EXHIBIT A - Past Performance Relevancy Questionnaire.docx

DOCX document 28 KB Posted

Attached to
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
Solicitation number
36C24420R0075
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document contains a past performance relevancy questionnaire and details of a federal construction solicitation. The past performance questionnaire requests information on up to three of the offeror's most relevant prior construction projects, including contract details, descriptions of work performed, and references. It will be sent to those references for feedback.

The federal solicitation is for the construction of a parking structure at a VA medical center with a budget between $10-20 million. It is a set aside for veteran-owned small businesses and will use tiered evaluation down to the large business level. Offerors must provide pricing in whole dollars. The contractor will be responsible for correct worker classification and wage compliance. The solicitation may be cancelled before award but after closing if in the government's best interest.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
015000TempFacilitiesControls.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
097753 Living Wall System.pdf PDF
074515 Composite Wall Panel.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Johnson Controls.pdf PDF
36C24420R0075_4.docx DOCX document
2903 312000 Earthwork 02.pdf PDF
280800.pdf PDF
262726.pdf PDF
230800.pdf PDF
221400.pdf PDF
221300.pdf PDF
220523.pdf PDF
210800.pdf PDF
210512.pdf PDF
111200 Parking Control Equipment.pdf PDF
099600 High Performance Coatings.pdf PDF
079020 Garage Waterproofing Systems.tha.pdf PDF
078410 Through Penetration Firestop Systems.pdf PDF
071113 Bituminous Dampproofing.pdf PDF
061000 Rough Carpentry.pdf PDF
055000 Metal Fabrications.pdf PDF
051200 Structural Steel Framing.pdf PDF
034500 Precast Architectural Concrete.pdf PDF
017900 Warranties_Single Prime.pdf PDF
017823 Operation and Maintenance Data_Single Prime.pdf PDF
015000 Temporary Facilities _ Controls_Single Prime.pdf PDF
014535.docx DOCX document
013100 Project Coordination_Single Prime.pdf PDF
012800 Field Engineering_Single Prime.pdf PDF
012600 Modification Procedures_Single Prime.pdf PDF
000000 Table of Contents_Single Prime 02.docx DOCX document
Arch Dwg 11-16.pdf PDF
S02 Dwg C2-E2.pdf PDF
S02 Parking Structure List of Dwgs.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
260511.pdf PDF
230711.pdf PDF
220800.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1: Prepare no more than three (3) Part 1 forms:

Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed any later than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use additional space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as Prime or _Subcontractor

2. Contract Number

3. Original Contract $ Value Current/Final Contract $ Value

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date:

2. Current Schedule: _____________________

3. Estimate/Final Completion Date:

4. Primary cause for Contract Modifications

D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)

In addition, address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on projects awarded under this solicitation. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this solicitation.

E. Point of Contact for Owner/Government agency Contracting Officer and or inspector (COR / COTR); include a current phone number and email address for each.

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit E – Past Performance Questionnaire to the reference(s) for each of the no more than three Construction Projects, or Specialty Trade if applicable provided in Exhibit A, Part 1.

See below for Exhibit A, Part 2.

Part 2, Additional offeror information required.

A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:

(Specialty Trades will address their specific trade for any major subcontractor or Teaming partner)

Page 1 of Page 1 of

File details come from the government source that posted it. Updated .