262200.pdf
PDF 53 KB Posted
- Attached to
- Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
- Solicitation number
- 36C24420R0075
About this file
This document contains a technical specification for low-voltage transformers and a related federal contract solicitation for construction of a parking garage. The technical specification outlines requirements for furnishing and installing low-voltage dry-type general purpose transformers for the parking garage project. It specifies transformer features such as ratings, winding configurations, insulation systems, cores, coils, taps, impedances, enclosures, and testing. The related federal contract solicitation seeks offers for construction of a new parking garage to accommodate approximately 435 vehicles on a VA medical center campus. The project is valued between $10 million and $20 million and uses NAICS code 236220 for commercial and institutional building construction. The solicitation is a set-aside for service-disabled veteran-owned small businesses and will use a tiered evaluation process including large businesses. Pricing must be in whole dollars and the contractor will be responsible for correct worker classification and wage compliance.
View the file
Other files for this federal contract opportunity
Show all 50
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania
262200 - 1
SECTION 26 22 00 - LOW-VOLTAGE TRANSFORMERS
PART 1 – GENERAL
1.1 DESCRIPTION
A. This section specifies the furnishing, installation, connection, and testing of low-voltage dry-type general-purpose transformers, indicated as transformers in this section.
1.2 RELATED WORK
A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS:
Requirements that apply to all sections of Division 26.
B. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND
CABLES: Low-voltage conductors.
C. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:
Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.
D. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduit.
1.3 QUALITY ASSURANCE
Refer to Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES), in Section 26
05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
1.4 SUBMITTALS
A. Submit six copies of the following in accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
1. Shop Drawings:
a. Submit sufficient information to demonstrate compliance with drawings and specifications.
b. Include electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, temperature rise, wiring and connection diagrams, plan, front, side, and rear elevations, accessories, and device nameplate data.
2. Manuals:
a. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets and wiring diagrams.
Wilkes-Barre, Pennsylvania
262200 - 2
1) Schematic signal and control diagrams, with all terminals identified, matching terminal identification in the transformers.
2) Include information for testing, repair, troubleshooting, assembly, disassembly, and factory recommended/required periodic maintenance procedures and frequency.
b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.
3. Certifications: Two weeks prior to final inspection, submit the following.
a. Certification by the manufacturer that the transformers conform to the requirements of the drawings and specifications.
b. Certification by the Contractor that the transformers have been properly installed, adjusted, and tested.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B. International Code Council (ICC):
IBC-15 ...................................International Building Code
C. National Fire Protection Association (NFPA):
70-14 .....................................National Electrical Code (NEC)
D. National Electrical Manufacturers Association (NEMA):
TR 1-13..................................Transformers, Step Voltage Regulators and Reactors
ST 20-14................................Dry Type Transformers for General Applications
E. Underwriters Laboratories, Inc. (UL):
UL 506-08..............................Standard for Specialty Transformers
UL 1561-11............................Dry-Type General Purpose and Power Transformers
F. United States Department of Energy
10 CFR Part 431....................Energy Efficiency Program for Certain Commercial and
Industrial Equipment
SPEC WRITER NOTE: Delete between // ---- // if not applicable to project. Delete any other item or paragraph not applicable to the section and renumber the paragraphs.
Wilkes-Barre, Pennsylvania
262200 - 3
PART 2 - PRODUCTS
2.1 TRANSFORMERS
A. Unless otherwise specified, transformers shall be in accordance with NEMA, NEC, UL and as shown on the drawings.
B. Transformers shall have the following features:
1. Self-cooled by natural convection, isolating windings, //indoor//and outdoor// dry-type.
Autotransformers will not be accepted, except as specifically allowed for buck-boost applications.
2. Rating and winding connections shall be as shown on the drawings.
3. Ratings shown on the drawings are for continuous duty without the use of cooling fans.
4. Copper windings.
5. Insulation systems:
a. Transformers 30 kVA and larger: UL rated 220 °C (428 °F) system with an average maximum rise by resistance of 150 °C (302 °F) in a maximum ambient of 40 °C (104 °F).
b. Transformers below 30 kVA: Same as for 30 kVA and larger or UL rated 185 °C
(365 °F) system with an average maximum rise by resistance of 115 °C (239 °F) in a maximum ambient of 40 °C (104 °F).
6. Core and coil assemblies:
a. Rigidly braced to withstand the stresses caused by short-circuit currents and rough handling during shipment.
b. Cores shall be grain-oriented, non-aging, and silicon steel.
c. Coils shall be continuous windings without splices except for taps.
d. Coil loss and core loss shall be minimized for efficient operation.
e. Primary and secondary tap connections shall be brazed or pressure type.
f. Coil windings shall have end filters or tie-downs for maximum strength.
7. Average audible sound levels shall comply with NEMA.
SPEC WRITER NOTE: If a specific impedance is required to limit fault currents, verify that the transformer impedance is shown on the drawings.
8. If not shown on drawings, nominal impedance shall be as permitted by NEMA.
Wilkes-Barre, Pennsylvania
262200 - 4
9. Single phase transformers rated 15 kVA through 25 kVA shall have two 5% full capacity taps below normal rated primary voltage. All transformers rated 30 kVA and larger shall have two 2.5% full capacity taps above, and four 2.5% full capacity taps below normal rated primary voltage.
10. Core assemblies shall be grounded to their enclosures with adequate flexible ground straps.
11. Enclosures:
a. Comprised of not less than code gauge steel.
b. Outdoor enclosures shall be NEMA 3R.
c. Temperature rise at hottest spot shall conform to NEMA Standards, and shall not bake and peel off the enclosure paint after the transformer has been placed in service.
d. Ventilation openings shall prevent accidental access to live components.
e. The enclosure at the factory shall be thoroughly cleaned and painted with manufacturer's prime coat and standard finish.
12. Standard NEMA features and accessories, including ground pad, lifting provisions, and nameplate with the wiring diagram and sound level indicated.
13. Dimensions and configurations shall conform to the spaces designated for their installations.
14. Transformers shall meet the energy conservation standards for transformers per the
United States Department of Energy’s 10 CFR Part 431.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation of transformers shall be in accordance with the NEC, as recommended by the equipment manufacturer and as shown on the drawings.
B. Anchor transformers with rustproof bolts, nuts, and washers, in accordance with manufacturer’s instructions, and as shown on drawings.
C. Install transformers with manufacturer's recommended clearance from wall and adjacent equipment for air circulation. Minimum clearance shall be 150 mm (6 inches).
D. Install transformers on vibration pads designed to suppress transformer noise and vibrations.
Wilkes-Barre, Pennsylvania
262200 - 5
3.2 ACCEPTANCE CHECKS AND TESTS
A. Perform tests in accordance with the manufacturer's recommendations. In addition, include the following:
1. Visual Inspection and Tests:
a. Compare equipment nameplate data with specifications and approved shop drawings.
b. Inspect physical and mechanical condition.
c. Inspect all field-installed bolted electrical connections, using the calibrated torque-wrench method to verify tightness of accessible bolted electrical connections.
d. Perform specific inspections and mechanical tests as recommended by manufacturer.
e. Verify correct equipment grounding.
f. Verify proper secondary phase-to-phase and phase-to-neutral voltage after energization and prior to connection to loads.
3.3 FOLLOW-UP VERIFICATION
A. Upon completion of acceptance checks, settings, and tests, the contractor shall demonstrate that the transformers are in good operating condition, and properly performing the intended function.