shall be included in the building shell rental rate.

2.5.1.3 Third-party green building certification do not change what elements are considered part of building shell or tenant improvements. Instead, building elements may be required to have certain attributes, such as low volatile organic compound emissions.

2.5.1.4 Section 3 of the L-100 provides minimum requirements of the shell. Any further requirements identified in this LDN to items in Section 3 shall remain shell unless specifically designated as TI.

2.5.1.5 The following table shows the Shell requirements of the Base Building and the Occupant Areas.

June 9, 2024 Section 2 - Page 4

Base Building Occupant Areas

Base structure and building enclosure components (windows with exterior finishes) and any required enhancements (canopies, progressive collapse, etc.)

are complete.

Broom-clean concrete floor slab, with a flat and level floor.

Base building electrical and plumbing systems (e.g., central fire alarm, chiller plant, cooling tower) are complete and functional.

Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and tenant demising walls, without suite entry door.

Entire HVAC system is complete and functional. Conditioned space per the RDM.

All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete.

Suspended acoustical ceiling system including grid and lay-in tiles (or other building standard). Lighting luminaires should be installed in the ceiling grid for an open office plan at the rate of fixtures per 80 USF. Lighting controls with ambient lighting adjusted per daylight availability, occupancy, vacancy, or other building automation system signals.

Building common restrooms are complete and operational.

Tappable domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant demised areas.

All electrical power distribution panels and circuit breakers available in electrical closets, with capacities at 120/208 volt, 3- phase, 4-wire and 277/480 volt, 3-phase, 4-wire.

Any portion of a code required alternate power source (emergency generator, Essential Electrical System, etc.), required to support building life safety requirements including but not limited to transfer switches and distribution.

Designated connection point to the central fire alarm system for extension to tenant demised areas.

All fire alarm devices necessary required by tenant layout and AHJ.

Fire suppression system ready for extension to tenant demised areas.

Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.

Conduit pathways to distribution backboard within a demarcation room for connection to tenant telecommunications MCR or TR.

All security requirements designated as “Shell” in the Facility Security Level (FSL) Appendix are complete.

Proposed and required exterior site (property) improvements required for VA’s use of the premises and local municipality required off-site improvements are complete.

June 9, 2024 Section 2 - Page 5

2.5.2 Tenant Improvement Definitions

2.5.2.1 TIs are the finishes and fixtures that typically take space from the shell condition to a finished, usable condition. The resulting space is complete and meets applicable building codes.

2.5.2.2 TIs are typically items in addition to the items listed in the table above.

2.5.2.3 Section 5 of the L-100 provides minimum requirements of the TI. Any further requirements identified in this LDN to items in Section 5 shall remain TI unless specifically designated as Shell.

2.5.2.4 Typical Tenant Improvements include:

2.5.2.4.1 Electrical wiring, outlets, and horizontal conduit, including cable trays and hooks, within the demised premises. Telephone jacks, data, jacks, and horizontal conduit, including cable trays and hooks, within the demised premises.

2.5.2.4.2 Carpeting or other floor covering; raised access flooring.

2.5.2.4.3 Plumbing fixtures withing the demised premises and all distribution, drainage and vent piping connecting to the building core – except for common bathrooms.

2.5.2.4.4 Partitioning and wall finishes

2.5.2.4.5 Doors, sidelights, frames, and hardware.

2.5.2.4.6 Millwork

2.5.2.4.7 Window treatments

2.5.2.4.8 Adjustments or repositioning of fire sprinkler to avoid conflict with partitioning; additional sprinklers required by code to meet layout.

2.5.2.4.9 VA required signage on site, in the common areas and within the demised premises.

2.5.2.4.10 Additional lighting over the open office layout at a rate of fixtures per 80

USF.

2.5.2.4.11 Exterior site amenities required such as therapy gardens, gait training therapy areas and dining areas (site amenities proposed as building improvements by the lessor shall be shell).

2.5.2.4.12 Interior and exterior components of special systems required such as nurse call and duress systems.

2.6 CPM Schedule Requirements

CPM Schedules must include the following milestones.

2.6.1 Permits Received

2.6.2 Structure Complete (steel erection)

2.6.3 Dry-in (skin and windows)

2.6.4 Conditioned Space (HVAC equipment startup)

SECTION 3

PLANNING AND DESIGN CRITERIA

May 1, 2024 Section 3 - Page 1

SECTION 3 – PLANNING AND DESIGN CRITERIA

3.1. Background

3.1.1. VHA has committed to the development of a patient-centered medical home model for enhanced outpatient primary care services to veterans. The result was a patient care delivery model and a set of planning and design standards.

3.2. PACT Guiding Principles

3.2.1. An operational and planning design guide was developed which identified key principles and objectives. Refer to PACT Space Module Design Guide under References Section 2.4.

3.3. Community Based Outpatient Clinics (CBOC) Planning Approach

3.3.1. The development of the PACT Planning Module was complimented by the development of a Prototype for Standardized Design and Construction of Community Based Outpatient Clinics. Using the PACT Module as the building block, prototypes were developed for three types and sizes of outpatient facilities.

3.4. Health Care Centers (HCC) Planning Approach

3.4.1. HCCs include outpatient Ambulatory Surgical and Endovascular services and/or

Digestive Diseases – Endoscopy services within the program for design in addition to other typical CBOC services.

3.4.2. The Surgical and Endovascular Service Design Guide must be referenced and used to incorporate the VA typical departmental layout and workflow when the PFD includes these services.

3.4.3. The Digestive Diseases – Endoscopy Services Design Guide must be referenced and used to incorporate the VA typical departmental layout and workflow when the PFD includes these services.

3.5. Room Data Matrix

3.5.1. A collection of typical rooms within leased CBOCs. It lists the required finishes, STC ratings, ceiling heights, door size and type, hardware sets, HVAC space ventilation, number of electrical receptacles, lighting controls and fixture types, and number of standard density work area outlets for each room type.

3.5.2. The Lessor shall associate rooms listed on the program for design with the room data matrix by room name. Use department level room names and types when available, otherwise use general room/space for like room function.

3.5.3. FGI Equivalent for ASHRAE 170 – Where HVAC space ventilation requirements are omitted, ASHRAE 170 Tables 8-1 and 8-2 shall be followed. Column “FGI Equivalent for ASHRAE 170” lists the equivalent room name for use in the tables.

3.5.4. FGI Equivalent for Table 1.2-5 “Minimum Sound Isolation” - Where Column “STC” in the Room Data Matrix states “See FGI”, Column “FGI Equivalent for Table 1.2-5 Minimum Sound Isolation” lists the equivalent room name for use in FGI Table 1.2-5.

3.5.5. Additional Requirements in this LDN take precedence over the standard in the RDM.

https://www.cfm.va.gov/til/dGuide/dgSurg.pdf https://www.cfm.va.gov/til/dGuide/dgDigestiveEndoscopy.pdf

SECTION 4

TECHNICAL NARRATIVE

June 9, 2024 Section 4 - Page 1

SECTION 4 – TECHNICAL NARRATIVE

4.1 Site/Civil

4.1.1 Pedestrian and Vehicle Access & Circulation

4.1.1.1 Minimum traffic lane width is 12 feet, and minimum sidewalk width is 4 feet. Curves for traffic lanes and radii at intersections must be adequately sized to prevent vehicles from encroaching on an opposing lane of traffic.

4.1.1.2 Primary pedestrian access and circulation paths shall comfortably accommodate two-way wheelchair traffic.

4.1.1.3 An accessible route must be provided from the public right-of-way abutting the site to the accessible building entrance.

4.1.1.4 For one way traffic lanes that are used as fire and emergency equipment access the minimum width shall be 20 feet.

4.1.1.5 Provide a service/loading area designed to accommodate truck (WB-62) maneuverability. Provide canopy for unloading in adverse weather conditions with 14 feet of clearance from grade to the underside of the canopy.

4.1.1.6 Service area shall accommodate vehicles that pick-up trash and recycled materials.

Locate service area away from public and patient areas.

4.1.2 Physical Security

4.1.2.1 The physical security requirements are listed in the FSL Appendix as developed by the ISC process.

4.1.3 Parking

4.1.3.1 Parking lots with 90-degree stalls must have minimum parking stall dimensions of 9 feet by 18 feet, and a minimum drive aisle width of 24 feet. Angled parking must have one-way drive aisles with the same stall sizes as 90-degree parking. Angled parking drive aisle width must comply with a published design standard for a designated parking angle.

4.1.3.2 The total amount of accessible parking spaces provided shall be 6% of the total required spaces unless more is required by local code.

Additional Parking Requirements:

1. Provide truck bays with one Scissors Lift with capacity to be determined during design.

2. Provide two (2) hydraulic dock levelers at 25,000 lb. capacity each.

3. Dock leveler to include toe guard sensor and safety skirting.

4. Traffic flow to include patient/visitor drop off, pick up and Uber/Lyft traffic at main entry.

5. Lessor shall provide a main building entry canopy to cover a minimum of two traffic lanes at drop off.

6. The sidewalk under canopy at the main entry shall be at the same elevation as the drop off lane.

7. Main entry drop-off sidewalk to have traffic guard safety bollards.

8. Drop-off sidewalk to be a minimum of 50 linear feet long.

9. Traffic flow must differentiate between patient/visitors, ambulettes/ambulance, staff, and loading dock traffic.

10. Provide traffic calming devices as required by AHJ.

11. Where conditions permit, the site shall be landscaped for low maintenance and water conservation with plants that are either native or well adapted to local growing conditions.

June 9, 2024 Section 4 - Page 2

4.1.4 Roadway & Walkway Cross Slopes

4.1.4.1 Roads and walks should have a typical cross slope of 2% unless adequate surface drainage is provided by other slope conditions.

Additional Site/Civil Requirements:

4.2 Architecture

4.2.1 General Criteria

4.2.1.1 Refer to Appendix: Room Data Matrix for Door, Hardware and Acoustic requirements listed by Room Type.

4.2.2 Accommodations for Care of Patients of Size

4.2.2.1 Refer to FGI Guidelines for Outpatient Facilities for accommodations for care of patients of size. Minimum requirements are to provide access to a Procedure Room and Procedure Room Toilet in one PACT Module. A 750lb capacity must be used for the design of the space and its contents to include but not be limited to the lavatory, toilet, patient lifts, and necessary infrastructure to support. Additional capacity may be required and listed in the project specific requirements.

4.2.2.2 Rooms that are designed for access by individuals of size as noted on the PFD as Bariatric must have space for bariatric wheelchairs along the whole accessible route from the front doors to the bariatric spaces, to include elevators and lobby doors.

4.2.2.3 Turning Radius, Bariatric must be 1830 mm (6’0”)

4.2.2.4 T-Shaped Turning Space, Bariatric must be 1830 mm (6’0”) x (6’0”)

4.2.2.5 Distance from edge of toilet to side wall, Bariatric must be 915 mm (3’0”)

4.2.2.6 Grab bar configuration must have double swing-up bars with integral toilet paper dispenser.

4.2.2.7 Minimum width of doors in route to bariatric space must be 1220 mm (4’0”)

Additional Architectural Requirements:

1. All Procedure Rooms shall be provided with 42” door openings on the patient entrance side. Hallway doors leading to the back/staff support area for Procedure Rooms shall allow for 72” doors.

2. Hallways in the radiology area shall be 8’ wide.

4.2.3 Acoustics

4.2.3.1 Refer to FGI Guidelines for Outpatient Facilities for acoustics requirements for enclosed rooms. Refer to the Room Data Matrix-Interior Construction for

June 9, 2024 Section 4 - Page 3 information on rooms not covered under FGI or rooms with special acoustics requirements.

4.2.4 Equipment/Accessories/Furnishings

4.2.4.1 Refer to CBOC Project Contents List and Room Template sheets provided with the

RLP for equipment, accessories, and furnishings descriptions and locations. Items to be provided and/or installed by Lessor are noted on the list. Provide partitions, partition backing, and above ceiling structural support as required for wall and/or ceiling mounted equipment, accessories, and furnishings. Provide required utility connections for scheduled equipment.

4.2.5 Signage and Wayfinding

4.2.5.1 Refer to VA Signage Design Guide in Section 2.4 for signage standards and requirements.

Additional Signage Requirements:

1. Exterior Signage

a. Lessor shall develop and provide a complete exterior signage program to include identification, directional, informational, and regulatory signage including non-smoking. Signage must comply with the local municipality’s codes and specifications. Careful consideration of the location of monument signs shall be taken to avoid sight triangle encroachment. Signage on site must comply with VA Signage Design Guide, Exterior Signage Parts I and II, located in Design Guide PG-18-17, Environmental Planning Guide, available on VA Technical Information Library. Signage not located on site shall comply with local municipality’s codes and standards, except for monument signs. At each roadway entrance to the site furnish and install a sign, nominal size 18” X 24” on square bronze post, that reads,” NOTICE NO FIREARMS OR WEAPONS ALLOWED ON THIS PROPERTY 18 USC 930”, to include universal no weapons logo. Furnish and install on the building wall adjacent to each building entrance, two (2) signs. One sign, nominal size 12” X 18”, that states, “Firearms Prohibited Violation of VA Regulation 1.218 (b) (037) Penalty $500 Fine and Six Months Imprisonment”.

The second sign, nominal size 24” X 6”, that states, “For Your Safety No Guns, Knives, or Other Weapons Allowed”, to include universal no weapons logo.

b. Lessor shall provide ground mounted, illuminated, horizontal monument sign to identify the OPC main entrance. Lessor shall provide foundations and electrical power as necessary. The base shall be concrete or masonry and shall be compatible with building design and landscaping scheme. Monument signs shall be a minimum of 5’-0" high x 12’-0" wide. VA will furnish message layout, content, and colors for the monument sign. The graphic process shall be routed out copy backed with white, translucent acrylic.

c. Lessor shall provide illuminated wall mounted building identification signs of dimensional powder coated or anodized aluminum letters and numerals with VA logo. Letters and numerals shall be a minimum of 36 inches high. Logo shall be of design provided by VA and shall be 84 inches high. Sign messages shall be as follows:

i. Facility Name: “TBD” VA Clinic or as otherwise defined by the VA. VA logo shall precede facility name.

ii. The address sign shall consist of numerals for the building street address.

d. Exterior signage and roadway surface markings shall be designed to identify fire apparatus access.

e. Provide ambulance entrance signage on building or canopy.

June 9, 2024 Section 4 - Page 4

4.2.6 Critical Dimensions

4.2.6.1 Patient-use corridors are to be 6 feet minimum. Staff corridors for transport of supplies from loading dock area to services shall be 6 feet minimum.

4.2.6.2 Patient-use corridor doors must be a minimum of 42 inches wide.

4.2.6.3 Refer to Room Data Matrix – Interior Construction for required ceiling heights by room type.

4.2.7 Entry Canopies

4.2.7.1 Provide non-combustible canopies over the following locations: patient entry to clinic, ambulance building access point and receiving area/loading.

4.2.7.2 At patient entry, provide a covered patient drop-off zone with space for at least one full size passenger vehicle (19 feet long). The drop-off zone must have minimal change in level from drive isle to walkway for a minimum length of 20 feet.

4.2.7.3 At ambulance building access point, provide a covered patient drop-off zone with space for at least one ambulance (typical size used in area) and an accessible access aisle.

4.2.7.4 Provide clearance from grade to underside of canopy with for typical emergency and transport vehicles used in the area.

4.2.8 Elevators

4.2.8.1 Where elevators are provided in a leased facility, not less than one elevator car shall accommodate an ambulance stretcher of 24 inches by 84 inches in the horizontal open position and shall be identified by the international symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches high placed inside on both sides of the hoist way door frame.

4.2.8.2 Where bariatric spaces are above ground level, elevator doors must open minimum 48 inches.

4.2.9 Slab Depressions and Thickened Slabs

4.2.9.1 At new construction, provide slab depression and thickened slabs as required to provide flush threshold installation at audiology booths, MRIs, and other equipment requiring recessed installation or additional structure as recommended by equipment manufacturer. At these equipment locations, concrete slab levelness shall be level and true to meet vendor requirements and shall have a minimum flatness and levelness of FF=45 and FL=35. At existing construction, provide ramp to meet ABAAS.

4.2.10 Millwork

4.2.10.1 Quality compliance to conform to Architectural Woodwork Institute (AWI) and

Woodwork Institute (WI) quality standards.

4.2.10.2 Wood Veneer Casework Construction: Combination of custom wood casework and countertops to conform to program and functional requirements. (Location: Lobby, Reception)

4.2.10.2.1 Construction: Flush overlay construction with concealed hinges. AWI custom grade.

June 9, 2024 Section 4 - Page 5

4.2.10.3 Plastic Laminate Casework Construction: Custom plastic laminate casework to conform to program and functional requirements. (Location: Typical).

4.2.10.3.1 Construction: Flush overlay construction with concealed hinges, AWI Custom Grade.

4.2.10.3.2 Cabinet Hardware:

4.2.10.3.2.1 Concealed hinges, all metal, 110 degree opening, self-closing.

4.2.10.3.2.2 Full extension drawer guides, 100 lbs. capacity.

4.2.10.3.2.3 Door and drawer pulls: 4” center to center wire pull, 5/16” diameter round, 1 ¼” projection, satin chrome.

4.2.10.4 Solid Surface Fabrications: Hard, solid, non-porous mineral-filled acrylic resin

(methyl methacrylate) material in color to be selected by designer. Thickness: 1/2” minimum.

4.2.10.4.1 Locations:

4.2.10.4.1.1 Transaction tops at nurse stations and reception desks.

4.2.10.4.1.2 All counters in patient treatment areas to have solid surface countertop with 4” high minimum integral coved side and backsplash.

4.2.10.4.1.3 Where scheduled as wall protection, provide ¼” thick material with welded seams.

4.2.10.5 Heavy gauge stainless steel (SS): fully welded with a work surface load capacity of at least 300 lbs. per linear foot and antimicrobial.

4.2.10.5.1 Locations:

4.2.10.5.1.1 SPS Decontamination, Scope Processing, Preparations and Assembly, and Sterilization Areas.

4.2.11 Joint Sealant Systems

4.2.11.1 Joints at plumbing fixtures, ceramic tile to be mildew resistant silicone.

4.2.12 Doors and Frames

4.2.12.1 Refer to Room Data Matrix for door and hardware requirements by room type.

4.2.12.2 Minimum width of any door for patient use not specified in the RDM must be 42”.

4.2.12.3 Finish: Prefinished in compliance with AWI Section 1500.

4.2.12.4 Access Panels:

4.2.12.4.1 Flush stainless steel at toilet areas.

4.2.12.4.2 Flush gypsum board surface with concealed hinges at public and office areas.

4.2.12.4.3 Fire rated steel at rated construction.

4.2.13 Hardware

4.2.13.1 General Note

4.2.13.1.1 Hardware sets shall be provided as per RDM and Section 5 Hardware Groups and Modifiers. Provide extra heavy duty, Grade 1 hardware for all components.

4.2.13.2 Major components and finishes are as follows:

4.2.13.2.1 Cylinders and Keying: Key locks/cylinders in groups with new master key or grandmaster key system as directed by Owner. Provide three (3) keys per lock. Provide construction master keying. Cylinders shall meet the requirements of ANSI/BHMA A156.5-14.

4.2.13.2.2 Electronic access control: Electronic access control system/device(s), power supplies (unless otherwise noted in hardware group) and monitoring/alarm(s) are provided with Security System. General Contractor to coordinate the provision and installation of the products. Refer to documents with Security

June 9, 2024 Section 4 - Page 6

Information for location(s) and type(s) of control(s). Connection by Electrical.

4.2.14 Pharmacy Dispensing Windows

4.2.14.1 Provide secure transaction drawer/pass through cabinet and window with amplified speak thru at Pharmacy Dispense/Consult windows for staff to patient transactions.

4.2.14.2 Provide stainless steel, type 304, #4 finish, pass-through cabinet with mechanical interlock doors with clear tempered safety glass windows to comply with USP 800 clean air requirements at Pharmacy pass-through windows. (location: Clean Room- Chemotherapy Compounding)

4.2.14.3 Provide protection for dispensing windows, and for walls around windows, window and the wall around a dispensing window shall meet U.L. Standard 752 for Class III Ballistic level via the use of concrete block walls with cores filled with sand, or appropriately rated metal panels, and extension of perimeter walls to structure above.

4.2.15 Radiation Shielding

4.2.15.1 For Radiology, Fluoroscopy, Mammography, CT scan, and Dental X-Ray Rooms, obtain the services of a physicist to design, specify the level of radiation protection required, test and certifies the installations.

4.2.15.2 Comply with requirements of the National Council on Radiation Protection and Measurement (NCRP) Report #49.

4.2.15.3 Provide lead lining of gypsum wall board, wood doors and hardware, hollow metal frames, and lead glass view window.

4.2.15.4 Lead sheet to be FS QQ-L-201, Grade C, thickness as required by physicist report but not less than 1/16 inch.

4.2.16 Radio Frequency Shielding and Magnetic Shielding

4.2.16.1 Magnetic Resonance Imaging (MRI) Radio Frequency Interference Shielding: It is required that the RF shielded room and all penetrations through the RF Shielding, i.e., electrical plumbing, and venting be electrically isolated by 1000 ohms or greater and RFI filtered to meet the minimum attenuation level of 100dB (10 MHz- 100 MHz) for plane wave and 90 dB (10 MHz-30 MHz) for magnetic wave.

4.2.16.1.1 Material should be brass-copper or aluminum which has been treated to prevent oxidation and all joints should be either welded or lapped and bolted.

4.2.16.1.2 Shielding to include wall, floor, door, and windows.

4.2.16.2 Magnetic Shielding System: Annealed steel plate, accessories, and coordination of shielding work.

4.2.16.3 Applicable Standards: Comply with requirements of State and Local regulating agencies where standards and criteria apply. Comply with MIL-STDS-220A and 285.

4.2.16.4 Employ Independent Testing Laboratory (ITL), experienced in testing and design of RF and magnetic shielded rooms, to review fabrication, design, and installation, and perform tests of radio frequency shielding as required to ascertain correct functioning of shielding.

4.3.20.4.1 Correct part of work which is found to be deficient in electromagnetic shielding.

4.3.20.4.2 Provide second test of RF enclosure after construction is complete.

4.3.20.4.3 Submit certified test results.

June 9, 2024 Section 4 - Page 7

4.3 Interior Design

4.3.1 General Criteria

4.3.1.1 Refer to Appendix: Room Data Matrix – Interior Construction for finish requirements listed by room type.

4.3.2 Acoustic Ceiling Tile

4.3.2.1 AT: Acoustical ceiling tile, standard size to be 24”x24”x 1”.

4.3.2.2 AT-SP: Acoustical, scrubbable ceiling tile, standard size to be 24”x24”x 1”, with vinyl- laminated or sealed face and sealed edges.

4.3.3 Concrete Floor Treatment

4.3.3.1 Concrete Sealer (CS): 30 percent clear, non-yellowing, waterborne, membrane-forming curing and sealing compound: ASTM C1315, Type 1, Class A, minimum 30 percent total solids. Comply with ACI 301.

4.3.4 Fiberglass-Reinforced Panels

4.3.4.1 Fiberglass-reinforced panels (FRP): Gelcoat-finished, glass-fiber reinforced plastic panels complying with ASTM D 5319. Fire-Rating per ASTM E 84: Class A.

Nominal thickness: 0.09 inch.

4.3.5 Painting

4.3.5.1 Interior painting: Paint (P) and Epoxy Paint (EP): Paint surfaces with primer and two finish coats that are compatible with one another as demonstrated by manufacturer or field experience, unless otherwise indicated.

4.3.5.2 Materials: Use low VOC, low odor latex topcoats where indicated. Paint the following items and surfaces:

4.3.5.2.1 Ceilings: Flat latex.

4.3.5.2.2 Walls - gypsum wallboard: Satin latex.

4.3.5.2.3 Walls - concrete block: Semi-gloss latex with block filler.

4.3.5.2.4 Hollow metal doors and frames: Semi-gloss latex over alkyd primer.

4.3.6 Wall Protection & Handrails

4.3.6.1 Rigid Wall Covering (RWC): Nominal thickness .060 inch, high-impact, PVC-free, standard texture, chemical and stain resistant, with vertical, inside, and outside trims. To comply with ASTM E84, ASTM F476 and ASTM D543.

4.3.6.2 Corner Guard (CG): Surface mounted assembly for angled corner consisting of a continuous aluminum retainer and vinyl/alloy extrusion in standard texture with ¼ inch corner radius. Size to be 2” width each way from corner. Height to be 7’ from top of base.

4.3.6.2.1 Location: Provide at all outside exposed corners in all clinic corridors outside of public areas as defined by FGI.

4.3.6.3 Corner Guard – Stainless Steel (CG-SS): Surface mounted stainless steel, 3-1/2” wing size, 7’ height, 16 gauge in Kitchen and/or Standard Grade, #4 satin finish.

4.3.6.3.1 Location: Provide at all outside exposed corners in food service areas, loading dock area and heavy use equipment storage areas.

4.3.6.4 Handrails:

4.3.6.4.1 Location: Provide on both walls in all patient corridors.

June 9, 2024 Section 4 - Page 8

4.3.7 Window Shades

4.3.7.1 Manually operated window shade, chain driven, vertical roll-up, stainless steel bead chain with hold down clips, extruded aluminum rollers, and bottom slats.

Aluminum headbox with endcaps and fascia with powder coat finish. Light gap reduction channels available for black out shades. PVC-free shades, Flame- Resistance Ratings: NFPA 701. Comply with WCMA A100.1. Window treatments should not compromise patient safety.

4.3.7.1.1 Locations:

4.3.7.1.1.1 Semi-Transparent to be typical, unless otherwise noted.

4.3.7.1.1.2 Black-out at conference rooms, tele-medicine rooms, optometry exam rooms.

4.3.8 Privacy Curtains / Screens

4.3.8.1 Provide curtain tracks with carriers and hooks (curtains shall be provided by the

VA). Tracks shall be of extruded aluminum, ASTM B221, alloy 6063, temper T5 or T6, channel shaped, with smooth inside raceway for curtain carriers. End stop connectors, ceiling flanges and other accessories shall be fabricated from the same material with the same finish as the tracks or from nylon.

4.3.8.2 Provide privacy curtains/screens to encompass adequate space for the healthcare provider to perform examination unencumbered by the curtain and provide a visually private patient changing area that allows the provider to remain in the room.

4.3.8.2.1 Locations shall be per the room contents list.

4.3.9 Flooring, Carpet

4.3.9.1 Rooms specified to receive carpet and contain a sink shall a minimum 4’ x 4’ area of LVT installed at the sink location.

4.3.10 Special Architectural Conditions for Surgical and Endovascular Services

4.3.10.1 Minimum corridor width shall be 8 feet in patient areas to accommodate passage of equipment or beds, non-patient areas where gurneys are not utilized can be a minimum of 5 feet.

4.3.10.2 The Clean Core shall have a ceiling height minimum of 9 feet above finished floor and shall be monolithic and scrubbable.

Additional Architectural Requirements:

1. Miscellaneous

a. AEDs shall be placed in easily accessible and visible locations throughout the facility. Locations shall include receptions desks, waiting rooms, near elevators, and in hallways/corridors. Additionally, they should be placed near areas where there is a higher risk of cardiac emergencies.

b. All wall mounted equipment to be provided with fire resistant blocking.

c. Wall mounted equipment serving patients, shall be coordinated during design to be located and installed in such a manner to easily reach patient.

d. Locate Biohazard Storage Room on an exterior wall near the Dock.

e. Provide an electronic sound masking system in Staff Breakrooms, teamwork, workstations, and other high noise areas to be identified

June 9, 2024 Section 4 - Page 9 during design.

f. Omit carpet throughout this facility, except as required in Audio Booths or specific areas as requested by VA during the design process.

g. In areas requested to use carpet, carpet to be 100% dye solution.

h. Patient care room layouts follow guidelines for caregivers to safely exit room under duress.

i. Corridors within the radiology department and access corridors from loading dock and ambulance entry shall be 8’-0” minimum clear width.

j. Entrance doors at main entry, ambulance entry and staff entry shall be automatic, sliding anodized aluminum construction with safety glazing and comply with energy and sustainability requirements. Where vestibules are provided, exterior and interior door assemblies shall match.

k. Anodized aluminum construction ambulance entry door shall have a minimum 4’-0” clear opening.

l. Avoid barn style doors.

m. Provide power operated automatic door operators at public multiple stall toilet rooms and family restrooms near waiting areas.

n. Automatic doors to fail safely in the event of power failure.

o. Provide door operator controls and equipment that is easily accessible for maintenance.

p. Do not use floor stops unless specifically noted during design. Wall stops shall meet the requirements of ANSI/BHMA A156.16.09 and overhead stops shall meet ANSI/BHMA 156.08-05.

q. Omit flooring seams in areas that deal with blood

r. Identify rooms requiring use of “Bully Locks” products on doors during design to lock room in place during an aggression event.

s. Interior Design

i. Interior finishes shall be provided as indicated in VA Program Guide 18-14 Room Finishes, Door, and Hardware Schedule.

VA must review and approve any deviation from this document and/or conflicts with Room Data Matrix prior to the start of final construction documents.

ii. The interior design concept and materials must be approved by the Senior Resident Engineer in coordination with the Interior Designer of the Medical Center.

t. Wall Protection

i. Handrails - Provide snap on covers of resilient material consisting of high impact resistant extruded acrylic vinyl, polyvinyl chloride, or injection molded thermal plastic. Class 1 fire rating when tested in accordance with ASTM E84.

1. Location: Clinic corridors and public areas as defined by FGI.

ii. Wall Guards (Crash Rails) shall consist of Snap-On covers of

June 9, 2024 Section 4 - Page 10 resilient material, minimum 0.110-inch thick, free-floated over a continuous extruded aluminum retainer, minimum 0.090-inch thick anchored to wall at maximum 24 inches on center.

1. Location: Provide at all clinic corridors and public areas as defined by FGI.

u. The CBOC must comply with VHA Directive 1330.01(7), Health Care Services for Women Veterans and VA Design Alert 149 - Design for Patient Privacy and Women Veteran's Health.

2. PACT

a. Designate two (2) Workstation/Patient Education near the facility entrance vestibule for “My Healthy Vet”/Telehealth.

b. Shared Room/Multi-Function Rooms (OCB21) to be designed adjacent to each other and separated by a sound rated (STC 50) operable paneled partition.

c. One Procedure Room in PACT to be assigned as Telehealth capable during design.

d. One Exam Room in Women’s Health Clinic to be dedicated to “Pelvic Floor” during design.

3. Audiology

a. Audiology booths:

i. Fitted with fully recessed fire sprinklers on interior.

ii. Out single swinging doors.

iii. Minimum 7’-6” clear ceiling height.

4. Neuropsychology

a. Provide a two-way observation window between two (2)

Neuropsychology functional area exam rooms or have the capability to use a camera.

b. Neuropsychology FA22 Testing Rooms OPMH3 to have a minimum of 55 STC rated walls.

5. Police

a. Install a one-way glass, ballistic proof window with integral micro-shades between Operations Room SB811 and Waiting/Reception.

b. Police Department Secure Storage Room SSS01 is to be secured and alarmed separately from Police Locker Rooms SS251.

c. Provide direct access to the exterior from Police Service.

6. Pharmacy

a. Refer to Physical Security and Resiliency Design Manual for Pharmacy

Services design requirements.

b. Provide ballistic resistant window at Dispensing Window and

Receiving/Breakdown area.

c. Provide a queuing product (basis of design: Script Pro) with noticeboard display capabilities.

d. Provide double door access into OP Inventory/Receiving/Breakdown, June 9, 2024 Section 4 - Page 11

OP Filling & Assembly and OP Automated Filling/Storage areas.

e. Provide a doorbell from corridor into OP Inventory Receiving and

Breakdown.

7. CRRC

a. Laundry Room to have accessible space for mobile scooters transfer to chairs.

b. Laundry rooms shall have ADA compliant access to front loader washers and dryers.

c. Coordinate barber sink location in one Office/Consult Room OFCD1 closest to Group Therapy Room OPMH1 and Shared Group/Multifunction Room OCB21.

8. PRRC

a. Locate Group Therapy Rooms OPMH1 along a window wall. If that is not possible, provide light fixtures with natural light rendition.

b. Three (3) Consult Rooms to have furniture laid out in an informal seating format with couches, tables, and chairs in such a way that caregiver has easy exit and provisions of reachable duress alarm button.

9. Dermatology

a. Phototherapy Room PDU1 booths have high ceilings. Coordinate ceiling heights manufacturer’s requirements during design.

b. Locate YAG laser Room OPLS1 near Phototherapy Room PDU1.

10. HUDVASH

a. Coordinate location of a Lockbox in HAS – Health Administration

Services SC183.

11. Rehab R&D Motion Lab Gym

a. Space will require pressure sensors on the floor. Coordinate this requirement during design.

b. Motion Lab has equipment that requires ceiling heights of 12’-0” – 13’- 0” AFF. Coordinate structure height with manufacturer’s recommendations during design to accommodate required equipment ceiling heights and infrastructure clearances above ceilings.

12. Mental Health Intensive Case Management (MHICM)

a. One Consult Room OFDC1 to include a sink and locked cabinets. This room will double as the Nurse Exam Room.

13. Outpatient Trauma Recovery Program

a. Provide a minimum of 55 STC partitions on all walls.

14. Additional Information on Equipment/Accessories/Furnishing

a. The Contractor shall be responsible for arranging and scheduling meetings with respective acquisition codes (ACQ CODE) equipment vendors, relevant construction subcontractors, the user, the Government, and others to proactively manage coordination of design after award for all spaces regardless of ACQ CODE. Coordination shall occur well in advance of close-in of walls to avoid tear out of

June 9, 2024 Section 4 - Page 12 construction due to inadequate coordination. All ACQ CODE CC equipment in the solicitation will require government review and acceptance prior to purchase and installation.

b. JSNs with ACQ code CC identified in the PRCL shall be provided by the Contractor. All ACQ Code CC equipment requires government acceptance prior to purchase and installation. The contractor is required to provide cutsheets for all JSN listed on the PRCL. FF&E JSN cutsheets shall be coordinated with Contractor’s FF&E package. A cut sheet with a datasheet is a document that summarizes the performance and other technical characteristics of a product, machine, component (e.g., an electronic component), material, a subsystem (e.g., a power supply) or software in sufficient detail that allows a person to understand the function and requirements of the item.

Typically, information on a cut sheet or datasheet is sourced directly from the manufacturer. Cut sheet(s) will include equipment details such as nomenclature, manufacturer, model, vendor, and associated JSN, descriptive narrative of the product and its associated features, information on the connectivity of the device(s), and listings of specific and relevant characteristics and requirements, to include but not limited to, physical dimensions, mechanical, electrical, plumbing, utility, technological, structural, environmental, and any seismic requirements.

4.4 Mechanical

4.4.1 References

4.4.1.1 The following publications shall be referenced for applicable systems calculations and design information.

4.4.1.1.1 ASHRAE Handbooks.

4.4.2 HVAC Design Basis

4.4.2.1 Indoor design conditions:

4.4.2.1.1 Health care function design conditions shall be in compliance with the requirements of ASHRAE Standard 170, with the Room Data Matrix taking precedence and/or indicating required space design conditions when ASHRAE 170 do not fully address a space or room type.

4.4.2.1.2 Imaging Equipment Space Design Conditions

4.4.2.1.2.1 Equipment manufacturer requirements shall be followed.

4.4.2.1.2.2 Provide a dedicated computer room type AC unit to cool and control humidity for separate equipment rooms for radiology equipment.

4.4.2.1.2.3 Provide a computer room type AC unit to cool UPS rooms when segregated from other spaces.

4.4.2.1.3 Basic MEP Equipment Room Design Conditions:

4.7.2.1.5.1 Design conditions shall be as required to ensure tenant space design conditions are maintained.

4.4.2.1.4 Loading Docks:

4.4.2.1.4.1 Space shall have provisions to limit the intrusion airborne particulate and insects through dock door openings.

June 9, 2024 Section 4 - Page 13

4.4.2.2 Outdoor design conditions:

4.4.2.2.1 ASHRAE 99.6% (winter) and 0.4% (summer) conditions associated with the site-specific location.

4.4.3 Air Handling Units (AHUs)

4.4.3.1 For overall building capacity needs greater than 50,000 cfm, multiple AHUs shall be provided.

4.4.3.2 For building programs that have a Production Kitchen/Food Preparation, a dedicated air handling unit shall be provided capable of serving the conditioning and ventilation needs of the Kitchen space, including capability for a high percentage of outside air to accommodate the make-up air needs of the space.

4.4.3.3 The design criteria of the dedicated AHUs for Pharmacy Services, Pharmacy Compounding Suite, Sterile Processing Service (SPS), and the Surgical Suite shall be as required in the VA HVAC Design Manual. Where air handling units are combined the design shall be based on the aggregate of the most stringent requirements for the units being combined so that the selected unit meets all requirements of the combined units.

4.4.4 Exhaust Systems

4.4.4.1 Provide exhaust fans to provide general exhaust for toilet rooms, janitor’s closets, soiled utility rooms and similar spaces.

4.4.4.2 Dedicated exhaust fans shall be provided for Pharmacy, Sterile Processing Service

(SPS), Laboratory, Kitchen/Cafeteria areas, and similar specialized spaces.

4.4.5…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .