26R6006 Attach 21 - Contract Award Pricing Sheets.xlsx

XLSX spreadsheet 85 KB Posted

Attached to
Operation & Maintenance (O&M) of T-ATS Vessels
Solicitation number
N3220526R6006
Issued by

About this file

This is a Contract Award Pricing Sheets template for the Operation & Maintenance of T-ATS Navajo Class Vessels under solicitation N3220526R6006 with the Department of the Navy Military Sealift Command. The spreadsheet provides forms for awardees to complete pricing submissions across six vessel types: FOS (Flag Officer Steward), ROS (Reduced Operating Status), RAV (Reduced Availability), NUC-1, NUC-2, and NUC-3.

Form A requires awardees to submit total OPHIRE/Per Diem rates organized by cost category, including crew payroll costs (wages, fringe benefits, and payroll taxes), other direct costs (overlapping crew wages, port engineers, port captain, provisions, travel, training, loose equipment, transportation, ship expenses, and insurance), indirect costs (indirect expenses and general & administrative expenses), and profit, with separate submissions required for each contract period and vessel if daily wages differ. Forms B and C establish crew complement requirements and daily cost structures for each vessel type, with Form B addressing passthrough overtime for vessel crews by department (Deck, Engine, and Steward) and Forms C detailing complete crew schedules by rating and position. FOS vessels require 32 total crew members (14 Deck, 14 Engine, 4 Steward), ROS vessels require 20 crew members (8 Deck, 10 Engine, 2 Steward), and RAV, NUC-1, NUC-2, and NUC-3 vessels each require 17 crew members with varying departmental compositions. The pricing template is currently blank and serves as the framework for contract award submissions.

View the file

Other files

File Type Posted
N3220526R6006A0001_SF30.pdf PDF
26R6006 Attach 13 - GFP.xlsx XLSX spreadsheet
26R6006 Attach 4 - Protection_Indemnity.pdf PDF
26R6006 Attach 3 - T-ATS 26R6006 DD254 Signed.pdf PDF
26R6006 Attach 1 - Performance Work Statement.pdf PDF
Exhibit B - Reports_PWS Crosswalk.xlsx XLSX spreadsheet
Exhibit A T-ATS OM All_CDRLs.pdf PDF
26R6006 Attach 19- Ship Operating Experience.docx DOCX document
26R6006 Attach 18 - Volume III Part 2 Checklist.docx DOCX document
26R6006 Attach 16 - Volume I Checklist.docx DOCX document
26R6006 Attach 9 - MECSP Worksheet.pdf PDF
Solicitation - N3220526R6006 Final.pdf PDF
26R6006 Attach 15 - SF LLL.pdf PDF
26R6006 Attach 8 - Invoice Requirements.pdf PDF
26R6006 Attach 6 - QA Request for Clarification.docx DOCX document
26R6006 Attach 20 - Dry Docking Experience.docx DOCX document
26R6006 Attach 17 - Volume III Part 1 Checklist.docx DOCX document
26R6006 Attach 14 - Rev1 - Monthly Budget Report.xlsx XLSX spreadsheet
26R6006 Attach 12 - CPARS-Oversight and Metrics.pdf PDF
26R6006 Attach 11- Pricing Form A_B.xlsx XLSX spreadsheet
26R6006 Attach 10 - Technical Proposal Datasheets.docx DOCX document
26R6006 Attach 7 - Past Perf Narrative.docx DOCX document
26R6006 Attach 5 - Hull Clauses.pdf PDF
26R6006 Attach 2 - WD2019028823.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form A - Basic Pricing

Instructions:
The awardee shall complete this form for total OPHIRE/Per Diem rates.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form A - Schedule of Basic Pricing Data

Form A - Schedule of Basic Pricing Data - Contract Year 1

Rating FOS ROS RAV NUC-1 NUC-2 NUC-3

CREW PAYROLL COSTS
Total Crew Wage Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Crew Fringe Benefits & Payroll Taxes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal Crew Payroll Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
OTHER DIRECT COSTS:
Overlapping Crew Wages$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Port Engineers$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Port Captain$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provisions$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Training$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Loose Equipment & Consumables$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Transportation & Handling of Items$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Ship Expenses (Itemize)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance (Itemize)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal - Other Direct Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
INDIRECT COSTS
Indirect Expenses*$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General & Administrative Expenses*$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal - Direct & Indirect Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Profit $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

TOTAL PER DIEM PRICE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

PER DIEM RATE SUMMARY

FOSROSRAVNUC-1NUC-2NUC-3
Contract Year 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

&A

Form B - Passthrough OT

OPCO:
Vessel:
Contract Period:
Instructions:
The awardee shall complete this form for the passthrough overtime for vessel crews.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
In the box to the right of "Total billets" fill in the number of billets proposed for each department.
Note: The contractor must meet the mimumnim manning requirements found in Attachment 1 of the Solicitation and resultant contract
Deck DeptEngine Dept
Total billets:Total billets:
PositionFully Burdened overtime wage per hour (not including watch overtime)PositionFully Burdened overtime wage per hour (not including watch overtime)
Steward Dept
Total billets:Other Aboard
PositionFully Burdened overtime wage per hour (not including watch overtime)Total billets:
PositionFully Burdened overtime wage per hour (not including watch overtime)

Form C - Crewing (FOS)

Instructions:
The awardee shall complete this form for Schedule of Total Daily Crew Costs for each OPHIRE/Per Diem Status.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form C - FOS - Schedule of Total Daily Crew Costs*

Form C - FOS - Schedule of Total Daily Crew Costs - Contract Year 1

RatingTotal BilletsDaily Base
Wage (1 billet)Daily OT
(1 billet)Total Daily Wages
(total billets)Pension & Welfare
(1 billet)Vacation
(1 billet)Other**
(1 billet)Payroll Taxes
(1 billet)Total Fringes & PayrollTaxes
(all billets)Total Wages/Fringes/ Payroll Taxes
(all billets)*REVISE POSITIONS AS NECESSARY
Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
AB/Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department14$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electro-Technical Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Oiler3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department14$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward's Assistant2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 32 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Form A

&A Page &P

Form C - Crewing (ROS)

Instructions:
The awardee shall complete this form for Schedule of Total Daily Crew Costs for each OPHIRE/Per Diem Status.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form C - ROS - Schedule of Total Daily Crew Costs

Form C - ROS - Schedule of Total Daily Crew Costs - Contract Year 1

RatingTotal BilletsDaily Base
Wage (1 billet)Daily OT
(1 billet)Total Daily Wages
(total billets)Pension & Welfare
(1 billet)Vacation
(1 billet)Other**
(1 billet)Payroll Taxes
(1 billet)Total Fringes & PayrollTaxes
(all billets)Total Wages/Fringes/ Payroll Taxes

(all billets)

Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
AB/Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department8$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electro-Technical Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Oiler1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department10$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward's Assistant0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 20 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Form A

&A Page &P

Form C - Crewing (RAV)

Instructions:
The awardee shall complete this form for Schedule of Total Daily Crew Costs for each OPHIRE/Per Diem Status.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form C - RAV - Schedule of Total Daily Crew Costs

Form C - RAV - Schedule of Total Daily Crew Costs - Contract Year 1

RatingTotal BilletsDaily Base
Wage (1 billet)Daily OT
(1 billet)Total Daily Wages
(total billets)Pension & Welfare
(1 billet)Vacation
(1 billet)Other**
(1 billet)Payroll Taxes
(1 billet)Total Fringes & PayrollTaxes
(all billets)Total Wages/Fringes/ Payroll Taxes

(all billets)

Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
AB/Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electro-Technical Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Oiler0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward's Assistant0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 17 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Form A

&A Page &P

Form C - Crewing (NUC-1)

Instructions:
The awardee shall complete this form for Schedule of Total Daily Crew Costs for each OPHIRE/Per Diem Status.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form C - NUC-1- Schedule of Total Daily Crew Costs

Form C - NUC-1 - Schedule of Total Daily Crew Costs - Contract Year 1

RatingTotal BilletsDaily Base
Wage (1 billet)Daily OT
(1 billet)Total Daily Wages
(total billets)Pension & Welfare
(1 billet)Vacation
(1 billet)Other**
(1 billet)Payroll Taxes
(1 billet)Total Fringes & PayrollTaxes
(all billets)Total Wages/Fringes/ Payroll Taxes

(all billets)

Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
AB/Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electro-Technical Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Oiler0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward's Assistant0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 17 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Form A

&A Page &P

Form C - Crewing (NUC-2)

Instructions:
The awardee shall complete this form for Schedule of Total Daily Crew Costs for each OPHIRE/Per Diem Status.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form C - NUC-2- Schedule of Total Daily Crew Costs

Form C - NUC-2 - Schedule of Total Daily Crew Costs - Contract Year 1

RatingTotal BilletsDaily Base
Wage (1 billet)Daily OT
(1 billet)Total Daily Wages
(total billets)Pension & Welfare
(1 billet)Vacation
(1 billet)Other**
(1 billet)Payroll Taxes
(1 billet)Total Fringes & PayrollTaxes
(all billets)Total Wages/Fringes/ Payroll Taxes

(all billets)

Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
AB/Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electro-Technical Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Oiler0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward's Assistant0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 17 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Form A

&A Page &P

Form C - Crewing (NUC-3)

Instructions:
The awardee shall complete this form for Schedule of Total Daily Crew Costs for each OPHIRE/Per Diem Status.
This form shall be completed for each period
If total daily wages are different for each vessel, then complete the form for each vessel
Form C - NUC-3- Schedule of Total Daily Crew Costs

Form C - NUC-3 - Schedule of Total Daily Crew Costs - Contract Year 1

RatingTotal BilletsDaily Base
Wage (1 billet)Daily OT
(1 billet)Total Daily Wages
(total billets)Pension & Welfare
(1 billet)Vacation
(1 billet)Other**
(1 billet)Payroll Taxes
(1 billet)Total Fringes & PayrollTaxes
(all billets)Total Wages/Fringes/ Payroll Taxes

(all billets)

Deck Department:
Master1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Mate1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Mate0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Mate2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
AB/Bosun1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Able Seamen1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Ordinary Seamen0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Deck Department6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engine Department:
Chief Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
1st Assistant Engineer2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2nd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3rd Assistant Engineer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Electro-Technical Officer1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Storekeeper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Electrician1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
QMED/Oiler0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiper1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Engine Department9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward Department:
Steward Baker1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Chief Cook1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Steward's Assistant0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Steward Department2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL PER DAY/PER SHIP: 17 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Form A

&A Page &P

File details come from the government source that posted it. Updated .